This solicitation is for an Indefinite Delivery/Indefinite Quantity (IDIQ) Environmental Multiple Award Contract (EMAC) to provide environmental services and remedial actions at sites within the Naval Facilities Engineering Command (NAFAC) Mid-Atlantic Area of Responsibility. The performance period is a one-year base period followed by four one-year option periods. It is anticipated that three to five contracts will be awarded on a 100% competitive set-aside basis for Service Disabled Veteran Owned Small Businesses located in the Midwest region. The maximum contract value is $30 million to be allocated across all years and contracts via competitively awarded task orders ranging from $50,000 to $250,000. Services will include CERCLA, RCRA, UST, and other compliance work along with studies, sampling, inspections and remedial actions at sites including Naval Station Great Lakes in Illinois and Naval Support Activity Crane in Indiana.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dear r
If you
Resp
FG/
R u have any q pectfully subm
Ple
PO
P R O
RE:
uestions rega mitted, ase keep a
Box 80265 Sau
F E S S I O arding the atta a copy of th ukville, WI 530
O N A L T ached results he reports o
80 www.pro
A N K I N V s, please conta on site for tanic.com
V E S T I G A act your acco inspectors
(262) 268‐1
A T I O N C ount manager
C O R P .
r at (262) 268
8-1150.
PWD GREAT LAKES
Michelle Mosso
Building 1
2021-07-21 Naval Station Great Lakes
NAVFAC MID ATLANTIC
cba
Thank you for choosing Protanic. We appreciate your business and will do our best to earn it every time. Below you will find a list of testing and/or inspections performed at the above mentioned location. Please review the following pages for results.
Ms. Mosso, Great Lakes, IL 60088
Results of Work Performed
GREAT LAKES, IL 60088-2814
2021-07-28
PO Box 80265 Saukville, WI 53080 www.protanic.com (262) 268-1150
P R O F E S S I O N A L T A N K I N V E S T I G A T I O N C O R P .
July 28, 2021
NAVFAC Mid Atlantic Attn: Michelle Mosso PWD Great Lakes Great Lakes, IL 60088
Re: Work Performed July 21, 2021 Naval Station Great Lakes Building 1
Great Lakes, IL 60088
Dear Ms. Mosso, While performing testing procedures at the above mentioned location, the Protanic test technician reported the following:
1. The technician pumped 1” of water out of the Diesel spill bucket.
Sincerely, Frank Grebas Vice President FG/cba http://www.protanic.com/
Equipment Detail and Certifications
Alert Tank Tester Wis. Material Approval No. - 20170001
Technician Information
Respectfully submitted, Equipment Utilized
Comments
Customer Name and Address Site ID/Facility Name and Address Test Date
Product State ID Capacity Construction Volumetric Result GPH Score
Tank Tightness Test Results
Ullage Result
P R O F E S S I O N A L T A N K I N V E S T I G A T I O N C O R P .
PO Box 80265 Saukville, WI 53080 www.protanic.com (262) 268-1150
C28777Veeder Root bea843a6ALERT
IL-1413Illinois
492105WI Tank Tester
9fc213c0Petro-Tite
60088-2814ILGREAT LAKES
20238111
Pass+0.0004 gphPassFiberglass DW600Diesel
PWD GREAT LAKES
Michelle Mosso
60088ILGreat Lakes
Building 1 2021-07-21
Naval Station Great Lakes
NAVFAC MID ATLANTIC
Equipment Detail and Certifications
Petro-Tite Line Tester WI ILHR Material Approval No. - 2007002
Technician Information
Respectfully submitted, Product Piping System
Type Line Material
Precision Line
Test Result
Net Volume
Change
Equipment Utilized
Comments
LD Model
Line and Leak Detector Test Results
3 GPH Simulated Leak
Test Result
Test DateCustomer Name and Address Site ID/Facility Name and Address
P R O F E S S I O N A L T A N K I N V E S T I G A T I O N C O R P .
PO Box 80265 Saukville, WI 53080 www.protanic.com (262) 268-1150
C28777Veeder Root bea843a6ALERT
IL-1413Illinois
492105WI Tank Tester
9fc213c0Petro-Tite
N/A-0.0020 gphPassFiberglassSuctionDiesel Supply
60088-2814ILGREAT LAKES
20238111
PWD GREAT LAKES
Michelle Mosso
60088ILGreat Lakes Building 1 2021-07-21 Naval Station Great Lakes
Tank Product Tank Product
In-Tank Gauging Probe Model In-Tank Gauging Probe Model Fill Sump Sensor(s) Model Fill Sump Sensor(s) Model Tank Overfill/High-Level Sensor Model Tank Overfill/High-Level Sensor Model
Tank Product Tank Product
In-Tank Gauging Probe Model In-Tank Gauging Probe Model Fill Sump Sensor(s) Model Fill Sump Sensor(s) Model Tank Overfill/High-Level Sensor Model Tank Overfill/High-Level Sensor Model
Dispenser ID Dispenser ID
Dispenser Containment Sensor(s) Model Dispenser Containment Sensor(s) Model Dispenser Containment Float(s) Model Dispenser Containment Float(s) Model
Dispenser ID Dispenser ID
Dispenser Containment Sensor(s) Model Dispenser Containment Sensor(s) Model Dispenser Containment Float(s) Model Dispenser Containment Float(s) Model
Dispenser ID Dispenser ID
Dispenser Containment Sensor(s) Model Dispenser Containment Sensor(s) Model Dispenser Containment Float(s) Model Dispenser Containment Float(s) Model
Technician Name (Print): Technician Signature:
Facility Representative (Print): Facility Representative Signature:
Test DateCustomer Name and Address Site ID/Facility Name and Address
ATG Inspection
Certification
Inventory of Equipment Tested/Certified Check the appropriate boxes to indicate specific equipment inspected/serviced Make/Model of Monitoring System:
P R O F E S S I O N A L T A N K I N V E S T I G A T I O N C O R P .
PO Box 80265 Saukville, WI 5308 www.protanic.com (262) 268-1150 0
Mag One✔
Diesel
TLS-350
60088-2814ILGREAT LAKES
20238111
PWD GREAT LAKES
Michelle Mosso
60088ILGreat Lakes
Building 1 2021-07-21
Naval Station Great Lakes
Doug
Software Version Installed:
Yes No Is the audible alarm operational at the tank monitor?
Yes No Is the visual alarm operational at the tank monitor?
Yes No Were all sensors visually inspected, functionally tested, and confirmed operational?
Yes No If alarms are relayed to a remote monitoring system, is all communications equipment (e.g. modem) operational?
Yes No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) Product Water If yes, describe causes in comments, below.
Yes No Is all monitoring equipment operational per manufacturer's specifications?
* In Comments below, describe how and when these deficiencies were or will be corrected.
Yes No Was accuracy of system product level readings tested?
Yes No Were all probes reinstalled properly?
Yes No Were all items on the equipment manufacturer's maintenance checklist completed?
Comments
In-Tank Gauging / SIR Equipment
Does the ATG have a battery backup? If yes, is the battery backup functional? Tested and confirmed functional
The technician pumped 1" of water from the Diesel spill bucket.
324.00 kyliek Typewritten Text N/A kyliek Typewritten Text N/A kyliek Typewritten Text N/A kyliek Typewritten Text N/A
PO Box 80265 Saukville, WI 5308 www.protanic.com (262) 268-1150
P R O F E S S I O N A L T A N K I N V E S T I G A T I O N C O R P
Customer Name and Address
Facility ID Facility Name and Address
Test Date
Sensor Inspection/Certification
Was as system setup printed?
Sensor Location Type
Sensor in proper position when
ARRIVED?
Sensor in Alarm when
ARRIVED?
Functionality Test Result (Pass/Fail)
Sensor in proper position when LEFT site?
Sensor in Alarm when LEFT site?
Water present below sensor?
Is the sensor programmed for positive shutdown?
Did sensor shut down sub motor?
Comments
Technician Signature:
Yes
No
No
NoNoYesPassNoYesBrineDiesel Interstitial
NoNoYesPassNoYesFloatDiesel Manway
60088-2814ILGREAT LAKES
20238111
PWD GREAT LAKES
Michelle Mosso
60088ILGreat Lakes Building 1
2021-07-21Naval Station Great Lakes
NAVFAC MID ATLANTIC
http://www.protanic.com/
Facility #: __________________
Facility Address: ____________________________________________________________
Annual Walkthrough Inspection Report: 20___ (year)
A/B Operator Signature (if applicable): _______________________________________________
Print Name of A/B Operator (if applicable): ____________________________________________
Inspections Required Annually (Inspections of piping sump areas must be performed by a certified employee of a contractor licensed in either the Install/Retrofit or Tank Tightness Testing modules.) All piping sumps areas shall be checked annually. Sump lids must be lifted and dispenser cabinets opened to inspect piping containment sump areas.
Contractor must initial and enter date of Annual Walkthrough Inspection.
Day/Month/Year of Inspection
Contractor Initials
Enter comments below corresponding to inspections listed at left.
Visual check for damage to piping containment sump areas: Check lids, covers & containment for damage & leaks.
COMMENTS & ACTIONS TAKEN:
Check sumps for the presence of regulated substances or any indication that a release may have occurred. Remove any liquid or debris if present.
COMMENTS & ACTIONS TAKEN:
Check that interstices of double wall containment sumps are free of water or product.
COMMENTS & ACTIONS TAKEN:
If applicable: Check gauge stick (manual tank gauging) or bailer (GW monitoring).
COMMENTS & ACTIONS TAKEN:
Contractor Employee Conducting Annual Inspection of Piping Containment Sump Areas:
1) Signature: _____________________________________
2) Print Name & Title: _____________________________________
Annual Test & Inspection: May be Performed by Contractor or A/B Operator Contractor or A/B Operator must initial and enter date of Annual Emergency Stops Test.
Day/Month/Year of Emergency Stop Test
Contractor or A/B Operator Initials
Enter comments below regarding Annual Emergency Stops Test. Attach OSFM Operational Testing of Emergency Stops Report to Walkthrough Inspection Report & keep at facility.
Test Emergency Stops for interconnection and STP shutdown.
Attach OSFM report form.
COMMENTS:
Contractor or A/B Operator must initial and enter date of Annual Shear Valve Inspection.
Day/Month/Year of Shear Valve Inspection
Contractor or A/B Operator Initials
Enter comments below regarding Annual Shear Valve Inspection. Attach OSFM Annual Inspection of Shear Valves Report to Walkthrough Inspection Report & keep at facility.
Check shear valves for proper height, secure mounting & free operation of trip arm & poppet.
COMMENTS:
Doug Metzker
DM07/21/2021
DM07/21/2021
DM07/21/2021
DM
07/21/2021
Protanic Inc
20238111
Great LakesBuilding 1
| Site Survey Form |
| Tank Test Data Sheet Form |
| Tank Test Final Report |
| Line Test Data Sheet Form |
| Leak Detector Test Form |
| Line and LD Test Final Report |
| Pressure Decay Form |
| PV Vent Cap Form Report |
| Pressure Decay Final Report |
| Drop Tube Form |
| Cathodic Protection Report (Non-Wisconsin) |
| ATG Inspection Report - Protanic |
| Sensor Form Report |
| Overfill Prevention Equipment Inspection Report |
| Shear Valve Form Report |
| Shear Valve Report |
| Testing of Emergency Electrical Shutoff |
| Containment Sump Test Report |
| 30 Day Walkthrough Inspection Report |
| Annual Walkthrough Inspection Report |
| Repair Request - Tech Form |
| Parts Replaced Form |
| Failed Test Results Report |
| Post Site Inspection Testing Checklist Form |
| Submit Page |
| ClientName: NAVFAC MID ATLANTIC |
| FacilityName: Naval Station Great Lakes |
| Date: 2021-07-21 |
| FacilityAddress: Building 1 |
| FacilityCity: Great Lakes |
| FacilityState: IL |
| FacilityZip: 60088 |
| ClientPrimaryContactFirstName: Michelle Mosso |
| ClientAddress: PWD GREAT LAKES |
| ID618NetVolumeChange1: -0.0020 gph |
| ID618NetVolumeChange2: |
| ID618NetVolumeChange3: |
| Technician: |
| FacilityID: 20238111 |
| ClientCity: GREAT LAKES |
| ClientState: IL |
| ClientZip: 60088-2814 |
| CertName1: Petro-Tite |
| CertNumber1: 9fc213c0 |
| CertName2: WI Tank Tester |
| CertNumber2: 492105 |
| CertName3: Illinois |
| CertNumber3: IL-1413 |
| CertName4: ALERT |
| CertNumber4: bea843a6 |
| CertName5: Veeder Root |
| CertNumber5: C28777 |
| CertName6: |
| CertNumber6: |
| CertName7: |
| CertNumber7: |
| CompanyName: Protanic Inc |
| TechEmail: dougm@protanicinc.com |