Construction Des Project Data Sheet.pdf
PDF 15 KB Posted
- Solicitation number
- N4008521R0078
About this file
This document contains a project data sheet template for construction experience references and a solicitation for a Design-Build/Design-Bid-Build Indefinite Delivery/Indefinite Quantity Multiple Award Construction Contract for general construction services at Naval Submarine Base New London, Connecticut and Naval Station Newport, Rhode Island. The project data sheet requests information on past construction or design projects including award and completion dates, contract type and value, description of work performed, and sustainable or LEED certifications. The solicitation is for general construction services under an IDIQ contract at two Navy bases, with an anticipated award date in 2022. Offerors must demonstrate experience with design-build, design-bid-build, or IDIQ construction contracts. The Naval Facilities Engineering Command is the contracting agency.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT C
CONSTRUCTION EXPERIENCE PROJECT DATA SHEET
Project No. (check one) :
CON #1 CON #2 CON #3 CON #4 CON #5
DES #1 DES #2 DES #3 DES #4 DES #5
1. Experience for: Offeror Joint-Venture Other (Explain)
Firm Name:
Address:
Phone Number:
DUNS Number:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title: Location:
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
Design Completion Date (mm/dd/yy):
5. Type of work:
New Construction Renovation Repair Alteration Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
Firm-Fixed Price Cost/Time and Material Other (explain):
Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.
7. Construction Project:
Award Amount: Final Price:
Type of Contract/Task Order: (Check ALL that apply)
Design-Build Design-Bid-Build Delivery/Task Order (IDIQ) Other (explain):
If Design-Build, identify the Lead Firm:
8. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.
9. Provide a detailed description of what work your firm self-performed on this project:
10. Other Information:
File details come from the government source that posted it. Updated .