This document is an amendment to a solicitation for an indefinite delivery/indefinite quantity multiple award construction contract for general construction services at Naval Submarine Base New London in Connecticut and Naval Station Newport in Rhode Island. The amendment extends the proposal due date to November 5, 2021 at 1400 local time and answers pre-bid inquiry questions regarding electrical service equipment placement, panelboard replacement responsibilities, outside air intake elevations, equipment room sizing and capacity, system sizing for future floors, fan coil and chiller pump locations, and freeze protection methods.

View the file

Other files

File Type Posted
21R0078 0018.pdf PDF
21R0078 0016.pdf PDF
PPI 196 Photos.pdf PDF
21R0078 0015.pdf PDF
Site Visit Attendance Log.JPG JPG image
21R0078 0014.pdf PDF
21R0078 0013.pdf PDF
Attachment A - Construction and Design Experience Project Data Sheet 10-12.docx DOCX document
21R0078 0012.pdf PDF
SECNAV FORM 5512-NSNPT - JUL 2019.pdf PDF
SECNAV 5512 exp 2024 TEMPLATE.pdf PDF
21R0078 0011.pdf PDF
Attachment A - Construction and Design Experience Project Data Sheet.docx DOCX document
21R0078 0010.pdf PDF
21R0078 0009.pdf PDF
B345_CommsInfo.pdf PDF
REFERENCEInfoBldg345Comms.pdf PDF
21R0078 0008.pdf PDF
21R0078 0007.pdf PDF
21R0078 0006.pdf PDF
Attachment C Con Des Exp Proj Data Standard.pdf PDF
NAVSTA soil management plan.pdf PDF
01 31 23.13 20 eCMS.docx DOCX document
21R0078 0005.pdf PDF
21R0078 0004.pdf PDF
SECNAV FORM 5512-NSNPT - DEC 2019.pdf PDF
21R0078 0003.pdf PDF
21R0078 0001.pdf PDF
21R0078 0002.pdf PDF
PPQ.pdf PDF
PPI Log.xlsx XLSX spreadsheet
Construction Des Project Data Sheet.pdf PDF
Bldg 344 Design Build RFP.pdf PDF
Price Schedule 7-3-21.docx DOCX document
21R0078 NPT NLON RFP.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

J

PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

1-Nov-2021

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY CODE N40085 7. ADMINISTERED BY (If other than item 6) CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

See Item 6

8. NAME AND ADDRESS OF CONT RACT OR (No., Street, County, State and Zip Code) X

9A. AMENDMENT OF SOLICITATION NO.

N4008521R0078

X 9B. DATED (SEE ITEM 11)

03-Jul-2021

10A. MOD. OF CONT RACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILIT Y CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENT S OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or

(c) By separate letter or telegramwhich includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNT ING AND APPROPRIAT ION DAT A (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACTS/ORDERS.

IT MODIFIES THE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONT RACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUT HORIT Y OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUT HORIT Y OF:

D. OTHER (Specify type of modification and authority)

E. IMPORT ANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPT ION OF AMENDMENT /MODIFICAT ION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment incorporates the due date extension and PPI response.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONT RACTING OFFICER (Type or print)

TEL: EMAIL:

15B. CONT RACT OR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNIT ED ST AT ES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

30-105-04 ST ANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

N4008521R0078

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Amendment 0017 has been added:

This amendment hereby:

1. Extends the proposal due date to 5 November 2021 by 1400 local time.

2. Answers PPIs

# Reference Question Response

47 144 of 441 D50

With the added load of the new HVAC equipment it is anticipated that the new electrical service would need to be 480V. This will allow for better energy efficiency with the new loads and also allow for expansion during future renovations, specifically with the modular chillers. There is limited space in the building to house the new mechanical equipment and the added electrical equipment when bringing in a 480V service.

Please confirm that exterior mounted electrical service equipment (i.e. 480V panelboard and a step down transformer) will be permitted if found to be necessary during the design phase.

Exterior mounted electrical equipment will NOT be permitted. Bid per RFP.

48 If it is found during the arc flash that the existing to remain panelboards are not compliant and properly sized, is it the intent that the contractor would be responsible for the replacement of these panels, or would this be handled as a future modification?

Bid per RFP.

Part

RFP requires that new Windows comply with

ATFP latest code. Will ATFP standard be required for the HVAC systems? Based on ATFP requirements, outside air intakes for ERV units must be 10 feet above grade. With the existing first floor elevation and grade levels and obstructions, this may be difficult to achieve to place intake louvers at this elevation. Please confirm if this is required.

Confirmed

133 of 441 D30

Existing basement mechanical room is approximately 20x12’ with existing hot water heater, condensate pump, and miscellaneous piping. It appears the RFP intent is to place new hot water generation equipment including heat exchanger, pumps, steam control, expansion tank, air separator, etc. in this existing room also with future sized pads for future system to feed the second floor. It may be difficult to place equipment in this room with existing equipment and maintain access requirements with future expandability.

Please confirm.

Confirmed.

N4008521R0078

(End of Summary of Changes)

134 of 441 D30

RFP states to provide CHW and HHW pumps and piping sized for future use of the second floor and also states to provide design calcs for the 2nd and

3rd floors. Please confirm if it is anticipated that the third floor which was recently renovated would be fed from the heating hot water or chilled water systems, or if only the 2nd floor is to be considered.

3rd floor might convert to HHW at some point in the future if needed. The 3rd floor is not intended to be fed with Chilled water.

D30

RFP states in D3030 that the primary loop piping from the chiller to the mechanical room shall be sized for “entire building” however mentions that the 2nd floor would be fed. Please confirm if the intent is for this to also be sized to include future third floor fed from the chiller.

Right now the 3rd floor is not intended to be fed with chilled water.

135 of 441 D30

RFP mentions the use of hot water preheat coils in the outside air ducts for the ERV’s but does not mention glycol. Is use of glycol for freeze protection anticipated to be required since the coils are in outside air ducts?

Bid per RFP.

133 of 441 D30

Please confirm the existing steam condensate receiver and pump are to remain in the basement mechanical room

Confirmed.

135 of 441 D30

Please confirm if the ventilation outside air can be delivered directly into each space.

Confirmed.

134 of 441 D30

RFP states to use ceiling mounted fan coil units.

Where the existing wall convectors are being removed and with limited space in the ceiling, is it acceptable to use vertical wall/floor mounted fan coils to service the rooms?

Bid per RFP.

134 of 441 D30

RFP states to provide chilled water pumps and buffer tank inside the mechanical room. Often modular chillers are provided with pump packages controlled with the chiller and have options to have tanks which would be outside part of the chiller package and reduce interior dimensions. Would this be acceptable?

Bid per RFP.

136 of 441 D30

Heat trace is specified for use on exterior chilled water piping. No mention is made of using glycol.

Will the chiller system be drained during the winter to ensure no freezing within the chiller and components? Or will the chiller be required to operate during the winter months which would suggest glycol use.

The intent was to ensure that freeze protection was included for pricing. The DOR would make the decision in the load calcs if cooling would be required year round.