P1043 Amend 0003_Narrative.pdf
PDF 142 KB Posted
- Solicitation number
- N4008521R0052
About this file
This amendment modifies an existing solicitation for a water treatment plant replacement project on Marine Corps Base Camp Lejeune in North Carolina. The project constructs an 8 million gallon per day membrane filtration water treatment facility to enable compliance with current and future drinking water regulations and address potential saltwater intrusion issues. Revisions include replacing general notes and equipment tags on design drawings, modifying language in specification sections covering service piping, laboratory equipment, process piping, and membrane systems. Required membrane elements must be from a manufacturer with at least three operating municipal nanofiltration plants over 5 million gallons per day capacity and 5 years of experience in the United States.
View the file
Other files
Show 40 more
Latest 50 of 71 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4008521R0052
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
AMENDMENT 0003
CONTRACT DRAWINGS
NAVFAC Drawing No. 12771726 (CS103), 12771737 (CS114), 12771935 (P-911), 12772041 (P-131), 12772042 (P-132), 12772044 (P-431), 12772051 (P-931), 12772053 (P-933), 12772185 (P-191), and 12772187 (P-991) are revised as of June 22, 2021. These revised drawings accompany this Amendment.
NAVFAC Drawing No. 12771651 (G-016)
To the end of the Plumbing General Notes, ADD the following:
“21. COPPER TRAP PRIMER PIPING 1/2-INCH DIAMETER OR LESS MAY BE ENCASED IN
STRUCTURAL SLABS. IF PIPING IS RUN BELOW BOTTOM OF SLAB, CONCRETE ENCASE PER
DETAIL A4/S-803. ALL ENCASED COPPER PIPING SHALL BE BAGGED IN POLYETHYLENE
SLEEVE. DO NOT ATTACH OR PLACE COPPER PIPING IN DIRECT CONTACT WITH SLAB
REINFORCING STEEL.”
NAVFAC Drawing No. 12771933 (P-111)
REPLACE General Sheet Note 4 in its entirety with the following:
“4. CONCRETE ENCASE PIPING UNDER SLAB, SEE STRUCTURAL DETAIL A4/S-803.”
NAVFAC Drawing No. 12771962 (D-322)
At drawing coordinate B3, REPLACE the equipment tag “20DF-FV 41012” with “20MP-FV 41012”.
At drawing coordinate B4, REPLACE the equipment tag “20DF-FV 41011” with “20MP-FV 41011”.
NAVFAC Drawing No. 12771969 (S-133)
REPLACE Sheet Keynote 15 in its entirety with the following:
“15. CONTRACTOR DESIGNED FRP STAIRS AND RAILING TYP OF 8.”
NAVFAC Drawing No. 12772043 (P-331)
REPLACE General Sheet Note 2 in its entirety with the following:
“2. CONCRETE ENCASE PIPING UNDER SLAB, SEE STRUCTURAL DETAIL A4/S-803.”
NAVFAC Drawing No. 12772045 (P-432)
REPLACE General Sheet Note 3 in its entirety with the following:
“3. CONCRETE ENCASE PIPING UNDER SLAB, SEE STRUCTURAL DETAIL A4/S-803.”
NAVFAC Drawing No. 12772049 (P-602)
Last row of table (Tag LP-4), DELETE row in its entirety.
NAVFAC Drawing No. 12772056 (M-134)
DELETE all section cut symbols on this sheet.
NAVFAC Drawing No. 12772060 (M-601)
AIR OUTLETS AND INLETS Schedule
Second row of table (Tag CD1-2), DELETE row in its entirety.
NAVFAC Drawing No. 12772072 (D-132)
At drawing coordinate D3, REPLACE the equipment tag “40LCP01” with “40LCP61000”.
NAVFAC Drawing No. 12772132 (P-151)
REPLACE General Sheet Note 5 in its entirety with the following:
“5. CONCRETE ENCASE PIPING UNDER SLAB, SEE STRUCTURAL DETAIL A4/S-803.”
NAVFAC Drawing No. 12772134 (P-952)
REPLACE General Sheet Note 4 in its entirety with the following:
“4. CONCRETE ENCASE PIPING UNDER SLAB, SEE STRUCTURAL DETAIL A4/S-803.”
NAVFAC Drawing No. 12772135 (M-151)
At drawing coordinate B4, adjacent to equipment tag 50-EF-1, REPLACE the keynote callout “ 5 “ with callout “ 6 ”.
At drawing coordinate A5, adjacent to equipment tag 50-EF-2, REPLACE the keynote callout “ 5 “ with callout “ 6 ”.
CONTRACT SPECIFICATIONS
SECTION 33 52 10 SERVICE PIPING, FUEL SYSTEMS
1.6 PROJECT/SITE CONDITIONS
REPLACE paragraph 1.6 in its entirety with the following:
“1.6 PROJECT/SITE CONDITIONS
Fuel required for the testing, flushing and cleaning efforts, as specified in this section, will be provided and delivered by the Contractor. Do not flush, clean, or test any system with fuel or liquid not intended for final system operation.”
SECTION 11 53 00 LABORATORY EQUIPMENT AND FUME HOODS
2.3 LABORATORY SERVICE FIXTURES
DELETE subparagraph 2.3.3 Laboratory Vacuum Cock Supply, LP-4 in its entirety.
SECTION 40 05 13 PIPELINES, LIQUID PROCESS PIPING
Supplement 1, Pipe Schedule
On Page 4, REPLACE the row for Service/Flow Stream “Filter Backwash Supply/Filter Backwash Waste/Filter to Waste” in its entirety with the following:
On Page 5, REPLACE the row for Service/Flow Stream “Liquid Lime” in its entirety with the following:
SECTION 43 32 56 MEMBRANE SYSTEM
2.4 MEMBRANE ELEMENTS
To the end of subparagraph a., ADD the following:
“3. Supplied membranes shall treat water with the water quality listed in Table 2 (Supplement 1) and produce a permeate meeting the requirements listed in Table 4 (Supplement 3).
4. Supplied membranes shall be from a membrane element manufacturer that has at least three operating municipal water treatment nanofiltration membrane plants using the proposed membranes that have been operating for at least 5 years and a permeate production capacity of at least 5 million gallons per day within the United States.”
- End of Amendment -
Maximum Operating
Test
ELDI EXP/ENC
FBS = dark blue, FBW = lt. brown, FTW = lt. brown
Heat trace and insulate outdoor, exposed, pipes 8-inches diameter and smaller.
HDPE BUR --
Provide restrained HDPE to DI couplings at all transitions in piping material.
60 H
Material Installation
Pipe Schedule
Color Code Remarks
Pressure (psig)
Service/Flow Stream Legend Size
(inches)
FBS/FBW/FTW
Filter Backwash Supply/Filter
Backwash Waste/Filter to
Waste
All 40
Maximum Operating
Test
All PVC EXP 80 120 H per 10 State
Standards
In chemical storage area and chemical feed room
EXP/BUR 80 120 H --
Liquid Lime starting immediately downstream of metering pump skid to the injection point. Heat trace and insulate outdoor exposed piping.
Material Installation
Pipe Schedule
1" Fluoropolymer tubing inside 2-inch PVC conduit
Color Code Remarks
Pressure (psig)
Liquid Lime LL
Service/Flow Stream Legend Size
(inches)