This document contains an amendment to a solicitation for a design-bid-build water treatment plant replacement project on Marine Corps Base Camp Lejeune in North Carolina. The amendment provides responses to 159 pre-proposal inquiries to clarify requirements for the project, which includes constructing an 8 million gallon per day membrane filtration water treatment facility to improve compliance with regulations and address potential saltwater intrusion issues. The amendment revises pump specifications, clarifies that stainless steel and FRP framework do not require coating, adjusts valve failure positions, and extends the deadline for submitting hard copies of proposals to July 19th while maintaining the July 15th deadline for electronic submissions.

View the file

Other files

File Type Posted
AMENDMENT 0008.pdf PDF
AMENDMENT 0007.pdf PDF
AMENDMENT 0006.pdf PDF
REPOST AMENDMENT 0004 - P1F198_1.PDF PDF
REPOST AMENDMENT 0004 - P165D9_1.PDF PDF
REPOST AMENDMENT 0004 - P1043__1.PDF PDF
P1043 Amend 0005_Narrative.pdf PDF
REPOST AMENDMENT 0004 - P1043__4.PDF PDF
REPOST AMENDMENT 0004 - P1043__3.PDF PDF
REPOST AMENDMENT 0004 - P1043__2.PDF PDF
AMENDMENT 0004.pdf PDF
Amendment 0004 - P1043-1.pdf PDF
Amendment 0004 - P1043 -3.pdf PDF
Amendment 0004 - P1F198-1.pdf PDF
Amendment 0004 - P1043-4.pdf PDF
Amendment 0004 - P11F25-1.pdf PDF
P1043 Amend 0004_Narrative.pdf PDF
Amendment 0004 - P165D9-1.pdf PDF
Amendment 0004 - P1043 Amend 0003_Drawings_DP111.pdf PDF
Amendment 0004 - P11A90-1.pdf PDF
Amendment 0004 - P1043-2.pdf PDF
Amendment 0004 - P10384-1.pdf PDF
Amendment 0004 - P1043_FinalDrawings_Vol_36_6_BLDG209_HYPO_1999_22x34.pdf PDF
P1043 Amend 0003_Narrative.pdf PDF
P1043 Amend 0003_Drawings_Civil.pdf PDF
AMENDMENT 0003.pdf PDF
P1043 Amend 0003_Drawings_Plumbing.pdf PDF
P1043 Amend 0002_Narrative.pdf PDF
P1043 Amend 0002_Drawings_Arch.pdf PDF
P1043 Amend 0002_Drawings_Civil.pdf PDF
Amendment 0002 Site Visit Sign-in Sheet.pdf PDF
AMENDMENT 0002.pdf PDF
AMENDMENT 0001.pdf PDF
AMEND 0001 Attachment H - 00 22 13 00 20.pdf PDF
Attachment H - 00 22 13.00 20.pdf PDF
CampLejeuneVolume1_FinalSpecs_S and S.pdf PDF
796455_P1043_FinalDrawings_Vol_22.pdf PDF
796455_P1043_FinalDrawings_Vol_12.pdf PDF
796455_P1043_FinalDrawings_Vol_13b.pdf PDF
796455_P1043_FinalDrawings_Vol_8.pdf PDF
CampLejeuneVolume3_FinalSpecs_S and S.pdf PDF
Attachment C - Construction Experience Data Sheet.docx DOCX document
796455_P1043_FinalDrawings_Vol_21.pdf PDF
796455_P1043_FinalDrawings_Vol_6.pdf PDF
796455_P1043_FinalDrawings_Vol_5.pdf PDF
796455_P1043_FinalDrawings_Vol_16.pdf PDF
N4008521R0052.pdf PDF
Attachment A - PPII log.doc DOC document
796455_P1043_FinalDrawings_Vol_23.pdf PDF
796455_P1043_FinalDrawings_Vol_4.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION NO. N40085-21-R-0052, DBB P-1043 WATER TREATMENT PLANT, HADNOT POINT, MCB, CAMP LEJEUNE, NC

The purpose of this amendment is to provide responses to Pre-Proposal Inquiries (PPIs). The PPI cut-off date has now passed.

The proposal due date of 15 July 2021 NLT 2:00 PM EST remains unchanged.

See Continuation Page(s).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Jul-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521R0052

X 9B. DATED (SEE ITEM 11)

10-May-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Jul-2021

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008521R0052

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0005

Contract or PPI#

Section of RFP or Page Number

Paragraph Reference

Drawing Number

Question RESPONSE

Volume 11/D-314 & Volume 16/D-183

Please provide the basis of design and/or the minimum performance requirements for Davit Cranes.

Refer to Bid Specification

SECTION 22 11 23.00

10, Para. 2.6 for requirements.

150 Please reference Item 3 – Evaluation Factors for Award of the Solicitation.

Factor 1 – Corporate Experience requires that proposers demonstrate experience on Water Treatment Plant (WTP) projects that are similar in size, scope, and complexity by submitting up to five (5) relevant construction projects completed in the past ten (10) years. Such relevant projects must be an industrial facility with a total construction value of $10M or greater. Given the size, scope and complexity of this project, we are greatly concerned that the stated qualifications are grossly insufficient and will lead to the Government receiving unresponsible bids from unqualified proposers. In order to eliminate submissions from unresponsible bidders, we strongly recommend that proposers be required to demonstrate experience on at least one WTP project with a total construction

Propose to RFP.

value of $75,000,000 or greater.

151 Please refer to Section 43 32 56 Part 2.3.a.6, item 13 (page 17) Membrane Skid Framework. The second paragraph specifies FRP or 316 stainless steel material for frame, rack, or skid members. The seventh paragraph specifies that the FRP or stainless steel members be shop coated with paint system HP-4 per section 09 96

00. Providing a high performance coating on corrosion resistant materials like 316 stainless steel and FRP is uncommon in the industry and Section 090 00 Part 1.11.2.d specifically identifies stainless steel as s surface not to be painted. It is our interpretation that the list of item under Section 09 90 00 Part 1.11.2 Painting Excluded extends to Section 09 96 00 and that painting the membrane skid framing is not required. Please notify us by Amendment if our interpretation is not correct.

Framework made with FRP or 316 stainless steel in accordance with Section 43 32 56 Part 2.3.a.6 does not have to be coated. Stainless steel shall be passivated and pickled. Bid Specifications have been clarified accordingly.

152 Please refer to Section 43 21 39 Part 2.1. Section 43 21 39 Part 2.1.1 requires the pump equipment to be a manufacture’s standard product. Many pump manufacturer’s may not have certification from an accredited certification organization for a standard pump product modified to incorporate the specified materials of construction of the various pump components. It is our understanding that Part 2.1

Correct. Per Bid Specification, the wetted components of pumps shall be made of materials that are NSF 61 and NSF 372 approved for drinking water use. The pumps themselves are not required to have NSF certification.

allows pump manufacturers to certify that a pump product modified to incorporate the specified materials of construction as being NSF 61 and NSF 372 in lieu of an accredited third-party certification for that pump product when no third party certification is available. Please notify us via amendment if this is incorrect.

153 Please refer to Section 43 21 39, Part 2.3, Part 2.4.4, and Data Sheets (Supplements 1~4, Membrane Feed Pumps 1~4). The first sentence of Part 2.4.4 instructs the Bidder that the suction can length and diameter shall be as recommended by the pump manufacture as required to meet current and future conditions. The second sentence contradicts the first sentence by limiting the can length to the dimensions shown in the data sheets. Some pump manufacturers have noted that in order to accommodate the additional stages needed to meet the future design conditions, the suction can length will need to be a minimum of 12 ft in lieu of the 10 foot maximum length specified and the suction can diameter increased to 24” in lieu of the 20” diameter specified in order to meet H.I.

velocity standards. Please notify us by amendment if increasing the maximum length from the bottom of the base plate to the bottom of the suction can to 12 feet and the suction can

It is acceptable to increase the maximum diameter and length of the membrane feed pump cans to be 24 inches and 12 feet respectively. The Bid Specifications have been revised accordingly.

diameter to 24” is unacceptable.

154 Please refer to Section 43 21 39, Part 2.3. Some pump manufacturers have noted that the current secondary and future points for the membrane feed pumps, and the secondary low flowrate point for the transfer pumps are outside the AOR and cannot be guaranteed. Please issue an amendment deleting any requirement that the Bidder guarantee pump performance when operated outside the AOR of these pumps.

Subject pump operating points have been revised by Amendment.

155 The response to PPI #14 in Amendment No. 2 stated that “on loss of power, valves shall fail last position unless otherwise noted.” No valves are indicated to fail in any other position upon loss of power. It is our interpretation that all valves are to fail in last position upon loss of power, and that all fail positions indicated in Electrically Operated Valve Schedule are only to be applied to a loss of control signal. If this is not correct, please notify us via addendum and provide revised specifications and Electrically Operated Valve Schedule indicating applicable loss of power fail position.

Per the Bid Documents, valves shall fail last position unless otherwise noted.

Since the onset of the COVID-19 pandemic, NAVFAC has not been accepting hand-carried or courier packages, but requiring electronic copies only of proposal submissions via email

Hard copies are required. Per the RFP, page 19, the Non-Price and Price HARD COPY proposals shall be delivered by MAIL ONLY. Hand carried and/or DoD SAFE. Please confirm if hard copies are required via hand-carry or courier or if only electronic submission is required.

proposals will not be accepted.

Specific disciplines traditionally hold their final pricing until an hour before bids are due. By requiring a complete hard copy submission of both the Non-Price and Price proposals by 2:00 EDT on 15 July would require us to close our bid by 14 July latest, to allow for next day delivery of our proposal prior to bid closing time.

As the RFP also requires a complete electronic copy of the Non-Price and Price Proposals submission via DoD SAFE by 2:00 EDT on 15 July, and states on page 19 of 63 that “the DoD SAFE shall govern the timeliness of any proposal submission”, please confirm that the corresponding hard copy submission may be submitted by the following day on 16 July.

The corresponding hard copy should be received by Monday, 19 July 2021 via MAIL ONLY.

Hand carried proposals will not be accepted.

22 11 23.00 10

– Submersible Pump

Supplemen t 1, 2, & 3

Item 11 under Process Condition states abrasives are iron and sand. Please additional information on the iron and sand concentration in the water, i.e. maximum solids diameter, solids concentration by volume, etc.

Solids concentration by volume varies. Subject pumps are located in Backwash Waste Basin, which receives periodic backwash from greensand pressure filters and 50 micron sand strainers.

22 11 23.00 10

– Submersible Pump

Supplemen t 1, 2, 3, 12, & 13

Item 66 under Materials of Construction states the impeller shall be cast iron w/ epoxy coatings. Please specify the epoxy coating required.

Pump manufacturer's standard epoxy coating or as recommended by pump manufacturer is acceptable.

(End of Summary of Changes)