This amendment to solicitation N40085-21-R-0052 provides responses to 142 pre-proposal inquiries. The solicitation is for the design-bid-build of an 8 million gallon per day water treatment plant utilizing membrane filtration technology to replace the existing facility at Hadnot Point, Marine Corps Base, Camp Lejeune, North Carolina. The amendment clarifies scope items including required materials, permits that will be acquired by the agency, utility rates and availability, demolition and site work details, and equipment connection requirements. The proposal due date of July 15, 2021 at 2:00 PM EST is confirmed.

View the file

Other files

File Type Posted
AMENDMENT 0008.pdf PDF
AMENDMENT 0007.pdf PDF
AMENDMENT 0006.pdf PDF
REPOST AMENDMENT 0004 - P1F198_1.PDF PDF
AMENDMENT 0005.pdf PDF
REPOST AMENDMENT 0004 - P165D9_1.PDF PDF
REPOST AMENDMENT 0004 - P1043__1.PDF PDF
P1043 Amend 0005_Narrative.pdf PDF
REPOST AMENDMENT 0004 - P1043__4.PDF PDF
REPOST AMENDMENT 0004 - P1043__3.PDF PDF
REPOST AMENDMENT 0004 - P1043__2.PDF PDF
Amendment 0004 - P1043-1.pdf PDF
Amendment 0004 - P1043 -3.pdf PDF
Amendment 0004 - P1F198-1.pdf PDF
Amendment 0004 - P1043-4.pdf PDF
Amendment 0004 - P11F25-1.pdf PDF
P1043 Amend 0004_Narrative.pdf PDF
Amendment 0004 - P165D9-1.pdf PDF
Amendment 0004 - P1043 Amend 0003_Drawings_DP111.pdf PDF
Amendment 0004 - P11A90-1.pdf PDF
Amendment 0004 - P1043-2.pdf PDF
Amendment 0004 - P10384-1.pdf PDF
Amendment 0004 - P1043_FinalDrawings_Vol_36_6_BLDG209_HYPO_1999_22x34.pdf PDF
P1043 Amend 0003_Narrative.pdf PDF
P1043 Amend 0003_Drawings_Civil.pdf PDF
AMENDMENT 0003.pdf PDF
P1043 Amend 0003_Drawings_Plumbing.pdf PDF
P1043 Amend 0002_Narrative.pdf PDF
P1043 Amend 0002_Drawings_Arch.pdf PDF
P1043 Amend 0002_Drawings_Civil.pdf PDF
Amendment 0002 Site Visit Sign-in Sheet.pdf PDF
AMENDMENT 0002.pdf PDF
AMENDMENT 0001.pdf PDF
AMEND 0001 Attachment H - 00 22 13 00 20.pdf PDF
Attachment H - 00 22 13.00 20.pdf PDF
CampLejeuneVolume1_FinalSpecs_S and S.pdf PDF
796455_P1043_FinalDrawings_Vol_22.pdf PDF
796455_P1043_FinalDrawings_Vol_12.pdf PDF
796455_P1043_FinalDrawings_Vol_13b.pdf PDF
796455_P1043_FinalDrawings_Vol_8.pdf PDF
CampLejeuneVolume3_FinalSpecs_S and S.pdf PDF
Attachment C - Construction Experience Data Sheet.docx DOCX document
796455_P1043_FinalDrawings_Vol_21.pdf PDF
796455_P1043_FinalDrawings_Vol_6.pdf PDF
796455_P1043_FinalDrawings_Vol_5.pdf PDF
796455_P1043_FinalDrawings_Vol_16.pdf PDF
N4008521R0052.pdf PDF
Attachment A - PPII log.doc DOC document
796455_P1043_FinalDrawings_Vol_23.pdf PDF
796455_P1043_FinalDrawings_Vol_4.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION NO. N40085-21-R-0052, DBB P-1043 WATER TREATMENT PLANT, HADNOT POINT, MCB, CAMP LEJEUNE, NC

The purpose of this amendment is to provide responses to Pre-Proposal Inquiries (PPIs). The PPI cut-off date is 01 July 2021.

The proposal due date of 15 July 2021 NLT 2:00 PM EST remains unchanged.

See Continuation Page(s).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 19

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Jul-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521R0052

X 9B. DATED (SEE ITEM 11)

10-May-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Jul-2021

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008521R0052

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0004

Contract or PPI#

Section of RFP or Page Number

Paragraph Reference

Drawing Number

Question RESPONSE

102 Drawing Volume 9

DP111 Regarding the tie-in to the existing C900 PVC raw water main, what materials are to be used for the tie-in? Drawing DP111 appears to reflect DIP pipe and fittings; however, Supplement 1 to specification 40 05 13 indicates HDPE for buried raw water piping. Please clarify.

The raw water tie-in at Holcomb Blvd shall be cement-lined ductile iron. It will transition to HDPE at the branch isolation valve. Refer to revised Bid Drawing

DP111.

105 Please reference the following technical specifications in the referenced solicitation: • Section 11 24 27 – Air Stripper (Decarbonator)

• Section 43 43 56 – Membrane System

• Section 46 61 01 – Filtration Equipment (Bypass Filters) Each of the referenced specifications contains performance requirements that the equipment must meet during performance testing but do not contain any limitation of liability in the event the equipment does not meet the performance requirements.

This places an unquantifiable risk on the equipment suppliers which will most likely be reflected in their pricing structure for the project. In order to be able to quantify the risk of not being able to

Provide equipment and systems that satisfy the specified performance requirements.

meet the performance requirements and ensure the most competitive pricing structure for the project, we recommend establishing damages in the following amounts that shall be paid to the government and shall be the government’s sole remedy in the event a piece of equipment cannot meet the specified performance requirements: • Section 11 24 27 – Air Stripper (Decarbonator) - $50,000

• Section 43 43 56 – Membrane System - $200,000

• Section 46 61 01 – Filtration Equipment (Bypass Filters) - $100,000 We look forward to receipt of an addendum with revised performance testing language for each of these items.

106 Drawing DP-111 states that the casing pipe for the 20” FW line under Holcomb Blvd is to be installed using open cut methods, but work pits are shown on either side of the road as if this work was intended to be installed via a jack and bore method. It is our interpretation that this casing pipe is to be installed using open cut methods. If this is not correct, please notify us via amendment.

Per the Bid Documents, the 20” FW line under Holcomb Blvd is to be installed using open-cut methods. The work pits shown in the Drawings on either side are assumed to be necessary to make piping connections.

Contractor shall excavate and provide excavation support as required by his Means and Methods as part of the Work.

107 Specification Section 01 50 00.3.2.b states that utilitie s will be made available to the Contractor at the Prev ailing Government Rates.

Please provide the current prevailing Government Rat es for Water, Electricity, G as, and Sanitation/Sewer fo r FY 2021 and those from the previous five (5) fiscal years via amendment.

Current utility rates at MCB Camp Lejeune are as follows:

Activity Rates:

Electricity - $71.68/MWh Water - $2.73/k-gal Wastewater - $2.54/k-gal

Private Party Rates:

Electricity - $75.00/MWh Water - $4.10/k-gal Wastewater

- $3.34/k-gal

Natural Gas (market variable) Small General Service:

Nov-Mar: $9.42/dth Apr-Oct: $8.95

Medium General Service:

First 500 dth Nov-Mar: $8.34/dth Apr-Oct: $8.27/dth

After 500 dth:

Nov-Mar: $7.95/dth Apr-Oct: $7.91/dth

108 With regards to the Facility Performance Demonstrati on detailed in Specificatio n Section 01 75 00.1.3.4.4, it is our understanding tha t there are no overall water quality requirements for e ither Finished Water or Co ncentrate that the Contract or is required to meet to sa tisfy completion of this De monstration and/or Facilit y Turnover. Performance requirements with regards t o water quality of any para meter shall be limited to th ose explicitly required by t he Technical Specifications for individual equipment s ystems. If this is incorrect, please noti fy us via amendment.

The overall facility must demonstrate the ability to reliably satisfy the treatment requirements of the North Carolina Department of Environmental Quality, Public Water Supply Section. Performance requirements with regards to water quality of any specific parameter shall be as required by the Technical Specifications.

109 Specification Section 01 75 00-

1.3.4.4. g states that raw (w ell) water is to be used for the Facility Performance Demonstration. Paragraph

3.3 details the conditions f or raw water usage. It is o ur understanding that if ra w water is not made availa ble to the Contractor for th

Changes in the Work will be addressed in accordance with the Contract Documents and related FAR clauses.

e Facility Performance Demonstration or Performance Demonstration or suspended during this Demonstration after the Contractor has followed the proper notification and work restriction provisions it will be a changed condition resolved via the Contract Clause entitled “Changes”. If this is incorrect, please notify us via amendment.

110 Specification Section 01 75

00.3.1 states that the Contr actor shall provide water tr eatment chemicals necessar y for start-up and testing. Please prov ide the anticipated daily us age rates for all water treat ment chemicals for the WT P operating in normal cond ition. If not provided, it wi ll be our understanding that the minimum flow rate for each, individual chemical pump shall be utilized in d etermining the volume of water treatment chemicals t o supply during the Facility Performance Demonstratio

n. If this is incorrect, pleas e notify us via amendment.

Alternatively, an Allowance could be established for start-up and testing chemicals

Contractor shall provide the volume of chemicals necessary for the proper startup and testing of the facility in accordance with Bid Documents.

111 Specification Section 01 75 00 does not indicate who will be responsible for electric utility charges during start-up and testing.

It is our understanding that the Government shall be responsible for all electric utility charges associated with all phases of start-up and testing. If this understanding is incorrect, please notify us via amendment.

The Contractor is responsible for all electric charges through Government Acceptance. Refer to Specification Section 01 50 00, Para. 3.2.2, which states that utilities will be made available to the Contractor at the Prevailing Government Rates.

112 The Tank Data Sheets at th e end of Specification Section 43 41

16.16 all states that all co nnections shall be made w ith Viton Gaskets and Re e ncapsulated Titanium Bolts . The Connection pipeline s are all PVC, CPVC, or PVDF and per Specification Section 40 05 13 all list B8 bolts with P TFE Gaskets. It is our interpretation that th e first connection at the ta nk requires the Titanium b olts and Viton gaskets as s pecified on the Tank Data Sheets, but that all subseq uent connections are to rec eive B8 bolts and PTFE ga skets as specified in Sectio n 40 05 13. It is also our interpretation th at control rods and plates, if required, shall be Stainless Steel and not Titanium. If this is incorrect, please notify us via amendment and provid e revised drawings and Pip ing Schedule.

It is confirmed that the viton gasket and the titanium bolts are for connection to the tanks only, not for other connections.

113 The Contract Documents r equire clarification regarding the requirements and locations of flexible connections at t ank connections. Specific ation Section 43 41 16.16- 2.5.7.c, which only applies to the Sodium Bisulfate Tank and the Membrane Cleaning Chemical Mixing Tank, states that "all tank fitting attachments shall be equipped with flexible couplers." Subsections for all other tanks are silent on the need for flexible connections. It is our interpretation that only Vertical Atmospheric Thanks and Vessels which

As shown in the Bid Drawings, Teflon bellows are also required on the FRP Membrane Cleaning Tank (RO Membrane CIP Tank, 40CF-

TNK61000)

connections as shown on drawings. For all other FRP tanks, follow tank manufacturers’ requirements for flexible connections.

Note that the membrane cleaning chemical mix tank’s (40CF- TNK61001) overflow and drain are not open ended. They shall be provided with flexible require any flexible connections are the Sodium Bisulfate and Membrane Cleaning Chemical Mixing tanks. It is our further understanding that, at these tanks, flexible connections are limited to those with hard connections to other equipment or piping systems and that open-ended lines, such as tank drains and Overflow lines, will not require flexible connections. If this is incorrect, please notify us via amendment and provide revised drawings and Piping Schedule.

connections. It is confirmed that drain and overflow pipes on the sodium bisulfate tank do not require flexible connection.

114 Specification Section 40 05 13-

2.18.2 states to “heat trace all outdoor exposed pipes, valves, and appurtenances that are 12” or smaller.”

However, there are numer ous instances where an ex posed pipe that is 12” or s maller is not indicated to r eceive insulation and Heat Tracing under the “Remar ks” column of the Pipe Sc hedule in Specification Sec tion 40 05 13 and that no heat tr acing power connection is shown on the Electrical Dr awings. These instances include, but are not limited to, the following: a.

Bypass Filter Building i.

12” MB extending outside the east wall

b. Decarbonator and Transfer Pump Station

i. DC Pipe and Instrumentation/sampling pipe off Decarbonators.

ii. 12” FMB Pipe on south side of structure.

iii. 3” branch and quick disconnect off 16” DMP lines

c. Operations and Treatment Building

i. Fluoride/Sulfuric Acid/Scale Inhibitor Corrosion Inhibitor/Liquid Lime/Sodium Hydroxide/Sodium Hypochlorite Fill Connection

d. Raw and Finished Water Pumps and Strainer Building

i. 12” Pressure Relief Discharge Locations

e. Generator and Fuel Storage Tank

i. All piping

f. Finished Water Storage Tank

i. Level Transmitter Wall

Whether shown on the Drawings or not, in accordance with Specification Section 40 05 13-2.18.2, heat trace all outdoor exposed pipes, valves, and appurtenances that are 12” or smaller.

Vents, overflows, and similar non-pressurized piping do not need to be heat traced and insulated. “Heat Trace” connection points are intended to serve multiple heat trace elements and are shown on the Bid Documents in the following locations: a. Outfall Sidestream Pump Building i. Heat trace connection point shown on drawing EX310. b.

Backwash Waste Basin

ii. Heat trace connection points shown on drawings E- 113 and E-613. c.

Decarbonator and Transfer Pump Station iii.,iv.,v. and vi.: Heat trace connection points shown on drawings E- 121 and E-621. d. Raw and Finished Water Pumps and Strainer Building vii. The 10” BWW on exterior of building running to the Backwash Waste Basin is a gravity (non-pressurized) drain and therefore does not require heat trace and insulation. e.

Concentrate Clarifier viii., ix.,x. , xi., xii., xiii.: Heat trace connection points shown on drawings E- 181, E-182 and E-693.

f. Concentrate Clarifier Building xiv. Heat trace

Pipe

g. Concentrate Clarifier

i. 12” CDW (Pipe Schedule only says to Insulate and Heat Trace 8” and less)

ii. 10” MC

iii. 12” OF

h. All Exterior Locations

i. 1” Vent pipe from ARVs It is our interpretation that, in any such instance, the pipelines do not receive insulation or heat tracing.

If this is not correct. Please notify us via amendment and provide revised Drawings and Pipe Schedule.

connection points shown on drawings E- 181, and E-693.

115 There are various locations where the Piping Schedul e in Specification Section 40 05 13 states to heat trace and insulate exposed piping, but where no “Heat Trace” connection point is referenced on the Electrical Drawings.

These instances include, but are not limited to, the following:

a. Outfall Sidestream Pump Building

i. 6” CDW shown in Specification Section A4 on DX311

b. Backwash Waste Basin

ii. 8” FBW/FTW

Whether shown on the Drawings or not, in accordance with Specification Section 40 05 13-2.18.2, heat trace all outdoor exposed pipes, valves, and appurtenances that are 12” or smaller.

Vents, overflows, and similar non-pressurized piping do not need to be heat traced and insulated.

c. Decarbonator and Transfer Pump Station

iii. Air Release Valve 20MP-ARV41000 on the 14” MP line

iv. ½” SHC at injection location

v. ½” SA off DMP, FW, and BDP lines

vi. 1-1/2” BDP

d. Raw and Finished Water Pumps and Strainer Building

vii. 10” BWW on exterior of building running to the Backwash Waste Basin

e. Concentrate Clarifier

viii. 6” CDW

ix. 6” BWW

x. 4” CW Drawoff locations from Sludge Collectors

xi. ½” SBS at injection location

xii. 1” and ½” Sample lines off the MC and CDW lines

xiii. ¼” SHC at injection location

f. Concentrate Clarifier Building

xiv. ½” SBS in 2” Carrier piping where it penetrations exterior wall It is our interpretation that, in any such instance, the pipelines do not receive insulation or heat tracing.

If this is not correct. please notify us via amendment and provide revised Drawings and Pipe Schedule

116 Please clarify via amendme nt if borrow material is availabl e from the stockpile locati ons indicated Specificatio n Section 01 57 19.01 20.1 .1.1.1.2 and acceptable for use at either the New or Ex isting WTP Sites. If avail able, please also provide via amendment the

Specification Section 01 57 19.01

20.1.1.1.1.2 identifies locations where surplus soils shall be deposited.

The stockpiles are not available for the Contractor’s use as a source for imported fill material to the Site.

quantity of material availa ble at these stockpile locat ions.

117 The demolition of Ex. Stru cture S- 44 (shown on GD001B, C D102B and CG102B) in a ccordance with CLIN 002 will require work beyond t he limits of disturbance (L OD) shown if open cut exc avation methods are utilize

d. It is our understanding t hat that open cut excavatio ns are preferred and accept able and that the LOD can be disturbed. If this is inc orrect, please clarify by a mendment.

The plans have been permitted by the North Carolina Department of Environmental Quality.

The permitted limits of demolition is the existing fence line, refer to the Construction Sequence for Erosion Control on CD103B. All work outside of the permitted limits of demolition will require resubmittal to the State.

118 The Site Demolition Drawi ngs for the Existing WTP ( CD101B to CD104B) indi cates tree protection in mu ltiple locations. In order to perform the work require d by CLIN 0002 utilizing open cut methods, many o f these trees and/or their ro ot systems will be disturbed. It is our understanding that these trees can be removed and replaced in kind to complete CLIN 002 utilizing open cut methods.

If this is incorrect, please clarify by amendment.

Bid per Contractor Documents, refer to Specification Sections 01 57 19 and 02 41 00.

119 It is our understanding that surplus suitable excavated material s from the new WTP const ruction can be used as bac kfill during the demolition of the existing WTP. If thi s is incorrect, please clarify by amendment.

Surplus suitable excavated materials from the new WTP construction can be used as backfill during the demolition of the existing WTP provided they satisfy the requirements of Section 31 23 00.00 20.

120 Specification Section 31 23 00.00 20 paragraph 2.1.2 states “ Unsatisfactory materials al so include … backfills fro m previous construction.”

It is our understanding that the soils excavated around the existing structures for the purpose of demolition at the existing Hadnot Point WTP can be reused to backfill of existing demolishing voids. If this is incorrect, please clarify by amendment.

Soils excavated around the existing structures for the purpose of demolition at the existing Hadnot Point WTP can be reused to backfill existing demolishing voids as long as they satisfy the requirements of “Satisfactory Materials” defined in Section 31 23 00.00 20, paragraph 2.1.1.

121 Specification Section 40 05 13-

3.3.3 states that “flexible c ouplings and expansion joi nts shall be installed at con nections to equipment,” bu t there are various instance s where no flexible coupli ng or expansion joint is sh own on the drawings. Exa mples of these locations in clude, but are not necessar ily limited to, connections to the Concentrate Outfall Pump Package on drawing DX311, connections to the Cartridge Filter, and all the piping connections to the Membrane Skids. Additio nally, there are locations w here dismantling joints are shown near an equipment connection, but not necessa rily at that connection poin t and it is unclear if additio nal expansion joints need t o be included at the equip ment. These include, but a re not necessarily limited t o, the connection to the Tr ansfer Pumps on Drawing D- 122 and the connection to the FW and RW pumps on Drawing D-

152. It is our interpretatio n that flexible couplings a nd expansion joints are onl y required where specifical

Whether shown on the Drawings or not, in accordance with the Bid Specifications, provide flexible couplings and expansion joints at all connections to equipment. If flexible couplings, expansion joints, or dismantling joints are shown on the Drawings within 5 feet of equipment, then no additional flexible couplings, expansion joints, or dismantling joints are required at the piping connection to the equipment.

ly shown on the drawings.

If this is not correct, pleas e notify us via amendment and provide revised drawings indicating locations and type of any additional flexible couplings or expansion joints.

122 Specification Section 01 57 19.3.13 details the emergency resp onse protocol and training necessary relative to Unex ploded Ordinance (UXO).

It is our understanding that no areas of the Project are l ocated within contaminate d areas and should any UX O be encountered and/or UXO surveys or the servic es of a qualified UXO tech nical be required it will be a changed condition resolv ed via the Contract Clause entitled “Changes”. If this is incorrect, please notify us via amend ment.

No areas of the Project have been identified as located within known UXO zones.

123 40 05 13 2.18.2 C-301 through C-336

Please confirm if the Air Release Valves on the Sanitary Sewer outfall and the Concentrate Outfall do not require any heat tracing of the valves and only insulation per 2.18.1.e?

There is no source of electricity that is close to

The subject air release valves do not require heat tracing.

most of these valve locations.

124 Appendix D – Specifications, Part 4 of 970

(Pages 815 through

826)

The Permits approval for the NC EROSION &

SEDIMENT CONTROL

for the project site with NCDENR (permits ONSLO-2018-048 and ONSLO-2018-049) will expire by June 20th of this year. Is the government acquiring replacement permits? They are expiring after 3 years since the project has not broken ground.

Yes, Government is acquiring replacement Erosion and Sediment Control permits.

125 Appendix D – Specifications, Part 4 of 970

(Page 829 through

843)

The Permit approval for the NDPES permit and authorization to discharge by NCDEQ is currently set to expire on December 31, 2023. The current project schedule will not likely have the plant completed before that date. Is the government acquiring a new permit?

The Government will acquire a new permit/extension prior to expiration.

126 Appendix D – Specifications, Part 4 of 970

NCDEQ requires discharge monitoring and use of an online reporting system.

Is the contractor to supply the information to the base to submit through the system during commissioning/startup?

Regulatory compliance reporting referenced in the subject NPDES permit is required post BOD and will be provided by the Government.

127 Appendix D – Specifications, Part 4 of 970

NCDEQ requires discharge monitoring and use of an online reporting system.

Is the contractor required to do all of the testing shown on this page for the period we are doing the commissioning /startup?

Regulatory compliance reporting referenced in the subject NPDES permit is required post BOD and will be provided by the Government.

128 Appendix D – Specifications, Part 4 of 970

(Pages 815 through

826)

The Authorization to construct by NCDEQ expired in November 2020 (24 month approval)? Is the government acquiring a new permit?

NCDEQ ATC has been extended to November 3, 2023 and will be extended again by the Government as required. Permit conditions are unchanged and remain in effect.

129 Appendix D – Specifications, Part 4 of 970

(Pages 889 through

970)

The NWP 7 and 12 permits are set to expire in March 2023, which is before the construction is to be completed. Is the government acquiring new permits?

The Government will acquire a new permit/extension prior to expiration.

130 Appendix D - Specifications, Part 4

Pages 779 through

Is the government’s designer of record responsible for doing the closeout certifications with the North Carolina state agencies on the approved permits?

Permits requiring design engineer certification (e.g. Public Water Supply Final Approval) for closeout will be provided by the Government.

131 Drawings Vol.

B-206 The concentrate outfall requires a 24” conductor casing near the diffuser outfall. Is this conductor casing required to be installed or is it optional?

Is the reason for this casing the Peat layer shown in the Appendix B geotechnical Report? That report offered it as a suggestion, but not a requirement depending on HDD driller experience.

It is not optional.

Provide subject 24" conductor casing per the Bid Documents.

132 Please confirm if pricing is to be submitted on Section 00 10 00-Solicitation (pages 3-4 of the RFP), OR Attachment H (Section 00 22 13.00 20 pages 1-5) of the RFP.

Pricing shall be submitted on Attachment H and can be submitted electronically by the proposal due date and time. If Attachments E, F, G and H are submitted electronically, they do NOT need to be included in the hard copy submission.

133 SB Participation Plan and SB Plan: The SB Participation Plan requires us to provide dollar values for work to be subcontracted to each individual SB. In addition, we must calculate percentages of total contract dollars going to SBs and each minority category (WOSB, SDB, etc.). It is typical that many subcontractors do not provide their final price proposals until the day of the bid and often provide updated and more favorable pricing within the last few hours prior to the proposal due date and time. For this reason, it is extremely difficult to update the SB Participation Plan and SB Plan on the same day the proposals are due since changing prices can result in the need to revise dozens of dollar values and percentages in the last few hours prior to submittal. Therefore, we respectfully request that you provide a one day extension for submittal of the SB Participation Plan and SB Plan following the submittal of the price proposal so that we have time to update and finalize the SB Participation Plan and SB Plan based on final dollar values from our subcontractors. NAVFAC has agreed to and allowed this extension for submission of SB documents for previously submitted proposals.

Alternatively, if this is not acceptable, would you allow us to base our final price and dollars going to SBs on the values we have two days prior to the final

Propose per the RFP.

proposal due date even though we know the dollar values and percentages will probably change in the final bid.

134 GD121B,

GD122B,

GD123B

Does the government have any other as-builts for building 20 (to include raw water storage tank? What is the size of the raw water tank? Do you have sections detailing the depth of the structure as well as any other as-builts?

Yes. Record Drawings are provided for reference as part of this Amendment.

135 GD150B Does the government have any of as-builts for building S-44? Specially the depth of the storage tank/capacity?

Yes. Record Drawings are provided for reference as part of this Amendment.

136 GD160B,

GD170B

Does the government have any as-builts for both storage tanks S-763 and S- 735? What is the capacity of these tanks?

Yes. Record Drawings are provided for reference as part of this Amendment.

137 Since the onset of the COVID-19 pandemic, NAVFAC has not been accepting hand-carried or courier packages, but requiring electronic copies only of proposal submissions via email and/or DoD SAFE. Please confirm if hard copies are required via hand-carry or courier or if only electronic submission is required.

Proposal submission requirements are provided on pages 17- 19 of the RFP.

138 Part 1, Page 588 1.5.2.8 Lead Waste Manageme nt

The RFP states to assume all painted surfaces are coated with lead based/containing paint and to provide unit cost for hazardous waste disposal according to contractor's Lead Waste Management Plan. The Price Proposal Form does not provide a section for that unit

Costs associated with remediation/disposal of lead contaminated materials shall be included in the Base Bid. As indicated in the Bid Documents, Bidders are to assume all painted surfaces to be demolished are coated with lead pricing. a) How does the Government want bidders to price lead contaminated materials?

b) Please provide quantity to assume for bidding purposes or a unit cost line item on the Price Proposal Form.

based/containing paint.

The unit price referenced in Section 02 83 13.00 20, Para.

1.5.2.8 is to be provided as a construction submittal in the Lead Waste Management Plan.

139 33 00 00 Utilities Specs

Will horizontal deviations of the location of the force main and concentrate line, during construction and relative to the design, be allowed in an effort to avoid existing obstructions and reduce clearing & grubbing?

Bid Concentrate Force Main location as designed. Realignment during construction will be decided on a case by case basis.

140 33 00 00 Utilities Specs

What percentage of the force main/concentrate line should contractors assume will require dewatering?

Refer to project Specifications, Appendix A, Final Geotechnical Data for groundwater information.

141 33 00 00 Utilities Specs

a) Is there water (potable or non-potable) available to used to on the base? b) If so, can those locations be provided?

c) Is there a cost associated to purchase the water?

Refer to project Specification Section 01 50 00 for temporary utility connections.

142 33 00 00 Utilities Specs

a) Is there an allowable location on-base to use as a waste area for earth, pipe, structure spoils? b) If so, could those locations be provided?

c) Would the Camp Lejeune Landfill be allowable?

d) Would there be a cost?

Refer to project Specification Sections 01 57 19.01 20 and 02 41 00 for stockpiling and disposal of excavation and fill material.

143 33 11 00 Section 2.2.1

Spec section 33 11 00

SITE WATER

DISTRIBUTION PIPING,

includes sections 2.2.1

DUCTILE IRON PIPING

& 2.2.2 PLASTIC PIPING.

The plans do not denote which type of pipe material is to be used for the on-site civil water distribution piping. Considering the existing solid classification, should

Refer to project Specification Section 33 11 00, para. 2.1.1 and 2.1.2.

contractors assume PVC pipe shall be used for all 2.5", 3", and 8" site/civil water line and fire line?

Please advise.

144 32 00 00 Exterior Improveme nts

C506 Is there a spec required for the aggregate base material to be placed beneath the asphalt and concrete pavements? There is no spec section provided and the details on plan sheet C- 506 denote the aggregate as "NCDOT NO. ABC."

Refer to "NCDOT Standard Specifications for Roads and Structures" for NCDOT ABC aggregate specifications. Refer to Specification Section 32 10 00, para. 2.2.

145 Drwgs Plant Schedule

L-503 The plans call for trees that are not regularly available in the area and are very limited in availability.

Would it be acceptable to substitute specified trees for an equal, more readily available tree in order to reduce cost?

Bid per Bid Documents. Cost reduction proposals may be submitted during construction for Government consideration.

146 Volume 23 GD121B, GD122B, GD123B

a) Does the government have any other as-builts for Building 20 (to include raw water storage tank)? b) What is the size of the raw water tank?

c) Are the sections detailing the depth of the structure available, as well as any other as-builts?

Yes. Available reference drawings for structures at the existing Hadnot Point WTP are provided for reference as part of this Amendment.

147 Volume 23 GD150B Does the government have any of as-builts for building S-44, specifically the depth of the storage tank/capacity?

Yes. Available reference drawings for structures at the existing Hadnot Point WTP are provided for reference as part of this Amendment.

148 Volume 23 GD160B, GD170B

a) Does the government have any as-builts for both storage tanks S-763 and S- 735? b) Please provide the capacity of these tanks.

Yes. Available reference drawings for structures at the existing Hadnot Point WTP are provided for reference as part of this Amendment.