CampLejeuneVolume3_FinalSpecs_S and S.pdf
PDF 10 MB Posted
- Solicitation number
- N4008521R0052
About this file
This solicitation requests proposals for a water treatment plant replacement project at Marine Corps Base Camp Lejeune in North Carolina. The project scope includes constructing an 8 million gallon per day membrane filtration water treatment facility to comply with current and future drinking water regulations and address potential saltwater intrusion issues. Interested offerors should respond with proposals by the specified deadline. The selected contractor will be responsible for providing adequate and environmentally compliant potable water supplies to meet domestic, industrial, and fire protection needs at Camp Lejeune. The soliciting agency is the Naval Facilities Engineering Command within the Department of the Navy.
View the file
Other files
Show 40 more
Latest 50 of 71 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(Final Design) eProjects Work Order Number(s):
796455
Appropriation: MCON
VOLUME 3
WATER TREATMENT PLANT REPLACEMENT HADNOT POINT
At the
MCB Camp Lejeune, NC
(P-1043)
DESIGNED BY:
CH2M HILL/CLARK NEXSEN ENERGY PARTNERS
9191 S JAMAICA ST
ENGLEWOOD, CO 80112-5946
SPECIFICATION PREPARED BY:
Water Treatment: Jarrett Selig, PE (CH2M HILL) Architectural: Timothy Dodge, RA (CH2M HILL) Civil: Anna Lee Bamforth, PE, LS (C. Allan Bamforth Engineer-Surveyor) Structural: Rocco Koekemoer, PE (CH2M HILL) Mechanical: Angel Valiente, PE (CH2M HILL) Electrical: David Nicholson, PE (CH2M HILL) Instrumentation and Control: Yvette Ratzlaff, PE (CH2M HILL) Fire Protection: Bruce Peabody, FPE (CH2M HILL) Geotechnical: Curt Basnett, PE, GE (CH2M HILL) Interior Design: Briana Ernsting, NCIDQ/CID (CH2M HILL) Telecommunications: Marc Adkison, RCDD (CH2M HILL) Landscape: Sarah Marrs, LA (CH2M HILL) Specification: Jill Kaylor/CH2M HILL
SPECIFICATION APPROVED BY:
For Commander, NAVFAC MID-ATLANTIC:
Date: April 2021
Abel Valiente 2021-04-26T11:40:22-04:00
Bruce Peabody 2021-04-26T17:57:15-04:00
David Nicholson 2021-04-26T11:41:30-04:00
Sarah Marrs 2021-04-26T17:18:38-04:00
Rocco Koekemoer 2021-04-23T16:36:44-04:00
Briana Ernsting 2021-04-26T08:37:08-04:00
Timothy Dodge 2021-04-28T11:16:24-04:00
Curtis Basnett 2021-04-26T15:42:51-04:00
Marc Adkison 2021-04-26T10:33:56-04:00
Jarrett Selig 2021-04-27T16:20:28-04:00
Yvette Ratzlaff 2021-04-23T17:03:24-04:00
P1043 HADNOT POINT WTP REPLACEMENT EPROJECTS W.O. NO: 796455
MARINE CORPS BASE CAMP LEJEUNE, NC
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
VOLUME 1
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
ATTACHMENT NRZ FACILITY-TURNOVER-PLANNING-MEETING-
AGENDA 12-1003
ATTACHMENT NRZ-CHECKLIST-POAM-ITEMS 15-1216
ATTACHMENT PERFORMANCE ASSESSMENT PLAN
01 30 01.00 22 DESIGN, PROCUREMENT, AND INSTALLATION OF FURNITURE,
FIXTURES, AND EQUIPMENT
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 17.00 20 NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
ATTACHMENT SUBMITTAL REGISTER
01 33 29 SUSTAINABILITY REPORTING
ATTACHMENT NAVFAC SUSTAINABLE ENERGY DATA RECORD CARD
- HPSB
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
ATTACHMENT CONTRACTOR ELECTRICAL ENERGIZED WORK PERMIT
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 QUALITY CONTROL
ATTACHMENT ACCEPTANCE TESTING OF CRITICAL SYSTEMS
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 13.00 22 EROSION AND SEDIMENT CONTROL
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
ATTACHMENT PROJECT SIGN DETAILS 2009 09 16
PROJECT TABLE OF CONTENTS Page 2
01 60 00.00 22 REQUIREMENTS FOR PESTICIDE AND HERBICIDE COORDINATION
ATTACHMENT NAVFAC PESTICIDE & HERBICIDE RECORD FORM
REVISED 24 OCT 12
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 75 00 STARTING AND ADJUSTING
01 78 00 CLOSEOUT SUBMITTALS
ATTACHMENT A DD FORM 1354 REVISED 2011 04 20
ATTACHMENT B DD 1354 ADDENDUM
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
01 78 30.00 22 GIS DATA DELIVERABLES
01 91 13.00 22 GENERAL COMMISSIONING REQUIREMENTS FOR CONSTRUCTION
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 16 REMOVAL AND DISPOSAL OF ASBESTOS MATERIALS
ATTACHMENT ASBESTOS INSPECTION REPORTING FORM
02 83 13.00 20 LEAD IN CONSTRUCTION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING
PCBs AND MERCURY
DIVISION 03 - CONCRETE
03 01 30.71 CONCRETE REHABILITATION
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 37 13 SHOTCRETE
03 39 00.00 10 CONCRETE CURING
03 41 33 PRECAST STRUCTURAL PRETENSIONED CONCRETE
PROJECT TABLE OF CONTENTS Page 3
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
04 23 00 GLASS UNIT MASONRY
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 14 00.13 WELDING STRUCTURAL ALUMINUM FRAMING
05 21 19 OPEN WEB STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CASEWORK
06 61 16 SOLID SURFACING FABRICATIONS
06 71 33 FIBERGLASS REINFORCED PLASTIC (FRP) LADDERS
06 73 01 FIBERGLASS REINFORCED PLASTIC (FRP) GRATING
06 82 14 FIBERGLASS REINFORCED PLASTIC (FRP) PIPE AND TUBE
RAILINGS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 15 00.00 22 AIR AND VAPOR BARRIERS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
PROJECT TABLE OF CONTENTS Page 4
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 60 00 FLASHING AND SHEET METAL
07 72 01 ROOFING ACCESSORIES
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
VOLUME 2
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 22 20 FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FRAMES
08 33 23 OVERHEAD COILING DOORS
08 34 17 VERTICAL BI-FOLD DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 45 23.00 22 INSULATED TRANSLUCENT FIBERGLASS SANDWICH PANEL SYSTEM
08 51 13 ALUMINUM WINDOWS
08 62 50 TUBULAR DAYLIGHTING DEVICES
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 67 23.13 STANDARD RESINOUS FLOORING
09 68 00 CARPETING
PROJECT TABLE OF CONTENTS Page 5
09 90 00 PAINTS AND COATINGS
ATTACHMENT PAINT SYSTEM DATA SHEET
ATTACHMENT PAINT PRODUCT DATA SHEET
09 96 00 HIGH-PERFORMANCE COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
ATTACHMENT – EXTERIOR SIGN SCHEDULE
10 14 00.20 INTERIOR SIGNAGE
ATTACHMENT – EXTERIOR SIGN SCHEDULE
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHER CABINETS
10 51 13 HDPE LOCKERS AND BENCHES
DIVISION 11 - EQUIPMENT
11 24 27 AIR STRIPPER (DECARBONATOR)
11 31 13 ELECTRIC KITCHEN EQUIPMENT
11 53 00 LABORATORY EQUIPMENT AND FUME HOODS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 32 00 6MANUFACTURED WOOD CASEWORK
12 36 00 COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 93 00 SITE FURNISHINGS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 23 00.00 20 WET CHEMICAL FIRE EXTINGUISHING FOR KITCHEN CABINET
21 30 00 FIRE PUMPS
PROJECT TABLE OF CONTENTS Page 6
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
22 08 00.00 22 COMMISSIONING OF PLUMBING SYSTEMS
22 11 23.00 10 SUBMERSIBLE PUMP
ATTACHMENT Sup01_10BWW-PMP72001 ATTACHMENT Sup02_10BWW-PMP72002 ATTACHMENT Sup03_10BWW-PMP72003 ATTACHMENT Sup04_80CW-PMP74001 ATTACHMENT Sup05_80CW-PMP74002 ATTACHMENT Sup06_40SPD-PMP71001 ATTACHMENT Sup07_40SPD-PMP71002 ATTACHMENT Sup08_40SPD-PMP63010 ATTACHMENT Sup09_40SPD-PMP64010 ATTACHMENT Sup10_40SPD-PMP66010 ATTACHMENT Sup11_40SPD-PMP67010 ATTACHMENT Sup12_50SPD-PMP71001 ATTACHMENT Sup13_50SPD-PMP71002
22 15 14.00 40 COMPRESSED-AIR SYSTEMS AND OXYGEN GENERATORS
22 66 53.00 40 LABORATORY CHEMICAL-WASTE AND VENT PIPING
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 000 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST
SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 22 COMMISSIONING OF HVAC SYSTEMS
23 09 23.13 22 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
ATTACHMENT EMCS EQUIPMENT AND POINTS NOMENCLATURE FOR
CAMP LEJEUNE
23 11 25 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 35 19.00 20 INDUSTRIAL VENTILATION AND EXHAUST
23 52 00 HEATING BOILERS
PROJECT TABLE OF CONTENTS Page 7
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
23 82 00.00 20 TERMINAL HEATING UNITS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
25 50 00.00 20 CYBERSECURITY OF FACILITY-RELATED CONTROL SYSTEMS
APPENDIX A – UFC 4-010-6 TABLE H-4
ATTACHMENT 1 – TABLE 1 - CCI AND CLASSIFICATION TABLE
FOR P1043
ATTACHMENT 2 – FIGURE 1 - UFC 4‐010‐6 FIGURE E‐1
CONTROL SYSTEM REFERENCE ARCHITECTURE – LEVEL 3 FPOC
AND ABOVE RESPONSIBILITY OF SYSTEM OWNER
VOLUME 3
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
ATTACHMENT ELECTRICAL NUMBERING CONVENTION
26 08 00 APPARATUS INSPECTION AND TESTING
26 08 10.00 22 COMMISSIONING OF ELECTRICAL SYSTEMS
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 13 010 AD-MOUNTED MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCH
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 23 00 LOW-VOLTAGE SWITCHGEAR
26 24 13 SWITCHBOARDS
26 27 14.00 20 ELECTRICITY METERING
ATTACHMENT MCLB REVENUE METERING SPEC 10 2019
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 13.00 20 SINGLE OPERATION GENERATOR SETS
26 33 53.00 20 UNINTERRUPTIBLE POWER SUPPLY (UPS)
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
PROJECT TABLE OF CONTENTS Page 8
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
ATTACHMENT ENCL A RACK ELEVATION EXAMPLE
ATTACHMENT ENCL B BACKBOARD EXAMPLE
ATTACHMENT ENCL C TELECOMM ROOM TYPICAL LAYOUT
27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76.00 22 INTERIOR COMBINATION EMERGENCY COMMUNICATIONS SYSTEMS
DIVISION 31 - EARTHWORK
31 05 21 GEOGRID SOIL REINFORCEMENT
31 11 00 CLEARING AND GRUBBING
31 23 00.00 20 EXCAVATION AND FILL
31 31 16.00 22 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL
31 62 19.13 TIMBER MARINE PILES
31 63 35 AGGREGATE PIER AND RIGID INCLUSION GROUND IMPROVEMENTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.17 COLD MILLING OF BITUMINOUS PAVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 10 00 BITUMINOUS CONCRETE PAVEMENT
32 13 13.06 PORTLAND CEMENT CONCRETE FOR PAVEMENT AND SITE
FACILITIES
32 14 20 BRICK PAVERS
32 17 23.00 20 PAVEMENT MARKINGS & SIGNAGE
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
PROJECT TABLE OF CONTENTS Page 9
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
ATTACHMENT – BED EDGING DETAIL
DIVISION 33 - UTILITIES
33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 08 55 COMMISSIONING OF FUEL FACILITY SYSTEMS
33 11 00 SITE WATER DISTRIBUTION PIPING
33 16 13.16 WIRE-WOUND CIRCULAR PRESTRESSED-CONCRETE WATER TANK
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
ATTACHMENT – NAVY LID VERIFICATION REPORT
33 52 10 SERVICE PIPING, FUEL SYSTEMS
33 52 90.00 20 WELDING FOR POL SERVICE PIPING
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 81 00 RADIO TOWERS
ATTACHMENT – RADIATION HAZARD WARNING SIGN
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 40 - PROCESS INTERCONNECTIONS
40 05 13 PIPELINES, LIQUID PROCESS PIPING
ATTACHMENT Sup01 PIPE SCHEDULE
ATTACHMENT Sup02 PNEUMATICALLY OPERATED CONTROL VALVE
SCHEDULE
ATTACHMENT Sup03 ELECTRICALLY OPERATED CONTROL VALVES ATTACHMENT Sup04 AIR RELIEF VALVES ATTACHMENT Sup05 SOLENOID VALVES ATTACHMENT Sup06 PRESSURE REGULATING AND RELIEF VALVES
40 05 13.96 WELDING PROCESS PIPING
PROJECT TABLE OF CONTENTS Page 10
40 95 00 PROCESS CONTROL
ATTACHMENT SUP A PREPARATION FOR TESTING AND
FUNCTIONAL TESTING FORMS
ATTACHMENT SUP B PERFORMANCE TEST SHEET
ATTACHMENT SUP C PLC INPUT/OUTPUT LIST
ATTACHMENT SUP D PLC EQUIPMENT LIST
ATTACHMENT SUP E CONTROL PANEL SCHEDULE
ATTACHMENT SUP F ETHERNET DATA EXCHANGE LIST
ATTACHMENT SUP G EXISTING MCB CAMP LEJEUNE PROCESS
CONTROL SOFTWARE AND HARDWARE EQUIPMENT LIST
40 95 50 INSTRUMENTATION AND CONTROL COMPONENTS
ATTACHMENT SUP A INSTRUMENT LIST SUMMARY
ATTACHMENT SUP B INSTRUMENT OPTION SHEETS
ATTACHMENT SUP C WELL TAG LIST
40 95 90 ETHERNET NETWORK COMPONENTS
40 96 00 APPLICATIONS SOFTWARE
ATTACHMENT SUP A EXAMPLE SCREENS
ATTACHMENT SUP B PROCESS CONTROL NARRATIVES
ATTACHMENT SUP C SEQUENCE OF OPERATION
40 99 90 PACKAGE CONTROL SYSTEMS
VOLUME 4
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING
41 22 23.19 MONORAIL HOISTS
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND
STORAGE EQUIPMENT
43 21 13 PUMPS: WATER, CENTRIFUGAL
ATTACHMENT Sup01_40CPR-PMP61000 ATTACHMENT Sup02_40CFI-PMP25001 ATTACHMENT Sup03_40CFI-PMP25002 ATTACHMENT Sup04_40MP-PMP82001 ATTACHMENT Sup05_40MP-PMP82002 ATTACHMENT Sup06_40CI-PMP65000 ATTACHMENT Sup07_40SI-PMP62000 ATTACHMENT Sup08_40MP-PMP34002 ATTACHMENT Sup09_50RW-PMP11001 ATTACHMENT Sup10_50RW-PMP11002 ATTACHMENT Sup11_50RW-PMP11003 ATTACHMENT Sup12_50RW-PMP11004 ATTACHMENT Sup13_50RW-PMP11005
PROJECT TABLE OF CONTENTS Page 11
ATTACHMENT Sup14_50FW-PMP55001 ATTACHMENT Sup15_50FW-PMP55002 ATTACHMENT Sup16_50FW-PMP55003 ATTACHMENT Sup17_50FW-PMP55004 ATTACHMENT Sup18_80CDW-PMP66001 ATTACHMENT Sup19_80CDW-PMP66002 ATTACHMENT Sup20_40FW-PMP44001 ATTACHMENT Sup21_40FW-PMP44002
43 21 39 PUMPS: WATER, VERTICAL TURBINE
ATTACHMENT Sup01_40MF-PMP31001 ATTACHMENT Sup02_40MF-PMP31002 ATTACHMENT Sup03_40MF-PMP31003 ATTACHMENT Sup04_40MF-PMP31004 ATTACHMENT Sup05_20BDP-PMP42001 ATTACHMENT Sup06_20BDP-PMP42002 ATTACHMENT Sup07_20BDP-PMP42003 ATTACHMENT Sup08_20BDP-PMP42004 ATTACHMENT Sup09_20BDP-PMP42005 ATTACHMENT Sup10_20FBS-PMP43001
43 32 56 MEMBRANE SYSTEM
43 32 69 CHEMICAL FEED SYSTEMS
ATTACHMENT Sup01_40SI-PMP62001 ATTACHMENT Sup02_40SI-PMP62002 ATTACHMENT Sup03_40SU-PMP63001 ATTACHMENT Sup04_40SU-PMP63002 ATTACHMENT Sup05_40SHC-PMP64001 ATTACHMENT Sup06_40SHC-PMP64002 ATTACHMENT Sup07_40SHC-PMP64003 ATTACHMENT Sup08_40SHC-PMP64004 ATTACHMENT Sup09_40SHC-PMP64005 ATTACHMENT Sup10_40SHC-PMP64006 ATTACHMENT Sup11_40CI-PMP65001 ATTACHMENT Sup12_40CI-PMP65002 ATTACHMENT Sup13_40FL-PMP66001 ATTACHMENT Sup14_40FL-PMP66002 ATTACHMENT Sup15_40NA-PMP68001 ATTACHMENT Sup16_40NA-PMP68002 ATTACHMENT Sup17_90SBS-PMP69001 ATTACHMENT Sup18_90SBS-PMP69002
43 41 16.16 40 VERTICAL ATMOSPHERIC TANKS AND VESSELS
ATTACHMENT Sup01_TD_TNK66000_FL
ATTACHMENT Sup02_TD_TNK67000_LL ATTACHMENT Sup03_TD_TNK68000_NA ATTACHMENT Sup04A _TD_TNK64001_SHC ATTACHMENT Sup04B_TD_TNK64002_SHC ATTACHMENT Sup05_TD_TNK61000_CIP ATTACHMENT Sup06_TD_TNK63000_SU ATTACHMENT Sup07_TD_TNK62000_SI ATTACHMENT Sup08_TD_TNK65000_CI
PROJECT TABLE OF CONTENTS Page 12
ATTACHMENT Sup09_TD_TNK69000_SBS ATTACHMENT Sup010_TD_TNK61001 CA
DIVISION 44 - POLLUTION AND WASTE CONTROL EQUIPMENT
44 43 33 STRAINERS
44 44 56.04 OXYGEN AND AIR INJECTION SYSTEM
44 44 57 INCLINED PLATE SETTLER CLARIFIERS AND RESIDUALS
COLLECTION EQUIPMENT
DIVISION 46 - WATER AND WASTEWATER EQUIPMENT
46 61 01 FILTRATION EQUIPMENT (BYPASS FILTERS)
46 61 02 FILTRATION EQUIPMENT (CARTRIDGE FILTERS)
APPENDICES
APPENDIX A FINAL GEOTECHNICAL DATA
APPENDIX B GEOTECHNICAL BASELINE REPORT
APPENDIX C REPORT OF HAZARDOUS MATERIALS (HADNOT POINT WTP)
APPENDIX D PERMITS OBTAINED BY THE GOVERNMENT
-- End of Project Table of Contents --
SECTION 26 00 00.00 20
BASIC ELECTRICAL MATERIALS AND METHODS
07/06
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D709 (2017) Standard Specification for Laminated Thermosetting Materials
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms
IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National Electrical Safety Code
IEEE C57.12.28 (2014) Standard for Pad-Mounted Equipment
- Enclosure Integrity
IEEE C57.12.29 (2014) Standard for Pad-Mounted Equipment
- Enclosure Integrity for Coastal Environments
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA 250 (2018) Enclosures for Electrical Equipment (1000 Volts Maximum)
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2020; ERTA 20-1 2020; ERTA 20-2 2020; TIA
20-1; TIA 20-2; TIA 20-3; TIA 20-4)
National Electrical Code
1.2 RELATED REQUIREMENTS
This section applies to certain sections of Division 02, EXISTING CONDITIONS; Division 11, EQUIPMENT; Division 13, SPECIAL CONSTRUCTION;
Division 22 , PLUMBING; and Division 23, HEATING VENTILATING AND AIR CONDITIONING. This section applies to all sections of Division 26 and 33, ELECTRICAL and UTILITIES, of this project specification unless specified otherwise in the individual sections. This section has been incorporated into, and thus, does not apply to, and is not referenced in the following sections.
Section 26 12 19.10 THREE-PHASE PAD MOUNTED TRANSFORMERS Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM Section 26 23 00 LOW VOLTAGE SWITCHGEAR
SECTION 26 00 00.00 20 Page 1
Section 26 24 13 SWITCHBOARDS Section 26 51 00 INTERIOR LIGHTING Section 26 56 00 EXTERIOR LIGHTING Section 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM Section 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION Section 33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
1.3 DEFINITIONS
a. Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, and on the drawings, shall be as defined in IEEE 100 .
b. The technical sections referred to herein are those specification sections that describe products, installation procedures, and equipment operations and that refer to this section for detailed description of submittal types.
c. The technical paragraphs referred to herein are those paragraphs in PART 2 - PRODUCTS and PART 3 - EXECUTION of the technical sections that describe products, systems, installation procedures, equipment, and test methods.
1.4 ELECTRICAL CHARACTERISTICS
Electrical characteristics for this project shall be 12.47 kV primary, three-phase, three - wire, 60 - Hz, and 480 volts secondary, three - phase, four -wire. Final connections to the power distribution system at the existing substation shall be made by the Contractor as directed by the Contracting Officer.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.
SD-03 Product Data
Utility Pole and Equipment Field Identification Tags/Holders ; G
SD-11 Closeout Submittals
New Facility Data Forms ; G
1.6 ADDITIONAL SUBMITTALS INFORMATION
Submittals required in other sections that refer to this section must conform to the following additional requirements as applicable.
1.6.1 Shop Drawings
Include wiring diagrams and installation details of equipment indicating proposed location, layout and arrangement, control panels, accessories, piping, ductwork, and other items that must be shown to ensure a
SECTION 26 00 00.00 20 Page 2 coordinated installation. Wiring diagrams shall identify circuit terminals and indicate the internal wiring for each item of equipment and the interconnection between each item of equipment. Drawings shall indicate adequate clearance for operation, maintenance, and replacement of operating equipment devices.
1.6.2 Product Data
Submittal shall include performance and characteristic curves.
Utility Pole and Equipment Field Identification Tags/Holders
1.6.3 Forms
New Facility Data Forms
1.7 QUALITY ASSURANCE
1.7.1 Regulatory Requirements
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Equipment, materials, installation, and workmanship shall be in accordance with the mandatory and advisory provisions of NFPA 70 unless more stringent requirements are specified or indicated.
1.7.2 Standard Products
Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year period shall include applications of equipment and materials under similar circumstances and of similar size. The product shall have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. Where two or more items of the same class of equipment are required, these items shall be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in the technical section.
1.7.2.1 Alternative Qualifications
Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.
1.7.2.2 Material and Equipment Manufacturing Date
Products manufactured more than 3 years prior to date of delivery to site shall not be used, unless specified otherwise.
1.8 WARRANTY
The equipment items shall be supported by service organizations which are
SECTION 26 00 00.00 20 Page 3 reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
1.9 POSTED OPERATING INSTRUCTIONS
Provide for each system and principal item of equipment as specified in the technical sections for use by operation and maintenance personnel.
The operating instructions shall include the following:
a. Wiring diagrams, control diagrams, and control sequence for each principal system and item of equipment.
b. Start up, proper adjustment, operating, lubrication, and shutdown procedures.
c. Safety precautions.
d. The procedure in the event of equipment failure.
e. Other items of instruction as recommended by the manufacturer of each system or item of equipment.
Print or engrave operating instructions and frame under glass or in approved laminated plastic. Post instructions where directed. For operating instructions exposed to the weather, provide weather-resistant materials or weatherproof enclosures. Operating instructions shall not fade when exposed to sunlight and shall be secured to prevent easy removal or peeling.
1.10 MANUFACTURER'S NAMEPLATE
Each item of equipment shall have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.
1.11 FIELD FABRICATED NAMEPLATES
ASTM D709. Provide laminated plastic nameplates for each equipment enclosure, relay, switch, and device; as specified in the technical sections or as indicated on the drawings. Each nameplate inscription shall identify the function and, when applicable, the position.
Nameplates shall be melamine plastic, 0.125 inch thick, white with black center core. Surface shall be matte finish. Corners shall be square.
Accurately align lettering and engrave into the core. Minimum size of nameplates shall be one by 2.5 inches . Lettering shall be a minimum of 0.25-inch high normal block style.
1.12 WARNING SIGNS
Provide warning signs for the enclosures of electrical equipment including substations, pad-mounted transformers, pad-mounted switches, generators, and switchgear having a nominal rating exceeding 600 volts.
a. When the enclosure integrity of such equipment is specified to be in accordance with IEEE C57.12.28 or IEEE C57.12.29 , such as for pad-mounted transformers and pad-mounted SF6 switches, provide self-adhesive warning signs on the outside of the high voltage
SECTION 26 00 00.00 20 Page 4 compartment door(s). Sign shall be a decal and shall have nominal dimensions of 7 by 10 inches with the legend "DANGER HIGH VOLTAGE" printed in two lines of nominal 2-inch high letters. The word "DANGER" shall be in white letters on a red background and the words "HIGH VOLTAGE" shall be in black letters on a white background. Decal shall be Panduit No. PPSO710D72 or approved equal.
b. When such equipment is guided by a fence, mount signs on the fence.
Provide metal signs having nominal dimensions of 14 by 10 inches with the legend "DANGER HIGH VOLTAGE KEEP OUT" printed in three lines of nominal 3-inch high white letters on a red and black field.
1.13 ELECTRICAL REQUIREMENTS
Electrical installations shall conform to IEEE C2 , NFPA 70 , and requirements specified herein.
1.14 OPERATIONS AND TREATMENT BUILDING
Overhead utilities and fixtures and associated supports much be designed in accordance with Standard 19 of UFC 4-010-01. Submit Signed and Sealed Shop drawings and calculations.
1.15 INSTRUCTION TO GOVERNMENT PERSONNEL
Where specified in the technical sections, furnish the services of competent instructors to give full instruction to designated Government personnel in the adjustment, operation, and maintenance of the specified systems and equipment, including pertinent safety requirements as required. Instructors shall be thoroughly familiar with all parts of the installation and shall be trained in operating theory as well as practical operation and maintenance work. Instruction shall be given during the first regular work week after the equipment or system has been accepted and turned over to the Government for regular operation. The number of person-days (8 hours per day) of instruction furnished shall be as specified in the individual section. When more than 4 person-days of instruction are specified, use approximately half of the time for classroom instruction. Use other time for instruction with equipment or system. When significant changes or modifications in the equipment or system are made under the terms of the contract, provide additional instructions to acquaint the operating personnel with the changes or modifications.
1.16 UTILITY POLE AND ELECTRICAL EQUIPMENT FIELD IDENTIFICATION
Identify and label power and lighting utility poles, pad-mounted transformers, pad-mounted switch-gear, pad-mounted junction cabinets, and secondary pedestals, to include fuse size tags, in accordance with the Supplements (CLGIS-01, CLGIS-02, GLGIS-03, and CLGIS 04) attached to this specification.
For each new pole, pad-mounted transformer, pad-mounted switch-gear, pad-mounted junction cabinet, and secondary pedestal, complete the "New Facility Data Form" provided as a Supplement (CLGIS-05) to this specification and submit to the Contracting Officer.
Record Drawings: Provide record drawings for new poles, pad-mounted transformers, pad-mounted switch-gear, pad-mounted junction cabinets, and secondary pedestals in accordance with Section 01 78 00 CLOSEOUT
SECTION 26 00 00.00 20 Page 5
SUBMITTALS and as indicated herein. Record Drawings for these new facilities shall reflect tag numbering convention described in the Supplement and shall match the "New Facility Data Form" completed for each facility.
PART 2 PRODUCTS
2.1 FACTORY APPLIED FINISH
Electrical equipment shall have factory-applied painting systems which shall, as a minimum, meet the requirements of NEMA 250 corrosion-resistance test and the additional requirements specified in the technical sections.
PART 3 EXECUTION
3.1 FIELD APPLIED PAINTING
Paint electrical equipment as required to match finish of adjacent surfaces or to meet the indicated or specified safety criteria. Painting shall be as specified in Section 09 90 00 PAINTS AND COATINGS.
3.2 FIELD FABRICATED NAMEPLATE MOUNTING
Provide number, location, and letter designation of nameplates as indicated. Fasten nameplates to the device with a minimum of two sheet-metal screws or two rivets.
3.3 WARNING SIGN MOUNTING
Provide the number of signs required to be readable from each accessible side, but space the signs a maximum of 30 feet apart.
3.4 ENVIRONMENTAL CONDITIONS
Provide materials and installations meeting the following requirements, based on environmental conditions.
The following areas are classified Hazardous Class I, Division 1, Group D, due to the potential for occurrence of hazardous concentrations of combustible gases, and for exposure to corrosive environment. Use materials and methods required for such areas.
a. Inside Waste Decant Pump Station Wetwell.
The following areas are classified nonhazardous, wet, and corrosive. Use materials and methods required for such areas.
a. Chemical Rooms, including those with access to exterior.
The following areas are classified nonhazardous and wet. Use materials and methods required for such areas.
a. Outdoor abovegrade areas not covered above.
b. Belowgrade vaults or structures.
The following areas are classified finished and wet. Use materials and methods required for such areas.
SECTION 26 00 00.00 20 Page 6
a. Labs.
b. Locker Rooms.
The following areas are classified as finished and dry:
a. Non-Process Areas of the Operations and Treatment Building.
The following areas are classified as indoor and dry:
a. Electrical Rooms.
b. Mechanical Rooms
The following areas are classified as indoor and damp:
a. Process Areas of the Operations and Treatment Building.
b. Bypass Filter Building.
c. Process areas of the raw and finished water pump and strainers building.
d. Process areas of the concentrate clarifier building.
The following areas are not classified. Use dust-tight and oil-tight NEMA 12 materials and methods.
a. Areas not covered above.
For areas designated Hazardous Class1, Division 1, Group D, provide the following materials:
a. Enclosures: NEMA 250, TYPE 7.
b. Conduit: PVC- Coated RGS.
c. Device Boxes: PVC Coated Malleable Iron.
d. Conduit/Cable Tray Supports: 316 SST.
e. Electrical Framing Channel Material: PVC-Coated carbon steel.
For areas designated non-hazardous, wet, and corrosive, provide the following materials:
a. Enclosures: NEMA 250, TYPE 4X.
b. Conduit: PVC- Coated RGS.
c. Device Boxes: PVC Coated Malleable Iron.
d. Conduit/Cable Tray Supports: 316 SST.
e. Electrical Framing Channel Material: PVC-Coated carbon steel or non-metallic.
For areas designated non-hazardous, and wet, provide the following
SECTION 26 00 00.00 20 Page 7 materials:
a. Enclosures: NEMA 250, TYPE 4X.
b. Conduit: Aluminum.
c. Device Boxes: Aluminum.
d. Conduit/Cable Tray Supports: 316 SST.
e. Electrical Framing Channel Material: Aluminum.
For areas designated finished and wet, provide the following materials:
a. Enclosures: NEMA 250, TYPE 4.
b. Conduit: RG5.
c. Device Boxes: Malleable Iron.
d. Conduit/Cable Tray Supports: Hot-Dipped Galvanized.
e. Electrical Framing Channel Material: Hot-Dipped Galvanized.
For areas designated indoor and dry, provide the following materials:
a. Enclosures: NEMA 250, TYPE 1.
b. Conduit: RGS.
c. Device Boxes: Malleable Iron.
d. Conduit/Cable Tray Supports: Hot-Dipped Galvanized.
e. Electrical Framing Channel Material: Hot-Dipped Galvanized.
For areas designated finished and dry, provide the following materials:
a. Enclosures: NEMA 250, TYPE 1.
b. Conduit: EMT.
c. Device Boxes: Malleable Iron.
d. Conduit/Cable Tray Supports: Hot-Dipped Galvanized.
e. Electrical Framing Channel Material: Hot-Dipped Galvanized.
3.5 SUPPLEMENTS
The supplements listed below, following "End of Section", are part of this Specification.
a. GIS Numbering Convention (CLGIS-01).
b. Pole Numbers and Fuse Size Tags - Wood Poles (CLGIS-02).
c. Pole Numbers and Fuse Size Tags - Non-Wood Poles (CLGIS-03).
SECTION 26 00 00.00 20 Page 8
d. Numbers and Fuse Size Tags - Underground Equipment/Facility (CLGIS-04).
e. New Facility Data Form (CLGIS-05).
-- End of Section --
SECTION 26 00 00.00 20 Page 9
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 26 00 00.00 20 Page 10
CAMP LEJEUNE
GIS NUMBERING CONVENTION
APPR.REVISED BY CHK'D
CLGIS-01
3/6/19
JANNING
67526-36864
POLE LOCATION EXAMPLE: 34.39786 - ONLY 39786 IS UTILIZED FOR THE POLE NUMBER.
THE NUMBERING SYSTEM USES THE FACILITY (POLE, TRANSFORMER, ETC.) ACTUAL GPS COORDINATE. THE LATITUDE AND LONGITUDE IS USED TO ESTABLISH THE FACILITY NUMBER. THE USE OF GPS COORDINATE SYSTEM ENSURES THAT CIRCUIT AND OTHER CHANGES WILL NOT RESULT IN FUTURE RENUMBERING EFFORTS.
THE NUMBERING CONVENTION TRUNCATES DECIMAL DEGREES SO THAT ONLY THE DEGREES ARE REMAINING.
-77.46264 - ONLY 46264 IS UTILIZED FOR THE POLE NUMBER.
THEN WHEN AMENDED TOGETHER (WITH A DASH BETWEEN) THE NUMBER FOR THAT FACILITY WOULD BE AS
FOLLOWS.
FACILITY (POLE, TRANSFORMER, ETC.) NUMBER: 39786-46264
LIST OF FACILITIES FOR NUMBERING
1. POLES (WOOD, CONCRETE, COMPOSITE/FIBERGLASS)
A. DISTRIBUTION - PRIMARY VOLTAGE
B. DISTRIBUTION - SECONDARY
C. DISTRIBUTION - SPAN GUY
D. LIGHTING - ROADWAY
E. LIGHTING - PARKING
F. LIGHTING - AREA
2. PAD-MOUNTED TRANSFORMER
3. PAD-MOUNTED SWITCH GEAR
4. PAD-MOUNTED JUNCTION CABINETS
NUMBERING CONVENTION
5. PEDESTALS - SECONDARY
G. LIGHTING - SPORTS FIELD
48" MIN.
NOTES:
1. THE HORIZONTAL TAG HOLDER WILL ACCOMMODATE UP TO 12 ALUMINUM
2. CRIMP THE EDGES OF TAG HOLDER TO SECURE THE TAGS IN THE HOLDER.
3. ATTACH GIS TAG HOLDER ON THE POLE A MINIMUM OF 48" ABOVE
GROUND USE TWO ALUMINUM NAILS, ONE ON EACH SIDE IN CENTER
HOLE, ALMETEK P/N AN.1.
4. INSTALL TAG HOLDER TO FACE THE ROADWAY OR VISIBLE APPROACH. DO
NOT COVER POLE BRAND.
5. A COMPARTMENTALIZED METAL BOX FOR SORTING AND CARRYING POLE
7. INSTALL FUSE SIZE AND TYPE USING A SEPARATE TAG HOLDER
GIS NUMBER LOCATION.
6" MIN.
"FUSE SIZE"
TAG HOLDER
SEE NOTE 7
NUMBERING ITEMS IS AVAILABLE (TK-1S).
6. VERTICAL ALUMINUM TAG HOLDER (TA-12).
WITH "FUSE SIZE" TAG AND FUSE TAG HOLDER 6" ABOVE THE
CAMP LEJEUNE
POLE NUMBERS AND FUSE SIZE TAGS -
WOODEN POLES
TAGS. THE VERTICAL TAG HOLDER WILL ACCOMMODATE UP TO 12 TAGS.
APPR.REVISED BY CHK'D
CLGIS-02
SIZE
FUSE
SEE NOTE 7
FUSE SIZE TAG
CRIMP
1-5/8"
7-3/4"
CRIMPCRIMP
CRIMP
TAG HOLDER
P/N: TH-6A
FUSE
SIZE
MFG: ALMETEK
5 K0
8. REFER TO DWG. CLGIS-03 FOR APPROPRIATE POLE NUMBERING
GUIDELINES FOR ALL LIGHTING POLES, INCLUDING DECORATIVE,
STEEL AND COMPOSITE STRUCTURES.
2/6/19
JANNING
TA-12
TAG HOLDER
CRIMP
CRIMP
VERTICAL TAG
1.67"
11.75"
MFG: ALMETEK
P/N: V500
1.594"
0.875"0.75"
R 0.62" TYP.
DUKE ENERGY STANDARD
WOOD POLE VERTICAL TAG
NUMBER
TAG
POLE
DUKE ENERGY STANDARD
FUSE TAG
MFG: ALMETEK
P/N: H500
DUKE ENERGY STANDARD
1.594"
0.875"
R 0.62" TYP.
1"
MFG: ALMETEK
DUKE ENERGY STANDARD
P/N: CH3-148
POLE NUMBERS AND FUSE SIZE TAGS -
NON-WOOD POLES (CONCRETE, METAL, COMPOSITE)
APPR.REVISED BY CHK'D
CLGIS-03
3/6/19
JANNING
NON-WOOD POLE TAG
MFG: ALMETEK
P/N: TH-12A-SL
SS BANDING
DUKE ENERGY STANDARD
(CONCRETE, METAL, COMPOSITE)
MFG: ALMETEK
P/N: BB-4
MFG: ALMETEK
P/N: BT-02
STAINLESS STEEL BUCKLES
BANDING TOOL (1/2")
DUKE ENERGY STANDARD
DUKE ENERGY STANDARD
48" MIN.
6" MIN.
"FUSE SIZE"
TAG HOLDER
SEE NOTE 7
NUMBER
TAG
POLE
MFG: ALMETEK
P/N: V500
1.594"
0.875"0.75"
R 0.62" TYP.
DUKE ENGERGY STANDARD
VERTICAL TAG
NOTES:
1. THE HORIZONTAL TAG HOLDER WILL ACCOMMODATE UP TO 12 ALUMINUM
2. CRIMP THE EDGES OF TAG HOLDER TO SECURE THE TAGS IN THE HOLDER.
3. ATTACH GIS TAG HOLDER ON THE POLE A MINIMUM OF 48" ABOVE
GROUND USE TWO ALUMINUM NAILS, ONE ON EACH SIDE IN CENTER
HOLE, ALMETEK P/N AN.1.
4. INSTALL TAG HOLDER TO FACE THE ROADWAY OR VISIBLE APPROACH. DO
NOT COVER POLE BRAND.
5. A COMPARTMENTALIZED METAL BOX FOR SORTING AND CARRYING POLE
7. INSTALL FUSE SIZE AND TYPE USING A SEPARATE TAG HOLDER
GIS NUMBER LOCATION.
NUMBERING ITEMS IS AVAILABLE (TK-1S).
6. VERTICAL ALUMINUM TAG HOLDER (TH-12A).
WITH "FUSE SIZE" TAG AND FUSE TAG HOLDER 6" ABOVE THE
TAGS. THE VERTICAL TAG HOLDER WILL ACCOMMODATE UP TO 12 TAGS.
8. REFER TO DWG. CLGIS-02 FOR APPROPRIATE POLE NUMBERING
GUIDELINES FOR ALL WOOD POLES.
13.745"
1.62"
NUMBERS AND FUSE SIZE TAGS -
UNDERGROUND EQUIPMENT/FACILITY
APPR.REVISED BY CHK'D
CLGIS-04
3/6/19
JANNING
PAD-MOUNTED TRANSFORMER
SECONDARY PEDESTAL
P/N: HIPS1.2RY-CUT
MFG: ALMETEK
HIGH INTENSITY REFLECTIVE LABELS
DUKE ENERGY STANDARD
P/N: HIPS2.5RY-CUT
MFG: ALMETEK
HIGH INTENSITY REFLECTIVE LABELS
DUKE ENERGY STANDARD
P/N: HIPS2.5RY-CUT
MFG: ALMETEK
HIGH INTENSITY REFLECTIVE LABELS
DUKE ENERGY STANDARD
PAD-MOUNTED EQUIPMENT, PEDESTALS, AND JUNCTION BOXES TAG
P/N: HIPS2.5RY-CUT
MFG: ALMETEK
HIGH INTENSITY REFLECTIVE LABELS
DUKE ENERGY STANDARD
P/N: HIPS1.2RY-CUT (PEDESTALS)
NOTES:
1.5"
1.0"
1.0"
1. GIS NUMBERS SHALL BE INSTALLED AS SHOWN UNLESS
THERE IS A PHYSICAL BARRIER OBSTRUCTING VIEW.
2. THIS STANDARD APPLIES TO ALL OTHER CATEGORIES OF
UNDERGROUND EQUIPMENT (I.E. SWITCHGEAR,
JUNCTIONS).
3. NUMBER MOUNTING SURFACE SHALL BE WIPED CLEAN
BEFORE INSTALLATION.
4. USE NUMBERS FROM CLGIS-03 EXCEPT REPLACE "POLE"
WITH "EQUIPMENT".
5. PAD-MOUNTED SWITCHGEAR AND OTHER PAD-MOUNTED
EQUIPMENT SHALL BE LABELED CONSISTENTLY WITH
THE PAD-MOUNTED TRANSFORMER STANDARD AS
SHOWN.
1-3/4"
2-7/8" 2-7/8"
NEW FACILITY DATA FORM
APPR.REVISED BY CHK'D
CLGIS-05
7/15/19
JANNING
INSTRUCTIONS:
1. CONTRACTOR SHALL COMPLETE THIS FORM FOR EACH NEW POLE, PADMOUNT TRANSFORMER, SECONDARY
PEDESTAL, AND SWITCHGEAR.
2. COMPLETED FORM SHALL BE SUBMITTED TO THE BASE CONTRACT REPRESENTATIVE.
COMMENTS
NEW FACILITY DATA FORM
ASSET NUMBER LAT # (DECIMAL VALUE)
ASSET NUMBER LONG# (DECIMAL VALUE)
FEEDER NAME
PRIMARY VOLTAGE
POLE TYPE (W,M,C,O)
POLE CATEGORY
PRIMARY FRAME (DELTA, XARM, VERT, N/A)
POLE JOINT USE (Y/N)
PRIMARY CONDUCTOR PHASES (1,2,3)
PRIMARY CONDUCTOR SIZE AND TYPE
PRIMARY SWITCH/RECLOSER (Y/N)
PRIMARY TAP FUSE CUTOUT (Y/N)
POLE MOUNT TRANS (Y/N)
POLE MOUNT TRANS QUANTITY (1,2,3)
PAD MOUNT TRANS (Y/N)
SECONDARY VOLTAGE
PRIMARY CONNECTION
SECONDARY CONNECTION
KVA RATING
IMPEDANCE
SECONDARY PEDESTAL (Y/N)
PADMOUNTED SWITCH (Y/N)
LIGHT FIXTURE AND QTY (Y/N,#)
UG PRIMARY RISER (Y/N)
UG SEC RISER (Y/N)
(PRIMARY, SECONDARY, LIGHTING, OTHER, N/A)
SECTION 26 08 00
APPARATUS INSPECTION AND TESTING
08/08
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2017; Errata 2017) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
1.2 RELATED REQUIREMENTS
Section 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS applies to this section with additions and modifications specified herein.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-06 Test Reports
Acceptance tests and inspections ; G
SD-07 Certificates
Qualifications of organization, and lead engineering technician; G
Acceptance test and inspections procedure ; G
1.4 QUALITY ASSURANCE
1.4.1 Qualifications
Contractor shall engage the services of a qualified testing organization to provide inspection, testing, calibration, and adjustment of the electrical distribution system and generation equipment listed in paragraph entitled "Acceptance Tests and Inspections" herein.
Organization shall be independent of the supplier, manufacturer, and installer of the equipment. The organization shall be a first tier subcontractor. No work required by this section of the specification shall be performed by a second-tier subcontractor.
a. Submit name and qualifications of organization. Organization shall have been regularly engaged in the testing of electrical materials, SECTION 26 08 00 Page 1 devices, installations, and systems for a minimum of 5 years. The organization shall have a calibration program, and test instruments used shall be calibrated in accordance with NETA ATS.
b. Submit name and qualifications of the lead engineering technician performing the required testing services. Include a list of three comparable jobs performed by the technician with specific names and telephone numbers for reference. Testing, inspection, calibration, and adjustments shall be performed by an engineering technician, certified by NETA or the National Institute for Certification in Engineering Technologies (NICET) with a minimum of 5 years' experience inspecting, testing, and calibrating electrical distribution and generation equipment, systems, and devices.
1.4.2 Acceptance Tests and Inspections Reports
Submit certified copies of inspection reports and test reports. Reports shall include certification of compliance with specified requirements, identify deficiencies, and recommend corrective action when appropriate.
Type and neatly bind test reports to form a part of the final record.
Submit test reports documenting the results of each test not more than 10 days after test is completed.
1.4.3 Acceptance Test and Inspections Procedure
Submit test procedure reports for each item of equipment to be field tested at least 45 days prior to planned testing date. Do not perform testing until after test procedure has been approved.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 ACCEPTANCE TESTS AND INSPECTIONS
Testing organization shall perform acceptance tests and inspections. Test methods, procedures, and test values shall be performed and evaluated in accordance with NETA ATS, the manufacturer's recommendations, and paragraph entitled "Field Quality Control" of each applicable specification section. Tests identified as optional in NETA ATS are not required unless otherwise specified. Equipment shall be placed in service only after completion of required tests and evaluation of the test results have been completed. Contractor shall supply to the testing organization complete sets of shop drawings, settings of adjustable devices, and other information necessary for an accurate test and inspection of the system prior to the performance of any final testing. Contracting Officer shall be notified at least 14 days in advance of when tests will be conducted by the testing organization. Perform acceptance tests and inspections on applicable equipment and systems specified in the following sections:
a. Section 26 32 13.00 20 SINGLE OPERATION GENERATOR SETS. Functional engine shutdown tests, vibration base-line test, and load bank test shall not be performed by the testing organization. These tests shall be performed by the equipment suppliers start-up engineer.
b. Section 26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
SECTION 26 08 00 Page 2
c. Section 33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
d. Section 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION. Medium voltage cables and grounding systems only.
f . Section 26 23 00 LOW VOLTAGE SWITCHGEAR
g. Section 26 24 13 SWITCHBOARDS
3.2 SYSTEM ACCEPTANCE
Final acceptance of the system is contingent upon satisfactory completion of acceptance tests and inspections.
3.3 PLACING EQUIPMENT IN SERVICE
A representative of the approved testing organization shall be present when equipment tested by the organization is initially energized and placed in service.
SECTION 26 08 00 Page 3
SECTION 26 08 00 Page 4
SECTION 26 08 10.00 22
COMMISSIONING OF ELECTRICAL SYSTEMS
03/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASSOCIATED AIR BALANCE COUNCIL (AABC)
ACG Commissioning Guideline (2005) Commissioning Guideline
NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB)
NEBB Commissioning Standard (2009) Procedural Standards for Whole Building Systems Commissioning of New Construction; 3rd Edition
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2017; Errata 2017) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION (NECA)
NECA/NEIS 90 (2009) Standard for Commissioning Building Electrical Systems
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 111 (2013) Standard on Stored Electrical Energy Emergency and Standby Power Systems
1.2 SUMMARY
1.2.1 General
The requirements of this section apply to all sections of Division 26, Electrical . Refer to Section 01 91 13.00 22 GENERAL COMMISSIONING REQUIREMENTS FOR CONSTRUCTION for general commissioning requirements applicable to the entire project.
The purpose of this Section is to define Contractor responsibilities in the commissioning process, which are being directed by the Government.
Additional electrical system testing is required under some Division 27, and 33 Specification Sections. NECA/NEIS 90 provides additional guidance for the commissioning of electrical systems.
This Section includes Commissioning process requirements for electrical systems, assemblies, components and equipment, and requires the participation of the Contractor, to ensure that the work has been completed as specified and that systems are functioning in the manner
SECTION 26 08 10.00 22 Page 1 consistent with the Contract Documents as described herein, and as specified in the system operating criteria for this project.
a. Commissioning will commence according to the approved construction schedule, after electrical system rough-in, and after the preliminary inspection punchlist items and commissioning deficiencies are completed by the Contractor.
b. Construction phase commissioning process shall include the following:
1. Step One: Installation Verification.
2. Step Two: System Startup.
3. Step Three: Functional Performance Testing.
The electrical commissioning process includes the following tasks:
a. Testing and startup of electrical equipment and systems.
b. Electrical equipment and system verification checks.
c. Assistance in functional performance testing to verify equipment and system performance.
d. Provide qualified personnel to assist in commissioning tests, including seasonal testing.
e. Complete and endorse construction phase checklists provided by Commissioning Authority (CxA) to assure equipment and systems are fully operational and ready for functional performance testing.
f. Provide equipment, materials, and labor necessary to correct deficiencies found during commissioning process and to fulfill contract and warranty requirements.
g. Provide operation and maintenance information and record drawings to Commissioning Authority for review verification and organization, prior to distribution.
h. Provide assistance to CxA to develop, edit, and document system operation descriptions.
i. Provide training for systems specified in this Section, coordinated with the CxA.
The commissioning process will also be used to develop test protocol and record the associated test data in an effort to advance the building electrical systems from a state of substantial completion to a full dynamic operation.
The commissioning process is also intended to assist the Government's operating and maintenance staff in the training and familiarization with new electrical systems and equipment. The Commissioning Plan and final Commissioning Report should also serve as tools to reduce post-occupancy critical systems operational difficulty or failure. Operational staff training is essential to the commissioning process and will run concurrently with Steps One through Three referenced above.
SECTION 26 08 10.00 22 Page 2
The commissioning required by this section is intended to supplement the inspection, testing, and training requirements contained in the technical sections and to consolidate the reports required by those sections.
Duplication of the inspection, testing and training required by the technical sections is not required. This section does include additional commissioning requirements.
1.3 DEFINITIONS
Refer to Section 01 91 13.00 22 GENERAL COMMISSIONING REQUIREMENTS FOR CONSTRUCTION, Article "Definitions" for definitions applicable to this section.
1.4 COMMISSIONING SUBMITTAL REQUIREMENTS
Commissioning Authority (CxA) shall prepare Commissioning Plan, Prefunctional Checklists, Functional Performance Test (FPT) procedures, narrative descriptions of the design intent for each of the systems identified, and the Commissioning Report, and execute and document results.
a. Contractor shall provide CxA with documentation required for Commissioning Work. At minimum, documentation shall include:
detailed start-up procedures, full sequences of operation, Operating and Maintenance data and performance data, control drawings, and details of Government-contracted tests.
b. Contractor shall submit to CxA the manufacturers' installation and checkout materials actually shipped inside equipment and actual field checkout sheet forms used by factory or field technicians.
c. Contractor shall review and approve other relative documentation for impact on FPT's of the systems:
1. Verify manufacturer's installation instructions are followed by completing the prefunctional checklists for all electrical equipment.
2. Factory Performance Test Reports: Review and compile all factory performance data to assure that the data is complete prior to executing the FPT's.
3. Completed equipment Start-up certification forms along with the manufacturer's field or factory performance and Start-up test documentation: Subcontractor performing the test will review the documentation prior to commencing with the scheduled FPT's.
Government may require that system one-line diagrams and applicable Specification Section(s) be attached to the FPT documentation.
4. Operating and Maintenance (O&M) information per requirements of the Technical Specifications and Division 01 requirements: To validate adequacy and completeness of the FPT, the Contractor shall ensure that the O&M manual content, marked-up record Drawings and Specifications, component submittal drawings, and other pertinent documents are available at the…
This is the start of the file's text. The full file is on GovTribe.