CampLejeuneVolume3_FinalSpecs_S and S.pdf

PDF 10 MB Posted

Attached to
P1043 Water Treatment Plant Replacement, MCB, Camp Lejeune, NC
Solicitation number
N4008521R0052
Issued by

About this file

This solicitation requests proposals for a water treatment plant replacement project at Marine Corps Base Camp Lejeune in North Carolina. The project scope includes constructing an 8 million gallon per day membrane filtration water treatment facility to comply with current and future drinking water regulations and address potential saltwater intrusion issues. Interested offerors should respond with proposals by the specified deadline. The selected contractor will be responsible for providing adequate and environmentally compliant potable water supplies to meet domestic, industrial, and fire protection needs at Camp Lejeune. The soliciting agency is the Naval Facilities Engineering Command within the Department of the Navy.

View the file

Other files

File Type Posted
AMENDMENT 0008.pdf PDF
AMENDMENT 0007.pdf PDF
AMENDMENT 0006.pdf PDF
REPOST AMENDMENT 0004 - P1F198_1.PDF PDF
AMENDMENT 0005.pdf PDF
REPOST AMENDMENT 0004 - P165D9_1.PDF PDF
REPOST AMENDMENT 0004 - P1043__1.PDF PDF
P1043 Amend 0005_Narrative.pdf PDF
REPOST AMENDMENT 0004 - P1043__4.PDF PDF
REPOST AMENDMENT 0004 - P1043__3.PDF PDF
REPOST AMENDMENT 0004 - P1043__2.PDF PDF
AMENDMENT 0004.pdf PDF
Amendment 0004 - P1043-1.pdf PDF
Amendment 0004 - P1043 -3.pdf PDF
Amendment 0004 - P1F198-1.pdf PDF
Amendment 0004 - P1043-4.pdf PDF
Amendment 0004 - P11F25-1.pdf PDF
P1043 Amend 0004_Narrative.pdf PDF
Amendment 0004 - P165D9-1.pdf PDF
Amendment 0004 - P1043 Amend 0003_Drawings_DP111.pdf PDF
Amendment 0004 - P11A90-1.pdf PDF
Amendment 0004 - P1043-2.pdf PDF
Amendment 0004 - P10384-1.pdf PDF
Amendment 0004 - P1043_FinalDrawings_Vol_36_6_BLDG209_HYPO_1999_22x34.pdf PDF
P1043 Amend 0003_Narrative.pdf PDF
P1043 Amend 0003_Drawings_Civil.pdf PDF
AMENDMENT 0003.pdf PDF
P1043 Amend 0003_Drawings_Plumbing.pdf PDF
P1043 Amend 0002_Narrative.pdf PDF
P1043 Amend 0002_Drawings_Arch.pdf PDF
P1043 Amend 0002_Drawings_Civil.pdf PDF
Amendment 0002 Site Visit Sign-in Sheet.pdf PDF
AMENDMENT 0002.pdf PDF
AMENDMENT 0001.pdf PDF
AMEND 0001 Attachment H - 00 22 13 00 20.pdf PDF
Attachment H - 00 22 13.00 20.pdf PDF
CampLejeuneVolume1_FinalSpecs_S and S.pdf PDF
796455_P1043_FinalDrawings_Vol_22.pdf PDF
796455_P1043_FinalDrawings_Vol_12.pdf PDF
796455_P1043_FinalDrawings_Vol_13b.pdf PDF
796455_P1043_FinalDrawings_Vol_8.pdf PDF
Attachment C - Construction Experience Data Sheet.docx DOCX document
796455_P1043_FinalDrawings_Vol_21.pdf PDF
796455_P1043_FinalDrawings_Vol_6.pdf PDF
796455_P1043_FinalDrawings_Vol_5.pdf PDF
796455_P1043_FinalDrawings_Vol_16.pdf PDF
N4008521R0052.pdf PDF
Attachment A - PPII log.doc DOC document
796455_P1043_FinalDrawings_Vol_23.pdf PDF
796455_P1043_FinalDrawings_Vol_4.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(Final Design) eProjects Work Order Number(s):

796455

Appropriation: MCON

VOLUME 3

WATER TREATMENT PLANT REPLACEMENT HADNOT POINT

At the

MCB Camp Lejeune, NC

(P-1043)

DESIGNED BY:

CH2M HILL/CLARK NEXSEN ENERGY PARTNERS

9191 S JAMAICA ST

ENGLEWOOD, CO 80112-5946

SPECIFICATION PREPARED BY:

Water Treatment: Jarrett Selig, PE (CH2M HILL) Architectural: Timothy Dodge, RA (CH2M HILL) Civil: Anna Lee Bamforth, PE, LS (C. Allan Bamforth Engineer-Surveyor) Structural: Rocco Koekemoer, PE (CH2M HILL) Mechanical: Angel Valiente, PE (CH2M HILL) Electrical: David Nicholson, PE (CH2M HILL) Instrumentation and Control: Yvette Ratzlaff, PE (CH2M HILL) Fire Protection: Bruce Peabody, FPE (CH2M HILL) Geotechnical: Curt Basnett, PE, GE (CH2M HILL) Interior Design: Briana Ernsting, NCIDQ/CID (CH2M HILL) Telecommunications: Marc Adkison, RCDD (CH2M HILL) Landscape: Sarah Marrs, LA (CH2M HILL) Specification: Jill Kaylor/CH2M HILL

SPECIFICATION APPROVED BY:

For Commander, NAVFAC MID-ATLANTIC:

Date: April 2021

Abel Valiente 2021-04-26T11:40:22-04:00

Bruce Peabody 2021-04-26T17:57:15-04:00

David Nicholson 2021-04-26T11:41:30-04:00

Sarah Marrs 2021-04-26T17:18:38-04:00

Rocco Koekemoer 2021-04-23T16:36:44-04:00

Briana Ernsting 2021-04-26T08:37:08-04:00

Timothy Dodge 2021-04-28T11:16:24-04:00

Curtis Basnett 2021-04-26T15:42:51-04:00

Marc Adkison 2021-04-26T10:33:56-04:00

Jarrett Selig 2021-04-27T16:20:28-04:00

Yvette Ratzlaff 2021-04-23T17:03:24-04:00

P1043 HADNOT POINT WTP REPLACEMENT EPROJECTS W.O. NO: 796455

MARINE CORPS BASE CAMP LEJEUNE, NC

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

VOLUME 1

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 20 00.00 20 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

ATTACHMENT NRZ FACILITY-TURNOVER-PLANNING-MEETING-

AGENDA 12-1003

ATTACHMENT NRZ-CHECKLIST-POAM-ITEMS 15-1216

ATTACHMENT PERFORMANCE ASSESSMENT PLAN

01 30 01.00 22 DESIGN, PROCUREMENT, AND INSTALLATION OF FURNITURE,

FIXTURES, AND EQUIPMENT

01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT

MANAGEMENT SYSTEM

01 32 17.00 20 NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 SUBMITTAL PROCEDURES

ATTACHMENT SUBMITTAL REGISTER

01 33 29 SUSTAINABILITY REPORTING

ATTACHMENT NAVFAC SUSTAINABLE ENERGY DATA RECORD CARD

- HPSB

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

ATTACHMENT CONTRACTOR ELECTRICAL ENERGIZED WORK PERMIT

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 20 QUALITY CONTROL

ATTACHMENT ACCEPTANCE TESTING OF CRITICAL SYSTEMS

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 13.00 22 EROSION AND SEDIMENT CONTROL

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

ATTACHMENT PROJECT SIGN DETAILS 2009 09 16

PROJECT TABLE OF CONTENTS Page 2

01 60 00.00 22 REQUIREMENTS FOR PESTICIDE AND HERBICIDE COORDINATION

ATTACHMENT NAVFAC PESTICIDE & HERBICIDE RECORD FORM

REVISED 24 OCT 12

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 75 00 STARTING AND ADJUSTING

01 78 00 CLOSEOUT SUBMITTALS

ATTACHMENT A DD FORM 1354 REVISED 2011 04 20

ATTACHMENT B DD 1354 ADDENDUM

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT

INFORMATION (eOMSI)

01 78 30.00 22 GIS DATA DELIVERABLES

01 91 13.00 22 GENERAL COMMISSIONING REQUIREMENTS FOR CONSTRUCTION

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 82 16 REMOVAL AND DISPOSAL OF ASBESTOS MATERIALS

ATTACHMENT ASBESTOS INSPECTION REPORTING FORM

02 83 13.00 20 LEAD IN CONSTRUCTION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING

PCBs AND MERCURY

DIVISION 03 - CONCRETE

03 01 30.71 CONCRETE REHABILITATION

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 37 13 SHOTCRETE

03 39 00.00 10 CONCRETE CURING

03 41 33 PRECAST STRUCTURAL PRETENSIONED CONCRETE

PROJECT TABLE OF CONTENTS Page 3

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

04 23 00 GLASS UNIT MASONRY

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 14 00.13 WELDING STRUCTURAL ALUMINUM FRAMING

05 21 19 OPEN WEB STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CASEWORK

06 61 16 SOLID SURFACING FABRICATIONS

06 71 33 FIBERGLASS REINFORCED PLASTIC (FRP) LADDERS

06 73 01 FIBERGLASS REINFORCED PLASTIC (FRP) GRATING

06 82 14 FIBERGLASS REINFORCED PLASTIC (FRP) PIPE AND TUBE

RAILINGS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 15 00.00 22 AIR AND VAPOR BARRIERS

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

PROJECT TABLE OF CONTENTS Page 4

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 41 13 METAL ROOF PANELS

07 60 00 FLASHING AND SHEET METAL

07 72 01 ROOFING ACCESSORIES

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

VOLUME 2

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 22 20 FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FRAMES

08 33 23 OVERHEAD COILING DOORS

08 34 17 VERTICAL BI-FOLD DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 45 23.00 22 INSULATED TRANSLUCENT FIBERGLASS SANDWICH PANEL SYSTEM

08 51 13 ALUMINUM WINDOWS

08 62 50 TUBULAR DAYLIGHTING DEVICES

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 67 23.13 STANDARD RESINOUS FLOORING

09 68 00 CARPETING

PROJECT TABLE OF CONTENTS Page 5

09 90 00 PAINTS AND COATINGS

ATTACHMENT PAINT SYSTEM DATA SHEET

ATTACHMENT PAINT PRODUCT DATA SHEET

09 96 00 HIGH-PERFORMANCE COATINGS

DIVISION 10 - SPECIALTIES

10 11 00 VISUAL DISPLAY UNITS

10 14 00.10 EXTERIOR SIGNAGE

ATTACHMENT – EXTERIOR SIGN SCHEDULE

10 14 00.20 INTERIOR SIGNAGE

ATTACHMENT – EXTERIOR SIGN SCHEDULE

10 21 13 TOILET COMPARTMENTS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHER CABINETS

10 51 13 HDPE LOCKERS AND BENCHES

DIVISION 11 - EQUIPMENT

11 24 27 AIR STRIPPER (DECARBONATOR)

11 31 13 ELECTRIC KITCHEN EQUIPMENT

11 53 00 LABORATORY EQUIPMENT AND FUME HOODS

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 32 00 6MANUFACTURED WOOD CASEWORK

12 36 00 COUNTERTOPS

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

12 93 00 SITE FURNISHINGS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 23 00.00 20 WET CHEMICAL FIRE EXTINGUISHING FOR KITCHEN CABINET

21 30 00 FIRE PUMPS

PROJECT TABLE OF CONTENTS Page 6

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL

22 08 00.00 22 COMMISSIONING OF PLUMBING SYSTEMS

22 11 23.00 10 SUBMERSIBLE PUMP

ATTACHMENT Sup01_10BWW-PMP72001 ATTACHMENT Sup02_10BWW-PMP72002 ATTACHMENT Sup03_10BWW-PMP72003 ATTACHMENT Sup04_80CW-PMP74001 ATTACHMENT Sup05_80CW-PMP74002 ATTACHMENT Sup06_40SPD-PMP71001 ATTACHMENT Sup07_40SPD-PMP71002 ATTACHMENT Sup08_40SPD-PMP63010 ATTACHMENT Sup09_40SPD-PMP64010 ATTACHMENT Sup10_40SPD-PMP66010 ATTACHMENT Sup11_40SPD-PMP67010 ATTACHMENT Sup12_50SPD-PMP71001 ATTACHMENT Sup13_50SPD-PMP71002

22 15 14.00 40 COMPRESSED-AIR SYSTEMS AND OXYGEN GENERATORS

22 66 53.00 40 LABORATORY CHEMICAL-WASTE AND VENT PIPING

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 000 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST

SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 COMMON PIPING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 22 COMMISSIONING OF HVAC SYSTEMS

23 09 23.13 22 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC

ATTACHMENT EMCS EQUIPMENT AND POINTS NOMENCLATURE FOR

CAMP LEJEUNE

23 11 25 FACILITY GAS PIPING

23 23 00 REFRIGERANT PIPING

23 35 19.00 20 INDUSTRIAL VENTILATION AND EXHAUST

23 52 00 HEATING BOILERS

PROJECT TABLE OF CONTENTS Page 7

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT

23 82 00.00 20 TERMINAL HEATING UNITS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

25 50 00.00 20 CYBERSECURITY OF FACILITY-RELATED CONTROL SYSTEMS

APPENDIX A – UFC 4-010-6 TABLE H-4

ATTACHMENT 1 – TABLE 1 - CCI AND CLASSIFICATION TABLE

FOR P1043

ATTACHMENT 2 – FIGURE 1 - UFC 4‐010‐6 FIGURE E‐1

CONTROL SYSTEM REFERENCE ARCHITECTURE – LEVEL 3 FPOC

AND ABOVE RESPONSIBILITY OF SYSTEM OWNER

VOLUME 3

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

ATTACHMENT ELECTRICAL NUMBERING CONVENTION

26 08 00 APPARATUS INSPECTION AND TESTING

26 08 10.00 22 COMMISSIONING OF ELECTRICAL SYSTEMS

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 13 010 AD-MOUNTED MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCH

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 23 00 LOW-VOLTAGE SWITCHGEAR

26 24 13 SWITCHBOARDS

26 27 14.00 20 ELECTRICITY METERING

ATTACHMENT MCLB REVENUE METERING SPEC 10 2019

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 32 13.00 20 SINGLE OPERATION GENERATOR SETS

26 33 53.00 20 UNINTERRUPTIBLE POWER SUPPLY (UPS)

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

PROJECT TABLE OF CONTENTS Page 8

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

ATTACHMENT ENCL A RACK ELEVATION EXAMPLE

ATTACHMENT ENCL B BACKBOARD EXAMPLE

ATTACHMENT ENCL C TELECOMM ROOM TYPICAL LAYOUT

27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76.00 22 INTERIOR COMBINATION EMERGENCY COMMUNICATIONS SYSTEMS

DIVISION 31 - EARTHWORK

31 05 21 GEOGRID SOIL REINFORCEMENT

31 11 00 CLEARING AND GRUBBING

31 23 00.00 20 EXCAVATION AND FILL

31 31 16.00 22 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL

31 62 19.13 TIMBER MARINE PILES

31 63 35 AGGREGATE PIER AND RIGID INCLUSION GROUND IMPROVEMENTS

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 16.17 COLD MILLING OF BITUMINOUS PAVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 10 00 BITUMINOUS CONCRETE PAVEMENT

32 13 13.06 PORTLAND CEMENT CONCRETE FOR PAVEMENT AND SITE

FACILITIES

32 14 20 BRICK PAVERS

32 17 23.00 20 PAVEMENT MARKINGS & SIGNAGE

32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES

PROJECT TABLE OF CONTENTS Page 9

32 92 19 SEEDING

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

ATTACHMENT – BED EDGING DETAIL

DIVISION 33 - UTILITIES

33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING

33 08 55 COMMISSIONING OF FUEL FACILITY SYSTEMS

33 11 00 SITE WATER DISTRIBUTION PIPING

33 16 13.16 WIRE-WOUND CIRCULAR PRESTRESSED-CONCRETE WATER TANK

33 30 00 SANITARY SEWERS

33 40 00 STORM DRAINAGE UTILITIES

ATTACHMENT – NAVY LID VERIFICATION REPORT

33 52 10 SERVICE PIPING, FUEL SYSTEMS

33 52 90.00 20 WELDING FOR POL SERVICE PIPING

33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS

33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 81 00 RADIO TOWERS

ATTACHMENT – RADIATION HAZARD WARNING SIGN

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 40 - PROCESS INTERCONNECTIONS

40 05 13 PIPELINES, LIQUID PROCESS PIPING

ATTACHMENT Sup01 PIPE SCHEDULE

ATTACHMENT Sup02 PNEUMATICALLY OPERATED CONTROL VALVE

SCHEDULE

ATTACHMENT Sup03 ELECTRICALLY OPERATED CONTROL VALVES ATTACHMENT Sup04 AIR RELIEF VALVES ATTACHMENT Sup05 SOLENOID VALVES ATTACHMENT Sup06 PRESSURE REGULATING AND RELIEF VALVES

40 05 13.96 WELDING PROCESS PIPING

PROJECT TABLE OF CONTENTS Page 10

40 95 00 PROCESS CONTROL

ATTACHMENT SUP A PREPARATION FOR TESTING AND

FUNCTIONAL TESTING FORMS

ATTACHMENT SUP B PERFORMANCE TEST SHEET

ATTACHMENT SUP C PLC INPUT/OUTPUT LIST

ATTACHMENT SUP D PLC EQUIPMENT LIST

ATTACHMENT SUP E CONTROL PANEL SCHEDULE

ATTACHMENT SUP F ETHERNET DATA EXCHANGE LIST

ATTACHMENT SUP G EXISTING MCB CAMP LEJEUNE PROCESS

CONTROL SOFTWARE AND HARDWARE EQUIPMENT LIST

40 95 50 INSTRUMENTATION AND CONTROL COMPONENTS

ATTACHMENT SUP A INSTRUMENT LIST SUMMARY

ATTACHMENT SUP B INSTRUMENT OPTION SHEETS

ATTACHMENT SUP C WELL TAG LIST

40 95 90 ETHERNET NETWORK COMPONENTS

40 96 00 APPLICATIONS SOFTWARE

ATTACHMENT SUP A EXAMPLE SCREENS

ATTACHMENT SUP B PROCESS CONTROL NARRATIVES

ATTACHMENT SUP C SEQUENCE OF OPERATION

40 99 90 PACKAGE CONTROL SYSTEMS

VOLUME 4

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING

41 22 23.19 MONORAIL HOISTS

DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND

STORAGE EQUIPMENT

43 21 13 PUMPS: WATER, CENTRIFUGAL

ATTACHMENT Sup01_40CPR-PMP61000 ATTACHMENT Sup02_40CFI-PMP25001 ATTACHMENT Sup03_40CFI-PMP25002 ATTACHMENT Sup04_40MP-PMP82001 ATTACHMENT Sup05_40MP-PMP82002 ATTACHMENT Sup06_40CI-PMP65000 ATTACHMENT Sup07_40SI-PMP62000 ATTACHMENT Sup08_40MP-PMP34002 ATTACHMENT Sup09_50RW-PMP11001 ATTACHMENT Sup10_50RW-PMP11002 ATTACHMENT Sup11_50RW-PMP11003 ATTACHMENT Sup12_50RW-PMP11004 ATTACHMENT Sup13_50RW-PMP11005

PROJECT TABLE OF CONTENTS Page 11

ATTACHMENT Sup14_50FW-PMP55001 ATTACHMENT Sup15_50FW-PMP55002 ATTACHMENT Sup16_50FW-PMP55003 ATTACHMENT Sup17_50FW-PMP55004 ATTACHMENT Sup18_80CDW-PMP66001 ATTACHMENT Sup19_80CDW-PMP66002 ATTACHMENT Sup20_40FW-PMP44001 ATTACHMENT Sup21_40FW-PMP44002

43 21 39 PUMPS: WATER, VERTICAL TURBINE

ATTACHMENT Sup01_40MF-PMP31001 ATTACHMENT Sup02_40MF-PMP31002 ATTACHMENT Sup03_40MF-PMP31003 ATTACHMENT Sup04_40MF-PMP31004 ATTACHMENT Sup05_20BDP-PMP42001 ATTACHMENT Sup06_20BDP-PMP42002 ATTACHMENT Sup07_20BDP-PMP42003 ATTACHMENT Sup08_20BDP-PMP42004 ATTACHMENT Sup09_20BDP-PMP42005 ATTACHMENT Sup10_20FBS-PMP43001

43 32 56 MEMBRANE SYSTEM

43 32 69 CHEMICAL FEED SYSTEMS

ATTACHMENT Sup01_40SI-PMP62001 ATTACHMENT Sup02_40SI-PMP62002 ATTACHMENT Sup03_40SU-PMP63001 ATTACHMENT Sup04_40SU-PMP63002 ATTACHMENT Sup05_40SHC-PMP64001 ATTACHMENT Sup06_40SHC-PMP64002 ATTACHMENT Sup07_40SHC-PMP64003 ATTACHMENT Sup08_40SHC-PMP64004 ATTACHMENT Sup09_40SHC-PMP64005 ATTACHMENT Sup10_40SHC-PMP64006 ATTACHMENT Sup11_40CI-PMP65001 ATTACHMENT Sup12_40CI-PMP65002 ATTACHMENT Sup13_40FL-PMP66001 ATTACHMENT Sup14_40FL-PMP66002 ATTACHMENT Sup15_40NA-PMP68001 ATTACHMENT Sup16_40NA-PMP68002 ATTACHMENT Sup17_90SBS-PMP69001 ATTACHMENT Sup18_90SBS-PMP69002

43 41 16.16 40 VERTICAL ATMOSPHERIC TANKS AND VESSELS

ATTACHMENT Sup01_TD_TNK66000_FL

ATTACHMENT Sup02_TD_TNK67000_LL ATTACHMENT Sup03_TD_TNK68000_NA ATTACHMENT Sup04A _TD_TNK64001_SHC ATTACHMENT Sup04B_TD_TNK64002_SHC ATTACHMENT Sup05_TD_TNK61000_CIP ATTACHMENT Sup06_TD_TNK63000_SU ATTACHMENT Sup07_TD_TNK62000_SI ATTACHMENT Sup08_TD_TNK65000_CI

PROJECT TABLE OF CONTENTS Page 12

ATTACHMENT Sup09_TD_TNK69000_SBS ATTACHMENT Sup010_TD_TNK61001 CA

DIVISION 44 - POLLUTION AND WASTE CONTROL EQUIPMENT

44 43 33 STRAINERS

44 44 56.04 OXYGEN AND AIR INJECTION SYSTEM

44 44 57 INCLINED PLATE SETTLER CLARIFIERS AND RESIDUALS

COLLECTION EQUIPMENT

DIVISION 46 - WATER AND WASTEWATER EQUIPMENT

46 61 01 FILTRATION EQUIPMENT (BYPASS FILTERS)

46 61 02 FILTRATION EQUIPMENT (CARTRIDGE FILTERS)

APPENDICES

APPENDIX A FINAL GEOTECHNICAL DATA

APPENDIX B GEOTECHNICAL BASELINE REPORT

APPENDIX C REPORT OF HAZARDOUS MATERIALS (HADNOT POINT WTP)

APPENDIX D PERMITS OBTAINED BY THE GOVERNMENT

-- End of Project Table of Contents --

SECTION 26 00 00.00 20

BASIC ELECTRICAL MATERIALS AND METHODS

07/06

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D709 (2017) Standard Specification for Laminated Thermosetting Materials

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms

IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National Electrical Safety Code

IEEE C57.12.28 (2014) Standard for Pad-Mounted Equipment

- Enclosure Integrity

IEEE C57.12.29 (2014) Standard for Pad-Mounted Equipment

- Enclosure Integrity for Coastal Environments

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA 250 (2018) Enclosures for Electrical Equipment (1000 Volts Maximum)

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2020; ERTA 20-1 2020; ERTA 20-2 2020; TIA

20-1; TIA 20-2; TIA 20-3; TIA 20-4)

National Electrical Code

1.2 RELATED REQUIREMENTS

This section applies to certain sections of Division 02, EXISTING CONDITIONS; Division 11, EQUIPMENT; Division 13, SPECIAL CONSTRUCTION;

Division 22 , PLUMBING; and Division 23, HEATING VENTILATING AND AIR CONDITIONING. This section applies to all sections of Division 26 and 33, ELECTRICAL and UTILITIES, of this project specification unless specified otherwise in the individual sections. This section has been incorporated into, and thus, does not apply to, and is not referenced in the following sections.

Section 26 12 19.10 THREE-PHASE PAD MOUNTED TRANSFORMERS Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM Section 26 23 00 LOW VOLTAGE SWITCHGEAR

SECTION 26 00 00.00 20 Page 1

Section 26 24 13 SWITCHBOARDS Section 26 51 00 INTERIOR LIGHTING Section 26 56 00 EXTERIOR LIGHTING Section 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM Section 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION Section 33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

1.3 DEFINITIONS

a. Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, and on the drawings, shall be as defined in IEEE 100 .

b. The technical sections referred to herein are those specification sections that describe products, installation procedures, and equipment operations and that refer to this section for detailed description of submittal types.

c. The technical paragraphs referred to herein are those paragraphs in PART 2 - PRODUCTS and PART 3 - EXECUTION of the technical sections that describe products, systems, installation procedures, equipment, and test methods.

1.4 ELECTRICAL CHARACTERISTICS

Electrical characteristics for this project shall be 12.47 kV primary, three-phase, three - wire, 60 - Hz, and 480 volts secondary, three - phase, four -wire. Final connections to the power distribution system at the existing substation shall be made by the Contractor as directed by the Contracting Officer.

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.

SD-03 Product Data

Utility Pole and Equipment Field Identification Tags/Holders ; G

SD-11 Closeout Submittals

New Facility Data Forms ; G

1.6 ADDITIONAL SUBMITTALS INFORMATION

Submittals required in other sections that refer to this section must conform to the following additional requirements as applicable.

1.6.1 Shop Drawings

Include wiring diagrams and installation details of equipment indicating proposed location, layout and arrangement, control panels, accessories, piping, ductwork, and other items that must be shown to ensure a

SECTION 26 00 00.00 20 Page 2 coordinated installation. Wiring diagrams shall identify circuit terminals and indicate the internal wiring for each item of equipment and the interconnection between each item of equipment. Drawings shall indicate adequate clearance for operation, maintenance, and replacement of operating equipment devices.

1.6.2 Product Data

Submittal shall include performance and characteristic curves.

Utility Pole and Equipment Field Identification Tags/Holders

1.6.3 Forms

New Facility Data Forms

1.7 QUALITY ASSURANCE

1.7.1 Regulatory Requirements

In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Equipment, materials, installation, and workmanship shall be in accordance with the mandatory and advisory provisions of NFPA 70 unless more stringent requirements are specified or indicated.

1.7.2 Standard Products

Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year period shall include applications of equipment and materials under similar circumstances and of similar size. The product shall have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. Where two or more items of the same class of equipment are required, these items shall be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in the technical section.

1.7.2.1 Alternative Qualifications

Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.

1.7.2.2 Material and Equipment Manufacturing Date

Products manufactured more than 3 years prior to date of delivery to site shall not be used, unless specified otherwise.

1.8 WARRANTY

The equipment items shall be supported by service organizations which are

SECTION 26 00 00.00 20 Page 3 reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.

1.9 POSTED OPERATING INSTRUCTIONS

Provide for each system and principal item of equipment as specified in the technical sections for use by operation and maintenance personnel.

The operating instructions shall include the following:

a. Wiring diagrams, control diagrams, and control sequence for each principal system and item of equipment.

b. Start up, proper adjustment, operating, lubrication, and shutdown procedures.

c. Safety precautions.

d. The procedure in the event of equipment failure.

e. Other items of instruction as recommended by the manufacturer of each system or item of equipment.

Print or engrave operating instructions and frame under glass or in approved laminated plastic. Post instructions where directed. For operating instructions exposed to the weather, provide weather-resistant materials or weatherproof enclosures. Operating instructions shall not fade when exposed to sunlight and shall be secured to prevent easy removal or peeling.

1.10 MANUFACTURER'S NAMEPLATE

Each item of equipment shall have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.

1.11 FIELD FABRICATED NAMEPLATES

ASTM D709. Provide laminated plastic nameplates for each equipment enclosure, relay, switch, and device; as specified in the technical sections or as indicated on the drawings. Each nameplate inscription shall identify the function and, when applicable, the position.

Nameplates shall be melamine plastic, 0.125 inch thick, white with black center core. Surface shall be matte finish. Corners shall be square.

Accurately align lettering and engrave into the core. Minimum size of nameplates shall be one by 2.5 inches . Lettering shall be a minimum of 0.25-inch high normal block style.

1.12 WARNING SIGNS

Provide warning signs for the enclosures of electrical equipment including substations, pad-mounted transformers, pad-mounted switches, generators, and switchgear having a nominal rating exceeding 600 volts.

a. When the enclosure integrity of such equipment is specified to be in accordance with IEEE C57.12.28 or IEEE C57.12.29 , such as for pad-mounted transformers and pad-mounted SF6 switches, provide self-adhesive warning signs on the outside of the high voltage

SECTION 26 00 00.00 20 Page 4 compartment door(s). Sign shall be a decal and shall have nominal dimensions of 7 by 10 inches with the legend "DANGER HIGH VOLTAGE" printed in two lines of nominal 2-inch high letters. The word "DANGER" shall be in white letters on a red background and the words "HIGH VOLTAGE" shall be in black letters on a white background. Decal shall be Panduit No. PPSO710D72 or approved equal.

b. When such equipment is guided by a fence, mount signs on the fence.

Provide metal signs having nominal dimensions of 14 by 10 inches with the legend "DANGER HIGH VOLTAGE KEEP OUT" printed in three lines of nominal 3-inch high white letters on a red and black field.

1.13 ELECTRICAL REQUIREMENTS

Electrical installations shall conform to IEEE C2 , NFPA 70 , and requirements specified herein.

1.14 OPERATIONS AND TREATMENT BUILDING

Overhead utilities and fixtures and associated supports much be designed in accordance with Standard 19 of UFC 4-010-01. Submit Signed and Sealed Shop drawings and calculations.

1.15 INSTRUCTION TO GOVERNMENT PERSONNEL

Where specified in the technical sections, furnish the services of competent instructors to give full instruction to designated Government personnel in the adjustment, operation, and maintenance of the specified systems and equipment, including pertinent safety requirements as required. Instructors shall be thoroughly familiar with all parts of the installation and shall be trained in operating theory as well as practical operation and maintenance work. Instruction shall be given during the first regular work week after the equipment or system has been accepted and turned over to the Government for regular operation. The number of person-days (8 hours per day) of instruction furnished shall be as specified in the individual section. When more than 4 person-days of instruction are specified, use approximately half of the time for classroom instruction. Use other time for instruction with equipment or system. When significant changes or modifications in the equipment or system are made under the terms of the contract, provide additional instructions to acquaint the operating personnel with the changes or modifications.

1.16 UTILITY POLE AND ELECTRICAL EQUIPMENT FIELD IDENTIFICATION

Identify and label power and lighting utility poles, pad-mounted transformers, pad-mounted switch-gear, pad-mounted junction cabinets, and secondary pedestals, to include fuse size tags, in accordance with the Supplements (CLGIS-01, CLGIS-02, GLGIS-03, and CLGIS 04) attached to this specification.

For each new pole, pad-mounted transformer, pad-mounted switch-gear, pad-mounted junction cabinet, and secondary pedestal, complete the "New Facility Data Form" provided as a Supplement (CLGIS-05) to this specification and submit to the Contracting Officer.

Record Drawings: Provide record drawings for new poles, pad-mounted transformers, pad-mounted switch-gear, pad-mounted junction cabinets, and secondary pedestals in accordance with Section 01 78 00 CLOSEOUT

SECTION 26 00 00.00 20 Page 5

SUBMITTALS and as indicated herein. Record Drawings for these new facilities shall reflect tag numbering convention described in the Supplement and shall match the "New Facility Data Form" completed for each facility.

PART 2 PRODUCTS

2.1 FACTORY APPLIED FINISH

Electrical equipment shall have factory-applied painting systems which shall, as a minimum, meet the requirements of NEMA 250 corrosion-resistance test and the additional requirements specified in the technical sections.

PART 3 EXECUTION

3.1 FIELD APPLIED PAINTING

Paint electrical equipment as required to match finish of adjacent surfaces or to meet the indicated or specified safety criteria. Painting shall be as specified in Section 09 90 00 PAINTS AND COATINGS.

3.2 FIELD FABRICATED NAMEPLATE MOUNTING

Provide number, location, and letter designation of nameplates as indicated. Fasten nameplates to the device with a minimum of two sheet-metal screws or two rivets.

3.3 WARNING SIGN MOUNTING

Provide the number of signs required to be readable from each accessible side, but space the signs a maximum of 30 feet apart.

3.4 ENVIRONMENTAL CONDITIONS

Provide materials and installations meeting the following requirements, based on environmental conditions.

The following areas are classified Hazardous Class I, Division 1, Group D, due to the potential for occurrence of hazardous concentrations of combustible gases, and for exposure to corrosive environment. Use materials and methods required for such areas.

a. Inside Waste Decant Pump Station Wetwell.

The following areas are classified nonhazardous, wet, and corrosive. Use materials and methods required for such areas.

a. Chemical Rooms, including those with access to exterior.

The following areas are classified nonhazardous and wet. Use materials and methods required for such areas.

a. Outdoor abovegrade areas not covered above.

b. Belowgrade vaults or structures.

The following areas are classified finished and wet. Use materials and methods required for such areas.

SECTION 26 00 00.00 20 Page 6

a. Labs.

b. Locker Rooms.

The following areas are classified as finished and dry:

a. Non-Process Areas of the Operations and Treatment Building.

The following areas are classified as indoor and dry:

a. Electrical Rooms.

b. Mechanical Rooms

The following areas are classified as indoor and damp:

a. Process Areas of the Operations and Treatment Building.

b. Bypass Filter Building.

c. Process areas of the raw and finished water pump and strainers building.

d. Process areas of the concentrate clarifier building.

The following areas are not classified. Use dust-tight and oil-tight NEMA 12 materials and methods.

a. Areas not covered above.

For areas designated Hazardous Class1, Division 1, Group D, provide the following materials:

a. Enclosures: NEMA 250, TYPE 7.

b. Conduit: PVC- Coated RGS.

c. Device Boxes: PVC Coated Malleable Iron.

d. Conduit/Cable Tray Supports: 316 SST.

e. Electrical Framing Channel Material: PVC-Coated carbon steel.

For areas designated non-hazardous, wet, and corrosive, provide the following materials:

a. Enclosures: NEMA 250, TYPE 4X.

b. Conduit: PVC- Coated RGS.

c. Device Boxes: PVC Coated Malleable Iron.

d. Conduit/Cable Tray Supports: 316 SST.

e. Electrical Framing Channel Material: PVC-Coated carbon steel or non-metallic.

For areas designated non-hazardous, and wet, provide the following

SECTION 26 00 00.00 20 Page 7 materials:

a. Enclosures: NEMA 250, TYPE 4X.

b. Conduit: Aluminum.

c. Device Boxes: Aluminum.

d. Conduit/Cable Tray Supports: 316 SST.

e. Electrical Framing Channel Material: Aluminum.

For areas designated finished and wet, provide the following materials:

a. Enclosures: NEMA 250, TYPE 4.

b. Conduit: RG5.

c. Device Boxes: Malleable Iron.

d. Conduit/Cable Tray Supports: Hot-Dipped Galvanized.

e. Electrical Framing Channel Material: Hot-Dipped Galvanized.

For areas designated indoor and dry, provide the following materials:

a. Enclosures: NEMA 250, TYPE 1.

b. Conduit: RGS.

c. Device Boxes: Malleable Iron.

d. Conduit/Cable Tray Supports: Hot-Dipped Galvanized.

e. Electrical Framing Channel Material: Hot-Dipped Galvanized.

For areas designated finished and dry, provide the following materials:

a. Enclosures: NEMA 250, TYPE 1.

b. Conduit: EMT.

c. Device Boxes: Malleable Iron.

d. Conduit/Cable Tray Supports: Hot-Dipped Galvanized.

e. Electrical Framing Channel Material: Hot-Dipped Galvanized.

3.5 SUPPLEMENTS

The supplements listed below, following "End of Section", are part of this Specification.

a. GIS Numbering Convention (CLGIS-01).

b. Pole Numbers and Fuse Size Tags - Wood Poles (CLGIS-02).

c. Pole Numbers and Fuse Size Tags - Non-Wood Poles (CLGIS-03).

SECTION 26 00 00.00 20 Page 8

d. Numbers and Fuse Size Tags - Underground Equipment/Facility (CLGIS-04).

e. New Facility Data Form (CLGIS-05).

-- End of Section --

SECTION 26 00 00.00 20 Page 9

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 26 00 00.00 20 Page 10

CAMP LEJEUNE

GIS NUMBERING CONVENTION

APPR.REVISED BY CHK'D

CLGIS-01

3/6/19

JANNING

67526-36864

POLE LOCATION EXAMPLE: 34.39786 - ONLY 39786 IS UTILIZED FOR THE POLE NUMBER.

THE NUMBERING SYSTEM USES THE FACILITY (POLE, TRANSFORMER, ETC.) ACTUAL GPS COORDINATE. THE LATITUDE AND LONGITUDE IS USED TO ESTABLISH THE FACILITY NUMBER. THE USE OF GPS COORDINATE SYSTEM ENSURES THAT CIRCUIT AND OTHER CHANGES WILL NOT RESULT IN FUTURE RENUMBERING EFFORTS.

THE NUMBERING CONVENTION TRUNCATES DECIMAL DEGREES SO THAT ONLY THE DEGREES ARE REMAINING.

-77.46264 - ONLY 46264 IS UTILIZED FOR THE POLE NUMBER.

THEN WHEN AMENDED TOGETHER (WITH A DASH BETWEEN) THE NUMBER FOR THAT FACILITY WOULD BE AS

FOLLOWS.

FACILITY (POLE, TRANSFORMER, ETC.) NUMBER: 39786-46264

LIST OF FACILITIES FOR NUMBERING

1. POLES (WOOD, CONCRETE, COMPOSITE/FIBERGLASS)

A. DISTRIBUTION - PRIMARY VOLTAGE

B. DISTRIBUTION - SECONDARY

C. DISTRIBUTION - SPAN GUY

D. LIGHTING - ROADWAY

E. LIGHTING - PARKING

F. LIGHTING - AREA

2. PAD-MOUNTED TRANSFORMER

3. PAD-MOUNTED SWITCH GEAR

4. PAD-MOUNTED JUNCTION CABINETS

NUMBERING CONVENTION

5. PEDESTALS - SECONDARY

G. LIGHTING - SPORTS FIELD

48" MIN.

NOTES:

1. THE HORIZONTAL TAG HOLDER WILL ACCOMMODATE UP TO 12 ALUMINUM

2. CRIMP THE EDGES OF TAG HOLDER TO SECURE THE TAGS IN THE HOLDER.

3. ATTACH GIS TAG HOLDER ON THE POLE A MINIMUM OF 48" ABOVE

GROUND USE TWO ALUMINUM NAILS, ONE ON EACH SIDE IN CENTER

HOLE, ALMETEK P/N AN.1.

4. INSTALL TAG HOLDER TO FACE THE ROADWAY OR VISIBLE APPROACH. DO

NOT COVER POLE BRAND.

5. A COMPARTMENTALIZED METAL BOX FOR SORTING AND CARRYING POLE

7. INSTALL FUSE SIZE AND TYPE USING A SEPARATE TAG HOLDER

GIS NUMBER LOCATION.

6" MIN.

"FUSE SIZE"

TAG HOLDER

SEE NOTE 7

NUMBERING ITEMS IS AVAILABLE (TK-1S).

6. VERTICAL ALUMINUM TAG HOLDER (TA-12).

WITH "FUSE SIZE" TAG AND FUSE TAG HOLDER 6" ABOVE THE

CAMP LEJEUNE

POLE NUMBERS AND FUSE SIZE TAGS -

WOODEN POLES

TAGS. THE VERTICAL TAG HOLDER WILL ACCOMMODATE UP TO 12 TAGS.

APPR.REVISED BY CHK'D

CLGIS-02

SIZE

FUSE

SEE NOTE 7

FUSE SIZE TAG

CRIMP

1-5/8"

7-3/4"

CRIMPCRIMP

CRIMP

TAG HOLDER

P/N: TH-6A

FUSE

SIZE

MFG: ALMETEK

5 K0

8. REFER TO DWG. CLGIS-03 FOR APPROPRIATE POLE NUMBERING

GUIDELINES FOR ALL LIGHTING POLES, INCLUDING DECORATIVE,

STEEL AND COMPOSITE STRUCTURES.

2/6/19

JANNING

TA-12

TAG HOLDER

CRIMP

CRIMP

VERTICAL TAG

1.67"

11.75"

MFG: ALMETEK

P/N: V500

1.594"

0.875"0.75"

R 0.62" TYP.

DUKE ENERGY STANDARD

WOOD POLE VERTICAL TAG

NUMBER

TAG

POLE

DUKE ENERGY STANDARD

FUSE TAG

MFG: ALMETEK

P/N: H500

DUKE ENERGY STANDARD

1.594"

0.875"

R 0.62" TYP.

1"

MFG: ALMETEK

DUKE ENERGY STANDARD

P/N: CH3-148

POLE NUMBERS AND FUSE SIZE TAGS -

NON-WOOD POLES (CONCRETE, METAL, COMPOSITE)

APPR.REVISED BY CHK'D

CLGIS-03

3/6/19

JANNING

NON-WOOD POLE TAG

MFG: ALMETEK

P/N: TH-12A-SL

SS BANDING

DUKE ENERGY STANDARD

(CONCRETE, METAL, COMPOSITE)

MFG: ALMETEK

P/N: BB-4

MFG: ALMETEK

P/N: BT-02

STAINLESS STEEL BUCKLES

BANDING TOOL (1/2")

DUKE ENERGY STANDARD

DUKE ENERGY STANDARD

48" MIN.

6" MIN.

"FUSE SIZE"

TAG HOLDER

SEE NOTE 7

NUMBER

TAG

POLE

MFG: ALMETEK

P/N: V500

1.594"

0.875"0.75"

R 0.62" TYP.

DUKE ENGERGY STANDARD

VERTICAL TAG

NOTES:

1. THE HORIZONTAL TAG HOLDER WILL ACCOMMODATE UP TO 12 ALUMINUM

2. CRIMP THE EDGES OF TAG HOLDER TO SECURE THE TAGS IN THE HOLDER.

3. ATTACH GIS TAG HOLDER ON THE POLE A MINIMUM OF 48" ABOVE

GROUND USE TWO ALUMINUM NAILS, ONE ON EACH SIDE IN CENTER

HOLE, ALMETEK P/N AN.1.

4. INSTALL TAG HOLDER TO FACE THE ROADWAY OR VISIBLE APPROACH. DO

NOT COVER POLE BRAND.

5. A COMPARTMENTALIZED METAL BOX FOR SORTING AND CARRYING POLE

7. INSTALL FUSE SIZE AND TYPE USING A SEPARATE TAG HOLDER

GIS NUMBER LOCATION.

NUMBERING ITEMS IS AVAILABLE (TK-1S).

6. VERTICAL ALUMINUM TAG HOLDER (TH-12A).

WITH "FUSE SIZE" TAG AND FUSE TAG HOLDER 6" ABOVE THE

TAGS. THE VERTICAL TAG HOLDER WILL ACCOMMODATE UP TO 12 TAGS.

8. REFER TO DWG. CLGIS-02 FOR APPROPRIATE POLE NUMBERING

GUIDELINES FOR ALL WOOD POLES.

13.745"

1.62"

NUMBERS AND FUSE SIZE TAGS -

UNDERGROUND EQUIPMENT/FACILITY

APPR.REVISED BY CHK'D

CLGIS-04

3/6/19

JANNING

PAD-MOUNTED TRANSFORMER

SECONDARY PEDESTAL

P/N: HIPS1.2RY-CUT

MFG: ALMETEK

HIGH INTENSITY REFLECTIVE LABELS

DUKE ENERGY STANDARD

P/N: HIPS2.5RY-CUT

MFG: ALMETEK

HIGH INTENSITY REFLECTIVE LABELS

DUKE ENERGY STANDARD

P/N: HIPS2.5RY-CUT

MFG: ALMETEK

HIGH INTENSITY REFLECTIVE LABELS

DUKE ENERGY STANDARD

PAD-MOUNTED EQUIPMENT, PEDESTALS, AND JUNCTION BOXES TAG

P/N: HIPS2.5RY-CUT

MFG: ALMETEK

HIGH INTENSITY REFLECTIVE LABELS

DUKE ENERGY STANDARD

P/N: HIPS1.2RY-CUT (PEDESTALS)

NOTES:

1.5"

1.0"

1.0"

1. GIS NUMBERS SHALL BE INSTALLED AS SHOWN UNLESS

THERE IS A PHYSICAL BARRIER OBSTRUCTING VIEW.

2. THIS STANDARD APPLIES TO ALL OTHER CATEGORIES OF

UNDERGROUND EQUIPMENT (I.E. SWITCHGEAR,

JUNCTIONS).

3. NUMBER MOUNTING SURFACE SHALL BE WIPED CLEAN

BEFORE INSTALLATION.

4. USE NUMBERS FROM CLGIS-03 EXCEPT REPLACE "POLE"

WITH "EQUIPMENT".

5. PAD-MOUNTED SWITCHGEAR AND OTHER PAD-MOUNTED

EQUIPMENT SHALL BE LABELED CONSISTENTLY WITH

THE PAD-MOUNTED TRANSFORMER STANDARD AS

SHOWN.

1-3/4"

2-7/8" 2-7/8"

NEW FACILITY DATA FORM

APPR.REVISED BY CHK'D

CLGIS-05

7/15/19

JANNING

INSTRUCTIONS:

1. CONTRACTOR SHALL COMPLETE THIS FORM FOR EACH NEW POLE, PADMOUNT TRANSFORMER, SECONDARY

PEDESTAL, AND SWITCHGEAR.

2. COMPLETED FORM SHALL BE SUBMITTED TO THE BASE CONTRACT REPRESENTATIVE.

COMMENTS

NEW FACILITY DATA FORM

ASSET NUMBER LAT # (DECIMAL VALUE)

ASSET NUMBER LONG# (DECIMAL VALUE)

FEEDER NAME

PRIMARY VOLTAGE

POLE TYPE (W,M,C,O)

POLE CATEGORY

PRIMARY FRAME (DELTA, XARM, VERT, N/A)

POLE JOINT USE (Y/N)

PRIMARY CONDUCTOR PHASES (1,2,3)

PRIMARY CONDUCTOR SIZE AND TYPE

PRIMARY SWITCH/RECLOSER (Y/N)

PRIMARY TAP FUSE CUTOUT (Y/N)

POLE MOUNT TRANS (Y/N)

POLE MOUNT TRANS QUANTITY (1,2,3)

PAD MOUNT TRANS (Y/N)

SECONDARY VOLTAGE

PRIMARY CONNECTION

SECONDARY CONNECTION

KVA RATING

IMPEDANCE

SECONDARY PEDESTAL (Y/N)

PADMOUNTED SWITCH (Y/N)

LIGHT FIXTURE AND QTY (Y/N,#)

UG PRIMARY RISER (Y/N)

UG SEC RISER (Y/N)

(PRIMARY, SECONDARY, LIGHTING, OTHER, N/A)

SECTION 26 08 00

APPARATUS INSPECTION AND TESTING

08/08

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)

NETA ATS (2017; Errata 2017) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems

1.2 RELATED REQUIREMENTS

Section 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS applies to this section with additions and modifications specified herein.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-06 Test Reports

Acceptance tests and inspections ; G

SD-07 Certificates

Qualifications of organization, and lead engineering technician; G

Acceptance test and inspections procedure ; G

1.4 QUALITY ASSURANCE

1.4.1 Qualifications

Contractor shall engage the services of a qualified testing organization to provide inspection, testing, calibration, and adjustment of the electrical distribution system and generation equipment listed in paragraph entitled "Acceptance Tests and Inspections" herein.

Organization shall be independent of the supplier, manufacturer, and installer of the equipment. The organization shall be a first tier subcontractor. No work required by this section of the specification shall be performed by a second-tier subcontractor.

a. Submit name and qualifications of organization. Organization shall have been regularly engaged in the testing of electrical materials, SECTION 26 08 00 Page 1 devices, installations, and systems for a minimum of 5 years. The organization shall have a calibration program, and test instruments used shall be calibrated in accordance with NETA ATS.

b. Submit name and qualifications of the lead engineering technician performing the required testing services. Include a list of three comparable jobs performed by the technician with specific names and telephone numbers for reference. Testing, inspection, calibration, and adjustments shall be performed by an engineering technician, certified by NETA or the National Institute for Certification in Engineering Technologies (NICET) with a minimum of 5 years' experience inspecting, testing, and calibrating electrical distribution and generation equipment, systems, and devices.

1.4.2 Acceptance Tests and Inspections Reports

Submit certified copies of inspection reports and test reports. Reports shall include certification of compliance with specified requirements, identify deficiencies, and recommend corrective action when appropriate.

Type and neatly bind test reports to form a part of the final record.

Submit test reports documenting the results of each test not more than 10 days after test is completed.

1.4.3 Acceptance Test and Inspections Procedure

Submit test procedure reports for each item of equipment to be field tested at least 45 days prior to planned testing date. Do not perform testing until after test procedure has been approved.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

3.1 ACCEPTANCE TESTS AND INSPECTIONS

Testing organization shall perform acceptance tests and inspections. Test methods, procedures, and test values shall be performed and evaluated in accordance with NETA ATS, the manufacturer's recommendations, and paragraph entitled "Field Quality Control" of each applicable specification section. Tests identified as optional in NETA ATS are not required unless otherwise specified. Equipment shall be placed in service only after completion of required tests and evaluation of the test results have been completed. Contractor shall supply to the testing organization complete sets of shop drawings, settings of adjustable devices, and other information necessary for an accurate test and inspection of the system prior to the performance of any final testing. Contracting Officer shall be notified at least 14 days in advance of when tests will be conducted by the testing organization. Perform acceptance tests and inspections on applicable equipment and systems specified in the following sections:

a. Section 26 32 13.00 20 SINGLE OPERATION GENERATOR SETS. Functional engine shutdown tests, vibration base-line test, and load bank test shall not be performed by the testing organization. These tests shall be performed by the equipment suppliers start-up engineer.

b. Section 26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

SECTION 26 08 00 Page 2

c. Section 33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION

d. Section 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION. Medium voltage cables and grounding systems only.

f . Section 26 23 00 LOW VOLTAGE SWITCHGEAR

g. Section 26 24 13 SWITCHBOARDS

3.2 SYSTEM ACCEPTANCE

Final acceptance of the system is contingent upon satisfactory completion of acceptance tests and inspections.

3.3 PLACING EQUIPMENT IN SERVICE

A representative of the approved testing organization shall be present when equipment tested by the organization is initially energized and placed in service.

SECTION 26 08 00 Page 3

SECTION 26 08 00 Page 4

SECTION 26 08 10.00 22

COMMISSIONING OF ELECTRICAL SYSTEMS

03/17

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASSOCIATED AIR BALANCE COUNCIL (AABC)

ACG Commissioning Guideline (2005) Commissioning Guideline

NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB)

NEBB Commissioning Standard (2009) Procedural Standards for Whole Building Systems Commissioning of New Construction; 3rd Edition

INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)

NETA ATS (2017; Errata 2017) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems

NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION (NECA)

NECA/NEIS 90 (2009) Standard for Commissioning Building Electrical Systems

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 111 (2013) Standard on Stored Electrical Energy Emergency and Standby Power Systems

1.2 SUMMARY

1.2.1 General

The requirements of this section apply to all sections of Division 26, Electrical . Refer to Section 01 91 13.00 22 GENERAL COMMISSIONING REQUIREMENTS FOR CONSTRUCTION for general commissioning requirements applicable to the entire project.

The purpose of this Section is to define Contractor responsibilities in the commissioning process, which are being directed by the Government.

Additional electrical system testing is required under some Division 27, and 33 Specification Sections. NECA/NEIS 90 provides additional guidance for the commissioning of electrical systems.

This Section includes Commissioning process requirements for electrical systems, assemblies, components and equipment, and requires the participation of the Contractor, to ensure that the work has been completed as specified and that systems are functioning in the manner

SECTION 26 08 10.00 22 Page 1 consistent with the Contract Documents as described herein, and as specified in the system operating criteria for this project.

a. Commissioning will commence according to the approved construction schedule, after electrical system rough-in, and after the preliminary inspection punchlist items and commissioning deficiencies are completed by the Contractor.

b. Construction phase commissioning process shall include the following:

1. Step One: Installation Verification.

2. Step Two: System Startup.

3. Step Three: Functional Performance Testing.

The electrical commissioning process includes the following tasks:

a. Testing and startup of electrical equipment and systems.

b. Electrical equipment and system verification checks.

c. Assistance in functional performance testing to verify equipment and system performance.

d. Provide qualified personnel to assist in commissioning tests, including seasonal testing.

e. Complete and endorse construction phase checklists provided by Commissioning Authority (CxA) to assure equipment and systems are fully operational and ready for functional performance testing.

f. Provide equipment, materials, and labor necessary to correct deficiencies found during commissioning process and to fulfill contract and warranty requirements.

g. Provide operation and maintenance information and record drawings to Commissioning Authority for review verification and organization, prior to distribution.

h. Provide assistance to CxA to develop, edit, and document system operation descriptions.

i. Provide training for systems specified in this Section, coordinated with the CxA.

The commissioning process will also be used to develop test protocol and record the associated test data in an effort to advance the building electrical systems from a state of substantial completion to a full dynamic operation.

The commissioning process is also intended to assist the Government's operating and maintenance staff in the training and familiarization with new electrical systems and equipment. The Commissioning Plan and final Commissioning Report should also serve as tools to reduce post-occupancy critical systems operational difficulty or failure. Operational staff training is essential to the commissioning process and will run concurrently with Steps One through Three referenced above.

SECTION 26 08 10.00 22 Page 2

The commissioning required by this section is intended to supplement the inspection, testing, and training requirements contained in the technical sections and to consolidate the reports required by those sections.

Duplication of the inspection, testing and training required by the technical sections is not required. This section does include additional commissioning requirements.

1.3 DEFINITIONS

Refer to Section 01 91 13.00 22 GENERAL COMMISSIONING REQUIREMENTS FOR CONSTRUCTION, Article "Definitions" for definitions applicable to this section.

1.4 COMMISSIONING SUBMITTAL REQUIREMENTS

Commissioning Authority (CxA) shall prepare Commissioning Plan, Prefunctional Checklists, Functional Performance Test (FPT) procedures, narrative descriptions of the design intent for each of the systems identified, and the Commissioning Report, and execute and document results.

a. Contractor shall provide CxA with documentation required for Commissioning Work. At minimum, documentation shall include:

detailed start-up procedures, full sequences of operation, Operating and Maintenance data and performance data, control drawings, and details of Government-contracted tests.

b. Contractor shall submit to CxA the manufacturers' installation and checkout materials actually shipped inside equipment and actual field checkout sheet forms used by factory or field technicians.

c. Contractor shall review and approve other relative documentation for impact on FPT's of the systems:

1. Verify manufacturer's installation instructions are followed by completing the prefunctional checklists for all electrical equipment.

2. Factory Performance Test Reports: Review and compile all factory performance data to assure that the data is complete prior to executing the FPT's.

3. Completed equipment Start-up certification forms along with the manufacturer's field or factory performance and Start-up test documentation: Subcontractor performing the test will review the documentation prior to commencing with the scheduled FPT's.

Government may require that system one-line diagrams and applicable Specification Section(s) be attached to the FPT documentation.

4. Operating and Maintenance (O&M) information per requirements of the Technical Specifications and Division 01 requirements: To validate adequacy and completeness of the FPT, the Contractor shall ensure that the O&M manual content, marked-up record Drawings and Specifications, component submittal drawings, and other pertinent documents are available at the…