Attachment C - Construction Experience Data Sheet.docx

DOCX document 14 KB Posted

Attached to
P1043 Water Treatment Plant Replacement, MCB, Camp Lejeune, NC
Solicitation number
N4008521R0052
Issued by

About this file

This document contains an attachment for collecting construction experience data and details of a federal contract opportunity for a water treatment plant replacement project. The attachment requests information on up to five past construction projects, including award and completion dates, types of work performed, contract amounts, and descriptions of relevancy and the offeror's scope. The federal contract opportunity is a design-bid-build solicitation from the Department of the Navy to construct an 8 million gallon per day water treatment facility utilizing membrane filtration technology at Marine Corps Base Camp Lejeune. This will provide potable water and enable compliance with regulatory requirements while addressing potential saltwater intrusion issues. The response is due by the date specified in the solicitation.

View the file

Other files

File Type Posted
AMENDMENT 0008.pdf PDF
AMENDMENT 0007.pdf PDF
AMENDMENT 0006.pdf PDF
REPOST AMENDMENT 0004 - P1F198_1.PDF PDF
AMENDMENT 0005.pdf PDF
REPOST AMENDMENT 0004 - P165D9_1.PDF PDF
REPOST AMENDMENT 0004 - P1043__1.PDF PDF
P1043 Amend 0005_Narrative.pdf PDF
REPOST AMENDMENT 0004 - P1043__4.PDF PDF
REPOST AMENDMENT 0004 - P1043__3.PDF PDF
REPOST AMENDMENT 0004 - P1043__2.PDF PDF
AMENDMENT 0004.pdf PDF
Amendment 0004 - P1043-1.pdf PDF
Amendment 0004 - P1043 -3.pdf PDF
Amendment 0004 - P1F198-1.pdf PDF
Amendment 0004 - P1043-4.pdf PDF
Amendment 0004 - P11F25-1.pdf PDF
P1043 Amend 0004_Narrative.pdf PDF
Amendment 0004 - P165D9-1.pdf PDF
Amendment 0004 - P1043 Amend 0003_Drawings_DP111.pdf PDF
Amendment 0004 - P11A90-1.pdf PDF
Amendment 0004 - P1043-2.pdf PDF
Amendment 0004 - P10384-1.pdf PDF
Amendment 0004 - P1043_FinalDrawings_Vol_36_6_BLDG209_HYPO_1999_22x34.pdf PDF
P1043 Amend 0003_Narrative.pdf PDF
P1043 Amend 0003_Drawings_Civil.pdf PDF
AMENDMENT 0003.pdf PDF
P1043 Amend 0003_Drawings_Plumbing.pdf PDF
P1043 Amend 0002_Narrative.pdf PDF
P1043 Amend 0002_Drawings_Arch.pdf PDF
P1043 Amend 0002_Drawings_Civil.pdf PDF
Amendment 0002 Site Visit Sign-in Sheet.pdf PDF
AMENDMENT 0002.pdf PDF
AMENDMENT 0001.pdf PDF
AMEND 0001 Attachment H - 00 22 13 00 20.pdf PDF
Attachment H - 00 22 13.00 20.pdf PDF
CampLejeuneVolume1_FinalSpecs_S and S.pdf PDF
796455_P1043_FinalDrawings_Vol_22.pdf PDF
796455_P1043_FinalDrawings_Vol_12.pdf PDF
796455_P1043_FinalDrawings_Vol_13b.pdf PDF
796455_P1043_FinalDrawings_Vol_8.pdf PDF
CampLejeuneVolume3_FinalSpecs_S and S.pdf PDF
796455_P1043_FinalDrawings_Vol_21.pdf PDF
796455_P1043_FinalDrawings_Vol_6.pdf PDF
796455_P1043_FinalDrawings_Vol_5.pdf PDF
796455_P1043_FinalDrawings_Vol_16.pdf PDF
N4008521R0052.pdf PDF
Attachment A - PPII log.doc DOC document
796455_P1043_FinalDrawings_Vol_23.pdf PDF
796455_P1043_FinalDrawings_Vol_4.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5

1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)

Firm Name:

Address:

Phone Number:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):

Complete Block 7 for Construction Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.

9. Provide a detailed description of what work your firm self-performed on this project:

10. Other Information:

File details come from the government source that posted it. Updated .