J-1502000-5D HVAC 2018 Call Log.xlsx

XLSX spreadsheet 350 KB Posted

Attached to
HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) Maintenance and Repair Services and Direct Digital Controls (DDC)
Solicitation number
N4008520R2502
Issued by

View the file

Other files

File Type Posted
N4008520R250200003.pdf PDF
N4008520R25020002.pdf PDF
J-0200000-04 Invoice Form.pdf PDF
N4008520R25010001.pdf PDF
J-1502000-12A NAVSUBASE NLON FY14 UPV CERT CARDS.pdf PDF
J-1502000-08B BOILER INVENTORY REVISED 2.xls XLS spreadsheet
J-0200000-02D CBA Sup 30OCT19.pdf PDF
J-0200000-02C CBA.pdf PDF
N4008520R2502.pdf PDF
J-0200000-09 - CHARACTERISTIC METER READING INFORMATION v2 - 2016-09-30.xlsx XLSX spreadsheet
HVAC 1502000 WBS Facility Investment.pdf PDF
HVAC 1502000 SECTION J.pdf PDF
J-1502000-20 Service Order Summary Report.xls XLS spreadsheet
J-1502000-16 Navy Sub Systems Water Testing.xlsx XLSX spreadsheet
J-0200000-05F On site Labor Summary Report reviewed.xls XLS spreadsheet
J-1502000-05A HVAC-CALLS 1-1-15 to 12-31-15.xls XLS spreadsheet
J-0200000-15 ACM HISTORICAL DATA.xls XLS spreadsheet
J-1502000-21 Monthly Preventative Maintenance Summary Report.xls XLS spreadsheet
J-0200000-02B SCA 2015-4111.pdf PDF
J-0200000-16 UEM Contractor Outage Process 20141120.pdf PDF
J-1502000-09 BUILDING INVENTORY FOR BAS.xlsx XLSX spreadsheet
0200000 F Management and Administration.pdf PDF
J-1502000-8A Unfired Pressure Vessels NEWLON.xlsx XLSX spreadsheet
J-0200000-07 - ASSET INFORMATION v2 - 2017-04-26.xlsx XLSX spreadsheet
J-1502000-24 Asset Condition Report 2018.xlsx XLSX spreadsheet
J-0200000-06 - SERVICE PROVIDER INFORMATION v1 - 2013-07-07.xlsx XLSX spreadsheet
J-0200000-05E Quality Inspection and Surveillance report reviewed.xls XLS spreadsheet
HVAC 1502000 SECTION F.pdf PDF
J-1502000-19 Direct Condition Rating Guidance.pdf PDF
J-0200000-12 Installation Spill Control Plan.pdf PDF
0200000 C Management and Administration.pdf PDF
0200000 J Management and Administration.pdf PDF
J-0200000-05D contractor incident report system.pdf PDF
J-1502000-10A Refrigerant Appliance Disposal.pdf PDF
J-1502000-05B HVAC-CALLS 1-1-16 to 12-31-16.xls XLS spreadsheet
J-1502000-06 PROPERTY ASSET INVENTORY revised.xls XLS spreadsheet
J-1502000-12B NAVSUBASE NLON FY14 BOILER CERT CARDS.pdf PDF
J-1502000-25 Hot and Cold Closed Loop HVAC.pdf PDF
J-1502000-17 HVAC Systems Seasonal Start-Up and Shutodwn.xlsx XLSX spreadsheet
J-1502000-03 BUILDING INVENTORY.xls XLS spreadsheet
J-1502000-22 Prescriptive Maintenance Summary Report.xls XLS spreadsheet
J-1502000-5C HVAC 2017 Call Log.xlsx XLSX spreadsheet
0100000 C General Information.pdf PDF
J-1502000-10B Refrigerant Appliance Installation.pdf PDF
J-1502000-18 Uniformat Classification.pdf PDF
HVAC BID SCHEDULE.xls XLS spreadsheet
J-0200000-08 - ASSET SPECIFICATION v1 - 2016-01-20.xlsx XLSX spreadsheet
J-1502000-23 MP-217_D_00_SB.pdf PDF
J-0200000-02A DBA WD CT20190024.pdf PDF
HVAC 1502000 SECTION C.pdf PDF
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J-1502000-5D HVAC 2018 Call Log

approveddateworktypeservprvrefcodedescriptionlocationreportedbymastersystemstatusstatusdatewopriorityactstartactfinishsupervisoractlabhrsactlabcostactmatcostestdurassetnumtargcompdatetargstartdatereportdateleadschedstartschedfinishchangedatechangebypmnextduedateistask_textparentwonumdetaillocclincustomercodesubworktypepersongroupglaccountoutagetypeoutagereasonnumbldgsaffectedoutagestartdateoutageenddate
Aug 13, 2018, 8:38 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) Transfer pump leaking in the Mechanical Room in bldg. 522; Hot water in building is affected.NEWLON-522BAILEYALD30 - HVACCLOSEAug 9, 2019, 8:45 PM5Aug 13, 2018, 9:00 AMAug 13, 2018, 12:00 PM0:00000:00Aug 20, 2018, 8:38 AMAug 13, 2018, 8:37 AMAug 10, 2018, 3:52 PMKTR-NL01Aug 9, 2019, 8:45 PMMAXADMINNDK3GRZFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Oct 19, 2018, 7:37 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) HVAC No flow in fin tube heatingNEWLON-449BAILEYALCOMPAug 20, 2019, 8:54 AMOct 19, 2018, 7:37 AMAug 20, 2019, 8:54 AM0:00000:00Nov 18, 2018, 7:37 AMOct 19, 2018, 7:37 AMOct 19, 2018, 4:08 AMKTR-NL01Aug 20, 2019, 8:54 AMSCHULLERC1NDLPXPVFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Sep 12, 2018, 10:17 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) RM 152 No AC.NEWLON-430BAILEYALCLOSESep 14, 2019, 10:02 PMSep 12, 2018, 10:17 AMSep 13, 2018, 9:00 AM0:00000:00Sep 19, 2018, 10:17 AMSep 12, 2018, 10:17 AMSep 12, 2018, 9:58 AMKTR-NL01Sep 14, 2019, 10:02 PMMAXADMINNDKRWC3FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 30, 2018, 1:34 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606P) NO AC TO ROOM 201 BLDG 456NEWLON-456BAILEYALCLOSEAug 24, 2019, 9:40 PMJul 30, 2018, 3:00 PMJul 30, 2018, 5:00 PM0:00000:00Aug 6, 2018, 1:34 PMJul 30, 2018, 1:33 PMJul 30, 2018, 12:38 PMKTR-NL01Aug 24, 2019, 9:40 PMMAXADMINNDJTLHWFACILITIESKTR-NL01A.N00129NL.10.1JF5111A2018
Aug 13, 2018, 1:16 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) Bldg 434 Room104 A/C motor does not come onNEWLON-434BAILEYALCLOSEAug 15, 2019, 1:50 PMAug 14, 2018, 12:30 PMAug 14, 2018, 3:30 PM0:00000:00Sep 12, 2018, 1:16 PMAug 13, 2018, 1:16 PMAug 10, 2018, 12:23 PMKTR-NL01Aug 15, 2019, 1:50 PMMAXADMINNDK3JCPFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 30, 2018, 8:56 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) Request NAVFAC support in identifying the HVAC issues at the Vet Clinic.NEWLON-521BAILEYALCLOSESep 14, 2019, 9:25 PMAug 30, 2018, 8:56 AMAug 30, 2018, 12:00 PM0:00000:00Sep 6, 2018, 8:56 AMAug 30, 2018, 8:55 AMAug 29, 2018, 12:59 PMKTR-NL01Sep 14, 2019, 9:25 PMMAXADMINNDKKNHMFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 31, 2018, 11:58 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) HVAC-AHU drip pan full and leaking onto machine room floor.NEWLON-575BAILEYALCLOSESep 14, 2019, 9:31 PMAug 31, 2018, 11:58 AMAug 31, 2018, 2:30 PM0:00000:00Sep 7, 2018, 11:58 AMAug 31, 2018, 11:57 AMAug 31, 2018, 8:56 AMKTR-NL01Sep 14, 2019, 9:31 PMMAXADMINNDKL4BFFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 7, 2018, 9:38 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) REQUESTING SERVICES TO REPAIR LEAK FROM CONDENSATE PUMP IN ROOM 401.NEWLON-499BAILEYALCLOSEAug 8, 2019, 11:46 AMAug 8, 2018, 7:00 AMAug 8, 2018, 8:00 AM0:00000:00Sep 6, 2018, 9:38 AMAug 7, 2018, 9:38 AMAug 6, 2018, 3:52 PMKTR-NL01Aug 8, 2019, 11:46 AMMAXADMINNDJYHBZFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 30, 2018, 2:19 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) OVERHEAD DRAIN VALVE IN FAN UNIT IN RM 234. CEILING TILE BECAME WATER LOGGED AND FELLNEWLON-519BAILEYALD20 - PLUMBINGCLOSESep 14, 2019, 9:26 PM3Aug 30, 2018, 2:41 PMSep 5, 2018, 10:00 AM0:00000:00Sep 29, 2018, 2:19 PMAug 30, 2018, 2:19 PMAug 20, 2018, 3:23 PMKTR-NL01Sep 14, 2019, 9:26 PMMAXADMINNDKKPXHFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Sep 14, 2018, 8:51 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) Loud squealing coming from cooling tower. Please check / replace belts.NEWLON-488BAILEYALCLOSESep 14, 2019, 10:05 PMSep 14, 2018, 8:51 AMSep 14, 2018, 3:30 PM0:00000:00Oct 14, 2018, 8:51 AMSep 14, 2018, 8:50 AMSep 14, 2018, 8:19 AMKTR-NL01Sep 14, 2019, 10:05 PMMAXADMINNDKSJLPFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 14, 2018, 6:06 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) THE DEHUMIDIFIER UNIT IN ROOM 437 IS DISCHARGING WATER INTO THE P-WAY. REQUEST PERSONNEL TROUBLESHOOT AND REPAIR THE UNIT.NEWLON-518BAILEYALCLOSEAug 15, 2019, 1:51 PM1Aug 15, 2018, 7:00 AMAug 15, 2018, 10:30 AM0:00000:00Sep 13, 2018, 6:06 AMAug 14, 2018, 6:06 AMAug 13, 2018, 10:18 AMKTR-NL01Aug 15, 2019, 1:51 PMMAXADMINNDK3TKLFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 14, 2018, 10:19 AMEMERGENCYP) AC IN GYM NO WORKING 77 DEGREES AND RISING ALSO CAFETERIA FOR KIDS LUNCH CONDENSATION INCREASINGNAUPAR1-CH905BAILEYALCLOSEAug 15, 2019, 1:53 PM1Aug 14, 2018, 10:30 AMAug 14, 2018, 1:00 PM0:00000:00Aug 15, 2018, 10:19 AMAug 14, 2018, 11:19 AMAug 14, 2018, 10:10 AMKTR-NL01Aug 15, 2019, 1:53 PMMAXADMINNDK3WTMFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 27, 2018, 1:29 PMEMERGENCYP) AC OUT IN ENTIRE BLDG 571NEWLON-A571BAILEYALCLOSEJul 29, 2019, 3:20 AM1Jul 27, 2018, 2:00 PMJul 31, 2018, 7:15 AM0:00000:00Jul 28, 2018, 1:29 PMJul 27, 2018, 2:29 PMJul 27, 2018, 1:25 PMKTR-NL01Jul 29, 2019, 3:20 AMMAXADMINNDJSMPMFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 9, 2018, 7:52 AMEMERGENCYP) A/C NOT WORKING TO BRIDGE TRAINER ROOM 126NEWLON-448BAILEYALCLOSEAug 8, 2019, 11:52 AM1Aug 9, 2018, 9:00 AMAug 9, 2018, 11:00 AM0:00000:00Aug 10, 2018, 7:52 AMAug 9, 2018, 8:52 AMAug 9, 2018, 7:49 AMKTR-NL01Aug 8, 2019, 11:52 AMMAXADMINNDJZLGSFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Dec 11, 2018, 8:50 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) REQUEST NAVFAC TO INVISTIGATE LOW TEMPATURE IN ROOM 351.NEWLON-519BAILEYALCOMPAug 20, 2019, 9:35 AMDec 11, 2018, 8:50 AMAug 20, 2019, 9:35 AM0:00000:00Jan 10, 2019, 8:49 AMDec 11, 2018, 8:49 AMDec 11, 2018, 3:41 AMKTR-NL01Aug 20, 2019, 9:35 AMJUDGECGNDMWBJGFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Nov 6, 2018, 7:29 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) Check all spaces for proper operation of heating equipment. LCDR Fornal or CS2 Gonzales can provide access to any secure spaces.NEWLON-439BAILEYALCOMPMay 8, 2019, 9:28 AMNov 6, 2018, 7:29 AMFeb 12, 2019, 3:30 PM0:00000:00Dec 6, 2018, 7:28 AMNov 6, 2018, 7:28 AMNov 5, 2018, 10:29 PMKTR-NL01May 8, 2019, 9:28 AMJUDGECGNDM9B9NFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Nov 9, 2018, 9:05 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) fan in vestibule heater rattlingNEWLON-484BAILEYALCOMPNov 14, 2018, 8:42 AMNov 9, 2018, 9:05 AMNov 13, 2018, 9:30 AM0:00000:00Dec 9, 2018, 9:05 AMNov 9, 2018, 9:05 AMNov 9, 2018, 3:30 AMKTR-NL01Nov 14, 2018, 8:43 AMJUDGECGNDMBNGDFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Dec 14, 2018, 7:18 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) the outside air dampener is not opening. first floor is over heating.NEWLON-484BAILEYALCOMPJan 10, 2019, 3:13 PMDec 14, 2018, 7:18 AMDec 14, 2018, 8:00 AM0:00000:00Jan 13, 2019, 7:17 AMDec 14, 2018, 7:17 AMDec 14, 2018, 1:25 AMKTR-NL01Jan 10, 2019, 3:13 PMJUDGECGNDMXN76FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 31, 2018, 10:13 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606Please disable/override occupancy sensors in rooms to allow HVAC to operate when rooms are emptyNEWLON-430BAILEYALCOMPAug 20, 2019, 8:54 AMAug 31, 2018, 10:13 AMAug 20, 2019, 8:54 AM0:00000:00Sep 7, 2018, 10:13 AMAug 31, 2018, 10:13 AMAug 31, 2018, 9:15 AMKTR-NL01Aug 20, 2019, 8:54 AMSCHULLERC1NDKL3ZCFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Sep 12, 2018, 10:19 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) RM 159 AC thermostat broken.NEWLON-430BAILEYALCOMPAug 20, 2019, 8:54 AMSep 12, 2018, 10:19 AMAug 20, 2019, 8:54 AM0:00000:00Sep 19, 2018, 10:19 AMSep 12, 2018, 10:19 AMSep 12, 2018, 10:01 AMKTR-NL01Aug 20, 2019, 8:54 AMSCHULLERC1NDKRWCFFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Dec 7, 2018, 7:56 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606F) THE HEAT IS THE STORE IS NOT WORKING WAREHOUSE, OFFICE, AND SALES FLOOR IS COLDNEWLON-40BAILEYALCOMPJan 9, 2019, 4:22 PMDec 7, 2018, 7:56 AMDec 7, 2018, 8:00 AM0:00000:00Dec 14, 2018, 7:55 AMDec 7, 2018, 7:55 AMDec 7, 2018, 6:15 AMKTR-NL01Jan 9, 2019, 4:22 PMJUDGECGNDMTZLBFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 20, 2018, 3:01 PMEMERGENCYP) ROOF TOP CHILLER NOT SUPPYING AIR TO ENTIRE BLDGNEWLON-141BAILEYALCLOSEAug 24, 2019, 10:37 PM1Aug 20, 2018, 3:30 PMAug 21, 2018, 9:00 AM0:00000:00Aug 21, 2018, 3:01 PMAug 20, 2018, 4:01 PMAug 20, 2018, 2:51 PMKTR-NL01Aug 24, 2019, 10:37 PMMAXADMINNDK73ZGFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Sep 13, 2018, 1:38 PMEMERGENCYE) No hot water again. Request to please have USP came out and evaluate the water heater. ThanksNEWLON-561BAILEYALCOMPOct 11, 2018, 11:01 AM1Sep 13, 2018, 1:38 PMOct 10, 2018, 10:00 AM0:00000:00Sep 14, 2018, 1:38 PMSep 13, 2018, 2:38 PMSep 13, 2018, 1:34 PMKTR-NL01Oct 11, 2018, 11:01 AMJUDGECGNDKSBY3FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Dec 20, 2018, 2:31 PMEMERGENCYP) NO HEAT ENTIRE BLDGNEWLON-408BAILEYALCOMPJan 9, 2019, 4:20 PM1Dec 20, 2018, 2:31 PMDec 20, 2018, 3:45 PM0:00000:00Dec 21, 2018, 2:31 PMDec 20, 2018, 3:31 PMDec 20, 2018, 2:27 PMKTR-NL01Jan 9, 2019, 4:20 PMJUDGECGNDN4SDBFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Sep 25, 2018, 6:04 AMEMERGENCYP) STEAM LEAK IN THE BASEMENT CAUSING WATER CONDENSATIONNEWLON-120BAILEYALCOMPOct 4, 2018, 2:43 PM1Sep 25, 2018, 6:05 AMSep 27, 2018, 12:00 PM0:00000:00Sep 26, 2018, 6:04 AMSep 25, 2018, 7:04 AMSep 25, 2018, 5:33 AMKTR-NL01Oct 4, 2018, 2:43 PMJUDGECGNDLBK6HFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Nov 5, 2018, 5:36 AMEMERGENCYP) VENTILATION IS OUT IN ENTIRE BLDGNEWLON-499BAILEYALCOMPJan 10, 2019, 8:11 AM1Nov 5, 2018, 5:44 AMNov 16, 2018, 3:30 PM0:00000:00Nov 6, 2018, 5:36 AMNov 5, 2018, 6:36 AMNov 5, 2018, 5:30 AMKTR-NL01Jan 10, 2019, 8:11 AMJUDGECGNDM7WLMFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Sep 18, 2018, 7:02 AMEMERGENCYHVAC CONTRACT: USP: N40085-15-D-9606E) The water heater in the utility room is leaking water and now the whole building is out of hot water. this is a urgent issue as this building is thNEWLON-446BAILEYALCOMPAug 20, 2019, 8:54 AM1Aug 20, 2019, 8:54 AMAug 20, 2019, 8:54 AM0:00000:00Sep 19, 2018, 7:02 AMSep 18, 2018, 8:02 AMSep 17, 2018, 10:11 PMKTR-NL01Aug 20, 2019, 8:54 AMSCHULLERC1NDKTFCRFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Oct 22, 2018, 6:30 AMEMERGENCYP) NO STEAM TO VAPORIZER ROOM UNABLE TO TRAINNEWLON-520BAILEYALCOMPAug 20, 2019, 8:54 AMAug 20, 2019, 8:54 AMAug 20, 2019, 8:54 AM0:00000:00Oct 23, 2018, 6:30 AMOct 22, 2018, 7:30 AMOct 22, 2018, 6:09 AMKTR-NL01Aug 20, 2019, 8:54 AMSCHULLERC1NDLXWPZFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Sep 17, 2018, 6:27 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) CT-186-check the positive air flow of classrooms and offices spaces to see if there needs to be an adjustment. An air quality survey wasCONTOW-CT186BAILEYALCOMPOct 11, 2018, 4:20 PMSep 17, 2018, 6:27 AMSep 17, 2018, 12:00 PM0:00000:00Oct 17, 2018, 6:27 AMSep 17, 2018, 6:27 AMSep 14, 2018, 2:27 PMKTR-NL01Oct 11, 2018, 4:21 PMJUDGECGNDKSXN4FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Oct 30, 2018, 6:33 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) Outbound Tower at Gate 1 has no heat. System only blows cold air.NEWLON-587BAILEYALCOMPAug 20, 2019, 8:54 AMAug 20, 2019, 8:54 AMAug 20, 2019, 8:54 AM0:00000:00Nov 29, 2018, 6:33 AMOct 30, 2018, 6:33 AMOct 29, 2018, 7:22 PMKTR-NL01Aug 20, 2019, 8:55 AMSCHULLERC1NDM4VT7FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Dec 21, 2018, 7:57 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) Temperature in the Library has been 67 degrees for the past two days. It has been a bit chillier since the temp outside has dropped.NEWLON-164BAILEYALD30 - HVACCOMPAug 20, 2019, 9:35 AM3Dec 21, 2018, 7:57 AMAug 20, 2019, 9:35 AM0:00000:00Jan 20, 2019, 7:57 AMDec 21, 2018, 7:57 AMDec 20, 2018, 11:03 PMKTR-NL01Aug 20, 2019, 9:35 AMJUDGECGNDN4SR4FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Dec 21, 2018, 7:12 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) MAU2 is inoperative. Please repair.NEWLON-562BAILEYALCOMPJan 23, 2019, 3:39 PMDec 21, 2018, 7:12 AMJan 7, 2019, 1:30 PM0:00000:00Jan 20, 2019, 7:11 AMDec 21, 2018, 7:11 AMDec 20, 2018, 7:51 PMKTR-NL01Jan 23, 2019, 3:39 PMJUDGECGNDN4SMDFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Nov 9, 2018, 7:25 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) HVAC- Extend steam vent up past louver, steam is entering the mechanical room mezzanineNEWLON-449BAILEYALCOMPSep 19, 2019, 8:37 AMSep 19, 2019, 8:37 AMSep 19, 2019, 8:37 AM0:00000:00Dec 9, 2018, 7:25 AMNov 9, 2018, 7:25 AMNov 8, 2018, 12:36 AMKTR-NL01Sep 19, 2019, 8:37 AMJUDGECGNDMBN39FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Oct 30, 2018, 6:28 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) THERE IS A LEAK IN ROOM 203 THAT IS ABOVE A CEILING TILE AND IS LEAKING ON THE FLOOR. REQUESTING TO HAVE FIX LEAKNEWLON-83BAILEYALCOMPAug 20, 2019, 8:54 AMAug 20, 2019, 8:54 AMAug 20, 2019, 8:54 AM0:00000:00Nov 29, 2018, 6:28 AMOct 30, 2018, 6:28 AMOct 29, 2018, 7:31 PMKTR-NL01Aug 20, 2019, 8:55 AMSCHULLERC1NDM4VPRFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Dec 7, 2018, 7:50 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) 411 south room too hot, fan securedNEWLON-488BAILEYALCOMPDec 19, 2018, 3:59 PMDec 7, 2018, 7:50 AMDec 10, 2018, 10:00 AM0:00000:00Jan 6, 2019, 7:50 AMDec 7, 2018, 7:50 AMDec 7, 2018, 2:18 AMKTR-NL01Dec 19, 2018, 3:59 PMJUDGECGNDMTZKWFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 24, 2018, 8:12 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606P) CHILLER FOR AC IS OFF AND ON, AFFECTING MULTIPLE FLOORS IN THE ENTIRE BLDGNEWLON-492BAILEYALCLOSEAug 24, 2019, 10:46 PMAug 24, 2018, 8:00 AMAug 24, 2018, 10:00 AM0:00000:00Aug 31, 2018, 8:12 AMAug 24, 2018, 8:12 AMAug 23, 2018, 2:51 PMKTR-NL01Aug 24, 2019, 10:46 PMMAXADMINNDK9KVNFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 23, 2018, 12:40 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) Adjust air conditioning for office spaces rooms 211 and 212. These two rooms are excessively cold. A quick response is requested. Waste energy.NEWLON-456BULLOCKBECLOSEJul 29, 2019, 3:04 AMJul 24, 2018, 12:30 PMJul 24, 2018, 3:30 PM0:00000:00Jul 30, 2018, 12:40 PMJul 23, 2018, 12:39 PMJul 23, 2018, 11:13 AMKTR-NL01Jul 29, 2019, 3:04 AMMAXADMINNDJNZH3FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 9, 2018, 1:47 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) BLDG 534 RM 414B A/C NOT WORKINGNEWLON-534BULLOCKBED30 - HVACCLOSEJul 18, 2019, 12:03 AMJul 9, 2018, 2:30 PMJul 9, 2018, 3:00 PM0:00000:00Jul 16, 2018, 1:47 PMJul 9, 2018, 1:47 PMJul 9, 2018, 9:29 AMKTR-NL01Jul 18, 2019, 12:03 AMMAXADMINNDJB9MGFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 22, 2018, 8:03 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606RM 353 A/C NOT WORKING IN ROOMNEWLON-435BULLOCKBECLOSEAug 24, 2019, 10:41 PMAug 22, 2018, 10:00 AMAug 22, 2018, 11:30 AM0:00000:00Aug 29, 2018, 8:03 AMAug 22, 2018, 8:03 AMAug 21, 2018, 1:20 PMKTR-NL01Aug 24, 2019, 10:41 PMMAXADMINNDK7ZXYFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Mar 9, 2018, 9:39 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) THERE IS NO HOT WATER OR HEAT THROUGHOUT THE ENTRIE BLDG, SYSTEMS RUN CONCURRENTLYNEWLON-435BULLOCKBECLOSEMar 11, 2019, 9:24 PMMar 9, 2018, 10:00 AMMar 9, 2018, 11:00 AM0:00000:00Mar 16, 2018, 9:39 AMMar 9, 2018, 9:38 AMMar 9, 2018, 7:59 AMKTR-NL01Mar 11, 2019, 9:24 PMMAXADMINNDDHTS3FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jun 19, 2018, 12:34 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606RM208 AIR CONDITIONING NOT WORKING.NEWLON-462BULLOCKBED30 - HVACCLOSEJun 17, 2019, 6:22 PMJun 19, 2018, 1:00 PMJun 19, 2018, 1:00 PM0:00000:00Jun 26, 2018, 12:34 PMJun 19, 2018, 12:33 PMJun 18, 2018, 12:15 PMKTR-NL01Jun 17, 2019, 6:22 PMMAXADMINNDHB63GFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 9, 2018, 1:48 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) 225B NO A/CNEWLON-492BULLOCKBED30 - HVACCLOSEJul 29, 2019, 1:43 AMJul 9, 2018, 3:00 PMJul 23, 2018, 3:30 PM0:00000:00Jul 16, 2018, 1:48 PMJul 9, 2018, 1:48 PMJul 9, 2018, 9:18 AMKTR-NL01Jul 29, 2019, 1:43 AMMAXADMINNDJB9MHFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 9, 2018, 1:49 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) 128 south room to hot, ac not workingNEWLON-488BULLOCKBED30 - HVACCLOSEJul 29, 2019, 1:43 AMJul 9, 2018, 3:00 PMJul 25, 2018, 11:30 AM0:00000:00Jul 16, 2018, 1:49 PMJul 9, 2018, 1:49 PMJul 9, 2018, 9:20 AMKTR-NL01Jul 29, 2019, 1:43 AMMAXADMINNDJB9MJFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 9, 2018, 1:50 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) 526 north room too hot, ac not workingNEWLON-488BULLOCKBED30 - HVACCLOSEJul 18, 2019, 12:03 AMJul 9, 2018, 3:00 PMJul 13, 2018, 10:00 AM0:00000:00Jul 16, 2018, 1:50 PMJul 9, 2018, 1:49 PMJul 9, 2018, 9:22 AMKTR-NL01Jul 18, 2019, 12:03 AMMAXADMINNDJB9MMFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 18, 2018, 4:04 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) RM 515(A/B) *HOT RM TEMP ON GUN *84 (WINDOW CLOSED) NO AIR COMING OUT OF REGISTER VENTNEWLON-455BULLOCKBED30 - HVACCLOSEJul 29, 2019, 2:33 AMJul 18, 2018, 5:15 PMJul 19, 2018, 8:30 AM0:00000:00Jul 25, 2018, 4:04 PMJul 18, 2018, 4:04 PMJul 18, 2018, 1:21 PMKTR-NL01Jul 29, 2019, 2:33 AMMAXADMINNDJG4ZRFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 22, 2018, 7:51 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) Respond to loud noise from Air conditioning unit located over the mechanical room north side of building 88.NEWLON-88BULLOCKBECLOSEAug 24, 2019, 10:41 PMAug 22, 2018, 9:00 AMAug 22, 2018, 10:00 AM0:00000:00Aug 29, 2018, 7:51 AMAug 22, 2018, 7:50 AMAug 21, 2018, 1:34 PMKTR-NL01Aug 24, 2019, 10:41 PMMAXADMINNDK7ZVXFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 23, 2018, 12:38 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) Restore air conditioning to room 105 engraving shop. After swapping the circuit breaker in the main distribution panel.NEWLON-88BULLOCKBECLOSEJul 29, 2019, 3:04 AMJul 23, 2018, 1:00 PMJul 23, 2018, 3:00 PM0:00000:00Jul 30, 2018, 12:38 PMJul 23, 2018, 12:38 PMJul 23, 2018, 11:11 AMKTR-NL01Jul 29, 2019, 3:04 AMMAXADMINNDJNZGMFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Sep 12, 2018, 9:53 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) 418A a/c does not workNEWLON-492BULLOCKBECLOSESep 14, 2019, 10:02 PMSep 12, 2018, 9:53 AMSep 13, 2018, 10:00 AM0:00000:00Sep 19, 2018, 9:53 AMSep 12, 2018, 9:53 AMSep 12, 2018, 8:38 AMKTR-NL01Sep 14, 2019, 10:02 PMMAXADMINNDKRW74FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 22, 2018, 6:19 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) 518 NO A/C IN THE ROOMNEWLON-560BULLOCKBECLOSEAug 24, 2019, 10:41 PMAug 22, 2018, 7:00 AMAug 22, 2018, 8:00 AM0:00000:00Aug 29, 2018, 6:19 AMAug 22, 2018, 6:19 AMAug 21, 2018, 12:10 PMKTR-NL01Aug 24, 2019, 10:41 PMMAXADMINNDK7ZKKFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jun 25, 2018, 1:06 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) Water leak RM 108 in overhead. Ceiling Tile wet and mold already present. Office was just rehabbed 2 months ago andNEWLON-462BULLOCKBED30 - HVACCLOSEJun 23, 2019, 9:58 PMJun 25, 2018, 12:30 PMJun 25, 2018, 3:30 PM0:00000:00Jul 2, 2018, 1:06 PMJun 25, 2018, 1:05 PMJun 25, 2018, 12:33 PMKTR-NL01Jun 23, 2019, 9:58 PMMAXADMINNDHHMLVFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 2, 2018, 1:18 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) THE AC ON THE SECOND DECK, SOUTH END IS NOT WORKING PROPERLY. THE OFFICES ARE READING 86 DEGREES.NEWLON-83BULLOCKBECLOSEJul 17, 2019, 11:31 PMJul 2, 2018, 1:00 PMJul 2, 2018, 3:30 PM0:00000:00Jul 9, 2018, 1:18 PMJul 2, 2018, 1:18 PMJul 2, 2018, 11:52 AMKTR-NL01Jul 17, 2019, 11:31 PMMAXADMINNDHT9ZRFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 17, 2018, 1:35 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) 424A a/c not workingNEWLON-492BULLOCKBECLOSEAug 24, 2019, 8:48 PMJul 17, 2018, 2:30 PMJul 31, 2018, 11:00 AM0:00000:00Jul 24, 2018, 1:35 PMJul 17, 2018, 1:35 PMJul 17, 2018, 1:13 PMKTR-NL01Aug 24, 2019, 8:48 PMMAXADMINNDJFDB3FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 17, 2018, 1:37 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) 114A a/c not workingNEWLON-492BULLOCKBECLOSEAug 9, 2019, 8:30 PMJul 17, 2018, 2:30 PMAug 10, 2018, 3:30 PM0:00000:00Jul 24, 2018, 1:37 PMJul 17, 2018, 1:37 PMJul 17, 2018, 1:11 PMKTR-NL01Aug 9, 2019, 8:30 PMMAXADMINNDJFDB9FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 16, 2018, 2:43 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) AC IS NOT WORKING PROPERLY THROUGHOUT BASEMENT CAUSING OFFICES TO GET HOT.NEWLON-83BULLOCKBECLOSEJul 29, 2019, 2:22 AMJul 16, 2018, 3:30 PMJul 17, 2018, 12:00 PM0:00000:00Jul 23, 2018, 2:43 PMJul 16, 2018, 2:43 PMJul 16, 2018, 9:51 AMKTR-NL01Jul 29, 2019, 2:22 AMMAXADMINNDJDWNLFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 17, 2018, 1:49 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) RM 408(A/B) *WARM ROOM TEMP ON GUN *80-AIR NOT COMING OUT OF REGISTER VENT, WINDOW SHUTNEWLON-455BULLOCKBECLOSEJul 29, 2019, 2:26 AMJul 17, 2018, 2:30 PMJul 17, 2018, 3:30 PM0:00000:00Jul 24, 2018, 1:49 PMJul 17, 2018, 1:48 PMJul 17, 2018, 9:13 AMKTR-NL01Jul 29, 2019, 2:26 AMMAXADMINNDJFDCDFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 17, 2018, 1:36 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) 413A a/c not workingNEWLON-492BULLOCKBECLOSEAug 24, 2019, 8:48 PMJul 17, 2018, 2:30 PMJul 31, 2018, 2:30 PM0:00000:00Jul 24, 2018, 1:36 PMJul 17, 2018, 1:36 PMJul 17, 2018, 1:12 PMKTR-NL01Aug 24, 2019, 8:48 PMMAXADMINNDJFDB4FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 16, 2018, 1:04 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) RM 415 *HOT ROOM TEMP ON GUN *85*NEWLON-455BULLOCKBED30 - HVACCLOSEJul 18, 2019, 12:24 AM1Jul 16, 2018, 2:30 PMJul 16, 2018, 3:30 PM0:00000:00Jul 23, 2018, 1:04 PMJul 16, 2018, 1:04 PMJul 16, 2018, 10:31 AMKTR-NL01Jul 18, 2019, 12:24 AMMAXADMINNDJDW7FFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 16, 2018, 2:42 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) AC IS NOT WORKING PROPERLY IN FLEET AND FAMILY AND IS MAKING THE OFFICES HOT.NEWLON-83BULLOCKBECLOSEJul 29, 2019, 2:22 AMJul 16, 2018, 3:30 PMJul 17, 2018, 3:45 PM0:00000:00Jul 23, 2018, 2:42 PMJul 16, 2018, 2:42 PMJul 16, 2018, 9:17 AMKTR-NL01Jul 29, 2019, 2:22 AMMAXADMINNDJDWNJFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 17, 2018, 1:33 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) 608B a/c not workingNEWLON-492BULLOCKBECLOSEJul 29, 2019, 2:26 AMJul 17, 2018, 2:30 PMJul 20, 2018, 12:00 PM0:00000:00Jul 24, 2018, 1:33 PMJul 17, 2018, 1:33 PMJul 17, 2018, 1:14 PMKTR-NL01Jul 29, 2019, 2:26 AMMAXADMINNDJFD9VFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Mar 6, 2018, 7:05 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) Requesting NAVFAC plumbing/heating to check hot water heater, Water temperature gets to scalding hot temperatures,( no adjustment for temp controlNEWLON-141BULLOCKBED30 - HVACCLOSEMar 11, 2019, 9:10 PMMar 6, 2018, 7:05 AMMar 7, 2018, 7:11 AM0:00000:00Apr 5, 2018, 7:05 AMMar 6, 2018, 7:04 AMMar 5, 2018, 1:20 PMKTR-NL01Mar 11, 2019, 9:10 PMMAXADMINNDDGGDKFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 24, 2018, 2:35 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) Room 3028 Water leaking in the overhead. This was looked at last week.NEWLON-449BULLOCKBECLOSEJul 29, 2019, 3:09 AMJul 25, 2018, 9:00 AMJul 25, 2018, 11:00 AM0:00000:00Aug 23, 2018, 2:35 PMJul 24, 2018, 2:35 PMJul 24, 2018, 8:22 AMKTR-NL01Jul 29, 2019, 3:09 AMMAXADMINNDJPTSZFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 24, 2018, 2:38 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) 3rd Floor Corridor Damper on VAV not opening causing loud pitch noise.NEWLON-449BULLOCKBECLOSEJul 29, 2019, 3:09 AMJul 25, 2018, 7:00 AMJul 25, 2018, 9:00 AM0:00000:00Aug 23, 2018, 2:38 PMJul 24, 2018, 2:38 PMJul 24, 2018, 8:23 AMKTR-NL01Jul 29, 2019, 3:09 AMMAXADMINNDJPTTSFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Mar 6, 2018, 4:16 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) 512B no heatNEWLON-492BULLOCKBECLOSEMar 11, 2019, 9:14 PMMar 7, 2018, 9:30 AMMar 9, 2018, 8:00 AM0:00000:00Apr 5, 2018, 4:16 PMMar 6, 2018, 4:16 PMMar 6, 2018, 2:02 PMKTR-NL01Mar 11, 2019, 9:14 PMMAXADMINNDDGTGNFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Apr 20, 2018, 8:34 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) THE HEATER IN THE BASEMENT NEXT TO THE ELEVATOR IS GIVING OFF A BURNING SMELL. THE HEATER HAS BEEN SHUT OFF FOR NOW.NEWLON-83BULLOCKBECLOSEApr 24, 2019, 12:21 AMApr 23, 2018, 7:30 AMApr 23, 2018, 10:00 AM0:00000:00May 20, 2018, 8:34 AMApr 20, 2018, 8:34 AMApr 19, 2018, 1:52 PMKTR-NL01Apr 24, 2019, 12:21 AMMAXADMINNDFL79RFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jun 25, 2018, 10:56 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) AHU-1 condensate blocked, water coming out the unit.NEWLON-449BULLOCKBECLOSEJun 23, 2019, 9:58 PMJun 25, 2018, 1:00 PMJun 26, 2018, 9:00 AM0:00000:00Jul 25, 2018, 10:56 AMJun 25, 2018, 10:56 AMJun 25, 2018, 6:48 AMKTR-NL01Jun 23, 2019, 9:58 PMMAXADMINNDHHK76FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 22, 2018, 6:18 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) 154 A/C leaking water into room. Repeat Issue.NEWLON-430BULLOCKBECLOSEAug 24, 2019, 10:41 PMAug 23, 2018, 10:30 AMAug 23, 2018, 12:30 PM0:00000:00Sep 21, 2018, 6:18 AMAug 22, 2018, 6:17 AMAug 21, 2018, 10:40 AMKTR-NL01Aug 24, 2019, 10:41 PMMAXADMINNDK7ZKGFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 22, 2018, 6:18 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606Room 303 water leaking from the A/C unitNEWLON-434BULLOCKBECLOSEAug 24, 2019, 10:41 PMAug 23, 2018, 7:00 AMAug 24, 2018, 10:30 AM0:00000:00Sep 21, 2018, 6:18 AMAug 22, 2018, 6:18 AMAug 21, 2018, 10:42 AMKTR-NL01Aug 24, 2019, 10:41 PMMAXADMINNDK7ZKHFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Apr 12, 2018, 7:24 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) RM 204 THERMOSTAT DOES NOT WORK ALWAYS BLOWING 90 DEGREE AIRNEWLON-430BULLOCKBECLOSEApr 23, 2019, 11:38 PMApr 12, 2018, 9:00 AMApr 18, 2018, 9:00 AM0:00000:00Apr 19, 2018, 7:24 AMApr 12, 2018, 7:24 AMApr 11, 2018, 12:27 PMKTR-NL01Apr 23, 2019, 11:38 PMMAXADMINNDFCYDKFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Apr 12, 2018, 2:15 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) Request replacement of valve for steam piping. There is a continuous stream flowing out of the telltale hole in the valve.NEWLON-533BULLOCKBED20 - PLUMBINGCLOSEApr 23, 2019, 11:44 PMApr 12, 2018, 2:30 PMApr 24, 2018, 12:00 PM0:00000:00Apr 19, 2018, 2:15 PMApr 12, 2018, 2:14 PMApr 12, 2018, 10:46 AMKTR-NL01Apr 23, 2019, 11:44 PMMAXADMINNDFDBXHFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Sep 12, 2018, 9:52 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) 420A a/c does not workNEWLON-492BULLOCKBECLOSESep 14, 2019, 10:02 PMSep 12, 2018, 9:52 AMSep 14, 2018, 11:00 AM0:00000:00Sep 19, 2018, 9:52 AMSep 12, 2018, 9:52 AMSep 12, 2018, 8:31 AMKTR-NL01Sep 14, 2019, 10:02 PMMAXADMINNDKRW6ZFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jun 21, 2018, 6:49 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) THERE IS NO A/C IN NAVY HOUSING RM 148NEWLON-83BULLOCKBECLOSEJun 17, 2019, 6:28 PMJun 21, 2018, 7:00 AMJun 21, 2018, 12:00 PM0:00000:00Jun 28, 2018, 6:49 AMJun 21, 2018, 6:48 AMJun 20, 2018, 1:24 PMKTR-NL01Jun 17, 2019, 6:28 PMMAXADMINNDHFYZHFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 5, 2018, 8:08 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606P) THE MECHANICAL ROOM PUMP IS LEAKING WATERDOLGAR-DG50BULLOCKBED20 - PLUMBINGCLOSEJul 17, 2019, 11:49 PMJul 16, 2018, 11:00 AMJul 16, 2018, 12:00 PM0:00000:00Jul 12, 2018, 8:08 AMJul 5, 2018, 8:08 AMJul 4, 2018, 12:02 PMKTR-NL01Jul 17, 2019, 11:49 PMMAXADMINNDJ7RW3FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 5, 2018, 8:34 AMURGENTFOLLOWUP CALL TO MAXIMO# DHTB4KNEWLON-562BULLOCKBED30 - HVACCLOSEJul 17, 2019, 11:49 PMJul 5, 2018, 9:00 AMJul 11, 2018, 3:30 PM0:00000:00Jul 12, 2018, 8:34 AMJul 5, 2018, 8:20 AMJul 5, 2018, 8:15 AMKTR-NL01Jul 17, 2019, 11:49 PMMAXADMINNDHTB4KDJ7RZFFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 7, 2018, 10:26 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) ROOF TOP A/C UNIT HAS CONDENSATE LEAK THAT IS LEAKING INTO RM 205NEWLON-40BULLOCKBECLOSEAug 8, 2019, 11:47 AMAug 7, 2018, 8:30 AMAug 7, 2018, 10:00 AM0:00000:00Aug 14, 2018, 10:26 AMAug 7, 2018, 10:25 AMAug 7, 2018, 6:34 AMKTR-NL01Aug 8, 2019, 11:47 AMMAXADMINNDJYHGPFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 28, 2018, 1:23 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) THE AC BODYWORKS GYMS IS NOT WORKING PROPELRY.NEWLON-83BULLOCKBECLOSEAug 24, 2019, 10:51 PMAug 28, 2018, 2:30 PMAug 28, 2018, 3:30 PM0:00000:00Sep 4, 2018, 1:23 PMAug 28, 2018, 1:23 PMAug 28, 2018, 8:55 AMKTR-NL01Aug 24, 2019, 10:51 PMMAXADMINNDKJR9NFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Mar 5, 2018, 7:03 AMURGENTP) NO HEAT IN PRINTING SHOP CURRENT TEMP IS 57 DEGREESNEWLON-83BULLOCKBECLOSEMar 11, 2019, 9:01 PM1Mar 5, 2018, 7:00 AMMar 5, 2018, 10:30 AM0:00000:00Mar 12, 2018, 7:03 AMMar 5, 2018, 7:02 AMMar 5, 2018, 7:00 AMKTR-NL01Mar 11, 2019, 9:01 PMMAXADMINNDDFN7MFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
May 2, 2018, 7:31 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) Rooms were overheating, facilities reversed action on VAV as temporary fix.NEWLON-575BULLOCKBECLOSEMay 11, 2019, 11:11 PMMay 2, 2018, 9:00 AMMay 2, 2018, 1:00 PM0:00000:00May 9, 2018, 7:31 AMMay 2, 2018, 7:31 AMMay 2, 2018, 6:26 AMKTR-NL01May 11, 2019, 11:11 PMMAXADMINNDFXZ94FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jun 5, 2018, 10:09 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606REQUESTING TO HAVE THE TEMPERATURE CHECKED OR ADJUSTED ON THE 3RD DECK NORTH END SOME AREAS ARE WARM AND SOME ARE COLD.NEWLON-83BULLOCKBECLOSEJun 5, 2019, 12:45 PMJun 5, 2018, 12:00 PMJun 5, 2018, 3:30 PM0:00000:00Jun 12, 2018, 10:09 AMJun 5, 2018, 10:09 AMJun 4, 2018, 12:26 PMKTR-NL01Jun 5, 2019, 12:45 PMMAXADMINNDGWZSGFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
May 21, 2018, 2:00 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) 1ST Floor AC has little to no airflow. Temps on 1st floor are warmer then the rest of the building.NEWLON-106BULLOCKBECLOSEMay 25, 2019, 11:05 PM3May 21, 2018, 2:30 PMMay 21, 2018, 3:30 PM0:00000:00May 28, 2018, 2:00 PMMay 21, 2018, 2:00 PMMay 21, 2018, 1:36 PMKTR-NL01May 25, 2019, 11:05 PMMAXADMINNDGFCWXFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jun 18, 2018, 7:56 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606P) AHU IS CURRENTLY OUT OF COMMISSIONNEWLON-518BULLOCKBED30 - HVACCLOSEJun 17, 2019, 6:17 PM5Jun 18, 2018, 9:30 AMJun 18, 2018, 1:30 PM0:00000:00Jun 25, 2018, 7:56 AMJun 18, 2018, 7:56 AMJun 18, 2018, 6:34 AMKTR-NL01Jun 17, 2019, 6:17 PMMAXADMINNDH67NCFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jun 20, 2018, 12:00 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) RM 514(A/B) *WARM RM TEMPS AT 78* ON THERMOMETER GUNNEWLON-455BULLOCKBECLOSEJun 23, 2019, 9:53 PMJun 20, 2018, 2:00 PMJun 26, 2018, 3:00 PM0:00000:00Jun 27, 2018, 12:00 PMJun 20, 2018, 12:00 PMJun 20, 2018, 10:59 AMKTR-NL01Jun 23, 2019, 9:53 PMMAXADMINNDHDXGGFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jun 20, 2018, 9:27 AMURGENTHVAC CONTRACT: USP: N40085-15-D-9606ROOMS 19 AND 20 AT REGION LEGAL SERVICE OFFICE HAVE BEEN VERY WARM FOR SEVERAL DAYS. REQUEST THATNEWLON-84BULLOCKBECLOSEJun 17, 2019, 6:26 PMJun 20, 2018, 11:00 AMJun 20, 2018, 12:00 PM0:00000:00Jun 27, 2018, 9:27 AMJun 20, 2018, 9:27 AMJun 19, 2018, 9:41 AMKTR-NL01Jun 17, 2019, 6:26 PMMAXADMINNDHDMBYFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 11, 2018, 12:38 PMURGENTHVAC CONTRACT: USP: N40085-15-D-9606E) 309 A/C BLOWER IS NOT WORKINGNEWLON-560BULLOCKBED30 - HVACCLOSEJul 18, 2019, 12:14 AM1Jul 11, 2018, 2:00 PMJul 13, 2018, 12:00 PM0:00000:00Jul 18, 2018, 12:38 PMJul 11, 2018, 12:38 PMJul 11, 2018, 9:45 AMKTR-NL01Jul 18, 2019, 12:14 AMMAXADMINNDJCG39FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 23, 2018, 2:12 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) 501B a/c not workingNEWLON-492BULLOCKBED30 - HVACCLOSEJul 29, 2019, 3:05 AMJul 25, 2018, 7:00 AMJul 25, 2018, 7:30 AM0:00000:00Aug 22, 2018, 2:12 PMJul 23, 2018, 2:12 PMJul 23, 2018, 9:19 AMKTR-NL01Jul 29, 2019, 3:05 AMMAXADMINNDJP3LKFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Mar 6, 2018, 7:55 AMROUTINEF/U CALL TO DDFPYJ FOR LEAK REPAIR. WATER LEAKING FROM WALLS PRESUMED TO BE STEAM LINESNEWLON-533BULLOCKBED30 - HVACCLOSEMar 11, 2019, 9:11 PMMar 6, 2018, 12:30 PMMar 6, 2018, 1:00 PM0:00000:00Apr 5, 2018, 7:55 AMMar 6, 2018, 7:53 AMMar 6, 2018, 7:50 AMKTR-NL01Mar 11, 2019, 9:11 PMMAXADMINNDDFPYJDDGLJVFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jun 21, 2018, 6:48 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606THERE IS A LEAK IN THE CEILING IN FLEET AND FAMILY BACK ROOM THAT HAS DAMAGED THE CEILING TILE AND IS LEAKING ON DECKNEWLON-83BULLOCKBECLOSEJul 17, 2019, 10:30 PMJun 21, 2018, 12:30 PMJul 9, 2018, 12:00 PM0:00000:00Jul 21, 2018, 6:48 AMJun 21, 2018, 6:48 AMJun 20, 2018, 1:14 PMKTR-NL01Jul 17, 2019, 10:30 PMMAXADMINNDHFYZGFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Apr 2, 2018, 11:53 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) RM 420 (A/B) COLD ROOM TEMP AT *65 ON THERMOMETER GUNNEWLON-455BULLOCKBECLOSEApr 3, 2019, 3:37 AMApr 3, 2018, 7:10 AMApr 3, 2018, 11:00 AM0:00000:00May 2, 2018, 11:53 AMApr 2, 2018, 11:52 AMMar 30, 2018, 8:05 AMKTR-NL01Apr 3, 2019, 3:37 AMMAXADMINNDF73YRFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Apr 19, 2018, 12:16 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) Please evaluate 2nd Heat Exchanger due to condition of 1st Heat Exchanger that failed and has since been replaced.NEWLON-449BULLOCKBECLOSEApr 24, 2019, 12:16 AMApr 20, 2018, 7:30 AMApr 20, 2018, 10:30 AM0:00000:00May 19, 2018, 12:16 PMApr 19, 2018, 12:15 PMApr 19, 2018, 7:53 AMKTR-NL01Apr 24, 2019, 12:16 AMMAXADMINNDFJ47PFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
May 2, 2018, 6:58 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) Request USP to investigate and repair/ restore if needed the chilled water loop. The chilled water pump #2 had an issue with the power feed.NEWLON-153BULLOCKBECLOSEMay 11, 2019, 11:11 PMMay 2, 2018, 1:00 PMMay 2, 2018, 3:00 PM0:00000:00Jun 1, 2018, 6:58 AMMay 2, 2018, 6:57 AMMay 1, 2018, 1:06 PMKTR-NL01May 11, 2019, 11:11 PMMAXADMINNDFXYXXFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Apr 30, 2018, 10:31 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) 423 SOUTH room too hot, fan securedNEWLON-488BULLOCKBECLOSEMay 11, 2019, 10:58 PMMay 1, 2018, 7:00 AMMay 1, 2018, 8:00 AM0:00000:00May 30, 2018, 10:31 AMApr 30, 2018, 10:31 AMApr 30, 2018, 8:27 AMKTR-NL01May 11, 2019, 10:58 PMMAXADMINNDFWFRNFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 20, 2018, 12:34 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) Resolve leak in ceiling of room 103. Ceiling tile has fallen from the ceiling. Looked in the overhead and can not determine to where it's coming fNEWLON-524BULLOCKBECLOSEAug 24, 2019, 10:36 PMAug 21, 2018, 9:00 AMAug 21, 2018, 11:15 AM0:00000:00Sep 19, 2018, 12:34 PMAug 20, 2018, 12:34 PMAug 20, 2018, 10:22 AMKTR-NL01Aug 24, 2019, 10:36 PMMAXADMINNDK6ZSHFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Apr 30, 2018, 9:18 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) 1/3, 2/3 steam valve leaking.NEWLON-449BULLOCKBECLOSEMay 11, 2019, 10:58 PMMay 1, 2018, 9:00 AMMay 1, 2018, 3:30 PM0:00000:00May 30, 2018, 9:18 AMApr 30, 2018, 9:18 AMApr 30, 2018, 7:19 AMKTR-NL01May 11, 2019, 10:58 PMMAXADMINNDFWF94FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Apr 30, 2018, 1:16 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) THE WATER HEATER IN THE FIRST DECK MACHINERY ROOM IS LEAKING. REQUEST PERSONNEL REPAIR THE LEAK.NEWLON-518BULLOCKBECLOSEMay 11, 2019, 10:59 PMMay 1, 2018, 7:00 AMMay 1, 2018, 10:00 AM0:00000:00May 30, 2018, 1:16 PMApr 30, 2018, 1:16 PMApr 30, 2018, 12:43 PMKTR-NL01May 11, 2019, 10:59 PMMAXADMINNDFWHJHFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jun 4, 2018, 12:38 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) 503 north room too hot, ac not workingNEWLON-488BULLOCKBED30 - HVACCLOSEJun 5, 2019, 12:42 PMJun 5, 2018, 1:45 PMJun 7, 2018, 9:15 AM0:00000:00Jul 4, 2018, 12:38 PMJun 4, 2018, 12:38 PMJun 4, 2018, 10:45 AMKTR-NL01Jun 5, 2019, 12:42 PMMAXADMINNDGWSZ7FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Feb 7, 2018, 8:10 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) Troubleshoot and repair heating system in the warehouse area of building 493; 1st floor, DLA spaces. Employees have reported cold temperatures inNEWLON-493BULLOCKBECLOSEFeb 9, 2019, 12:21 PMFeb 8, 2018, 8:00 AMFeb 8, 2018, 10:00 AM0:00000:00Mar 9, 2018, 8:10 AMFeb 7, 2018, 8:10 AMFeb 6, 2018, 1:46 PMKTR-NL01Feb 9, 2019, 12:21 PMMAXADMINNDCSL7HFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Mar 15, 2018, 3:03 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) Investigate leaks in ceiling. Five new spots in the ceiling have be noticed in the calibration lab. Room 201.NEWLON-456BULLOCKBECLOSEMar 21, 2019, 11:44 PMMar 19, 2018, 7:00 AMMar 19, 2018, 10:00 AM0:00000:00Apr 14, 2018, 3:03 PMMar 15, 2018, 3:02 PMMar 8, 2018, 10:51 AMKTR-NL01Mar 21, 2019, 11:44 PMMAXADMINNDDLL3NFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jun 6, 2018, 12:17 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) HVAC-Belimo leakingNEWLON-449BULLOCKBECLOSEJun 8, 2019, 9:49 PMJun 6, 2018, 1:30 PMJun 8, 2018, 11:00 AM0:00000:00Jul 6, 2018, 12:17 PMJun 6, 2018, 12:17 PMJun 6, 2018, 7:27 AMKTR-NL01Jun 8, 2019, 9:49 PMMAXADMINNDGYBBRFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 14, 2018, 1:18 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) This request is for PWD to have the Contractor look at the build up of Condensation through-out the station causing water to dripPOLPAR-PP141BULLOCKBECLOSEAug 15, 2019, 1:54 PMAug 15, 2018, 8:00 AMAug 17, 2018, 3:30 PM0:00000:00Sep 13, 2018, 1:18 PMAug 14, 2018, 1:18 PMAug 14, 2018, 11:00 AMKTR-NL01Aug 15, 2019, 1:54 PMMAXADMINNDK3Y3NFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Apr 12, 2018, 2:19 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) AHU 11 will not stay runningNEWLON-449BULLOCKBECLOSEApr 23, 2019, 11:44 PMApr 13, 2018, 7:00 AMApr 13, 2018, 8:30 AM0:00000:00May 12, 2018, 2:19 PMApr 12, 2018, 2:19 PMApr 12, 2018, 7:44 AMKTR-NL01Apr 23, 2019, 11:44 PMMAXADMINNDFDBXWFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 24, 2018, 1:06 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) Building 474 3rd Deck Floor AC UnitNEWLON-474BULLOCKBED30 - HVACCLOSEJul 29, 2019, 3:09 AMJul 25, 2018, 7:00 AMJul 25, 2018, 9:00 AM0:00000:00Aug 23, 2018, 1:06 PMJul 24, 2018, 1:06 PMJul 24, 2018, 12:16 PMKTR-NL01Jul 29, 2019, 3:09 AMMAXADMINNDJPTCTFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Sep 4, 2018, 12:41 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606613B WATER LEAKING FROM CEILING 613A WATER LEAKING FROM CEILINGNEWLON-560BULLOCKBECLOSESep 14, 2019, 9:37 PMSep 4, 2018, 12:41 PMSep 5, 2018, 12:00 PM0:00000:00Oct 4, 2018, 12:41 PMSep 4, 2018, 12:41 PMSep 4, 2018, 11:40 AMKTR-NL01Sep 14, 2019, 9:37 PMMAXADMINNDKM7DCFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Feb 26, 2018, 1:50 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) Heater constantly runningNEWLON-449BULLOCKBECLOSEMar 11, 2019, 8:26 PMFeb 27, 2018, 7:00 AMFeb 27, 2018, 9:30 AM0:00000:00Mar 28, 2018, 1:50 PMFeb 26, 2018, 1:50 PMFeb 26, 2018, 9:46 AMKTR-NL01Mar 11, 2019, 8:26 PMMAXADMINNDDBSLGFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Apr 26, 2018, 8:21 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) Air Handler in COMMS office is alarming and not working, request assessment and repair.NEWLON-87BULLOCKBECLOSEApr 27, 2019, 8:54 PMApr 27, 2018, 7:00 AMApr 27, 2018, 10:00 AM0:00000:00May 26, 2018, 8:21 AMApr 26, 2018, 8:21 AMApr 26, 2018, 8:16 AMKTR-NL01Apr 27, 2019, 8:54 PMMAXADMINNDFSSCGFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
May 23, 2018, 10:57 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) IN THE TRIAL DEPARTMENT CONFERENCE ROOM, ROOM 13, THERE HAS BEEN A INTERMITTENT NOISE COMING FROM ABOVE THE CEILING TILESNEWLON-84BULLOCKBECLOSEJun 9, 2019, 8:23 PMMay 24, 2018, 7:00 AMJun 13, 2018, 3:00 PM0:00000:00Jun 22, 2018, 10:57 AMMay 23, 2018, 10:57 AMMay 23, 2018, 10:01 AMKTR-NL01Jun 9, 2019, 8:23 PMMAXADMINNDGL9G9FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Mar 2, 2018, 6:15 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) In Building 383, the heaters in T3 and PS3 are broken. The corners of the heaters are loose and falling off.CONTOW-CT383BULLOCKBECLOSEMar 11, 2019, 8:54 PMMar 2, 2018, 7:00 AMMar 15, 2018, 9:30 AM0:00000:00Apr 1, 2018, 6:15 AMMar 2, 2018, 6:15 AMMar 1, 2018, 1:44 PMKTR-NL01Mar 11, 2019, 8:54 PMMAXADMINNDDDKCYFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Apr 12, 2018, 2:18 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) Water leak from heating line, was noticed when chiller kicked on.NEWLON-449BULLOCKBECLOSEApr 23, 2019, 11:44 PMApr 13, 2018, 8:00 AMApr 13, 2018, 3:30 PM0:00000:00May 12, 2018, 2:18 PMApr 12, 2018, 2:18 PMApr 12, 2018, 7:42 AMKTR-NL01Apr 23, 2019, 11:44 PMMAXADMINNDFDBXRFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jul 23, 2018, 10:58 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) 605B a/c not workingNEWLON-492BULLOCKBED30 - HVACCLOSEJul 29, 2019, 3:04 AMJul 25, 2018, 9:00 AMJul 25, 2018, 9:30 AM0:00000:00Aug 22, 2018, 10:58 AMJul 23, 2018, 10:57 AMJul 23, 2018, 9:35 AMKTR-NL01Jul 29, 2019, 3:04 AMMAXADMINNDJNYHHFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Apr 16, 2018, 3:30 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) 213A room is too hot 90 degreesNEWLON-492BULLOCKBECLOSEMay 11, 2019, 9:27 PMApr 17, 2018, 12:30 PMMay 2, 2018, 3:30 PM0:00000:00May 16, 2018, 3:30 PMApr 16, 2018, 3:29 PMApr 16, 2018, 1:16 PMKTR-NL01May 11, 2019, 9:27 PMMAXADMINNDFFKP6FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jun 6, 2018, 11:57 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) BLDG 455 LOWER LEVEL LAUNDRY ROOM WATER LEAKING FROM OVERHEAD PIPING SYSTEM (SUPPLY OR RETURN-LINE) AC UNITNEWLON-455BULLOCKBECLOSEJun 24, 2019, 8:34 PMJun 6, 2018, 1:30 PMJun 28, 2018, 3:00 PM0:00000:00Jul 6, 2018, 11:57 AMJun 6, 2018, 11:57 AMJun 5, 2018, 2:09 PMKTR-NL01Jun 24, 2019, 8:34 PMMAXADMINNDGYB7XFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
May 8, 2018, 10:41 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) FMS was on both rooftops recently and found 4 exhaust fans not working (believed to be bathroom fans)NEWLON-462BULLOCKBED30 - HVACCLOSEMay 11, 2019, 11:29 PM5May 9, 2018, 7:00 AMMay 14, 2018, 3:30 PM0:00000:00Jun 7, 2018, 10:41 AMMay 8, 2018, 10:40 AMMay 8, 2018, 9:29 AMKTR-NL01May 11, 2019, 11:29 PMMAXADMINNDG4VKMFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jun 6, 2018, 12:01 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) 526 NORTH room too hot, thermostat inoperableNEWLON-488BULLOCKBECLOSEJul 2, 2019, 12:29 PMJun 6, 2018, 1:30 PMJul 3, 2018, 12:00 PM0:00000:00Jul 6, 2018, 12:01 PMJun 6, 2018, 12:01 PMJun 6, 2018, 8:35 AMKTR-NL01Jul 2, 2019, 12:29 PMMAXADMINNDGYB99FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jun 6, 2018, 12:02 PMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) 320 MILDEW/DIRT COMING OUT OF VENTNEWLON-560BULLOCKBECLOSEJun 5, 2019, 12:48 PMJun 6, 2018, 2:00 PMJun 6, 2018, 3:00 PM0:00000:00Jul 6, 2018, 12:02 PMJun 6, 2018, 12:02 PMJun 6, 2018, 8:41 AMKTR-NL01Jun 5, 2019, 12:48 PMMAXADMINNDGYB9BFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 22, 2018, 8:19 AMROUTINEHVAC CONTRACT: USP: N40085-15-D-9606E) Request Trouble shooting and leak repair to Fan Coil Unit (156-FCU-240-3) located in northeast corner of NSMRL Library.NEWLON-156BULLOCKBECLOSEAug 24, 2019, 10:42 PMAug 23, 2018, 7:00 AMAug 23, 2018, 12:00 PM0:00000:00Sep 21, 2018, 8:19 AMAug 22, 2018, 8:18 AMAug 21, 2018, 8:44 AMKTR-NL01Aug 24, 2019, 10:42 PMMAXADMINNDK933FFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Mar 5, 2018, 9:26 AMEMERGENCYHVAC CONTRACT: USP: N40085-15-D-9606P) MAIN FAN RM AIR COMPRESSOR BELTS HAVE BROKEN AND HAVE CAUSED THE PUMPS TO SEIZE STOPPING TRAININGNEWLON-520BULLOCKBECLOSEMar 11, 2019, 9:05 PMMar 5, 2018, 9:30 AMMar 5, 2018, 3:30 PM0:00000:00Mar 6, 2018, 9:26 AMMar 5, 2018, 10:26 AMMar 5, 2018, 7:59 AMKTR-NL01Mar 11, 2019, 9:05 PMMAXADMINNDDFWZRFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
May 14, 2018, 10:17 AMEMERGENCYP) HIGH PRESSURE STEAM LEAK IN MECH ROOM 0100NEWLON-449BULLOCKBECLOSEMay 11, 2019, 11:39 PM1May 14, 2018, 10:00 AMMay 14, 2018, 3:30 PM0:00000:00May 15, 2018, 10:17 AMMay 14, 2018, 11:17 AMMay 14, 2018, 10:15 AMKTR-NL01May 11, 2019, 11:39 PMMAXADMINNDGBFCZFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jun 6, 2018, 11:47 AMEMERGENCYP) CHILLER DOWN - NO A.C THROUGHOUT ENTIRE BUILDINGNEWLON-434BULLOCKBECLOSEJun 5, 2019, 12:48 PM1Jun 6, 2018, 12:30 PMJun 6, 2018, 3:30 PM0:00000:00Jun 7, 2018, 11:47 AMJun 6, 2018, 12:47 PMJun 6, 2018, 11:46 AMKTR-NL01Jun 5, 2019, 12:48 PMMAXADMINNDGYB7MFACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Jun 18, 2018, 1:38 PMEMERGENCYP) THERE IS NO A/C IN PART OF THE BUILDINGNEWLON-448BULLOCKBECLOSEJun 17, 2019, 6:19 PM1Jun 18, 2018, 2:00 PMJun 18, 2018, 3:30 PM0:00000:00Jun 19, 2018, 1:38 PMJun 18, 2018, 2:38 PMJun 18, 2018, 1:36 PMKTR-NL01Jun 17, 2019, 6:19 PMMAXADMINNDH6CF4FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK
Aug 14, 2018, 12:41 PMEMERGENCYHVAC CONTRACT: USP: N40085-15-D-9606P)HVAC - LEAK IN GYM.NAUPAR1-CH905BULLOCKBED30 - HVACCLOSEAug 15, 2019, 1:54 PM5Aug 14, 2018, 1:00 PMAug 14, 2018, 1:30 PM0:00000:00Aug 15, 2018, 12:41 PMAug 14, 2018, 1:41 PMAug 14, 2018, 12:19 PMKTR-NL01Aug 15, 2019, 1:54 PMMAXADMINNDK3XS3FACILITIESKTR-NL01A.N4008500.10.TRACK10AWORK

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .