1502000 – Facility Investment
SECTION F: DELIVERIES OR PERFORMANCE
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original/ Copies
Number of Copies
(including original)
1502000/ 2.2.1
N/A
Certification, Training, and Licensing
Within 15 days after award or as requested by the
KO
KO 1 Once for initial submittal, then as requested
1502000/ 2.3
N/A Discharges of Sewer Compatible (MISC) Wastewater
First work day of the month
KO/EV 2 Quarterly
2.3.3.1 N/A Pre Existing
Conditions Survey
120 calendar days after contract award
KO 2 As Specified
1502000/ 2.3.6
J-1502000-10 Ozone Depleting Substances (ODS) Requirements for Refrigerant Recycling
Within the 10th day of the following month
KO/EV 2 Monthly
1502000/ 3.1
J-1502000-20 Service Order Summary Report
First work day of each month
KO 2 Monthly
1502000/ 3.2
Preventive Maintenance Program Plan
30 calendar days after contract award
KO 2 Annually
1502000/ 3.2
N/A Monthly PM Work Schedule
Five work days prior to the beginning of each month
KO 1 Monthly
1502000/ 3.2
J-1502000-21 Preventative Maintenance Summary Report
First work day of each month
KO 2 Monthly
1502000/ 3.2
N/A Unaccomplished PM Summary Report
First work day of each month
KO 2 Monthly
3.2.2 N/A Boilers and UPVs
Tune Up Report
First work day of each month
KO 2 Monthly
1502000/ 3.3
Prescriptive
Schedule
30 calendar days after contract award
KO 2 Annually
1502000/ 3.3
J-1502000-22 Prescriptive
Summary Report
First work day of each month
KO 2 Monthly
3.3.3 N/A Hot and Cold
Closed Loop HVAC Systems
First work day of each month
KO 2 Monthly
1502000/ 3.4
Inspection, Testing, and Certification Program Summary Report
KO 2 Monthly
1502000/ 3.4
Inspection, Testing and Certification
First work day of
KO 2 Monthly
Schedule and Equipment Certifications
1502000/ 3.4.1
Boilers and UPV inspection reports and inspection certificates
KO 2 Monthly
1502000/ 3.5.1
N/A Exhaust Hoods and Ducts Summary Report
First work day of each month
KO 2 Monthly
1502000/ 3.5.2
N/A HVAC Seasonal Start-Up and Shutdown Summary Report
Within 2 hours of start of regular business hours
KO 1 Daily During Start-Up and
Shutdown
1502000/ 3.5.3
N/A HVAC Water Treatment test Report
First work day of each month
KO 1 Monthly
1502000/ 3.5.4
N/A Boiler Seasonal Start-Up and Shutdown Summary Report
Within 2 hours of start of regular business hours
KO 1 Daily During Start-Up and
Shutdown
1502000/ 3.5.5
N/A Boiler Water Testing and Treatment Report
First work day of
KO 1 Monthly