HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) Maintenance and Repair Services and Direct Digital Controls (DDC)
Solicitation number
N4008520R2502
Issued by

View the file

Other files

File Type Posted
N4008520R250200003.pdf PDF
N4008520R25020002.pdf PDF
J-0200000-04 Invoice Form.pdf PDF
N4008520R25010001.pdf PDF
J-1502000-12A NAVSUBASE NLON FY14 UPV CERT CARDS.pdf PDF
J-1502000-08B BOILER INVENTORY REVISED 2.xls XLS spreadsheet
J-0200000-02D CBA Sup 30OCT19.pdf PDF
J-0200000-02C CBA.pdf PDF
N4008520R2502.pdf PDF
J-0200000-09 - CHARACTERISTIC METER READING INFORMATION v2 - 2016-09-30.xlsx XLSX spreadsheet
HVAC 1502000 WBS Facility Investment.pdf PDF
HVAC 1502000 SECTION J.pdf PDF
J-1502000-20 Service Order Summary Report.xls XLS spreadsheet
J-1502000-16 Navy Sub Systems Water Testing.xlsx XLSX spreadsheet
J-0200000-05F On site Labor Summary Report reviewed.xls XLS spreadsheet
J-1502000-05A HVAC-CALLS 1-1-15 to 12-31-15.xls XLS spreadsheet
J-0200000-15 ACM HISTORICAL DATA.xls XLS spreadsheet
J-1502000-21 Monthly Preventative Maintenance Summary Report.xls XLS spreadsheet
J-0200000-02B SCA 2015-4111.pdf PDF
J-0200000-16 UEM Contractor Outage Process 20141120.pdf PDF
J-1502000-09 BUILDING INVENTORY FOR BAS.xlsx XLSX spreadsheet
0200000 F Management and Administration.pdf PDF
J-1502000-8A Unfired Pressure Vessels NEWLON.xlsx XLSX spreadsheet
J-0200000-07 - ASSET INFORMATION v2 - 2017-04-26.xlsx XLSX spreadsheet
J-1502000-24 Asset Condition Report 2018.xlsx XLSX spreadsheet
J-0200000-06 - SERVICE PROVIDER INFORMATION v1 - 2013-07-07.xlsx XLSX spreadsheet
J-0200000-05E Quality Inspection and Surveillance report reviewed.xls XLS spreadsheet
HVAC 1502000 SECTION F.pdf PDF
J-1502000-19 Direct Condition Rating Guidance.pdf PDF
J-0200000-12 Installation Spill Control Plan.pdf PDF
0200000 C Management and Administration.pdf PDF
0200000 J Management and Administration.pdf PDF
J-0200000-05D contractor incident report system.pdf PDF
J-1502000-10A Refrigerant Appliance Disposal.pdf PDF
J-1502000-05B HVAC-CALLS 1-1-16 to 12-31-16.xls XLS spreadsheet
J-1502000-06 PROPERTY ASSET INVENTORY revised.xls XLS spreadsheet
J-1502000-5D HVAC 2018 Call Log.xlsx XLSX spreadsheet
J-1502000-12B NAVSUBASE NLON FY14 BOILER CERT CARDS.pdf PDF
J-1502000-25 Hot and Cold Closed Loop HVAC.pdf PDF
J-1502000-17 HVAC Systems Seasonal Start-Up and Shutodwn.xlsx XLSX spreadsheet
J-1502000-03 BUILDING INVENTORY.xls XLS spreadsheet
J-1502000-22 Prescriptive Maintenance Summary Report.xls XLS spreadsheet
J-1502000-5C HVAC 2017 Call Log.xlsx XLSX spreadsheet
J-1502000-10B Refrigerant Appliance Installation.pdf PDF
J-1502000-18 Uniformat Classification.pdf PDF
HVAC BID SCHEDULE.xls XLS spreadsheet
J-0200000-08 - ASSET SPECIFICATION v1 - 2016-01-20.xlsx XLSX spreadsheet
J-1502000-23 MP-217_D_00_SB.pdf PDF
J-0200000-02A DBA WD CT20190024.pdf PDF
HVAC 1502000 SECTION C.pdf PDF
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0100000 – General Information Spec Item Title 1 General Information

1.1 Outline of Services

1.2 Project Location

1.3 Acquisition of Additional Work

1.4 Background Information

1.5 Verification of Workload and Conditions

1.6 Climate Patterns

1.7 Related Information

1.8 Navy Approach to Service Contracting

1.8.1 Partnering Philosophy

1.8.2 Contractor's Knowledge

1.8.3 Industry Best Practices

1.9 Standard Template

1.10 Navy PBSA Approach

1.11 Technical Proposal Certification

Spec Item Title Description 1 General Information

1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at Naval Submarine Base New London under a performance-based contract that is comprised of both Recurring Work and Non-Recurring Work Items.

The PWS is organized into annexes. Annex 1 is "General Information".

Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements.

The annex numbers are identified as 1 through 18 in the description column, but the full expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).

Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff N/A Annex 4 Public Safety N/A Annex 5 Air Operations N/A Annex 6 Port Operations N/A Annex 7 Ordnance N/A Annex 8 Range Operations N/A Annex 9 Health Care Support N/A Annex 10 Supply N/A Annex 11 Personnel Support N/A Annex 12 Morale, Welfare and Recreation Support N/A Annex 13 Galley N/A Annex 14 Housing N/A Annex 15 Facilities Support 15020000 Facilities Investment Annex 16 Utilities N/A Annex 17 Base Support Vehicles and Equipment N/A Annex 18 Environmental N/A

1.2 Project Location The work shall be performed at various locations throughout Naval Submarine Base NLON and could vary from location to location. The following is an example of the dispersion of work at the various locations.

(1) Maintenance and Repair of HVAC systems and associated equipment:

various locations.

1.3 Acquisition of

Additional Work

The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.

1.4 Background Information Naval Submarine Base New London is the Navy's first Submarine Base and the "Home of the Submarine Force". In 1868, the State of Connecticut gave the Navy 112 acres of land along the Thames River to build a Naval Station. Although physically located in Groton, CT, the base had their main offices and housing in the larger city of New London, hence was christened as Naval Submarine Base New London. Following World War I, the Navy established schools and training facilities at the base. Today, the Naval Submarine Base New London (SUBASE NLON), located on the east side of Thames River in Groton, CT, proudly claims its motto to be "The First and Finest." The main base currently occupies more than 687 acres and “homeports” sixteen attack submarines. The base also supports more than 70 tenant commands including, Commander Navy Region Northeast (CNRNE), Commander Submarine Group Two (CSG2), Naval Submarine School (SUBSCOL), Naval Submarine Support Facility (NSSF), three Submarine Squadron staffs, the Submarine Force Museum with the world’s first nuclear submarine the USS Nautilus, and the housing and support facilities for more than 21,000 civilian workers, active-duty service members and their families.

1.5 Verification of

Workload and Conditions

Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, inventories, maps, floor plans, and tables to represent the type, quantity, and location of services to be provided.

As prescribed in FAR 52.237-1, offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

1.6 Climate Patterns Connecticut has a humid continental climate. The average yearly temperature along the coast is 51° F. Recorded temperatures in Connecticut range from –32° F, in 1943 at Falls Village, to 105° F, in 1926 at Waterbury.

Throughout most of the state, yearly precipitation varies between about 44 and 48 in. Annual snowfall on the coast is about 27” with inland accumulations averaging 53”. Violent storms in the state are rare, but several hurricanes have struck along the coast. A tornado, rare for this region, touched down North of Hartford in 1979 and did extensive damage.

1.7 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.

Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

Requirement Information further describes client requirements associated with each Performance Objective.

1.8 Navy Approach to

Service Contracting

The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations.

The Navy also supports the following principles:

1.8.1 Partnering Philosophy The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion.

Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.

1.8.2 Contractor's Knowledge The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle.

Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

1.8.3 Industry Best Practices The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. To that end, the Navy's emphasis will be in evaluating performance objectives (end results).

1.9 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.

The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract.

Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the management and administrative requirements. Specification Item 3 will always contain the Recurring Work requirements.

Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items.

Specification Items 3.2 and 3.3 are not considered subordinate to 3.1. All costs associated with Annexes 1 and 2 and Specification Items 1 and 2 must be priced and their price must be allocated across the Exhibit Line Items.

1.10 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.

1.11 Technical Proposal

Certification

The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.