0200000 F Management and Administration.pdf

PDF 104 KB Posted

Attached to
HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) Maintenance and Repair Services and Direct Digital Controls (DDC)
Solicitation number
N4008520R2502
Issued by

View the file

Other files

File Type Posted
N4008520R250200003.pdf PDF
N4008520R25020002.pdf PDF
J-0200000-04 Invoice Form.pdf PDF
N4008520R25010001.pdf PDF
J-1502000-12A NAVSUBASE NLON FY14 UPV CERT CARDS.pdf PDF
J-1502000-08B BOILER INVENTORY REVISED 2.xls XLS spreadsheet
J-0200000-02D CBA Sup 30OCT19.pdf PDF
J-0200000-02C CBA.pdf PDF
N4008520R2502.pdf PDF
J-0200000-09 - CHARACTERISTIC METER READING INFORMATION v2 - 2016-09-30.xlsx XLSX spreadsheet
HVAC 1502000 WBS Facility Investment.pdf PDF
HVAC 1502000 SECTION J.pdf PDF
J-1502000-20 Service Order Summary Report.xls XLS spreadsheet
J-1502000-16 Navy Sub Systems Water Testing.xlsx XLSX spreadsheet
J-0200000-05F On site Labor Summary Report reviewed.xls XLS spreadsheet
J-1502000-05A HVAC-CALLS 1-1-15 to 12-31-15.xls XLS spreadsheet
J-0200000-15 ACM HISTORICAL DATA.xls XLS spreadsheet
J-1502000-21 Monthly Preventative Maintenance Summary Report.xls XLS spreadsheet
J-0200000-02B SCA 2015-4111.pdf PDF
J-0200000-16 UEM Contractor Outage Process 20141120.pdf PDF
J-1502000-09 BUILDING INVENTORY FOR BAS.xlsx XLSX spreadsheet
J-1502000-8A Unfired Pressure Vessels NEWLON.xlsx XLSX spreadsheet
J-0200000-07 - ASSET INFORMATION v2 - 2017-04-26.xlsx XLSX spreadsheet
J-1502000-24 Asset Condition Report 2018.xlsx XLSX spreadsheet
J-0200000-06 - SERVICE PROVIDER INFORMATION v1 - 2013-07-07.xlsx XLSX spreadsheet
J-0200000-05E Quality Inspection and Surveillance report reviewed.xls XLS spreadsheet
HVAC 1502000 SECTION F.pdf PDF
J-1502000-19 Direct Condition Rating Guidance.pdf PDF
J-0200000-12 Installation Spill Control Plan.pdf PDF
0200000 C Management and Administration.pdf PDF
0200000 J Management and Administration.pdf PDF
J-0200000-05D contractor incident report system.pdf PDF
J-1502000-10A Refrigerant Appliance Disposal.pdf PDF
J-1502000-05B HVAC-CALLS 1-1-16 to 12-31-16.xls XLS spreadsheet
J-1502000-06 PROPERTY ASSET INVENTORY revised.xls XLS spreadsheet
J-1502000-5D HVAC 2018 Call Log.xlsx XLSX spreadsheet
J-1502000-12B NAVSUBASE NLON FY14 BOILER CERT CARDS.pdf PDF
J-1502000-25 Hot and Cold Closed Loop HVAC.pdf PDF
J-1502000-17 HVAC Systems Seasonal Start-Up and Shutodwn.xlsx XLSX spreadsheet
J-1502000-03 BUILDING INVENTORY.xls XLS spreadsheet
J-1502000-22 Prescriptive Maintenance Summary Report.xls XLS spreadsheet
J-1502000-5C HVAC 2017 Call Log.xlsx XLSX spreadsheet
0100000 C General Information.pdf PDF
J-1502000-10B Refrigerant Appliance Installation.pdf PDF
J-1502000-18 Uniformat Classification.pdf PDF
HVAC BID SCHEDULE.xls XLS spreadsheet
J-0200000-08 - ASSET SPECIFICATION v1 - 2016-01-20.xlsx XLSX spreadsheet
J-1502000-23 MP-217_D_00_SB.pdf PDF
J-0200000-02A DBA WD CT20190024.pdf PDF
HVAC 1502000 SECTION C.pdf PDF
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0200000 – Management and Administration

SECTION F: DELIVERIES OR PERFORMANCE

Section F – 0200000 Management and Administration

DELIVERABLES

Annex/ Spec Item

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.2.1.2

N/A Request to Work Outside Government’s Regular Working Hours

At least seven calendar days prior to requested day.

KO and

COR

1 As required

0200000/ 2.3.1

N/A Sign-In Sheets and Minutes

Within two working days.

KO, COR

and all attendees

1 As required

0200000/ 2.3.1

N/A Final Revision of Minutes

Within two working days.

KO, COR

and all attendees

1 As required

0200000/ 2.3.4

N/A Permits and Licenses

Before work commences and as requested by the KO.

KO and

COR

1 As specified

0200000/ 2.3.5

N/A Certificate of Insurance

At least 30 calendar days prior to start of contract performance.

KO and

COR

1 As specified

0200000/ 2.6.6.2

J-0200000-06 Service Provider Flat-file

By the end of the following work day when updates are required

KO and

COR

1 As required

0200000/ 2.6.6.2

J-0200000-07 Asset Flat-file By the end of the following work day when updates are required

KO and

COR

1 As required

0200000/ 2.6.6.2

J-0200000-08 Asset Specification Flat-file

By the end of the following work day when updates are required

KO and

COR

1 As required

0200000/ 2.6.6.2

J-0200000-09 Characteristic Meter Flat-file

By the end of the following work day when updates are required

KO and

COR

1 As required

0200000/ 2.6.6.2

J-0200000- 06,07,08,09

Sample Delimited Flat-file

At least 30 calendar days prior to start of contract performance.

KO and

COR

1 As specified

Spec Item

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.6.6.3

N/A List of Personnel Requiring

MAXIMO

Accounts

At least 30 calendar days prior to start of contract performance and within 15 calendar days prior to any changes.

KO and

COR

1 As specified

0200000/ 2.6.7.1

N/A Quality Management Plan

At least 30 calendar days prior to start of contract performance and within 15 calendar days prior to any changes.

KO and

COR

1 As specified

0200000/ 2.6.7.2

N/A QC Inspection File Within five calendar days of completion/ termination of the contract.

KO and

COR

1 As specified

0200000/ 2.6.7.3

J-0200000-5E Contractor Quality Inspection and Surveillance Report

First work day of each month.

KO and

1 Monthly

0200000/ 2.6.8

N/A Property Management Plan

At least 30 calendar days prior to start of contract performance.

N/A

KO and

N/A

2.7.1

N/A List of Key Personnel and Qualifications

At least 30 calendar days prior to start of contract performance.

KO and

COR

1 As specified

0200000/ 2.7.1

N/A Organizational Chart

At least 15 calendar days prior to start of contract performance.

KO and

COR

1 As specified

0200000/ 2.7.2.6

N/A Proof of Legal Residency

Prior to be admitted to site of work.

KO and

Spec Item

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.7.3

N/A Contractor Labor Hours (eCMRA) Report

No later than 31 October.

KO and

COR

1 Annually for labor executed during the period of performance during each Government fiscal year

(FY)

0200000/ 2.8.1

N/A Employee List Upon request. KO and

COR

1 As required

0200000/ 2.8.8

N/A Personnel Security Investigation (PSI), Fingerprint Card (FD87), and OF- 306 Declaration for Federal Employment

Prior to employee access to sensitive unclassified information.

KO, COR,

and

Security Manager

1 As required

0200000/ 2.9.1

N/A Accident Prevention Plan

At least 30 calendar days prior to start of contract performance and 15 calendar days prior to any changes.

KO and

COR

1 As specified

0200000/ 2.9.2

N/A Activity Hazard Analysis

Together with the Accident Prevention Plan and for changes.

KO and

COR

1 As specified

0200000/ 2.9.3

N/A Compliance Plans, Programs, and Procedures

Together with the Accident Prevention Plan and for changes.

KO and

COR

1 As specified

0200000/ 2.9.5

J-0200000- 05D

NAVFAC

Contractor Incident Reporting System

(CIRS)

Within five calendar days of accident.

KO and

COR

1 As required

0200000/ 2.9.5

J-0200000- 05B

Weight Handling Equipment Accident Report

Within 15 working days of accident.

KO and

COR

1 As required

0200000/ 2.9.5

J-0200000- 05C

Crane and Rigging Gear Near Miss Report

Within 15 working days of accident.

KO and

COR

1 As required

0200000/ 2.9.7

J-0200000- 05F

Monthly On-Site Labor Report

First work day of each month.

KO and

Spec Item

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.9.8

N/A OSHA Citations and Violations Corrective Action Report

Within 48 hours after receiving a citation.

KO and

COR

1 As required

0200000/ 2.9.10

N/A Safety Certifications

At least 15 calendar days prior to start of contract performance and prior to expiration of certifications.

KO and

COR

1 As specified

0200000/ 2.10.1.1

N/A Water Conservation Plan

At least 30 calendar days prior to start of contract performance and 15 calendar days prior to any changes.

KO and

COR

1 As specified

0200000/ 2.10.2.1

N/A Written Sampling Plan

Prior to each sampling event

N/A

KO and

1 As required

2.10.2.1

N/A Sampling Results Within 24 hours after receipt of laboratory analysis

N/A

KO and

2.10.2.2

N/A Class I and II ODS Report

Within 24 hours following delivery of refrigerant to

DLA

KO, EV

and COR

1 As required

0200000/ 2.10.2.3

N/A Solid Waste Management Reports

Within three months after start of contract performance and annually by October 10th thereafter

N/A

KO and

2.10.2.3

N/A Recycling Weight Ticket Receipts

As Specified

N/A

KO and

2 Quarterly

Spec Item

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.10.2.5

N/A Waste Stream Determination

At least 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.

N/A

KO and

2.10.2.7

N/A Spill Report Within 48 hours of spill occurrence

KO, EV

and COR

1 As required

0200000/ 2.10.2.8

J-0200000- 05H

Emergency Planning and Community Right- To-Know Act (EPCRA) Report

At least 15 calendar days prior to start of contract performance and not less than 10 working days prior to planned use of hazardous material.

KO, EV

and COR

2 As specified

0200000/ 2.10.2.8

J-0200000-13 Contractor Hazardous Material Inventory Log

Within 15 calendar days after the end of each calendar year and at termination of the contract.

KO, EV

and COR

2 Annually

0200000/ 2.10.2.12

N/A Asbestos Containing Material (ACM)

Written notification within 24 hours of discovery

KO, EV

and COR

2 As specified

0200000/ 2.10.2.13

J-0200000-05I Hazardous Air Pollutant (HAP) Monthly Data

First work day of each month.

KO, EV

and COR

1 Monthly

0200000/ 2.10.2.13

J-0200000-05I Hazardous Air Pollutant (HAP) Semi-annual Report

Semi-annually by July 10th and January 10th

KO, EV

and COR

1 Semi- Annually

Spec Item

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

0200000/ 2.10.3

N/A Sustainable Procurement and Practices Plan

At least 15 calendar days prior to start of contract performance and within 15 calendar days after exercised option periods.

KO and

COR

1 Annually

0200000/ 2.10.3

N/A Sustainable Delivery of Services Report

Within five calendar days after each contract period.

KO and

COR

1 Annually

0200000/ 2.10.3.2

N/A Recovered Material Certification

As specified KO and

COR

1 When a product containing recovered materials is equal to or better than the original and could be used.

0200000/ 2.14.1

N/A Detailed Scope of Work and Detailed Estimate

Within two work days

KO and

COR

2 As required

0200000/ 2.15.2.1

N/A Non-Recurring Work Proposals

Within two working days following receipt of request

KO and

COR

1 As required

0200000/ 2.15.1.1

N/A Non-Recurring Work Quantities Ordered via FedMall

First work day of each month.

N/A

KO and