This document is a price proposal form for a federal contract to repair a failing submarine school building at a naval base in New London, Connecticut. The contract includes whole building repairs, construction of a new sidewalk, site grading, and interior repairs to fire protection, finishes, electrical, HVAC, plumbing and exterior enclosure systems. The price proposal form outlines 14 contract line items for base requirements and options, including unit pricing for asbestos abatement work. The Navy Facilities Engineering Command will evaluate pricing for the base requirements and options that may be awarded within 90 days of contract award. The contractor must provide bonding to cover all line items if the options are exercised.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DBB Repair Failing (CI 58) Submarine A School BQ 488 N40085-20-R-0034 New London, CT Solicitation
ATTACHMENT F - PRICE PROPOSAL FORM REVISED
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001 ‐ BASE PRICE. Price includes the following:
CLIN 0001AA. Price for the entire work for renovations and repairs to Submarine School BQ488 complete to the 5 foot line outside of the building, in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, AND CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, and 0014.
| CLIN |
| ITEM |
| TOTAL PRICE FOR CLIN 0001AA |
| 0001AA |
| Renovation and repairs to BQ488 |
| $_______ |
CLIN 0001AB. Price for the entire project Site Work, outside the facility's 5-foot line, complete in accordance with the drawings and specifications but excluding work described in CLIN 0001AA, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, AND CLINs 0002, 0003, 0004, 0005, and 0006, 0007, 0008, 0009, 00010, 0011, 0012, 0013, and 0014.
| CLIN |
| ITEM |
| TOTAL PRICE FOR CLIN 0001AB |
| 0001AB |
| Site work outside the facility 5 foot line |
| $_______ |
CLIN 0001AC. Price for removal and disposal of asbestos containing floor tiles and mastic complete in accordance with the drawings and specifications but excluding work in CLIN 0001AA, 0001AB, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM AND CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, and 0014.
| CLIN |
| Item |
| Unit |
| Unit Price |
| No. Units |
| TOTAL PRICE FOR CLIN 0001AC (UNIT PRICE X NO. UNITS) |
| 0001AC |
| Asbestos floor tile and mastic |
| Square Feet |
| $________ |
| 10,780 |
| $_______ |
CLIN 0001AD. Price for removal and disposal of asbestos containing pipe insulation and fittings complete in accordance with the drawings and specifications but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM AND CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, and 0014.
| CLIN |
| Item |
| Unit |
| Unit Price |
| No. Units |
| TOTAL PRICE FOR CLIN 0001AD (UNIT PRICE X NO. UNITS) |
| 0001AD |
| Asbestos pipe insulation and fittings |
| Square Feet |
| $________ |
| 2,000 |
| $_______ |
CLIN 0001AE. Price for removal and disposal of asbestos containing subsurface transite or other subsurface pipe insulation complete in accordance with the drawings and specifications but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM AND CLINs 0002, 0003, 0004, 0005, 0006, 0007,0008, 0009, 0010, 0011, 0012, 0013, and 0014.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AE (UNIT |
PRICE X NO. UNITS)
| 0001AE |
| Asbestos subsurface transite and pipe insulation |
| Square |
Feet
| $_______ |
| 1,990 |
| $_______ |
CLIN 0001AF. Price for removal and disposal of asbestos steam line or metal pipe gaskets in accordance with the drawings and specifications but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM AND CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, and 0014.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. |
UNITS
TOTAL PRICE FOR
CLIN 0001AF (UNIT
PRICE X NO. UNITS)
| 0001AF |
| Asbestos steam line or metal pipe gaskets |
| Square Feet |
| $_______ |
| 154 |
| $_______ |
CLIN 0001AG. Price for removal and disposal of asbestos containing transite panels inside transformer unit complete in accordance with the drawings and specifications but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, AND CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, and 0014.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR |
CLIN 0001AG (UNIT
PRICE X NO. UNITS)
| 0001AG |
| Asbestos transite panels |
| Square Feet |
| $_______ |
| 60 |
| $_______ |
CLIN 0001AH. Price for removal and disposal of asbestos containing window sealant complete in accordance with the drawings and specifications but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM, AND CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, and 0014.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR |
CLIN 0001AH (UNIT
PRICE X NO. UNITS)
| 0001AH |
| Asbestos window sealant |
| Lineal Feet |
| $_______ |
| 14,500 |
| $_______ |
CLIN 0001AI. Price for removal and disposal of ledge, complete in accordance with the drawings and specifications, but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AJ, 0001AK, 0001AL, 0001AM, AND CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, and 0014, and in accordance with the following schedule.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR |
CLIN 0001AI (UNIT
PRICE X NO. UNITS)
| 0001AI |
| Ledge removal |
| Cubic Feet |
| $_______ |
| 2,200 |
| $_______ |
CLIN 0001AJ. Price for the entire work for rerouting power feeders, power communications cabling, conduits, testing/commissioning the rerouted power feeders and power communications cabling, providing an ice bridge to support coaxial cables running to the 30 ft ELMR tower mounted onto the elevator machine room, and verification testing for coaxial cables and antennas affected by ice bridge work, in accordance with the attached description, but excluding work described in CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AK, 0001AL, 0001AM, AND CLINs 0002, 0003, 0004, 0005, 0007, 0009, 00010, 0011, 0012, 0013, 0014.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0001AJ
| 0001AJ |
| Work associated with antenna support systems |
| $_______ |
CLIN 0001AK. Price for fire caulking existing penetrations found during construction not currently fire caulked with ½” rated sealant but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AI, 0001AJ, 0001AL, 0001AM and CLINs 0002, 0003, 0004, 0005, 0007, 0009, 0010, 0011, 0012, 0013, and 0014.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR |
CLIN 0001AK (UNIT
PRICE X NO. UNITS)
| 0001AK |
| Fire Caulk existing penetrations |
| Lineal Feet |
| $_______ |
| 300 |
| $_______ |
CLIN 0001AL. Price for infilling CMU walls after demolition of existing MEP Systems but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AI, 0001AJ, 0001AK, 0001AM AND CLINs 0002, 0003, 0004, 0005, 0007, 0009, 0010, 0011, 0012, 0013, and 0014.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR |
CLIN 0001AL (UNIT
PRICE X NO. UNITS)
| 0001AL |
| Infill CMU walls |
| Square Feet |
| $_______ |
| 20 |
| $_______ |
CLIN 0001AM. Price for infilling drywall partitions after demolition of existing MEP Systems but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AI, 0001AJ, 0001AK, 0001AL AND CLINs 0002, 0003, 0004, 0005, 0007, 0009, 0010, 0011, 0012, 0013, and 0014.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR |
CLIN 0001AM (UNIT
PRICE X NO. UNITS)
| 0001AM |
| Infill CMU walls |
| Square Feet |
| $_______ |
| 256 |
| $_______ |
CLIN 0001. Base Price – Price includes the following:
Total Base Price in accordance with the drawings and specifications includes CLINs 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM.
| CLIN |
| ITEM |
| TOTAL PRICE FOR CLIN 0001 |
| 0001 |
| Total Price for CLIN 0001 includes CLIN 001AA through CLIN 0001AM |
| $_______ |
CLIN 0002. Option Item No. 1 – Price includes the following:
Price for provision and installation of troweled gypsum knockdown finish at all corridor walls on exposed CMU.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0002
| 0002 |
| Troweled gypsum knockdown finish |
| $_______ |
CLIN 0003. Option Item No. 2 – Price includes the following:
Price for demolition of existing gypsum wallboard soffits within soffit outside of the Berthing Unit entries within all corridors and provision and installation of new gypsum wallboard soffit and new lighting in same area.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0003
| 0003 |
| Demo and replace GWB Soffits |
| $_______ |
CLIN 0004. Option Item No. 3 – Price includes the following:
Price for provision and installation of sensor faucets at lavatories in lieu of manual faucets.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0004
| 0004 |
| Automatic sensor faucets |
| $_______ |
CLIN 0005. Option Item No. 4 – Price includes the following:
Price for provision and installation of PVC roofing in lieu of TPO Roofing. Removal of the existing roofing and replacement with TPO Roofing is included under CLIN 0001AA.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0005
| 0005 |
| PVC Roofing |
| $_______ |
CLIN 0006. Option Item No. 5 – NOT USED
CLIN 0007. Option Item No. 6 – Price includes the following:
Price for removal and replacement of existing windows, window stools, spandrel glazing and frames.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0007
| 0007 |
| Remove and replace windows, stools, spandrel glazing and frames |
| $_______ |
CLIN 0008. Option Item No. 7 – NOT USED
CLIN 0009. Option Item No. 8b – Price includes the following:
Price for removal of existing shed skylight and installation of new metal standing seam roof complete with all flashing, blocking and attachments to make a complete enclosure.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0009
| 0009 |
| Replace existing shed skylight with standing seam metal roof |
| $_______ |
CLIN 0010. Option Item No. 8d – Price includes the following:
Price for removal of peaked roof skylight and installation of new metal standing seam roof complete with all flashing, blocking, and attachments to make a complete enclosure.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0010
| 0010 |
| Replace existing peaked skylight with standing seam metal roof |
| $_______ |
CLIN 0011. Option Item No. 9 – Price includes the following:
Price for provision and installation of solid surface window stools in all berthing rooms and office windows in lieu of replacement with wood sills.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0011
| 0011 |
| Replace windowsills with solid surface stools |
| $_______ |
CLIN 0012. Option Item No. 10 – Price includes the following:
Price for provision and installation of 2” furring and 2” of insulation at exterior walls in Berthing units in lieu of 1” furring and 1” of insulation.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0012
| 0012 |
| Replace wall furring and insulation at Berthing Unit exterior wall type |
| $_______ |
CLIN 0013. Option Item No. 11 – Price includes the following:
Price for provision and installation of full height tile walls in berthing unit toilet rooms and quarterdeck toilet room in lieu of half height walls.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0013
| 0013 |
| Full height wall tile berthing unit toilet and quarterdeck toilet rooms |
| $_______ |
CLIN 0014. Option Item No. 12 – Price includes the following:
Deduct price for leaving the entire roof on the north building, Column lines 3-18, and sealing the existing north roof entirely.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0014
| 0014 |
| Existing north building roof to remain and seal existing roof |
| $_______ |
1.2 GENERAL NOTES
a. Award will be made on the total sum of Contract Line Items 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AJ, 0001AK, 0001AL, 0001AM. For CLINs 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0001AK, 0001AL, and 0001AM enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
b. The Government reserves the unilateral right to award CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010, CLIN 0011, CLIN 0012, CLIN 0013, and CLIN 0014 to the Contractor at the proposed price within 90 calendar days after the contract award. A firm fixed proposed price is required for CLIN 0001, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010, CLIN 0011, CLIN 0012, CLIN 0013, and CLIN 0014. No provision is made for economic price adjustment. Award of CLIN 0007 extends the contract completion date by 30 calendar days upon award of the CLIN.
c. Evaluation of Options. Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Options to the total price for CLIN 0001, excluding CLIN 0014. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Options.
d. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
e. If CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010, CLIN 0011, CLIN 0012, and CLIN 0013 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Document --