Attachment F - Price Proposal Form.docx
DOCX document 28 KB Posted
- Solicitation number
- N40085-20-R-0034
About this file
This document is a price proposal form for a federal construction contract to repair a failing submarine school building at Naval Submarine Base New London in Connecticut. The contract includes base scope work for whole building repairs to the 109,442 square foot facility, new sidewalk and site work, and interior renovations including fire protection, interior finishes, mechanical and electrical systems upgrades. There are also 14 separately priced options that can be awarded within 120 to 365 days after contract award, such as replacing windows, mechanical equipment, roofing, and interior wall finishes. Pricing is required for the base scope as well as unit prices for asbestos abatement work and lump sums for each option. The Navy Facilities Engineering Command is the contracting agency. Award will be made based on the total price for the base scope items, and options will be evaluated and can be added to the contract post-award if determined to be in the government's best interest.
The document requires offerors to provide pricing for the base scope of work and 14 separately priced options on a firm-fixed-price basis.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DBB Repair Failing (CI 58) Submarine A School BQ 488 N40085-20-R-0034 New London, CT Solicitation
ATTACHMENT F - PRICE PROPOSAL FORM
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001 ‐ BASE PRICE. Price includes the following:
CLIN 0001AA. Price for the entire work for renovations and repairs to Submarine School BQ488 complete to the 5 foot line outside of the building, in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012.
| CLIN |
| ITEM |
| TOTAL PRICE FOR CLIN 0001AA |
| 0001AA |
| Renovation and repairs to BQ488 |
| $_______ |
CLIN 0001AB. Price for the entire project Site Work, outside the facility's 5-foot line, complete in accordance with the drawings and specifications but excluding work described in CLIN 0001AA, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, 0002, 0003, 0004, 0005, and 0006, 0007, 0008, 0009, 00010, 0011, 0012.
| CLIN |
| ITEM |
| TOTAL PRICE FOR CLIN 0001AB |
| 0001AB |
| Site work outside the facility 5 foot line |
| $_______ |
CLIN 0001AC. Price for removal and disposal of asbestos containing floor tiles and mastic complete in accordance with the drawings and specifications but excluding work in CLIN 0001AA, 0001AB, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, AND CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012.
| CLIN |
| Item |
| Unit |
| Unit Price |
| No. Units |
| TOTAL PRICE FOR CLIN 0001AC (UNIT PRICE X NO. UNITS) |
| 0001AC |
| Asbestos floor tile and mastic |
| Square Feet |
| $________ |
| 10,780 |
| $_______ |
CLIN 0001AD. Price for removal and disposal of asbestos containing pipe insulation and fittings complete in accordance with the drawings and specifications but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, AND CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012.
| CLIN |
| Item |
| Unit |
| Unit Price |
| No. Units |
| TOTAL PRICE FOR CLIN 0001AD (UNIT PRICE X NO. UNITS) |
| 0001AD |
| Asbestos pipe insulation and fittings |
| Square Feet |
| $________ |
| 2,000 |
| $_______ |
CLIN 0001AE. Price for removal and disposal of asbestos containing subsurface transite or other subsurface pipe insulation complete in accordance with the drawings and specifications but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AF, 0001AG, 0001AH, 0001AI, AND CLINs 0002, 0003, 0004, 0005, 0006, 0007,0008, 0009, 0010, 0011, 0012.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR CLIN 0001AE (UNIT |
PRICE X NO. UNITS)
| 0001AE |
| Asbestos subsurface transite and pipe insulation |
| Square |
Feet
| $_______ |
| 1,990 |
| $_______ |
CLIN 0001AF. Price for removal and disposal of asbestos steam line or metal pipe gaskets in accordance with the drawings and specifications but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AG, 0001AH, 0001AI, AND CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. |
UNITS
TOTAL PRICE FOR
CLIN 0001AF (UNIT
PRICE X NO. UNITS)
| 0001AF |
| Asbestos steam line or metal pipe gaskets |
| Square Feet |
| $_______ |
| 154 |
| $_______ |
CLIN 0001AG. Price for removal and disposal of asbestos containing transite panels inside transformer unit complete in accordance with the drawings and specifications but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AI, AND CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR |
CLIN 0001AG (UNIT
PRICE X NO. UNITS)
| 0001AG |
| Asbestos transite panels |
| Square Feet |
| $_______ |
| 60 |
| $_______ |
CLIN 0001AH. Price for removal and disposal of asbestos containing window sealant complete in accordance with the drawings and specifications but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AI, AND CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR |
CLIN 0001AH (UNIT
PRICE X NO. UNITS)
| 0001AH |
| Asbestos window sealant |
| Lineal Feet |
| $_______ |
| 14,500 |
| $_______ |
CLIN 0001AI. Price for removal and disposal of ledge, complete in accordance with the drawings and specifications, but excluding work in CLIN 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, AND CLINs 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012 and in accordance with the following schedule.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| NO. UNITS |
| TOTAL PRICE FOR |
CLIN 0001AI (UNIT
PRICE X NO. UNITS)
| 0001AI |
| Ledge removal |
| Cubic Feet |
| $_______ |
| 2,200 |
| $_______ |
CLIN 0001. Base Price – Price includes the following:
Total Base Price in accordance with the drawings and specifications includes CLINs 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, AND 001AI.
| CLIN |
| ITEM |
| TOTAL PRICE FOR CLIN 0001 |
| 0001 |
| Total Price for CLIN 0001 includes CLIN 001AA through CLIN 0001AI |
| $_______ |
CLIN 0002. Option Item No. 1 – Price includes the following:
Price for provision and installation of troweled gypsum knockdown finish at all corridor walls on exposed CMU.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0002
| 0002 |
| Troweled gypsum knockdown finish |
| $_______ |
CLIN 0003. Option Item No. 2 – Price includes the following:
Price for demolition of existing gypsum wallboard soffits within soffit outside of the Berthing Unit entries within all corridors and provision and installation of new gypsum wallboard soffit and new lighting in same area.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0003
| 0003 |
| Demo and replace GWB Soffits |
| $_______ |
CLIN 0004. Option Item No. 3 – Price includes the following:
Price for provision and installation of sensor faucets at lavatories in lieu of manual faucets.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0004
| 0004 |
| Automatic sensor faucets |
| $_______ |
CLIN 0005. Option Item No. 4 – Price includes the following:
Price for provision and installation of PVC roofing in lieu of TPO Roofing. Removal of the existing roofing and replacement with TPO Roofing is included under CLIN 0001AA.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0005
| 0005 |
| PVC Roofing |
| $_______ |
CLIN 0006. Option Item No. 5 – Price includes the following:
Price for removal of additional existing mechanical equipment in mechanical rooms and provision and installation of new equipment. (See mechanical drawings).
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0006
| 0006 |
| Replacement of additional mechanical equipment |
| $_______ |
CLIN 0007. Option Item No. 6 – Price includes the following:
Price for removal and replacement of existing windows, window stools, spandrel glazing and frames.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0007
| 0007 |
| Remove and replace windows, stools, spandel glazing and frames |
| $_______ |
CLIN 0008. Not Used.
CLIN 0009. Option Item No. 7 – Price includes the following:
Price for removal of existing shed skylight and installation of new metal standing seam roof complete with all flashing, blocking and attachments to make a complete enclosure.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0009
| 0009 |
| Replace existing shed skylight with standing seam metal roof |
| $_______ |
CLIN 0010. Option Item No. 8 – Price includes the following:
Price for removal of peaked roof skylight and installation of new metal standing seam roof complete with all flashing, blocking, and attachments to make a complete enclosure.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0010
| 0010 |
| Replace existing peaked skylight with standing seam metal roof |
| $_______ |
CLIN 0011. Option Item No. 9 – Price includes the following:
Price for provision and installation of solid surface window stools in all berthing rooms and office windows in lieu of replacement with wood sills.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0011
| 0011 |
| Replace windowsills with solid surface stools |
| $_______ |
CLIN 0012. Option Item No. 10 – Price includes the following:
Price for provision and installation of 2” furring and 2” of insulation at exterior walls in Berthing units in lieu of 1” furring and 1” of insulation.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0012
| 0012 |
| Replace wall furring and insulation at Berthing Unit exterior wall type |
| $_______ |
CLIN 0013. Option Item No. 11 – Price includes the following:
Price for provision and installation of full height tile walls in berthing unit toilet rooms and quarterdeck toilet room in lieu of half height walls.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0013
| 0013 |
| Replace half height tile walls with full height tile walls |
| $_______ |
CLIN 0014. Option Item No. 12 – Price includes the following:
Deduct price for sealing the existing roof on the north building in lieu of roof replacement Column lines 3-18.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR |
CLIN 0014
| 0014 |
| Seal North Roof in lieu of replacement |
| $_______ |
1.2 GENERAL NOTES
a. Award will be made on the total sum of Contract Line Items 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI. For CLINs 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, and 0001AI enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
b. The Government reserves the unilateral right to award CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010, CLIN 0011, CLIN 0012, and CLIN 0013 to the Contractor at the proposed price within 120 calendar days after the contract award. The Government reserves the unilateral right to award CLIN 0014 at the proposed price within 365 calendar days after the contract award.
A firm fixed proposed price is required for CLIN 0001, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010, CLIN 0011, CLIN 0012, CLIN 0013, and CLIN 0014. No provision is made for economic price adjustment.
Award of CLIN 0005, 0006, and 0007 extends the contract completion date by 30 calendar days upon award of each individual CLIN.
c. Evaluation of Options. Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Options to the total price for CLIN 0001, excluding CLIN 0014. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Options.
d. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
e. If CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010, CLIN 0011, CLIN 0012, and CLIN 0013 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Document --
File details come from the government source that posted it. Updated .