This document provides specifications for a construction project. The project includes repairs and renovations to Building 488 at the Naval Submarine Base in New London, Connecticut. Work includes interior and exterior repairs, upgrades to mechanical, electrical and plumbing systems, replacement of the roof and windows, and construction of a new sidewalk. Bids are due by a specified date, with award expected shortly thereafter. The Navy Facilities Engineering Command will oversee the project. The contractor must complete all work by the stated deadline and in accordance with the terms and conditions outlined in the specifications, including compliance with safety and administrative requirements.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER NO. 1600393
APPROPRIATION: O&M,N
SPECIFICATIONS
ISSUE FOR CONSTRUCTION – 1/28/2020
Volume 1 of 2
Repair Failing (C158) Submarine A School BQ488
At
Naval Subase, New London, CT
Triton Hall/Building 488
NAVAL SUBASE
New London, CT 06349
SUBMITTED BY:
Symmes Maini & McKee Associates
1000 Massachusetts Avenue
Cambridge, MA 02138
A/E Contract Number: N40085-17-D-5001
(Construction Contract Number: N40085-20-R-0034)
PREPARED BY:
Hazmat: Susan Cahalan, CDW Consultants, Inc.
Civil: Jennifer Howe, SMMA
Structural: Dylan Quinn, SMMA
Architectural: Karen Breslawski, SMMA
Interior Design: Alyssa Tomkins, SMMA
Fire Protection: Charles Mason, Jensen Hughes
Plumbing: Luis Moreno, SMMA
Mechanical: Andrew Oldeman, SMMA
Electrical: John Alfeo, SMMA
Commissioning: Keith Sheldon, Hallam ICS
APPROVED BY:
For Commander, NAVFAC Mid-Atlantic
Engineering Director: James E. Donahue, R.A.
CI Core – North Region
Karen Breslawski
Repair Failing Submarine A School BQ488
NAVSUBASE New London, CT
RM15-1230
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
VOLUME I
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 01 PROJECT SCHEDULE
01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00.00 20 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 45 35.10 UNACCOMPANIED HOUSING MOCK-UP
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
01 91 00.15 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
02 85 00 MOLD REMEDIATION
DIVISION 03 - CONCRETE
03 01 00 REHABILITATION OF CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
03 54 16 HYDRAULIC SELF-LEVELING CONCRETE TOPPING
03 62 16 METALLIC NON-SHRINK GROUTING
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
PROJECT TABLE OF CONTENTS Page 2
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 EXTERIOR METAL STAIRS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 16 16 CRYSTALLINE WATERPROOFING
07 21 13 BOARD INSULATION
07 21 16 MINERAL FIBER INSULATION
07 22 00 ROOF AND DECK INSULATION
07 24 10 DIRECT-APPLIED EXTERIOR FINISH SYSTEM (DEFS)
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 54 19 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING
07 54 19.04 POLYVINYL-CHLORIDE ROOFING - BID OPTION
07 60 00 FLASHING AND SHEET METAL
07 61 15.00 20 ALUMINUM STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 24 23 CEMENT STUCCO
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 SUSPENDED ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23.13 STANDARD RESINOUS FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
PROJECT TABLE OF CONTENTS Page 3
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 14 - CONVEYING EQUIPMENT
14 22 00 ELECTRIC TRACTION PASSENGER ELEVATORS - MODERNIZATION
VOLUME II
DIVISION 21 - FIRE SUPPRESSION
21 12 00 STANDPIPE SYSTEMS
21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 16.00 20 DRY-PIPE FIRE SPRINKLER SYSTEMS
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
22 05 83.63 CURED-IN-PLACE PIPE (CIPP) LINING
22 07 19.00 40 PLUMBING PIPING INSULATION
22 13 29 SANITARY SEWERAGE PUMPS
22 14 29.00 40 SUMP PUMPS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 01 30.41 HVAC SYSTEM CLEANING
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 09 33.00 40 ELECTRIC AND ELECTRONIC CONTROL SYSTEM FOR HVAC
23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 21 23 HYDRONIC PUMPS
23 22 26.00 20 STEAM SYSTEM AND TERMINAL UNITS
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 57 10.00 10 FORCED HOT WATER HEATING SYSTEMS USING WATER AND STEAM
HEAT EXCHANGERS
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 82 00.00 20 TERMINAL HEATING UNITS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END
AND INTEGRATION
PROJECT TABLE OF CONTENTS Page 4
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 74 SHORT CIRCUIT, PROTECTIVE DEVICE COORDINATION AND ARC
FLASH STUDY
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 22 GEOTEXTILES USED AS FILTERS
31 23 00.00 20 EXCAVATION AND FILL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 16 19 CONCRETE SIDEWALKS
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 40 00 STORM DRAINAGE UTILITIES
33 46 16 SUBDRAINAGE PIPING
APPENDIX A – HAZARDOUS MATERIAL REPORT
APPENDIX B - FURNITURE REMOVAL AND DISPOSAL INVENTORY
APPENDIX C -
-- End of Project Table of Contents --kbresl_smma Text Box
B488 - DD-1354
Repair Failing Submarine A School BQ488 RM15-1230
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
CONTRACT DRAWINGS
- SPECS
SHEET NUMBER NAVFAC
Drawing #
Current Revision
SHEET NAME
GENERAL
G-000A 12806853 COVER - VOLUME 1
G-001 12806854 INDEX OF DRAWINGS - VOLUME 1
G-003 12806855 BID OPTIONS DIAGRAM
G-000B 12807014 COVER - VOLUME 2
G-002 12807015 INDEX OF DRAWINGS - VOLUME 2
CIVIL
C-101 12806856 EXISTING CONDITIONS PLAN
C-102 12806857 SITE PREPARATION PLAN
C-103 12806858 LAYOUT & MATERIALS PLAN
C-104 12806859 GRADING & DRAINAGE PLAN
C-501 12806860 DETAILS I
C-502 12806861 DETAILS II
C-503 12806862 DETAILS III
STRUCTURAL
S-001 12806864 STRUCTURAL
DOCUMENT 00 01 15 Page 1
S-002 12806865 STRUCTURAL
S-003 12806866 STRUCTURAL
S-004 12806867 STRUCTURAL
ARCHITECTURAL
A-001 12806869 LEGENDS, NOTES, ABBREVIATIONS
A-002 12806870 PARTITION TYPES
A-003 12806871 EXTERIOR ASSEMBLIES
AD101 12806872 DEMOLITION PLANS - 1ST FLOOR TO 2ND
FLOOR
AD102 12806873 DEMOLITION PLANS - 3RD FLOOR TO 4TH
FLOOR
AD103 12806874 DEMOLITION PLANS - 5TH FLOOR TO ROOF
AD104 12806875 1ST FLOOR REFLECTED CEILING DEMOLITION
PLAN
AD105 12806876 2ND FLOOR REFLECTED CEILING DEMOLITION
PLAN
AD106 12806877 3RD FLOOR REFLECTED CEILING DEMOLITION
PLAN
AD107 12806878 4TH FLOOR REFLECTED CEILING DEMOLITION
PLAN
AD108 12806879 5TH FLOOR REFLECTED CEILING DEMOLITION
PLAN
AD401 12806880 TYP BERTHING UNIT - ENLARGED PLANS &
RCP DEMOLITION
AD404 12806881 FIRST FLOOR QUARTER DECK - ENLARGED
DEMOLITION PLANS & RCP
AD405 12806882 SECOND FLOOR QUARTER DECK - ENLARGED
DEMOLITION PLANS & RCP
AD407 12806883 FIRE PUMP RM, LAUNDRY RM, LOUNGES &
OFFICES - DEMO PLANS
AD409 12806884 BUILDING CORE DEMO PLAN, RCP &
ELEVATIONS
AD410 12806885 ELEVATOR MACHINE ROOM DEMO PLANS
AD510 12806923 EXTERIOR DETAILS - DEMOLITION
A-100 12806886 BASEMENT PLAN AND CONSTRUCTION PLAN
NOTES
A-101 12806887 1ST FLOOR CONSTRUCTION PLAN
A-102 12806888 2ND FLOOR CONSTRUCTION PLAN
A-103 12806889 3RD FLOOR CONSTRUCTION PLAN
A-104 12806890 4TH FLOOR CONSTRUCTION PLAN
DOCUMENT 00 01 15 Page 2
A-105 12806891 5TH FLOOR CONSTRUCTION PLAN
A-106 12806892 ROOF CONSTRUCTION PLAN
AR100 12806893 RCP NOTES & BASEMENT REFLECTED CEILING
PLAN
AR101 12806894 1ST FLOOR REFLECTED CEILING PLAN
AR102 12806895 2ND FLOOR REFLECTED CEILING PLAN
AR103 12806896 3RD FLOOR REFLECTED CEILING PLAN
AR104 12806897 4TH FLOOR REFLECTED CEILING PLAN
AR105 12806898 5TH FLOOR REFLECTED CEILING PLAN
A-201 12806899 NORTH WING - NORTH & SOUTH BUILDING
ELEVATIONS
A-202 12806900 SOUTH WING - NORTH & SOUTH BUILDING
ELEVATIONS
A-203 12806901 EAST & WEST BUILDING ELEVATIONS
A-204 12806902 INTERIOR ELEVATIONS
A-301 12806903 BUILDING SECTIONS - EAST/WEST
A-302 12806904 BUILDING SECTIONS - NORTH/SOUTH
A-303 12806905 WALL SECTIONS
A-400 12806906 ENLARGED DRAWING KEYNOTES, NOTES &
MOUNTING HEIGHTS
A-401 12806907 TYP UNIT & CORRIDOR - ENLARGED PLAN &
RCP
A-402 12806908 TYP UNIT & CORRIDOR FINISH PLAN &
ELEVATIONS
A-403 12806909 TYP UNIT SINK & BATHROOM - ENLARGED
PLANS & ELEVATIONS
A-404 12806910 FIRST FLOOR QUARTER DECK - ENLARGED
PLANS & RCP
A-405 12806911 SECOND FLOOR QUARTER DECK - ENLARGED
PLAN & RCP
A-406 12806912 RECEPTION C-106A PLANS AND W.C. C-114
PLANS, RCP & ELEVATIONS
A-407 12806913 LOUNGE AND STUDY PLANS & RCP
A-408 12806914 LAUNDRY RM & FIRE PUMP RM PLAN, RCP &
ELEVATIONS
A-409 12806915 BUILDING CORE PLANS AND RCPS
A-410 12806916 ELEV MACHINE ROOMS & EXTERIOR STAIRS
FROM MECHANICAL ROOMS
A-411 12806917 STAIR SECTION AND DETAILS
DOCUMENT 00 01 15 Page 3
A-501 12806918 EXTERIOR DETAILS - ROOF
A-502 12806919 EXTERIOR DETAILS - ROOF AND EXTERIOR
WALL
A-503 12806920 EXTERIOR DETAILS - ROOF
A-504 12806921 EXTERIOR DETAILS - EXT WALL AND WINDOW
A-505 12806922 EXTERIOR DETAILS - SOFFIT AND BASEMENT
A-551 12806924 INTERIOR DETAILS - CEILINGS AND CASEWORK
A-552 12806925 INTERIOR DETAILS - PARTITIONS AND
RAILINGS
A-553 12806926 INTERIOR DETAILS - MILLWORK
A-601 12806927 DOOR SCHEDULE, DOOR & FRAME TYPES &
DETAILS
A-602 12806928 WINDOW AND STOREFRONT TYPES
INTERIORS
I-101 12806930 1ST FLOOR FINISH AND SIGNAGE PLAN
I-102 12806931 2ND FLOOR FINISH AND SIGNAGE PLAN
I-103 12806932 3RD FLOOR FINISH AND SIGNAGE PLAN
I-104 12806933 4TH FLOOR FINISH AND SIGNAGE PLAN
I-105 12806934 5TH FLOOR FINISH AND SIGNAGE PLAN
I-110 12806935 FINISH SCHEDULE LEGEND & TRANSITION
DETAILS
I-111 12806936 ROOM FINISH SCHEDULES
I-112 12806937 SIGNAGE SCHEDULE - LEVEL 1, 2, 3
I-113 12806938 SIGNAGE SCHEDULE - LEVEL 4, 5
I-114 12806939 SIGNAGE DETAILS
I-115 12806940 SIGNAGE DETAILS
I-801 12806941 FURNITURE TEST FIT
LIFE SAFETY
LS-001 12806943 LIFE SAFETY NOTES AND SYMBOLS LEGEND
LS-002 12806944 LIFE SAFETY CODE COMPLIANCE SITE PLAN
LS-100 12806945 LIFE SAFETY OVERALL GROUND FLOOR PLAN
DOCUMENT 00 01 15 Page 4
LS-100A&B 12806946 LIFE SAFETY GROUND FLOOR PLAN - PART A
& B
LS-100D 12806947 LIFE SAFETY GROUND FLOOR PLAN - PART D
LS-101 12806948 LIFE SAFETY OVERALL FIRST FLOOR PLAN
LS-101A&B 12806949 LIFE SAFETY FIRST FLOOR PLAN - PART A &
B
LS-101C 12806950 LIFE SAFETY FIRST FLOOR PLAN - PART C
LS-101D 12806951 LIFE SAFETY FIRST FLOOR PLAN - PART D
LS-102 12806952 LIFE SAFETY OVERALL SECOND FLOOR PLAN
LS-102A&B 12806953 LIFE SAFETY SECOND FLOOR PLAN - PART A
& B
LS-102C 12806954 LIFE SAFETY SECOND FLOOR PLAN - PART C
LS-102D 12806955 LIFE SAFETY SECOND FLOOR PLAN - PART D
LS-103 12806956 LIFE SAFETY OVERALL THIRD FLOOR PLAN
LS-103A&B 12806957 LIFE SAFETY THIRD FLOOR PLAN - PART A &
B
LS-103C 12806958 LIFE SAFETY THIRD FLOOR PLAN - PART C
LS-103D 12806959 LIFE SAFETY THIRD FLOOR PLAN - PART D
LS-104 12806960 LIFE SAFETY OVERALL FOURTH FLOOR PLAN
LS-104A&B 12806961 LIFE SAFETY FOURTH FLOOR PLAN - PART A
& B
LS-104C 12806962 LIFE SAFETY FOURTH FLOOR PLAN - PART C
LS-104D 12806963 LIFE SAFETY FOURTH FLOOR PLAN - PART D
LS-105 12806964 LIFE SAFETY OVERALL FIFTH FLOOR PLAN
LS-105A&B 12806965 LIFE SAFETY FIFTH FLOOR PLAN - PART A &
B
LS-105C 12806966 LIFE SAFETY FIFTH FLOOR PLAN - PART C
LS-106 12806967 LIFE SAFETY OVERALL ROOF PLAN
LS-200 12806968 LIFE SAFETY DETAILS PLAN PART 1
LS-201 12806969 LIFE SAFETY DETAILS PLAN PART 2
FIRE ALARM
FA-001 12806971 FIRE ALARM NOTES AND SYMBOLD LEGEND
FA-002 12806972 FIRE ALARM CONCEPTUAL RISER DIAGRAM
DOCUMENT 00 01 15 Page 5
FAD-100A&B 12806973 FIRE ALARM GROUND FLOOR DEMO PLAN -
PART A & B
FAD-100D 12806974 FIRE ALARM GROUND FLOOR DEMO PLAN -
PART D
FAD-101A&B 12806975 FIRE ALARM FIRST FLOOR DEMO PLAN - PART
A & B
FAD-101C 12806976 FIRE ALARM FIRST FLOOR DEMO PLAN - PART
C
FAD-101D 12806977 FIRE ALARM FIRST FLOOR DEMO PLAN - PART
D
FAD-102A&B 12806978 FIRE ALARM SECOND FLOOR DEMO PLAN -
PART A & B
FAD-102C 12806979 FIRE ALARM SECOND FLOOR DEMO PLAN -
PART C
FAD-102D 12806980 FIRE ALARM SECOND FLOOR DEMO PLAN -
PART D
FAD-103A&B 12806981 FIRE ALARM THIRD FLOOR DEMO PLAN - PART
A & B
FAD-103C 12806982 FIRE ALARM THIRD FLOOR DEMO PLAN - PART
C
FAD-103D 12806983 FIRE ALARM THIRD FLOOR DEMO PLAN - PART
D
FAD-104A&B 12806984 FIRE ALARM FOURTH FLOOR DEMO PLAN -
PART A & B
FAD-104C 12806985 FIRE ALARM FOURTH FLOOR DEMO PLAN -
PART C
FAD-104D 12806986 FIRE ALARM FOURTH FLOOR DEMO PLAN -
PART D
FAD-105A&B 12806987 FIRE ALARM FIFTH FLOOR DEMO PLAN - PART
A & B
FAD-105C 12806988 FIRE ALARM FIFTH FLOOR DEMO PLAN - PART
C
FAD-105D 12806989 FIRE ALARM FIFTH FLOOR DEMO PLAN - PART
D
FAD-106A 12806990 FIRE ALARM SIXTH FLOOR DEMO PLAN - PART
A
FAD-106C 12806991 FIRE ALARM SIXTH FLOOR DEMO PLAN - PART
C
FAD-106D 12806992 FIRE ALARM SIXTH FLOOR DEMO PLAN - PART
D
FA-100A&B 12806993 FIRE ALARM GROUND FLOOR PLAN - PART A &
B
FA-100D 12806994 FIRE ALARM GROUND FLOOR PLAN - PART D
FA-101A&B 12806995 FIRE ALARM FIRST FLOOR PLAN - PART A & B
FA-101C 12806996 FIRE ALARM FIRST FLOOR PLAN - PART C
FA-101D 12806997 FIRE ALARM FIRST FLOOR PLAN - PART D
FA-102A&B 12806998 FIRE ALARM SECOND FLOOR PLAN - PART A &
B
FA-102C 12806999 FIRE ALARM SECOND FLOOR PLAN - PART C
DOCUMENT 00 01 15 Page 6
FA-102D 12807000 FIRE ALARM SECOND FLOOR PLAN - PART D
FA-103A&B 12807001 FIRE ALARM THIRD FLOOR PLAN - PART A & B
FA-103C 12807002 FIRE ALARM THIRD FLOOR PLAN - PART C
FA-103D 12807003 FIRE ALARM THIRD FLOOR PLAN - PART D
FA-104A&B 12807004 FIRE ALARM FOURTH FLOOR PLAN - PART A &
B
FA-104C 12807005 FIRE ALARM FOURTH FLOOR PLAN - PART C
FA-104D 12807006 FIRE ALARM FOURTH FLOOR PLAN - PART D
FA-105A&B 12807007 FIRE ALARM FIFTH FLOOR PLAN - PART A & B
FA-105C 12807008 FIRE ALARM FIFTH FLOOR PLAN - PART C
FA-105D 12807009 FIRE ALARM FIFTH FLOOR PLAN - PART D
FA-106A 12807010 FIRE ALARM ROOF PLAN - PART A & B
FA-106C 12807011 FIRE ALARM /rOOF PLAN - PART C
FA-106D 12807012 FIRE ALARM ROOF PLAN - PART D
FIRE PROTECTION
FP-001 12807016 FIRE PROTECTION NOTES AND SYMBOLS LEGEND
FP-002 12807017 FIRE PROTECTION CONCEPTUAL RISER DIAGRAM
FP-101A&B 12807018 FIRE PROTECTION FIRST FLOOR PLAN - PART
A & B
FP-101C 12807019 FIRE PROTECTION FIRST FLOOR PLAN - PART
C
FP-101D 12807020 FIRE PROTECTION FIRST FLOOR PLAN - PART
D
FP-102A&B 12807021 FIRE PROTECTION SECOND FLOOR PLAN -
PART A & B
FP-102C 12807022 FIRE PROTECTION SECOND FLOOR PLAN -
PART C
FP-102D 12807023 FIRE PROTECTION SECOND FLOOR PLAN -
PART D
FP-103A&B 12807024 FIRE PROTECTION THIRD FLOOR PLAN - PART
A & B
FP-103C 12807025 FIRE PROTECTION THIRD FLOOR PLAN - PART
C
FP-103D 12807026 FIRE PROTECTION THIRD FLOOR PLAN - PART
D
FP-104A&B 12807027 FIRE PROTECTION FOURTH FLOOR PLAN -
PART A & B
FP-104C 12807028 FIRE PROTECTION FOURTH FLOOR PLAN -
PART C
DOCUMENT 00 01 15 Page 7
FP-104D 12807029 FIRE PROTECTION FOURTH FLOOR PLAN -
PART D
FP-105A&B 12807030 FIRE PROTECTION FIFTH FLOOR PLAN - PART
A & B
FP-105C 12807031 FIRE PROTECTION FIFTH FLOOR PLAN - PART
C
FP-106C 12807032 FIRE PROTECTION ROOF PLAN - PART C
FP-200 12807033 FIRE PROTECTION FIRE PUMP ROOM PLAN
FP-201 12807034 FIRE PROTECTION DETAILS PLAN
PLUMBING
P-001 12807036 LEGEND, NOTES & SCHEDULES
PD101ab 12807037 FIRST FLOOR DEMOLITION PLAN - PART A & B
PD101c 12807038 FIRST FLOOR DEMOLITION PLAN - PART C
PD101d 12807039 FIRST FLOOR DEMOLITION PLAN - PART D
PD102ab 12807040 SECOND FLOOR DEMOLITION PLAN - PART A & B
PD102c 12807041 SECOND FLOOR DEMOLITION PLAN - PART C
PD102d 12807042 SECOND FLOOR DEMOLITION PLAN - PART D
PD103ab 12807043 THIRD FLOOR DEMOLITION PLAN - PART A & B
PD103c 12807044 THIRD FLOOR DEMOLITION PLAN - PART C
PD103d 12807045 THIRD FLOOR DEMOLITION PLAN - PART D
PD104ab 12807046 FOURTH FLOOR DEMOLITION PLAN - PART A & B
PD104c 12807047 FOURTH FLOOR DEMOLITION PLAN - PART C
PD104d 12807048 FOURTH FLOOR DEMOLITION PLAN - PART D
PD105ab 12807049 FIFTH FLOOR DEMOLITION PLAN - PART A & B
PD105c 12807050 FIFTH FLOOR DEMOLITION PLAN - PART C
PD106a 12807051 ROOF DEMOLITION PLAN - PART A
PD106c 12807052 ROOF DEMOLITION PLAN - PART C
PD401 12807053 ENLARGED DEMOLITION PLANS I
PD402 12807054 ENLARGED DEMOLITION PLANS II - NOT USED
PD701 12807055 DOMESTIC WATER RISER DIAGRAMS -
DEMOLITION
DOCUMENT 00 01 15 Page 8
PD702 12807056 S&V RISER DIAGRAMS - PART 1 DEMOLITION
PD703 12807057 S&V RISER DIAGRAMS PART 2 - PART D -
DEMO
PD704 12807058 JANITOR CLOSET RISER DIAGRAMS -
DEMOLITION
P-101ab 12807059 FIRST FLOOR CONSTRUCTION PLAN - PART A & B
P-101c 12807060 FIRST FLOOR CONSTRUCTION PLAN - PART C
P-101d 12807061 FIRST FLOOR CONSTRUCTION PLAN - PART D
P-102ab 12807062 SECOND FLOOR CONSTRUCTION PLAN - PART A & B
P-102c 12807063 SECOND FLOOR CONSTRUCTION PLAN - PART C
P-102d 12807064 SECOND FLOOR CONSTRUCTION PLAN - PART D
P-103ab 12807065 THIRD FLOOR CONSTRUCTION PLAN - PART A & B
P-103c 12807066 THIRD FLOOR CONSTRUCTION PLAN - PART C
P-103d 12807067 THIRD FLOOR CONSTRUCTION PLAN - PART D
P-104ab 12807068 FOURTH FLOOR CONSTRUCTION PLAN - PART A & B
P-104c 12807069 FOURTH FLOOR CONSTRUCTION PLAN - PART C
P-104d 12807070 FOURTH FLOOR CONSTRUCTION PLAN - PART D
P-105ab 12807071 FIFTH FLOOR CONSTRUCTION PLAN - PART A & B
P-105c 12807072 FIFTH FLOOR CONSTRUCTION PLAN - PART C
P-105d 12807073 FIFTH FLOOR CONSTRUCTION PLAN - PART D
P-106a 12807074 ROOF CONSTRUCTION PLAN - PART A
P-106c 12807075 ROOF CONSTRUCTION PLAN - PART C
P-401 12807076 ENLARGED CONSTRUCTION PLANS
P-402 12807077 LAUNDRY ROOM CONSTRUCTION
P-501 12807078 DETAILS I
P-502 12807079 DETAILS II
P-503 12807080 DETAILS III
P-504 12807081 DETAILS IV
P-601 12807082 SCHEDULES
DOCUMENT 00 01 15 Page 9
P-701 12807083 DOMESTIC WATER RISER DIAGRAM PART 1
P-702 12807084 DOMESTIC WATER RISER DIAGRAM PART 2
P-703 12807085 DOMESTIC WATER RISER DIAGRAM PART 3
P-704 12807086 S&V RISER DIAGRAMS - PART 1
P-705 12807087 S&V RISER DIAGRAMS - PART 2
P-706 12807088 S&V RISER DIAGRAMS- PART 3
P-707 12807089 S&V RISER- PART 4
MECHANICAL
M-001 12807091 LEGEND
MD101ab 12807092 FIRST FLOOR DEMOLITION PLAN PART A & B
MD101c 12807093 FIRST FLOOR DEMOLITION PLAN PART C
MD101d 12807094 FIRST FLOOR DEMOLITION PLAN PART D
MD102ab 12807095 SECOND FLOOR DEMOLITION PLAN PART A & B
MD102c 12807096 SECOND FLOOR DEMOLITION PLAN PART C
MD102d 12807097 SECOND FLOOR DEMOLITION PLAN PART D
MD103ab 12807098 THIRD FLOOR DEMOLITION PLAN PART A & B
MD103c 12807099 THIRD FLOOR DEMOLITION PLAN PART C
MD103d 12807100 THIRD FLOOR DEMOLITION PLAN PART D
MD104ab 12807101 FOURTH FLOOR DEMOLITION PLAN PART A & B
MD104c 12807102 FOURTH FLOOR DEMOLITION PLAN PART C
MD104d 12807103 FOURTH FLOOR DEMOLITION PLAN PART D
MD105ab 12807104 FIFTH FLOOR DEMOLITION PLAN PART A & B
MD105c 12807105 FIFTH FLOOR DEMOLITION PLAN PART C
MD105d 12807106 ROOF DEMOLITION PLAN PART D
MD106a 12807107 ROOF DEMOLITION PLAN PART A
MD106c 12807108 ROOF DEMOLITION PLAN PART C
M-101ab 12807109 FIRST FLOOR CONSTRUCTION PLAN PART A & B
DOCUMENT 00 01 15 Page 10
M-101c 12807110 FIRST FLOOR CONSTRUCTION PLAN PART C
M-101d 12807111 FIRST FLOOR CONSTRUCTION PLAN PART D
M-102ab 12807112 SECOND FLOOR CONSTRUCTION PLAN PART A & B
M-102c 12807113 SECOND FLOOR CONSTRUCTION PLAN PART C
M-102d 12807114 SECOND FLOOR CONSTRUCTION PLAN PART D
M-103ab 12807115 THIRD FLOOR CONSTRUCTION PLAN PART A & B
M-103c 12807116 THIRD FLOOR CONSTRUCTION PLAN PART C
M-103d 12807117 THIRD FLOOR CONSTRUCTION PLAN PART D
M-104ab 12807118 FOURTH FLOOR CONSTRUCTION PLAN PART A & B
M-104c 12807119 FOURTH FLOOR CONSTRUCTION PLAN PART C
M-104d 12807120 FOURTH FLOOR CONSTRUCTION PLAN PART D
M-105ab 12807121 FIFTH FLOOR CONSTRUCTION PLAN PART A & B
M-105c 12807122 FIFTH FLOOR CONSTRUCTION PLAN PART C
M-105d 12807123 ROOF CONSTRUCTION PLAN PART D
M-106a 12807124 ROOF CONSTRUCTION PLAN PART A
M-106c 12807125 ROOF CONSTRUCTION PLAN PART C
M-401 12807126 UNIT & LAUNDRY PLANS
M-402 12807127 MECHANICAL ROOM PLANS
M-501 12807128 DETAILS
M-502 12807129 DETAILS
M-503 12807130 DETAILS
M-504 12807131 DETAILS
M-505 12807132 DETAILS
M-506 12807133 DETAILS
M-601 12807134 SCHEDULES
M-701 12807135 STEAM, CHILLED WATER, & HOT WATER FLOW
DIAGRAMS
M-702 12807136 CONTROLS
DOCUMENT 00 01 15 Page 11
M-703 12807137 CONTROLS
M-704 12807138 CONTROLS
M-801 12807139 RISER DIAGRAMS
M-802 12807140 RISER DIAGRAMS
ELECTRICAL
E-001 12807141 SYMBOL LEGEND AND NOTES
E-002 12807142 GENERAL NOTES
ED101ab 12807143 FIRST FLOOR DEMOLITION PLAN PART A & B
ED101c 12807144 FIRST FLOOR DEMOLITION PLAN PART C
ED101d 12807145 FIRST FLOOR DEMOLITION PLAN PART D
ED102ab 12807146 SECOND FLOOR DEMOLITION PLAN PART A & B
ED102c 12807147 SECOUND FLOOR DEMOLITION PLAN PART C
ED102d 12807148 SECOUND FLOOR DEMOLITON PLAN PART D
ED103ab 12807149 THIRD FLOOR DEMOLITION PLAN PART A & B
ED103c 12807150 THIRD FLOOR DEMOLITION PLAN PART C
ED103d 12807151 THIRD FLOOR DEMOLITION PLAN PART D
ED104ab 12807152 FOURTH FLOOR DEMOLITION PLAN PART A & B
ED104c 12807153 FOURTH FLOOR DEMOLITION PLAN PART C
ED104d 12807154 FOURTH FLOOR DEMOLITION PLAN PART D
ED105b 12807155 FIFTH FLOOR DEMOLITION PLAN PART B
ED105c 12807156 FIFTH FLOOR DEMOLITION PLAN PART C
ED105d 12807157 ROOF DEMOLITION PLAN PART D
ED106a 12807158 ROOF DEMOLITION PLAN PART A
ED106c 12807159 ROOF DEMOLITION PLAN PART C
EL101ab 12807160 FIRST FLOOR LIGHTING PLAN PART A & B
EL101c 12807161 FIRST FLOOR LIGHTING PLAN PART C
EL101d 12807162 FIRST FLOOR LIGHTING PLAN PART D
DOCUMENT 00 01 15 Page 12
EL102ab 12807163 SECOND FLOOR LIGHTING PLAN PART A & B
EL102c 12807164 SECOND FLOOR LIGHTING PLAN PART C
EL102d 12807165 SECOND FLOOR LIGHTING PLAN PART D
EL103ab 12807166 THIRD FLOOR LIGHTING PLAN PART A & B
EL103c 12807167 THIRD FLOOR LIGHTING PLAN PART C
EL103d 12807168 THIRD FLOOR LIGHTING PLAN PART D
EL104ab 12807169 FOURTH FLOOR LIGHTING PLAN PART A & B
EL104c 12807170 FOURTH FLOOR LIGHTING PLAN PART C
EL104d 12807171 FOURTH FLOOR LIGTHING PLAN PART D
EL105c 12807172 FIFTH FLOOR LIGHTING PLAN PART C
EP100b 12807173 GROUND FLOOR ELECTRICAL PLAN PART B
EP101ab 12807174 FIRST FLOOR POWER PLAN PART A & B
EP101c 12807175 FIRST FLOOR POWER PLAN PART C
EP101d 12807176 FIRST FLOOR POWER PLAN PART D
EP102ab 12807177 SECOUND FLOOR POWER PLAN PART A & B
EP102c 12807178 SECOND FLOOR POWER PLAN PART C
EP102d 12807179 SECOND FLOOR POWER PART D
EP103ab 12807180 THIRD FLOOR POWER PLAN PART A & B
EP103c 12807181 THIRD FLOOR POWER PLAN PART C
EP103d 12807182 THIRD FLOOR POWER PLAN PART D
EP104ab 12807183 FOURTH FLOOR POWER PLAN PART A & B
EP104c 12807184 FOURTH FLOOR POWER PLAN PART C
EP104d 12807185 FOURTH FLOOR POWER PLAN PART D
EP105c 12807186 FIFTH FLOOR POWER PLAN PART C
EP105d 12807187 ROOF POWER PLAN PART D
EP106c 12807188 ROOF POWER PLAN PART C
EP107 12807189 LIGHTNING PROTECTION - ROOF PLAN
DOCUMENT 00 01 15 Page 13
E-501 12807190 DETAILS
E-502 12807191 HANGING DETAILS
EL501 12807192 LIGHTING DETAILS AND SCHEDULES
EL502 12807193 LIGHTING CONTROL DETAILS
EL503 12807194 LIGHTING CONTROL DETAILS
EP601 12807195 POWER ONE-LINE DIAGRAM
EP602 12807196 POWER SCHEDULES
EP603 12807197 PANEL SCHEDULES BUILDING PART A & C
EP604 12807198 PANEL SCHEDULES BUILDING PART A & C
EP605 12807199 PANEL SCHEDULES BUILDING PART B & D
E-401 12807200 TYPICAL BERTHING UNIT POWER DEMO & RENO
PLAN
E-402 12807201 TYPICAL BERTHING UNIT LIGHTING PLAN
ET501 12809195 ELECTRIFIED DOOR DIAGRAMS
-- End of Document --
DOCUMENT 00 01 15 Page 14
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Utility Outage Requests
Utility Connection Requests
Borrow Permits
Excavation Permits
Welding Permits
Burning Permits
Salvage Plan ; G
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The project includes renovation and repairs to Submarine A School Bachelor Quarters 488 on the NAVSUBASE New London, CT Campus. Building 488, is an approximately 109,442 square foot building built originally in 1982 and renovated in 1983 and 2004. It is comprised of a four and five story tower connected by a two-story quarterdeck space. The building will be unoccupied during construction. The project shall be constructed so that safe access is maintained to surrounding buildings, roads and parking and impacts to utilities are minimized.
a. The Submarine A School Bachelor Quarters 488 repairs and renovations shall include the following:
1. Reconfiguration of and repairs and new finishes to berthing units
2. Renovation and repairs to laundry rooms, lobby area, offices and ancillary spaces including new finishes.
3. Removal and disposal of existing furniture
4. Repairs and upgrades to mechanical, electrical, fire protection, fire alarm and plumbing systems and fixtures
5. Upgrades to and modernization of elevators (2)
6. Mold removal and remediation
7. Removal of hazardous materials as they relate to the renovation
8. Interior and exterior building signage
SECTION 01 11 00 Page 1
9. Construction of sidewalks
10. Exterior building repairs and renovations including removal and replacement of roof, repairs to windows, selected exterior door replacement, repairs to curtain walls and replacement of skylights with roof.
11. Improvements to site stormwater drainage
b. The following items have been identified to be included as Options to the Base Bid:
Bid Option 1 – Add troweled gypsum knockdown finish to corridor walls at exposed CMU
Bid Option 2 – Demolish and replace corridor GWB soffits and lighting within at Unit entries
Bid Option 3 – Automatic sensor faucets Bid Option 4 – PVC roofing Bid Option 5 – Replace all mechanical room equipment Bid Option 6 – Remove and replace existing windows Bid Option 7 – Replace existing panel feeders with copper Bid Option 8 – Replace existing shed skylight with new skylight Bid Option 9 - Replace existing shed skylight with standing seam metal roof Bid Option 10 – Replace existing peak skylight with new skylight.
Bid Option 11 – Replace existing peak skylight with metal standing seam roof Bid Option 12 - Acoustical accent wall panel in lieu of painted wall accent Bid Option 13 - New solid surface window stools Bid Option 14 - 2 inch wall furring and insulation at exterior walls.
1.2.2 Project Description
The work includes exterior and interior repairs and renovations to BQ488 and incidental related work.
1.2.3 Location
The work is located at the NAVSUBASE New London, CT , approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.4 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 48 hours prior to
SECTION 01 11 00 Page 2 excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered.
1.4.1 Notification Prior to Excavation
Notify the Contracting Officer at least 48 hours prior to starting excavation work.
1.5 NAVY AND MARINE CORPS (NMCI) COORDINATION REQUIREMENTS
1.5.1 NMCI Contractor Access
Allow the NMCI Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections.
Coordinate efforts with the NMCI Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the NMCI Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 3
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Contractor Regulations ; G
Transportation of Personnel, Materials, and Equipment ; G
Purchase Orders ; G
List of Contact Personnel ; G
Personnel List ; G
1.2 SPECIAL SCHEDULING REQUIREMENTS
a. The Navy Base - New London will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
b. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
c. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Ingress and egress of Contractor vehicles at the Activity is limited to Gate 7 . Use of gate 7 is between the hours of 5:30 am to 1:00 pm. unless otherwise approved by the Contracting Officer.
Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
SECTION 01 14 00 Page 1
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.1.2 Installation Access
1.3.1.3 NCACS Identification Badges and Installation Access
Application for and use of badges will be as directed. After submittal of all required paperwork, allow for a minimum of 15 days processing for access badges, including for delivery vehicle drivers. Obtain access to the installation by participating in the Navy Commercial Access Control System (NCACS), or by obtaining passes each day from the Base Pass and Identification Office. Costs for obtaining passes through the NCACS are the responsibility of the Contractor. One-day passes, issued through the Base Pass and Identification Office, will be furnished without charge.
Furnish a completed EMPLOYMENT ELIGIBILITY VERIFICATION (DHS FORM I-9) form for all personnel requesting badges. This form is available at http://www.uscis.gov/portal/site/uscis by searching or selecting Employment Verification (Form I-9). Immediately report instances of lost or stolen badges to the Contracting Officer.
a. NCACS Program: NCACS is a voluntary program in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to one year, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit.
The Government performs background screening and credentialing.
Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued NCACS participation and installation access privileges. Under the NCACS program, no commercial vehicle inspection is required, other than for Random Anti-Terrorism Measures (RAM) or in the case of an elevation of Force Protection Conditions (FPCON). Information on costs and requirements to participate and enroll in NCACS is available at http://www.rapidgate.com or by calling 1-877-727-4342. Contractors should be aware that the costs incurred to obtain NCACS credentials, or costs related to any means of access to a Navy Installation, are not reimbursable. Any time invested, or price(s) paid, for obtaining NCACS credentials will not be compensated in any way or approved as a direct cost of any contract with the Department of the Navy.
b. One-Day Passes: Participation in the NCACS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation.
The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the NCACS.
1.3.1.4 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under
SECTION 01 14 00 Page 2 renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.3.2 Working Hours
Regular working hours must consist of an 8 1/2 hour period established by the Contracting Officer, between 7 a.m. and 3:30 p.m., Monday through Friday, and 7 a.m. to 11 p.m. on Saturday, excluding Government holidays.
1.3.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.3.4 Occupied and Existing Buildings
The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.
The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.
Provide dust covers or protective enclosures to protect existing work that remains and Government material located in the Activity during the construction period.
Leave attached equipment in place, and protect it against damage, or temporarily disconnect, relocate, protect, and reinstall them at the completion of the work.
The Government will remove and relocate other Government property in the areas of the buildings scheduled to receive work.
1.3.5 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS.
d. Operation of Station Utilities: The Contractor must not operate nor
SECTION 01 14 00 Page 3 disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 14 00 Page 4
SECTION 01 20 00.00 20
PRICE AND PAYMENT PROCEDURES
11/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP 1110-1-8 (2016) Construction Equipment Ownership and Operating Expense Schedule
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Earned Value Report ; G
1.3 EARNED VALUE REPORT
1.3.1 Data Required
This contract requires the use of a cost-loaded Network Analysis Schedule (NAS). The information required for the Schedule of Prices will be entered as an integral part of the Network Analysis Schedule. Within 15 calendar days of notice of award, prepare and deliver to the Contracting Officer an Earned Value Report (construction contract) as directed by the Contracting Officer. Provide a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, unit prices, and extended prices. Costs shall be summarized and totals provided for each construction category.
1.3.2 Schedule Instructions
Payments will not be made until the Earned Value Report from the cost-loaded NAS has been submitted to and accepted by the Contracting Officer. Identify the cost for site work, and include incidental work to the 5 ft line. Identify costs for the building(s), and include work out to the 5 ft line. Work out to the 5 ft line shall include construction encompassed within a theoretical line 5 ft from the face of exterior walls and shall include attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 5 ft line.
SECTION 01 20 00.00 20 Page 1
1.4 CONTRACT MODIFICATIONS
In conjunction with the Contract Clause DFARS 252.236-7000 Modification Proposals-Price Breakdown, and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, equipment use rates shall be based upon the applicable provisions of the EP 1110-1-8 .
1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT
1.5.1 Content of Invoice
Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27 Prompt Payment for Construction Contracts and FAR 52.232-5 Payments Under Fixed-Price Construction Contracts. The requests for payment shall include the documents listed below.
a. The Contractor's invoice, on NAVFAC Form 7300/30 furnished by the Government, showing in summary form, the basis for arriving at the amount of the invoice. Form 7300/30 shall include certification by Contractor and Quality Control (QC) Manager.
b. The Earned Value Report from the cost-loaded NAS, showing in detail:
the estimated cost, percentage of completion, and value of completed performance for each of the construction categories stated in this contract. Use NAVFAC Form 43300/54 on NAVFAC contracts when a Monthly Estimate for Voucher is required.
c. Updated Project Schedule and reports required by the contract.
d. Contractor Safety Self Evaluation Checklist.
e. Other supporting documents as requested.
f. Updated copy of submittal register.
g. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies.
h. Contractor's Monthly Estimate for Voucher and Conractors Certification (NAVFAC Form 4330/54) with Subcontractor and supplier payment certification.
i. Materials on Site.
h. Monthly Work-hour report.
i. Solid Waste Disposal Report.
1.5.2 Submission of Invoices
If DFARS Clause 252.232-7006 Wide Area WorkFlow Payment Instructions is included in the contract, provide the documents listed in paragraph CONTENT OF INVOICE in their entirety as attachments in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF attachment is two megabytes, but there are no limits on the number of attachments. If a document cannot be attached in WAWF due to system or size restriction, provide it as instructed by the Contracting Officer.
SECTION 01 20 00.00 20 Page 2
1.5.3 Final Invoice
a. A final invoice shall be accompanied by the certification required by DFARS 252.247.7023 Transportation of Supplies by Sea, and the Contractor's Final Release. If the Contractor is incorporated, the Final Release shall contain the corporate seal. An officer of the corporation shall sign and the corporate secretary shall certify the Final Release.
b. For final invoices being submitted via WAWF, the original Contractor's Final Release Form and required certification of Transportation of Supplies by Sea must be provided directly to the respective Contracting Officer prior to submission of the final invoice. Once receipt of the original Final Release Form and required certification of Transportation of Supplies by Sea has been confirmed by the Contracting Officer, the Contractor shall then submit final invoice and attach a copy of the Final Release Form and required certification of Transportation of Supplies by Sea in WAWF.
c. Final invoices not accompanied by the Contractor's Final Release and required certification of Transportation of Supplies by Sea will be considered incomplete and will be returned to the Contractor.
1.6 PAYMENTS TO THE CONTRACTOR
Payments will be made on submission of itemized requests by the Contractor which comply with the requirements of this section, and will be subject to reduction for overpayments or increase for underpayments made on previous payments to the Contractor.
1.6.1 Obligation of Government Payments
The obligation of the Government to make payments required under the provisions of this contract will, at the discretion of the Contracting Officer, be subject to reductions and suspensions permitted under the FAR and agency regulations including the following in accordance with FAR 32.503-6 Suspension or Reduction of Payments:
a. Reasonable deductions due to defects in material or workmanship;
b. Claims which the Government may have against the Contractor under or in connection with this contract;
c. Unless otherwise adjusted, repayment to the Government upon demand for overpayments made to the Contractor; and
d. Failure to provide up to date record drawings not current as stated in Contract Clause "FAC 5252.236-9310, Record Drawings."
1.6.2 Payment for Onsite and Offsite Materials
Progress payments may be made to the contractor for materials delivered on the site, for materials stored off construction sites, or materials that are in transit to the construction sites under the following conditions:
a. FAR 52.232-5(b) Payments Under Fixed Price Construction Contracts.
b. Materials delivered on the site but not installed, including completed preparatory work, and off-site materials to be considered for progress
SECTION 01 20 00.00 20 Page 3 payment shall be major high cost, long lead, special order, or specialty items, not susceptible to deterioration or physical damage in storage or in transit to the construction site. Examples of materials acceptable for payment consideration include, but are not limited to, structural steel, non-magnetic steel, non-magnetic aggregate, equipment, machinery, large pipe and fittings,precast/prestressed concrete products, plastic lumber (e.g., fender piles/curbs), and high-voltage electrical cable. Materials not acceptable for payment include consumable materials such as nails, fasteners, conduits, gypsum board, glass, insulation, and wall coverings.
c. Materials to be considered for progress payment prior to installation shall be specifically and separately identified in the Contractor's estimates of work submitted for the Contracting Officer's approval in accordance with Schedule of Prices requirement of this contract.
Requests for progress payment consideration for such items shall be supported by documents establishing their value and that the title requirements of the clause at FAR 52.232-5 Payments Under Fixed-Price Construction Contracts have been met.
d. Materials are adequately insured and protected from theft and exposure.
e. Provide a written consent from the surety company with each payment request for offsite materials.
f. Materials to be considered for progress payments prior to installation shall be stored either in Hawaii, Guam, Puerto Rico, or the Continental United States. Other locations are subject to written approval by the Contracting Officer.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 20 00.00 20 Page 4
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
08/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
View Location Map ; G
Progress and Completion Pictures ; G
1.3 MINIMUM INSURANCE REQUIREMENTS
Provide the minimum insurance coverage required by FAR 28.307-2 Liability, during the entire period of performance under this contract. Provide other insurance coverage as required by law.
1.4 FIRST TIER CONTRACTOR REQUIREMENTS FOR ASBESTOS CONTAINING MATERIALS
Accomplish all contract requirements of Section 02 82 00 ASBESTOS REMEDIATION, assigned to the Private Qualified Person, directly with a first tier subcontractor.
1.5 SUPERVISION
1.5.1 Minimum Communication Requirements
Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of contract work. In addition, if a Quality Control (QC) representative is required on the contract, then that individual must also have fluent English communication skills.
SECTION 01 30 00 Page 1
1.5.2 Superintendent Qualifications
The project superintendent must have a minimum of 10 years experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings.