19095 SKS-001.pdf

PDF 104 KB Posted

Attached to
Repair Failing (CI58) Submarine A School Building 488, New London CT
Solicitation number
N40085-20-R-0034
Issued by

About this file

This document contains details for a federal solicitation seeking repair and renovation services. The Navy is soliciting bids to repair Building 488 at the Submarine School in New London, Connecticut. Work includes whole building repairs to the 109,442 square foot facility, constructing a new sidewalk, site work to improve drainage around the foundation, upgrading fire protection and other building systems, and restoring the exterior envelope. The scope also involves interior repairs such as replacing finishes, electrical, elevator, HVAC, and plumbing systems. Bids are due for award of a contract to restore and improve this 188-bed housing building for enlisted military personnel.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
02 03 44.pdf PDF
Amendment 0008.pdf PDF
B488_ELMR_Antenna_SOW_NAVFAC.docx DOCX document
Attachment F - Price Proposal Form REVISED.docx DOCX document
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
06 20 00.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
20R0034 Site Visit Log 2.pdf PDF
Amendment 0003.pdf PDF
20R0034 Site Visit Log.pdf PDF
Amendment 0002.pdf PDF
1600393dwg07of11-FIRE ALARM - corrected.pdf PDF
Amendment 0001.pdf PDF
1600393dwg02of11-CIVIL.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
1600393dwg11of11-ELECTRICAL.pdf PDF
1600393dwg07of11-FIRE ALARM.pdf PDF
1600393dwg08of11-FIRE PROTECTION.pdf PDF
1600393dwg10of11-MECHANICAL.pdf PDF
1600393spec01of02.pdf PDF
1600393dwg06of11-LIFE SAFETY.pdf PDF
1600393dwg09of11-PLUMBING.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Attachment B - SECNAV_5512_1_11787-One Day Past Request.pdf PDF
Attachment F - Price Proposal Form.docx DOCX document
1600393dwg05of11-INTERIORS.pdf PDF
1600393dwg03of11-STRUCTURAL.pdf PDF
1600393spec02of02.pdf PDF
1600393dwg01of11-GENERAL.pdf PDF
20R0034 Solicitation.pdf PDF
1600393dwg04of11-ARCHITECTURAL.pdf PDF
Attachment E - Small Business Subcontracting Plan.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLOOR ELEVATION

CHIP AND REMOVE 6" THICK CMU

BLOCK AS REQUIRED TO PROVIDE

TEMPORARY ACCESS FOR MEP

WORK. DO NOT CUT VERTICAL

REINFORCING IF ENCOUNTERED.

REPAIR WALL BY TOOTHING NEW

BLOCK THAT MATCHES EXISTING.

IF VERTICAL REINFORCEMENT IS

PRESENT, CUT A VERTICAL SLOT

IN THE FRONT OF BLOCK AND

SLIDE IN PLACE FROM BEHIND.

FOR BOND WITH HORIZONTAL

REINFORCEMENT, EPOXY DOWEL

NEW REBAR TO MATCH REMOVED

REBAR FROM BOND BEAM IN

ORDER TO PROVIDE A

CONTINUOUS BOND BEAM IN THE

FINAL CONDITION. EPOXY

EMBEDMENT TO HAVE EMBED

STRENGTH EQUAL TO BAR YIELD.

FORM AND GROUT CELLS

CONTAINING REBAR.

E X

IS

T

C

M U

W A

LL

IN

S

O U

N D

C

O N

D

IT

IO

N

CONTRACTOR TO COORDINATE

OPENING SIZE AS

REQUIRED TO ACCESS SHAFT

C O

N T

R A

C T

O R

T O

C O

O R

D

IN

A T

E

O P

E N

IN

G

S

IZ

E A

S R

E Q

U

IR

E D

T O

A C

C E

S S

S H

A F

T

E X

IS

T

C

M U

W A

LL

IN

S

O U

N D

C

O N

D

IT

IO

N

NOTE:

1. THIS DETAIL SUPERCEDES DETAIL A4/S-001. A4/S-001 IS NO LONGER APPLICABLE TO THE PROJECT.

2. THE WALL SHOWN IS A LOAD BEARING WALL AND PART OF THE GRAVITY LOAD RESISTING SYSTEM.

CONTRACTOR TO PROVIDE SHORING DESIGNED BY A REGISTERED DESIGN PROFESSIONAL TO

COMPLETE THE WORK SAFELY AND TO PREVENT DAMAGE TO THE BUILDING. SEE SPECIFICATION

SECTION "00 00 00 SHORING" FOR ADDITIONAL REQUIREMENTS.

DR BY:

CK BY:

REF:

SCALE:

DATE:

1000 Massachusetts Avenue Cambridge, MA 02138

617.547.5400 Fax 800.648.4920JOB NO.:

ISSUE:

1/2" = 1'-0"

DQ

A4/S-001

CMU WALL REPAIR

NEW LONDON, CT

PROJECT RM15-1230,

REPAIR FAILING

SUBMARINE A SCHOOL BQ

SKS-001

19095

18MAR2020

SCALE: 1/2" = 1'-0"

TEMPORARY PENETRATION IN CMU BEARING

WALL

Sheets
SKS-001 - CMU WALL REPAIR

File details come from the government source that posted it. Updated .