1600393dwg01of11-GENERAL.pdf
PDF 5 MB Posted
- Solicitation number
- N40085-20-R-0034
About this file
This solicitation is for repair and renovation work at Building 488, a 188-bed enlisted housing facility, at the Naval Submarine Base in New London, Connecticut. Work includes whole building repairs to the 109,442 square foot facility, construction of a new sidewalk, site grading, and interior repairs such as fire protection, interior finishes, electrical, elevator, HVAC, and plumbing upgrades. The exterior enclosure will also be repaired to restore adequacy and quality of life. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command for project RM15-1230. The response deadline is not stated.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION PLAN
NORTH
ROCK POND
SOUTH
B488
GATE 1
N.T.S.
WING
WING
N
PROJECT
NORTH
VICINITY MAP
U.S. NAVAL
SUBMARINE BASE
NEW LONDON
B488
N.T.S.
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
UNCLASSIFIED
U N C
LA
S S
IF
IE
D
UNCLASSIFIED
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
S Y M
D E S C R
IP
TI
O N
D
AT
E
AP
P R
DRAWFORM REVISION: 12 APRIL 2018
SYMMES MAINI & McKEE ASSOCIATES
1000 Massachusetts Avenue
Cambridge, Massachusetts 02138
P: 617.547.5400 F: 617.648.4920
F
IL
E
N A M E
L A Y O U T
N A M E
P L O T T E D
U S E R
OF 342
01/10/2020
APPROVED BY
JOHNATHAN JOHNS PM&EB Supervisor with NAVAL BASE, New London, CT
MRI/LEJ
EA
Y D o c u m e n ts R e v it L o c a l\ C e n tr a l_ A R B il o d e a u N L J W N .r v t
:1 :3
P M
P R
O
JE
C T
R M
-1
0, R E
P A
IR
F
A
IL
IN
G
S U
B M
A R
IN
E
A S
C H
O O
L B
Q
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
A
T L A
N T
IC
N
AV
Y B
AS
E
N E W
LO
N D O N
N E W
LO
N D O N C T
N
AV
Y B
AS
E N
EW
LO
D O N
D O N C T
N
AV
S U B
AS
E
P U B
LI
C
W O R K S
D
EP
AR
TM
EN
T
1600393
G-000A
N40085-20-R-0034
C O V E R
V O L U M E
G A
12806853
AF RB KBR
B il o d e a u N L J W N
NAVAL FACILITIES MILITARY COMMAND - MID ATLANTIC
NAVAL SUBMARINE BASE NEW LONDON, NEW LONDON, CONNECTICUT
PROJECT RM15-1230, REPAIR FAILING (C158)
SUBMARINE A SCHOOL BQ 488
PROJECT TEAM
CIVIL:
STRUCTURAL:
ARCHITECTURAL:
INTERIOR DESIGN:
FIRE PROTECTION:
PLUMBING:
MECHANICAL:
ELECTRICAL:
JENNIFER HOWE, SYMMES MAINI & MCKEE
DYLAN QUINN, SYMMES MAINI & MCKEE
KAREN BRESLAWSKI, SYMMES MAINI & MCKEE
ALYSSA TOMPKINS, SYMMES MAINI & MCKEE
CHARLES MASON, JENSEN HUGHES
LUIS MORENO, SYMMES MAINI & MCKEE
ANDREW OLDEMAN, SYMMES MAINI & MCKEE
JOHN ALFEO, SYMMES MAINI & MCKEE
VOLUME 1
IS
SU
E
FO
R C O N
ST
RU
C
TI
O N
2 0
Karen Breslawski
INDEX OF DRAWINGS SYMBOL LEGEND: ● CURRENT ISSUE ○ PREVIOUSLY ISSUED
PM/DMPM/DMPM/DMPM/DM
BRANCH MANAGERBRANCH MANAGERBRANCH MANAGERBRANCH MANAGER
CHIEF ENG/ARCHCHIEF ENG/ARCHCHIEF ENG/ARCHCHIEF ENG/ARCH
FIRE PROTECTIONFIRE PROTECTIONFIRE PROTECTIONFIRE PROTECTION
SATISFACTORY TOSATISFACTORY TOSATISFACTORY TOSATISFACTORY TO
APPROVEDAPPROVEDAPPROVEDAPPROVED
ACTIVITYACTIVITYACTIVITYACTIVITY
DATEDATEDATEDATE
FOR COMMANDER NAVFACFOR COMMANDER NAVFACFOR COMMANDER NAVFACFOR COMMANDER NAVFAC
SSSSEEEEAAAALLLL
AAAA////EEEE IIIINNNNFFFFOOOO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:SCALE:SCALE:SCALE:
CONSTR. CONTR. NO.CONSTR. CONTR. NO.CONSTR. CONTR. NO.CONSTR. CONTR. NO.
SHEETSHEETSHEETSHEET
NAVFAC DRAWING NO.NAVFAC DRAWING NO.NAVFAC DRAWING NO.NAVFAC DRAWING NO.
DESDESDESDES DRWDRWDRWDRW CCCCHHHHKKKK
EPROJECT NO.:EPROJECT NO.:EPROJECT NO.:EPROJECT NO.:
UNCLASSIFIEDUNCLASSIFIEDUNCLASSIFIEDUNCLASSIFIED
UUUU
NN NN
CC CC
LL LL AA AA
SS SS
SS SS
II II FF FF
II II EE EE
DD DD
UNCLASSIFIEDUNCLASSIFIEDUNCLASSIFIEDUNCLASSIFIED
D E P A R T M E N T
O F
T H E
N A V Y
D E P A R T M E N T
O F
T H E
N A V Y
D E P A R T M E N T
O F
T H E
N A V Y
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
SS SS
YY YY
MM MM
DD DD
EE EE
SS SS
CC CC
RR RR
II II PP PP
TT TT II II
OO OO
NN NN
DD DD
AA AA
TT TT EE EE
AA AA
PP PP
PP PP
RR RR
DDDDRRRRAAAAWWWWFFFFOOOORRRRMMMM RRRREEEEVVVVIIIISSSSIIIIOOOONNNN:::: 11112222 AAAAPPPPRRRRIIIILLLL 2222000011118888
SYMMES MAINI & McKEE ASSOCIATES
1000 Massachusetts Avenue
Cambridge, Massachusetts 02138
P: 617.547.5400 F: 617.648.4920
F
IL
E
N A M E
F
IL
E
N A M E
F
IL
E
N A M E
F
IL
E
N A M E
L A Y O U T
N A M E
L A Y O U T
N A M E
L A Y O U T
N A M E
L A Y O U T
N A M E
P L O T T E D
P L O T T E D
P L O T T E D
P L O T T E D
U S E R
U S E R
U S E R
U S E R
OFOFOFOF 342342342342
00001111////11110000////2222000022220000
APPROVED BY APPROVED BY APPROVED BY APPROVED BY
JJJJOOOOHHHHNNNNAAAATTTTHHHHAAAANNNN JJJJOOOOHHHHNNNNSSSS PPPPMMMM&&&&EEEEBBBB SSSSuuuuppppeeeerrrrvvvviiiissssoooorrrr wwwwiiiitttthhhh NNNNAAAAVVVVAAAALLLL BBBBAAAASSSSEEEE,,,, NNNNeeeewwww LLLLoooonnnnddddoooonnnn,,,, CCCCTTTT
MMMMRRRRIIII////LLLLEEEEJJJJ
EEEEAAAA
C e n tr a l_ A d e ta c h e d .r v t
C e n tr a l_ A d e ta c h e d .r v t
C e n tr a l_ A d e ta c h e d .r v t
C e n tr a l_ A d e ta c h e d .r v t
1111////4444"""" ==== 1111''''----0000""""
:1 :0
P M
:1 :0
P M
:1 :0
P M
:1 :0
P M
P R O
JE
C T R M -1 R E P A
IR
F A
IL
IN
G
S U B M A R
IN
E A S C H O O L B Q
N A V A L F A C
IL
IT
IE
S E N G
IN
E E R
IN
G C O M M A N D M
ID
A T L A N T
IC
N
AV
Y B
AS
E
N E W
LO
N D O N
N
AV
Y B
AS
E
N E W
LO
N D O N
N
AV
Y B
AS
E
N E W
LO
N D O N
N
AV
Y B
AS
E
N E W
LO
N D O N
N E W
LO
N D O N C T
N E W
LO
N D O N C T
N E W
LO
N D O N C T
N E W
LO
N D O N C T
N
AV
Y B
AS
E
D O
AV
Y B
AS
E
D
Y B
AS
E
D
Y B
AS
E
D O N
D O N C T
D O N C T
D O N C T
D O N C T
N
AV
S U B
AS
E
N
AV
S U B
AS
E
N
AV
S U B
AS
E
N
AV
S U B
AS
E
P U B
LI
C
W O R K S
D
EP
AR
TM
EN
T
P U B
LI
C
W O R K S
D
EP
AR
TM
EN
T
P U B
LI
C
W O R K S
D
EP
AR
TM
EN
T
P U B
LI
C
W O R K S
D
EP
AR
TM
EN
T
1111666600000000333399993333
G-001
N40085N40085N40085N40085----20202020----RRRR----0000000033334444
II II NN NN
DD DD
EE EE
XX XX
OO OO
FF FF
DD DD
RR RR
AA AA
WW WW
II II NN NN
GG GG
SS SS
VV VV
OO OO
LL LL
UU UU
MM MM
EE EE
11 11
GG GG
12806854128068541280685412806854
AFAFAFAF RBRBRBRB KKKKBBBBR
B il o d e a u N L J W N
R B il o d e a u N L J W N
R B il o d e a u N L J W N
R B il o d e a u N L J W N
DRAWING INDEX - VOLUME 1
SHEET
NUMBER
NAVFAC
DWG
NUMBER SHEET NAME 0
/2
/2
IS
S U
E F
O R
C O
N S
T R
U C
T
IO
FAD-101D 12806977 FIRE ALARM FIRST FLOOR DEMO PLAN - PART D ●
FAD-102A&B 12806978 FIRE ALARM SECOND FLOOR DEMO PLAN - PART A & B ●
FAD-102C 12806979 FIRE ALARM SECOND FLOOR DEMO PLAN - PART C ●
FAD-102D 12806980 FIRE ALARM SECOND FLOOR DEMO PLAN - PART D ●
FAD-103A&B 12806981 FIRE ALARM THIRD FLOOR DEMO PLAN - PART A & B ●
FAD-103C 12806982 FIRE ALARM THIRD FLOOR DEMO PLAN - PART C ●
FAD-103D 12806983 FIRE ALARM THIRD FLOOR DEMO PLAN - PART D ●
FAD-104A&B 12806984 FIRE ALARM FOURTH FLOOR DEMO PLAN - PART A & B ●
FAD-104C 12806985 FIRE ALARM FOURTH FLOOR DEMO PLAN - PART C ●
FAD-104D 12806986 FIRE ALARM FOURTH FLOOR DEMO PLAN - PART D ●
FAD-105A&B 12806987 FIRE ALARM FIFTH FLOOR DEMO PLAN - PART A & B ●
FAD-105C 12806988 FIRE ALARM FIFTH FLOOR DEMO PLAN - PART C ●
FAD-105D 12806989 FIRE ALARM FIFTH FLOOR DEMO PLAN - PART D ●
FAD-106A 12806990 FIRE ALARM ROOF DEMO PLAN - PART A ●
FAD-106C 12806991 FIRE ALARM ROOF DEMO PLAN - PART C ●
FAD-106D 12806992 FIRE ALARM ROOF DEMO PLAN - PART D ●
FA-100A&B 12806993 FIRE ALARM GROUND FLOOR PLAN - PART A & B ●
FA-100D 12806994 FIRE ALARM GROUND FLOOR PLAN - PART D ●
FA-101A&B 12806995 FIRE ALARM FIRST FLOOR PLAN - PART A & B ●
FA-101C 12806996 FIRE ALARM FIRST FLOOR PLAN - PART C ●
FA-101D 12806997 FIRE ALARM FIRST FLOOR PLAN - PART D ●
FA-102A&B 12806998 FIRE ALARM SECOND FLOOR PLAN - PART A & B ●
FA-102C 12806999 FIRE ALARM SECOND FLOOR PLAN - PART C ●
FA-102D 12807000 FIRE ALARM SECOND FLOOR PLAN - PART D ●
FA-103A&B 12807001 FIRE ALARM THIRD FLOOR PLAN - PART A & B ●
FA-103C 12807002 FIRE ALARM THIRD FLOOR PLAN - PART C ●
FA-103D 12807003 FIRE ALARM THIRD FLOOR PLAN - PART D ●
FA-104A&B 12807004 FIRE ALARM FOURTH FLOOR PLAN - PART A & B ●
FA-104C 12807005 FIRE ALARM FOURTH FLOOR PLAN - PART C ●
FA-104D 12807006 FIRE ALARM FOURTH FLOOR PLAN - PART D ●
FA-105A&B 12807007 FIRE ALARM FIFTH FLOOR PLAN - PART A & B ●
FA-105C 12807008 FIRE ALARM FIFTH FLOOR PLAN - PART C ●
FA-105D 12807009 FIRE ALARM FIFTH FLOOR PLAN - PART D ●
FA-106A 12807010 FIRE ALARM ROOF PLAN - PART A & B ●
FA-106C 12807011 FIRE ALARM ROOF PLAN - PART C ●
FA-106D 12807012 FIRE ALARM ROOF PLAN - PART D ●
DRAWING INDEX - VOLUME 1
SHEET
NUMBER
NAVFAC
DWG
NUMBER SHEET NAME 0
/2
/2
IS
S U
E F
O R
C O
N S
T R
U C
T
A-407 12806913 LOUNGE AND STUDY PLANS & RCP ●
A-408 12806914 LAUNDRY RM & FIRE PUMP RM PLAN, RCP & ELEVATIONS ●
A-409 12806915 BUILDING CORE PLANS AND RCPS ●
A-410 12806916 ELEV MACHINE ROOMS & EXTERIOR STAIRS FROM MECHANICAL ROOMS ●
A-411 12806917 STAIR SECTION AND DETAILS ●
A-501 12806918 EXTERIOR DETAILS - ROOF ●
A-502 12806919 EXTERIOR DETAILS - ROOF AND EXTERIOR WALL ●
A-503 12806920 EXTERIOR DETAILS - ROOF ●
A-504 12806921 EXTERIOR DETAILS - EXT WALL AND WINDOW ●
A-505 12806922 EXTERIOR DETAILS - SOFFIT AND BASEMENT ●
A-551 12806924 INTERIOR DETAILS - CEILINGS AND CASEWORK ●
A-552 12806925 INTERIOR DETAILS - PARTITIONS AND RAILINGS ●
A-553 12806926 INTERIOR DETAILS - MILLWORK ●
A-601 12806927 DOOR SCHEDULE, DOOR & FRAME TYPES & DETAILS ●
A-602 12806928 WINDOW AND STOREFRONT TYPES ●
INTERIORS
I-101 12806930 1ST FLOOR FINISH AND SIGNAGE PLAN ●
I-102 12806931 2ND FLOOR FINISH AND SIGNAGE PLAN ●
I-103 12806932 3RD FLOOR FINISH AND SIGNAGE PLAN ●
I-104 12806933 4TH FLOOR FINISH AND SIGNAGE PLAN ●
I-105 12806934 5TH FLOOR FINISH AND SIGNAGE PLAN ●
I-110 12806935 FINISH SCHEDULE LEGEND & TRANSITION DETAILS ●
I-111 12806936 ROOM FINISH SCHEDULES ●
I-112 12806937 SIGNAGE SCHEDULE - LEVEL 1, 2, 3 ●
I-113 12806938 SIGNAGE SCHEDULE - LEVEL 4, 5 ●
I-114 12806939 SIGNAGE DETAILS ●
I-115 12806940 SIGNAGE DETAILS ●
I-801 12806941 FURNITURE TEST FIT ●
LIFE SAFETY
LS-001 12806943 LIFE SAFETY NOTES AND SYMBOLS LEGEND ●
LS-002 12806944 LIFE SAFETY CODE COMPLIANCE SITE PLAN ●
LS-100 12806945 LIFE SAFETY OVERALL GROUND FLOOR PLAN ●
LS-100A&B 12806946 LIFE SAFETY GROUND FLOOR PLAN - PART A & B ●
LS-100D 12806947 LIFE SAFETY GROUND FLOOR PLAN - PART D ●
LS-101 12806948 LIFE SAFETY OVERALL FIRST FLOOR PLAN ●
LS-101A&B 12806949 LIFE SAFETY FIRST FLOOR PLAN - PART A & B ●
LS-101C 12806950 LIFE SAFETY FIRST FLOOR PLAN - PART C ●
LS-101D 12806951 LIFE SAFETY FIRST FLOOR PLAN - PART D ●
LS-102 12806952 LIFE SAFETY OVERALL SECOND FLOOR PLAN ●
LS-102A&B 12806953 LIFE SAFETY SECOND FLOOR PLAN - PART A & B ●
LS-102C 12806954 LIFE SAFETY SECOND FLOOR PLAN - PART C ●
LS-102D 12806955 LIFE SAFETY SECOND FLOOR PLAN - PART D ●
LS-103 12806956 LIFE SAFETY OVERALL THIRD FLOOR PLAN ●
LS-103A&B 12806957 LIFE SAFETY THIRD FLOOR PLAN - PART A & B ●
LS-103C 12806958 LIFE SAFETY THIRD FLOOR PLAN - PART C ●
LS-103D 12806959 LIFE SAFETY THIRD FLOOR PLAN - PART D ●
LS-104 12806960 LIFE SAFETY OVERALL FOURTH FLOOR PLAN ●
LS-104A&B 12806961 LIFE SAFETY FOURTH FLOOR PLAN - PART A & B ●
LS-104C 12806962 LIFE SAFETY FOURTH FLOOR PLAN - PART C ●
LS-104D 12806963 LIFE SAFETY FOURTH FLOOR PLAN - PART D ●
LS-105 12806964 LIFE SAFETY OVERALL FIFTH FLOOR PLAN ●
LS-105A&B 12806965 LIFE SAFETY FIFTH FLOOR PLAN - PART A & B ●
LS-105C 12806966 LIFE SAFETY FIFTH FLOOR PLAN - PART C ●
LS-106 12806967 LIFE SAFETY OVERALL ROOF PLAN ●
LS-200 12806968 LIFE SAFETY DETAILS PLAN PART 1 ●
LS-201 12806969 LIFE SAFETY DETAILS PLAN PART 2 ●
FIRE ALARM
FA-001 12806971 FIRE ALARM NOTES AND SYMBOLD LEGEND ●
FA-002 12806972 FIRE ALARM CONCEPTUAL RISER DIAGRAM ●
FAD-100A&B 12806973 FIRE ALARM GROUND FLOOR DEMO PLAN - PART A & B ●
FAD-100D 12806974 FIRE ALARM GROUND FLOOR DEMO PLAN - PART D ●
FAD-101A&B 12806975 FIRE ALARM FIRST FLOOR DEMO PLAN - PART A & B ●
FAD-101C 12806976 FIRE ALARM FIRST FLOOR DEMO PLAN - PART C ●
DRAWING INDEX - VOLUME 1
SHEET
NUMBER
NAVFAC
DWG
NUMBER SHEET NAME 0
/2
/2
IS
S U
E F
O R
C O
N S
T R
U C
T
GENERAL
G-000A 12806853 COVER - VOLUME 1 ●
G-001 12806854 INDEX OF DRAWINGS - VOLUME 1 ●
G-003 12806855 BID OPTIONS DIAGRAM ●
CIVIL
C-101 12806856 EXISTING CONDITIONS PLAN ●
C-102 12806857 SITE PREPARATION PLAN ●
C-103 12806858 LAYOUT & MATERIALS PLAN ●
C-104 12806859 GRADING & DRAINAGE PLAN ●
C-501 12806860 DETAILS I ●
C-502 12806861 DETAILS II ●
C-503 12806862 DETAILS III ●
STRUCTURAL
S-001 12806864 STRUCTURAL ●
S-002 12806865 STRUCTURAL ●
S-003 12806866 STRUCTURAL ●
S-004 12806867 STRUCTURAL ●
ARCHITECTURAL
A-001 12806869 LEGENDS, NOTES, ABBREVIATIONS ●
A-002 12806870 PARTITION TYPES ●
A-003 12806871 EXTERIOR ASSEMBLIES ●
AD101 12806872 DEMOLITION PLANS - 1ST FLOOR TO 2ND FLOOR ●
AD102 12806873 DEMOLITION PLANS - 3RD FLOOR TO 4TH FLOOR ●
AD103 12806874 DEMOLITION PLANS - 5TH FLOOR TO ROOF ●
AD104 12806875 1ST FLOOR REFLECTED CEILING DEMOLITION PLAN ●
AD105 12806876 2ND FLOOR REFLECTED CEILING DEMOLITION PLAN ●
AD106 12806877 3RD FLOOR REFLECTED CEILING DEMOLITION PLAN ●
AD107 12806878 4TH FLOOR REFLECTED CEILING DEMOLITION PLAN ●
AD108 12806879 5TH FLOOR REFLECTED CEILING DEMOLITION PLAN ●
AD401 12806880 TYP BERTHING UNIT - ENLARGED PLANS & RCP DEMOLITION ●
AD404 12806881 FIRST FLOOR QUARTER DECK - ENLARGED DEMOLITION PLANS & RCP ●
AD405 12806882 SECOND FLOOR QUARTER DECK - ENLARGED DEMOLITION PLANS & RCP ●
AD407 12806883 FIRE PUMP RM, LAUNDRY RM, LOUNGES & OFFICES - DEMO PLANS ●
AD409 12806884 BUILDING CORE DEMO PLAN, RCP & ELEVATIONS ●
AD410 12806885 ELEVATOR MACHINE ROOM DEMO PLANS ●
AD501 12806923 DETAILS - DEMOLITION ●
A-100 12806886 BASEMENT PLAN AND CONSTRUCTION PLAN NOTES ●
A-101 12806887 1ST FLOOR CONSTRUCTION PLAN ●
A-102 12806888 2ND FLOOR CONSTRUCTION PLAN ●
A-103 12806889 3RD FLOOR CONSTRUCTION PLAN ●
A-104 12806890 4TH FLOOR CONSTRUCTION PLAN ●
A-105 12806891 5TH FLOOR CONSTRUCTION PLAN ●
A-106 12806892 ROOF CONSTRUCTION PLAN ●
AR100 12806893 RCP NOTES & BASEMENT REFLECTED CEILING PLAN ●
AR101 12806894 1ST FLOOR REFLECTED CEILING PLAN ●
AR102 12806895 2ND FLOOR REFLECTED CEILING PLAN ●
AR103 12806896 3RD FLOOR REFLECTED CEILING PLAN ●
AR104 12806897 4TH FLOOR REFLECTED CEILING PLAN ●
AR105 12806898 5TH FLOOR REFLECTED CEILING PLAN ●
A-201 12806899 NORTH WING - NORTH & SOUTH BUILDING ELEVATIONS ●
A-202 12806900 SOUTH WING - NORTH & SOUTH BUILDING ELEVATIONS ●
A-203 12806901 EAST & WEST BUILDING ELEVATIONS ●
A-204 12806902 INTERIOR ELEVATIONS ●
A-301 12806903 BUILDING SECTIONS - EAST/WEST ●
A-302 12806904 BUILDING SECTIONS - NORTH/SOUTH ●
A-303 12806905 WALL SECTIONS ●
A-400 12806906 ENLARGED DRAWING KEYNOTES, NOTES & MOUNTING HEIGHTS ●
A-401 12806907 TYP UNIT & CORRIDOR - ENLARGED PLAN & RCP ●
A-402 12806908 TYP UNIT & CORRIDOR FINISH PLAN & ELEVATIONS ●
A-403 12806909 TYP UNIT SINK & BATHROOM - ENLARGED PLANS & ELEVATIONS ●
A-404 12806910 FIRST FLOOR QUARTER DECK - ENLARGED PLANS & RCP ●
A-405 12806911 SECOND FLOOR QUARTER DECK - ENLARGED PLAN & RCP ●
A-406 12806912 RECEPTION C-106A PLANS AND W.C. C-114 PLANS, RCP & ELEVATIONS ●
II II SS SS
SS SS UU UU
EE EE
FF FF OO OO
RR RR
CC CC
OO OO
NN NN
SS SS TT TT
RR RR
UU UU
CC CC
TT TT II II
OO OO
NN NN
00 00 11 11 // // 22 22 88 88 22 22 00 00 22 22 00 00
SUMMARY OF BID OPTIONS
1. APPLY A SMOOTH CEMENT STUCCO FINISH TO CORRIDOR WALLS AT EXPOSED CMU - SEE
SPECIFICATION SECTION 09 24 23 CEMENT STUCCO
2. ADD DEMOLITION AND REPLACEMENT OF GWB SOFFITS IN CORRIDORS AT UNIT ENTRIES
3. ADD AUTOMATIC SENSOR FAUCETS IN LIEU OF MANUAL FAUCETS AT LAVATORIES - REFER TO
PLUMBING DRAWINGS
4. INSTALL PVC ROOFING IN LIEU OF TPO ROOFING - SEE SPECIFICATION SECTION 07 54 19.04
PVC ROOFING
5. ADD REPLACEMENT OF ADDITIONAL EQUIPMENT IN MECHANICAL ROOMS - SEE MECHANICAL
DRAWINGS
6. ADD REMOVAL AND REPLACEMENT OF EXISTING WINDOWS: REPLACE EXISTING ALUMINUM
WINDOWS, INTERIOR WINDOW STOOLS, AND SPANDREL GLAZING AND FRAMES AT ALL
ELEVATIONS. SEE DETAILS AND WINDOW TYPES FOR MORE INFORMATION. IF OPTION 6 IS
SELECTED OPTION 9 CANNOT BE ACCEPTED.
7. NOT USED.
8. SKYLIGHTS - SEE DETAILS FOR MORE INFORMATION:
a. NOT USED
b. ADD REPLACEMENT OF EXISTING SHED SKYLIGHT WITH STANDING SEAM METAL ROOF
c. NOT USED
d. ADD REPLACEMENT OF EXISTING PEAKED SKYLIGHT WITH STANDING SEAM METAL ROOF
9. CHANGE REPLACEMENT OF INTERIOR WINDOW STOOLS WITH SOLID SURFACE STOOL - SEE
DETAILS FOR MORE INFORMATION
10. ADD FURRING REPLACEMENT AT BERTHING UNIT EXTERIOR WALL TYPE - SEE PARTITION
TYPES FOR MORE INFORMATION
11. CHANGE HALF HEIGHT WALL TILE IN BERTHING UNIT TOILET ROOMS AND 1ST FLOOR
QUARTERDECK TOILET ROOM TO FULL HEIGHT TILE TO CEILING.
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
UNCLASSIFIED
U N C
LA
S S
IF
IE
D
UNCLASSIFIED
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
S Y M
D E S C R
IP
TI
O N
D
AT
E
AP
P R
DRAWFORM REVISION: 12 APRIL 2018
SYMMES MAINI & McKEE ASSOCIATES
1000 Massachusetts Avenue
Cambridge, Massachusetts 02138
P: 617.547.5400 F: 617.648.4920
F
IL
E
N A M E
L A Y O U T
N A M E
P L O T T E D
KEY PLAN
U S E R
OF 342
01/10/2020
APPROVED BY
JOHNATHAN JOHNS PM&EB Supervisor with NAVAL BASE, New London, CT
MRI/LEJ
EA
Y D o c u m e n ts R e v it L o c a l\ C e n tr a l_ A R B il o d e a u N L J W N .r v t
1/16" = 1'-0"
:1 :5
P M
P R
O
JE
C T
R M
-1
0, R E
P A
IR
F
A
IL
IN
G
S U
B M
A R
IN
E
A S
C H
O O
L B
Q
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
A
T L A
N T
IC
N
AV
Y B
AS
E
N E W
LO
N D O N
N E W
LO
N D O N C T
N
AV
Y B
AS
E
D O N
D O N C T
N
AV
S U B
AS
E
P U B
LI
C
W O R K S
D
EP
AR
TM
EN
T
1600393
G-003
N40085-20-R-0034
B
ID
O P T
IO
N S
D
IA
G R A M
G
12806855
AF GG KBR
B il o d e a u N L J W N
SCALE:
BID OPTIONS AXON DIAGRAM
A1
BID OPTION 1
TYPICAL AT
CORRIDOR CMU
BID OPTION 2
BID OPTION 4 TYPICAL AT ERA-1a AND ERA-1b LOCATIONS
BID OPTION 6
TYPICAL FOR ALL
WINDOWS, ALL
ELEVATIONS
BID OPTION 8b
BID OPTION 5
BID OPTION 8d
BID OPTION 9
BID OPTION 10
IS
SU
E
FO
R C O N
ST
RU
C
TI
O N
2 0
VICINITY MAP
U.S. NAVAL
SUBMARINE BASE
NEW LONDON
B488
N.T.S.
LOCATION PLAN
NORTH
ROCK POND
SOUTH
B488
GATE 1
N.T.S.
WING
WING
N
PROJECT
NORTH
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
UNCLASSIFIED
U N C
LA
S S
IF
IE
D
UNCLASSIFIED
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
S Y M
D E S C R
IP
TI
O N
D
AT
E
AP
P R
DRAWFORM REVISION: 12 APRIL 2018
SYMMES MAINI & McKEE ASSOCIATES
1000 Massachusetts Avenue
Cambridge, Massachusetts 02138
P: 617.547.5400 F: 617.648.4920
F
IL
E
N A M E
L A Y O U T
N A M E
P L O T T E D
U S E R
OF 342
01/10/2020
APPROVED BY
JOHNATHAN JOHNS PM&EB Supervisor with NAVAL BASE, New London, CT
MRI/LEJ
EA
Y D o c u m e n ts R e v it L o c a l\ C e n tr a l_ A R B il o d e a u N L J W N .r v t
:1 :4
P M
P R
O
JE
C T
R M
-1
0, R E
P A
IR
F
A
IL
IN
G
S U
B M
A R
IN
E
A S
C H
O O
L B
Q
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
A
T L A
N T
IC
N
AV
Y B
AS
E
N E W
LO
N D O N
N E W
LO
N D O N C T
N
AV
Y B
AS
E
D O N
D O N C T
N
AV
S U B
AS
E
P U B
LI
C
W O R K S
D
EP
AR
TM
EN
T
1600393
G-000B
N40085-20-R-0034
C O V E R
V O L U M E
G B
12807014
AF RB KBR
B il o d e a u N L J W N
NAVAL FACILITIES MILITARY COMMAND - MID ATLANTIC
NAVAL SUBMARINE BASE NEW LONDON, NEW LONDON, CONNECTICUT
PROJECT RM15-1230, REPAIR FAILING (C158)
SUBMARINE A SCHOOL BQ 488
PROJECT TEAM
CIVIL:
STRUCTURAL:
ARCHITECTURAL:
INTERIOR DESIGN:
FIRE PROTECTION:
PLUMBING:
MECHANICAL:
ELECTRICAL:
JENNIFER HOWE, SYMMES MAINI & MCKEE
DYLAN QUINN, SYMMES MAINI & MCKEE
KAREN BRESLAWSKI, SYMMES MAINI & MCKEE
ALYSSA TOMPKINS, SYMMES MAINI & MCKEE
CHARLES MASON, JENSEN HUGHES
LUIS MORENO, SYMMES MAINI & MCKEE
ANDREW OLDEMAN, SYMMES MAINI & MCKEE
JOHN ALFEO, SYMMES MAINI & MCKEE
VOLUME 2
IS
SU
E
FO
R C O N
ST
RU
C
TI
O N
2 0
INDEX OF DRAWINGS SYMBOL LEGEND: ● CURRENT ISSUE ○ PREVIOUSLY ISSUED
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
UNCLASSIFIED
U N C
LA
S S
IF
IE
D
UNCLASSIFIED
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
S Y M
D E S C R
IP
TI
O N
D
AT
E
AP
P R
DRAWFORM REVISION: 12 APRIL 2018
SYMMES MAINI & McKEE ASSOCIATES
1000 Massachusetts Avenue
Cambridge, Massachusetts 02138
P: 617.547.5400 F: 617.648.4920
F
IL
E
N A M E
L A Y O U T
N A M E
P L O T T E D
U S E R
OF 342
01/10/2020
APPROVED BY
JOHNATHAN JOHNS PM&EB Supervisor with NAVAL BASE, New London, CT
MRI/LEJ
EA
Y D o c u m e n ts R e v it L o c a l\ C e n tr a l_ A R B il o d e a u N L J W N .r v t
:1 :4
P M
P R
O
JE
C T
R M
-1
0, R E
P A
IR
F
A
IL
IN
G
S U
B M
A R
IN
E
A S
C H
O O
L B
Q
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
A
T L A
N T
IC
N
AV
Y B
AS
E
N E W
LO
N D O N
N E W
LO
N D O N C T
N
AV
Y B
AS
E
D O N
D O N C T
N
AV
S U B
AS
E
P U B
LI
C
W O R K S
D
EP
AR
TM
EN
T
1600393
G-002
N40085-20-R-0034
IN
D E X
O F
D R A W
IN
G S
V O L U M E
G
12807015
AF RB KBR
B il o d e a u N L J W N
DRAWING INDEX - VOLUME 2
SHEET
NUMBER
NAVFAC
DWG
NUMBER SHEET NAME 0
/2
/2
IS
S U
E F
O R
C O
N S
T R
U C
T
ELECTRICAL
E-001 12807141 SYMBOL LEGEND AND NOTES ●
E-002 12807142 GENERAL NOTES ●
ED101ab 12807143 FIRST FLOOR DEMOLITION PLAN PART A & B ●
ED101c 12807144 FIRST FLOOR DEMOLITION PLAN PART C ●
ED101d 12807145 FIRST FLOOR DEMOLITION PLAN PART D ●
ED102ab 12807146 SECOND FLOOR DEMOLITION PLAN PART A & B ●
ED102c 12807147 SECOUND FLOOR DEMOLITION PLAN PART C ●
ED102d 12807148 SECOUND FLOOR DEMOLITON PLAN PART D ●
ED103ab 12807149 THIRD FLOOR DEMOLITION PLAN PART A & B ●
ED103c 12807150 THIRD FLOOR DEMOLITION PLAN PART C ●
ED103d 12807151 THIRD FLOOR DEMOLITION PLAN PART D ●
ED104ab 12807152 FOURTH FLOOR DEMOLITION PLAN PART A & B ●
ED104c 12807153 FOURTH FLOOR DEMOLITION PLAN PART C ●
ED104d 12807154 FOURTH FLOOR DEMOLITION PLAN PART D ●
ED105b 12807155 FIFTH FLOOR DEMOLITION PLAN PART B ●
ED105c 12807156 FIFTH FLOOR DEMOLITION PLAN PART C ●
ED105d 12807157 ROOF DEMOLITION PLAN PART D ●
ED106a 12807158 ROOF DEMOLITION PLAN PART A ●
ED106c 12807159 ROOF DEMOLITION PLAN PART C ●
EL101ab 12807160 FIRST FLOOR LIGHTING PLAN PART A & B ●
EL101c 12807161 FIRST FLOOR LIGHTING PLAN PART C ●
EL101d 12807162 FIRST FLOOR LIGHTING PLAN PART D ●
EL102ab 12807163 SECOND FLOOR LIGHTING PLAN PART A & B ●
EL102c 12807164 SECOND FLOOR LIGHTING PLAN PART C ●
EL102d 12807165 SECOND FLOOR LIGHTING PLAN PART D ●
EL103ab 12807166 THIRD FLOOR LIGHTING PLAN PART A & B ●
EL103c 12807167 THIRD FLOOR LIGHTING PLAN PART C ●
EL103d 12807168 THIRD FLOOR LIGHTING PLAN PART D ●
EL104ab 12807169 FOURTH FLOOR LIGHTING PLAN PART A & B ●
EL104c 12807170 FOURTH FLOOR LIGHTING PLAN PART C ●
EL104d 12807171 FOURTH FLOOR LIGTHING PLAN PART D ●
EL105c 12807172 FIFTH FLOOR LIGHTING PLAN PART C ●
EP100b 12807173 GROUND FLOOR ELECTRICAL PLAN PART B ●
EP101ab 12807174 FIRST FLOOR POWER PLAN PART A & B ●
EP101c 12807175 FIRST FLOOR POWER PLAN PART C ●
EP101d 12807176 FIRST FLOOR POWER PLAN PART D ●
EP102ab 12807177 SECOUND FLOOR POWER PLAN PART A & B ●
EP102c 12807178 SECOND FLOOR POWER PLAN PART C ●
EP102d 12807179 SECOND FLOOR POWER PART D ●
EP103ab 12807180 THIRD FLOOR POWER PLAN PART A & B ●
EP103c 12807181 THIRD FLOOR POWER PLAN PART C ●
EP103d 12807182 THIRD FLOOR POWER PLAN PART D ●
EP104ab 12807183 FOURTH FLOOR POWER PLAN PART A & B ●
EP104c 12807184 FOURTH FLOOR POWER PLAN PART C ●
EP104d 12807185 FOURTH FLOOR POWER PLAN PART D ●
EP105c 12807186 FIFTH FLOOR POWER PLAN PART C ●
EP105d 12807187 ROOF POWER PLAN PART D ●
EP106c 12807188 ROOF POWER PLAN PART C ●
EP107 12807189 LIGHTNING PROTECTION - ROOF PLAN ●
E-501 12807190 DETAILS ●
E-502 12807191 HANGING DETAILS ●
EL501 12807192 LIGHTING DETAILS AND SCHEDULES ●
EL502 12807193 LIGHTING CONTROL DETAILS ●
EL503 12807194 LIGHTING CONTROL DETAILS ●
EP601 12807195 POWER ONE-LINE DIAGRAM ●
EP602 12807196 POWER SCHEDULES ●
EP603 12807197 PANEL SCHEDULES BUILDING PART A & C ●
EP604 12807198 PANEL SCHEDULES BUILDING PART A & C ●
EP605 12807199 PANEL SCHEDULES BUILDING PART B & D ●
E-401 12807200 TYPICAL BERTHING UNIT POWER DEMO & RENO PLAN ●
E-402 12807201 TYPICAL BERTHING UNIT LIGHTING PLAN ●
ET501 12809195 ELECTRIFIED DOOR DIAGRAMS ●
DRAWING INDEX - VOLUME 2
SHEET
NUMBER
NAVFAC
DWG
NUMBER SHEET NAME 0
/2
/2
IS
S U
E F
O R
C O
N S
T R
U C
T
P-401 12807076 ENLARGED CONSTRUCTION PLANS 1 ●
P-402 12807077 ENLARGED CONSTRUCTION PLANS 2 ●
P-501 12807078 DETAILS I ●
P-502 12807079 DETAILS II ●
P-503 12807080 DETAILS III ●
P-504 12807081 DETAILS IV ●
P-601 12807082 SCHEDULES ●
P-701 12807083 DOMESTIC WATER RISER DIAGRAM PART 1 ●
P-702 12807084 DOMESTIC WATER RISER DIAGRAM PART 2 ●
P-703 12807085 DOMESTIC WATER RISER DIAGRAM PART 3 ●
P-704 12807086 S&V RISER DIAGRAMS - PART 1 ●
P-705 12807087 S&V RISER DIAGRAMS - PART 2 ●
P-706 12807088 S&V RISER DIAGRAMS- PART 3 ●
P-707 12807089 S&V RISER- PART 4 ●
MECHANICAL
M-001 12807091 LEGEND ●
MD101ab 12807092 FIRST FLOOR DEMOLITION PLAN PART A & B ●
MD101c 12807093 FIRST FLOOR DEMOLITION PLAN PART C ●
MD101d 12807094 FIRST FLOOR DEMOLITION PLAN PART D ●
MD102ab 12807095 SECOND FLOOR DEMOLITION PLAN PART A & B ●
MD102c 12807096 SECOND FLOOR DEMOLITION PLAN PART C ●
MD102d 12807097 SECOND FLOOR DEMOLITION PLAN PART D ●
MD103ab 12807098 THIRD FLOOR DEMOLITION PLAN PART A & B ●
MD103c 12807099 THIRD FLOOR DEMOLITION PLAN PART C ●
MD103d 12807100 THIRD FLOOR DEMOLITION PLAN PART D ●
MD104ab 12807101 FOURTH FLOOR DEMOLITION PLAN PART A & B ●
MD104c 12807102 FOURTH FLOOR DEMOLITION PLAN PART C ●
MD104d 12807103 FOURTH FLOOR DEMOLITION PLAN PART D ●
MD105ab 12807104 FIFTH FLOOR DEMOLITION PLAN PART A & B ●
MD105c 12807105 FIFTH FLOOR DEMOLITION PLAN PART C ●
MD105d 12807106 ROOF DEMOLITION PLAN PART D ●
MD106a 12807107 ROOF DEMOLITION PLAN PART A ●
MD106c 12807108 ROOF DEMOLITION PLAN PART C ●
M-101ab 12807109 FIRST FLOOR CONSTRUCTION PLAN PART A & B ●
M-101c 12807110 FIRST FLOOR CONSTRUCTION PLAN PART C ●
M-101d 12807111 FIRST FLOOR CONSTRUCTION PLAN PART D ●
M-102ab 12807112 SECOND FLOOR CONSTRUCTION PLAN PART A & B ●
M-102c 12807113 SECOND FLOOR CONSTRUCTION PLAN PART C ●
M-102d 12807114 SECOND FLOOR CONSTRUCTION PLAN PART D ●
M-103ab 12807115 THIRD FLOOR CONSTRUCTION PLAN PART A & B ●
M-103c 12807116 THIRD FLOOR CONSTRUCTION PLAN PART C ●
M-103d 12807117 THIRD FLOOR CONSTRUCTION PLAN PART D ●
M-104ab 12807118 FOURTH FLOOR CONSTRUCTION PLAN PART A & B ●
M-104c 12807119 FOURTH FLOOR CONSTRUCTION PLAN PART C ●
M-104d 12807120 FOURTH FLOOR CONSTRUCTION PLAN PART D ●
M-105ab 12807121 FIFTH FLOOR CONSTRUCTION PLAN PART A & B ●
M-105c 12807122 FIFTH FLOOR CONSTRUCTION PLAN PART C ●
M-105d 12807123 ROOF CONSTRUCTION PLAN PART D ●
M-106a 12807124 ROOF CONSTRUCTION PLAN PART A ●
M-106c 12807125 ROOF CONSTRUCTION PLAN PART C ●
M-401 12807126 UNIT & LAUNDRY PLANS ●
M-402 12807127 MECHANICAL ROOM PLANS ●
M-501 12807128 DETAILS ●
M-502 12807129 DETAILS ●
M-503 12807130 DETAILS ●
M-504 12807131 DETAILS ●
M-505 12807132 DETAILS ●
M-506 12807133 DETAILS ●
M-601 12807134 SCHEDULES ●
M-701 12807135 EXISTING AND STEAM/HOT WATER FLOW DIAGRAMS ●
M-702 12807136 CHILLED WATER FLOW DIAGRAM ●
M-703 12807137 CONTROLS ●
M-704 12807138 CONTROLS ●
M-801 12807139 RISER DIAGRAMS ●
M-802 12807140 RISER DIAGRAMS ●
DRAWING INDEX - VOLUME 2
SHEET
NUMBER
NAVFAC
DWG
NUMBER SHEET NAME 0
/2
/2
IS
S U
E F
O R
C O
N S
T R
U C
T
GENERAL
G-000B 12807014 COVER - VOLUME 2 ●
G-002 12807015 INDEX OF DRAWINGS - VOLUME 2 ●
FIRE PROTECTION
FP-001 12807016 FIRE PROTECTION NOTES AND SYMBOLS LEGEND ●
FP-002 12807017 FIRE PROTECTION CONCEPTUAL RISER DIAGRAM ●
FP-101A&B 12807018 FIRE PROTECTION FIRST FLOOR PLAN - PART A & B ●
FP-101C 12807019 FIRE PROTECTION FIRST FLOOR PLAN - PART C ●
FP-101D 12807020 FIRE PROTECTION FIRST FLOOR PLAN - PART D ●
FP-102A&B 12807021 FIRE PROTECTION SECOND FLOOR PLAN - PART A & B ●
FP-102C 12807022 FIRE PROTECTION SECOND FLOOR PLAN - PART C ●
FP-102D 12807023 FIRE PROTECTION SECOND FLOOR PLAN - PART D ●
FP-103A&B 12807024 FIRE PROTECTION THIRD FLOOR PLAN - PART A & B ●
FP-103C 12807025 FIRE PROTECTION THIRD FLOOR PLAN - PART C ●
FP-103D 12807026 FIRE PROTECTION THIRD FLOOR PLAN - PART D ●
FP-104A&B 12807027 FIRE PROTECTION FOURTH FLOOR PLAN - PART A & B ●
FP-104C 12807028 FIRE PROTECTION FOURTH FLOOR PLAN - PART C ●
FP-104D 12807029 FIRE PROTECTION FOURTH FLOOR PLAN - PART D ●
FP-105A&B 12807030 FIRE PROTECTION FIFTH FLOOR PLAN - PART A & B ●
FP-105C 12807031 FIRE PROTECTION FIFTH FLOOR PLAN - PART C ●
FP-106C 12807032 FIRE PROTECTION ROOF PLAN - PART C ●
FP-200 12807033 FIRE PROTECTION FIRE PUMP ROOM PLAN ●
FP-201 12807034 FIRE PROTECTION DETAILS PLAN ●
PLUMBING
P-001 12807036 LEGEND, NOTES & SCHEDULES ●
PD101ab 12807037 FIRST FLOOR DEMOLITION PLAN - PART A & B ●
PD101c 12807038 FIRST FLOOR DEMOLITION PLAN - PART C ●
PD101d 12807039 FIRST FLOOR DEMOLITION PLAN - PART D ●
PD102ab 12807040 SECOND FLOOR DEMOLITION PLAN - PART A & B ●
PD102c 12807041 SECOND FLOOR DEMOLITION PLAN - PART C ●
PD102d 12807042 SECOND FLOOR DEMOLITION PLAN - PART D ●
PD103ab 12807043 THIRD FLOOR DEMOLITION PLAN - PART A & B ●
PD103c 12807044 THIRD FLOOR DEMOLITION PLAN - PART C ●
PD103d 12807045 THIRD FLOOR DEMOLITION PLAN - PART D ●
PD104ab 12807046 FOURTH FLOOR DEMOLITION PLAN - PART A & B ●
PD104c 12807047 FOURTH FLOOR DEMOLITION PLAN - PART C ●
PD104d 12807048 FOURTH FLOOR DEMOLITION PLAN - PART D ●
PD105ab 12807049 FIFTH FLOOR DEMOLITION PLAN - PART A & B ●
PD105c 12807050 FIFTH FLOOR DEMOLITION PLAN - PART C ●
PD106a 12807051 ROOF DEMOLITION PLAN - PART A ●
PD106c 12807052 ROOF DEMOLITION PLAN - PART C ●
PD401 12807053 ENLARGED DEMOLITION PLANS I ●
PD402 12807054 ENLARGED DEMOLISION PLANS II - NOT USED
PD701 12807055 DOMESTIC WATER RISER DIAGRAMS - DEMOLITION ●
PD702 12807056 S&V RISER DIAGRAMS - PART 1 DEMOLITION ●
PD703 12807057 S&V RISER DIAGRAMS PART 2 - PART D - DEMO ●
PD704 12807058 JANITOR CLOSET RISER DIAGRAMS - DEMOLITION ●
P-101ab 12807059 FIRST FLOOR CONSTRUCTION PLAN - PART A & B ●
P-101c 12807060 FIRST FLOOR CONSTRUCTION PLAN - PART C ●
P-101d 12807061 FIRST FLOOR CONSTRUCTION PLAN - PART D ●
P-102ab 12807062 SECOND FLOOR CONSTRUCTION PLAN - PART A & B ●
P-102c 12807063 SECOND FLOOR CONSTRUCTION PLAN - PART C ●
P-102d 12807064 SECOND FLOOR CONSTRUCTION PLAN - PART D ●
P-103ab 12807065 THIRD FLOOR CONSTRUCTION PLAN - PART A & B ●
P-103c 12807066 THIRD FLOOR CONSTRUCTION PLAN - PART C ●
P-103d 12807067 THIRD FLOOR CONSTRUCTION PLAN - PART D ●
P-104ab 12807068 FOURTH FLOOR CONSTRUCTION PLAN - PART A & B ●
P-104c 12807069 FOURTH FLOOR CONSTRUCTION PLAN - PART C ●
P-104d 12807070 FOURTH FLOOR CONSTRUCTION PLAN - PART D ●
P-105ab 12807071 FIFTH FLOOR CONSTRUCTION PLAN - PART A & B ●
P-105c 12807072 FIFTH FLOOR CONSTRUCTION PLAN - PART C ●
P-105d 12807073 FIFTH FLOOR CONSTRUCTION PLAN - PART D ●
P-106a 12807074 ROOF CONSTRUCTION PLAN - PART A ●
P-106c 12807075 ROOF CONSTRUCTION PLAN - PART C ●
IS
SU
E
FO
R C O N
ST
RU
C
TI
O N
2 0
| GENERAL - VOLUME 1 |
| G-000A - COVER -VOLUME 1 |
| G-001 - INDEX OF DRAWINGS -VOLUME 1 |
| G-003 - BID OPTIONS DIAGRAM |
| GENERAL - VOLUME 2 |
| G-000B - COVER -VOLUME 2 |
| G-002 - INDEX OF DRAWINGS -VOLUME 2 |
2020-02-12T10:14:26-0500
2020-02-12T10:15:21-0500
2020-02-12T10:15:21-0500
2020-02-12T10:15:22-0500
2020-02-12T10:15:23-0500
2020-02-12T15:42:19-0500
2020-02-12T15:42:31-0500
2020-02-12T15:42:33-0500
2020-02-12T15:42:35-0500
2020-02-12T15:42:37-0500
| 2020-02-14T10:56:36-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-14T10:57:01-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-14T10:57:02-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-14T10:57:14-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-14T10:57:27-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-14T10:58:15-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-14T10:58:28-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-14T10:58:29-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-14T10:58:29-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-02-14T10:58:30-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
File details come from the government source that posted it. Updated .