MARSOC_MEC-A-3.2_CONTROL_ROOM.pdf

PDF 410 KB Posted

Attached to
IDIQ MACC LARGE CONSTRUCTION, MARINE CORPS, NORTH CAROLINA
Solicitation number
N4008519R9048
Issued by

About this file

This document package includes construction drawings and plans for a Marine Corps Special Operations Command control room as well as information on a related federal contract opportunity. The drawings show elevations, floor plans, and other details for building out the control room. The contract opportunity is an indefinite-delivery, indefinite-quantity multiple award construction contract with a one-year base period and four one-year options to be awarded by the Naval Facilities Engineering Command for large construction projects in North Carolina in support of the Marine Corps. Offerors are required to submit proposals by a specified date with work to commence upon award of task orders against the IDIQ contract.

MARSOC MEC-A-3.2 CONTROL ROOM

View the file

Other files

File Type Posted
19R9048_Amendment_0013.pdf PDF
19R9048_Amendment_0012.pdf PDF
MARSOC_MEC-A-1_FLOOR_PLAN.pdf PDF
MSART_LEAD_COLLECTION_BUCKET_17_OCT_2019.pdf PDF
19R9048_Amendment_0011.pdf PDF
Attachment_E_-_Small__Business_Participation_and_Commitment_Strategy_Rev_2.docx DOCX document
MSART_TRAP_OCT_17_2019.pdf PDF
MARSOC_MEC-A-3_INTERIOR_SNIPER.pdf PDF
Attachment_G_-_Small_Bus_Subcontract_Plan_Rev_2.docx DOCX document
Attachment_G_-_Small_Bus_Subcontract_Plan_Rev_1.docx DOCX document
Attachment_E_-_Small__Business_Participation_and_Commitment_Strategy_Rev_1.docx DOCX document
19R9048_Amendment_0010.pdf PDF
19R9048_Amendment_0009.pdf PDF
Wage_D.pdf PDF
19R9048_Amendment_0008.pdf PDF
SECNAV_5512.pdf PDF
Supplemental_Instructions_to_Offerors_N4008519R9048.pdf PDF
Sign_In_Q1394.pdf PDF
Attachment_E_-_Small__Business_Participation_and_Commitment_Strategy.docx DOCX document
19R9048_Amendment_0007.pdf PDF
19R9048_Amendment_0006.pdf PDF
Attachment_G_-_Small_Bus_Subcontract_Plan.docx DOCX document
Attachment_F_-_Small_Business_Subcontracting_Record.docx DOCX document
Supplemental_Instructions_to_Offerors_N4008519R9048.pdf PDF
19R9048_Amendment_0005.pdf PDF
19r9048_Amendment_0004_PPI_1.pdf PDF
19R9048_Amendment_0003.pdf PDF
Attachment_C_MARSOC_One_Day_Pass_Request.xlsx XLSX spreadsheet
N4008519R9048_Amendment_0002.pdf PDF
N4008519R9048_Amendment_0001.pdf PDF
1572053dwg01of10__GENERAL.pdf PDF
1572053dwg02of10__GEN-GEO.pdf PDF
Attachment_E_-_Small_Bus_Offeror_Small_Bus_Particip.docx DOCX document
N4008519R9048_RFP.pdf PDF
Attachment_F_-_Small_Bus_Subcontract_Plan.docx DOCX document
Attachment_D_PPI_form.xlsx XLSX spreadsheet
Attachment_B_Past_Performance_Questionnaire.pdf PDF
Attachment_A_Construction_and_Design_Experience_Project_Data_Sheet.pdf PDF
Attachment_C_One_Day_Visitor_Pass.xls XLS spreadsheet
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A3.2

CONTROL ROOM ELEVATIONS

SCALE: 1/2" = 1'-0"

CONTROL ROOM ELEVATION4

SCALE: 1/2" = 1'-0"

CONTROL ROOM ELEVATION1

SCALE: 1/2" = 1'-0"

CONTROL ROOM ELEVATION2

SCALE: 1/2" = 1'-0"

CONTROL ROOM OUTER ELEVATION3

SCALE: 1/2" = 1'-0"

CONTROL ROOM ELEVATION5

SCALE: 1" = 1'-0"

CONTROL ROOM FLOOR PLAN6

SCALE: 1" = 1'-0"

CONTROL ROOM REFLECTED CEILING PLAN7

SYMBOL SCHEDULE

SYMBOL DESCRIPTION

HEAT DETECTOR SENSOR CEILING MOUNT

DOUBLE DUPLEX ELECTRICAL RECEPTACLE

FIRE ALARM MANUAL PULL STATION

FIRE ALARM HORN STROBE RED WALL MOUNT

LUTRON LIGHT SWITCH

DUPLEX ELECTRICAL RECEPTACLE

FIRE EXTINGUISHER (WALL MOUNTED)

PUBLIC ADDRESS MICROPHONE

THERMOSTAT

1/4" THICK INTERLOCKING GRAY

RUBBER TILES ON FLOOR

POLISHED ALUMINUM DIAMOND TREAD PLATE

DUPLEX ELECTRICAL RECEPTACLE

DA

DS OPEN DOOR SENSOR

OPEN DOOR ALARMPRELIMINARY NOT FOR

CONSTRUCTION PER

PENDING APPROVAL

CUSTOMER SELECTS & SIGN OFF:

OPTION: SIGNATURE DATESELECTION

COLOR SELECTION

(TYP) SIERRA TAN

POWER LOCATION

OVERHEAD/ UNDERGROUND

HEATING SOURCE

LP-GAS/ELECTRIC

U.S. PATENT NO. 7,357,394s PAT. NO. 7,357,394

ZINC GREY

ELECTRIC

SONEX SOUND TILE

RANGE PRESSURE

FILTER PRESSURE

FIRE ALARM CONTROL PANEL WALL MOUNT

RS

Lo gi n:

J im R ic ha rd s

P lo t D at e:

0/ 6/

:3

7:

A M

Fi le

P at h S

:\S R

I D oc um en ts a nd P ar ts

\0

D ra w in gs \6

A

IS

P ro po se d\

M A

R S

O C

\M A

R S

O C

M E

C .d w g

P1 Issued for comment JCR

MARINE CORPS SPECIAL

CAMP LEJEUNE, N.C.

JCR 09.07.11 JC 09.07.11JC 09.07.11

SRI11016 AS NOTED

11016 MARSOC P6

ORTHOGRAPHIC PROJECTION

MAINTENANCE AND RESPONSIBILITIES

NOTICE TO ALL SHOOTING OWNERS, MANAGERS & OPERATORS:

Advanced Interactive Systems Inc. (AIS) is no way shape or form, responsible for the maintenance, operation, cleanliness, employee protection, lead collection or recycling, disposal or cleanup of any structure provided by AIS, or anyone affiliated or partnered with

AIS.

AIS, or anyone affiliated or partnered with AIS, will not be held liable for any negligence on the part of the structure personnel for any of the above items.

Improper maintenance or repair of the structures(s) by any personnel or it's users for any of the aforementioned items. structure maintenance manuals have been provided with every range manufactured by AIS at time of purchase.

1. H.V.A.C. systems must be in proper working condition and in operation at time of range operation and clean up. AIS is not responsible for this operation (interlocking system).

2. Supply & exhaust air must "always" be on and operating at the same time (interlocked together).

3. Structures must have a negative air pressure or a min. of 10% of total air supply.

4. AIS is not liable for H.V.A.C. system maintenance, air quality, filtration maintenance and air filter change outs.

5. No storage or work to be performed behind bullet traps at any time.

6. AIS suggests lead handling & employee protection by the manual provided by the

National Shooting Sports Foundation (NSSF).

The purpose of this letter/notes is to make sure you, as structure owner, manager, operator, or maintenance personnel are doing your/their part to make sure all people who come in contact with your structure are safe and comfortable in the indoor structure environment.

It is imperative that anyone involved in the operation, maintenance or repair of the structure(s) be diligent at minding all of the safety and operational standards that are set forth to ensure the safety of every shooter and employee that enters your place of business.

GENERAL NOTES

1. Air system comes as a completely balanced system by factory certified H.V.A.C.

specialists however, it is the customers responsibility to maintain a balanced air system.

2. If structure owner/ operator does not understand any of the above operations, lead management, structure safety or will not accept responsibility they should immediately cease all operations to prevent employees and/or customers against health problems or bodily harm.

3. AIS has incorporated the customer's specified wall and ceiling ballistic protection in the building design as has been called out in the customer's design requirements. as such, the customer takes full responsibility to ensure that no ammunition is fired in the range that could exceed the design capabilities the customer has specified in the design requirements. The customer is solely responsible for proper range operation, range maintenance, and range safety in accordance with the range training and maintenance manual.

P2 Issued for comment EDM P3 Issued for meeting EDM P4 Issued for approval EDM P5 Issued for approval EDM of

665 Andover Park West Seattle, WA 98188-3321 Tel: (206) 575-9797 Fax: (206) 575-8665 Website: www.ais-sim.com

11 1312 14 15 16

Drawing No.

Project No.

Drawn Date

Scale

Checked Date

Drawing Title

Project Title

Rev.

Approved Date

Client

R ev

Date Amendment

C hk

/A pp

D ra w n

NOTES

C

H

1 2 3

G

F

E

4 5 6 7

D

C

B

A

NOTE:

Drawings must not be scaled. where no dimensions are given, the matter shall be referred to the engineer.

Should dimensions or details on these drawings conflict, precedence shall be given to the larger scale drawing.

Where this drawing relates to existing or completed construction the contractor shall check that there is no conflict between actual building dimensions and drawing dimensions.

Written dimensions on these drawings shall have precedence over scaled dimensions.

contractor to verify and be responsible for all dimensions and conditions in the field. This office must be notified of any variations from the dimensions and conditions shown by these drawings. shop details of adequate scale must be submitted to this office for approval before proceeding with fabrication on items so noted.

Such conflicts noted above shall be reported immediately to the engineer.

The information disclosed in this document contains proprietary data of Advanced Interactive Systems, Inc. All rights reserved. no part of this document/drawing may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopy, recording or otherwise without the written consent of the intellectual copyright owner, application for which can be made to Advanced Interactive Systems, Inc. 665 Andover Park West, Seattle WA 98188-3321. patent pending

17 188

11 1312 14 15 161 2 3 4 5 6 7 17 188 9 10

H

G

F

E

D

C

B

A

Sheet No.

Sheet

P6 Issued for approval JCR

File details come from the government source that posted it. Updated .