This document is an amendment to a solicitation for an Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for large construction projects at Marine Corps installations in North Carolina. The amendment extends the pre-proposal inquiry deadline to October 7th, revises the construction period from 734 to 555 days, provides a bid schedule attachment, removes a duplicate drawing, and extends the project experience lookback period from 5 to 7 years to allow for more relevant past performance examples. The procurement is a full and open competition for the Department of the Navy Naval Facilities Engineering Command and seeks to award multiple ID/IQ contracts for construction services at Marine Corps bases in North Carolina.
Amendment 0005
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Please see continuation page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9048
X 9B. DATED (SEE ITEM 11)
17-Sep-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Sep-2019
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008519R9048
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0005
This amendment hereby incorporates the following:
1. Changes the Construction period from 734 days to 555 days
2. Extends Pre-Proposal Inquiry Due Date to 7 October 2019
3. Provides Supplemental Instructions to Bidders (Bid Schedule) Contractors shall submit completed Bid Schedule with proposal submissions.
4. Removes Duplicate Attachment from Section 01 00 00 - General Requirements:
Attachment I and Attachment J are duplicate drawings.
Attachment I removed.
Attachments as follows:
(H) Site Visit Attendees
(J) 1572053dwg01of10_GENERAL.PDF
(K) 1572053dwg02of10_GEN-GEO.PDF
(L) 1572053dwg03of10_CIVIL.PDF
(M) 1572053dwg04of10_CIVIL.PDF
(N) 1572053dwg05of10_CIVIL.PDF
(O) 1572053dwg06of10_LA-STRUC.PDF
(P) 1572053dwg07of10_ARCH.PDF
(Q) 1572053dwg08of10_ID-AV-FP.PDF
(R) 1572053dwg09of10_MECH.PDF
(S) 1572053dwg10of10_ELEC.PDF
(T) 1572053spc01of02.PDF
(U) 1572053spc02of02.PDF
5. Revises Factor 1 - Experience
(1) Construction Experience
From : Projects submitted for the Offeror must have been completed within the previous five (5) years of the proposal due date for this RFP. If discussions are required, the due date of initial proposals will be the date used to determine if projects were completed “within the five (5) years of the proposal due date of this RFP,” not any revised proposal due date.
To : Projects submitted for the Offeror must have been completed within the previous seven (7) years of the proposal due date for this RFP. If discussions are required, the due date of initial proposals will be the date used to determine if projects were completed “within the seven (7) years of the proposal due date of this RFP,” not any revised proposal due date.
(2) Design Experience
From: Projects submitted for the Offeror’ DOR must have been completed within the previous five (5) years of the proposal due date for this RFP. If discussions are required, the due date of initial proposals will be the date used to determine if projects were completed “within the previous five (5) years of the proposal due date of this RFP,” not any revised proposal due date. For design-build projects, the design portion of the contract shall have been completed within the previous five (5) years of the proposal due date of this RFP. The design completion date shall be clearly stated on the Construction & Design Experience Project Data Sheet (Attachment C). The project will be deemed not relevant if the design completion date is not clearly provided.
To: Projects submitted for the Offeror’ DOR must have been completed within the previous seven (7) years of the proposal due date for this RFP. If discussions are required, the due date of initial proposals will be the date used to determine if projects were completed “within the previous seven (7) years of the proposal due date of this RFP,” not any revised proposal due date. For design-build projects, the design portion of the contract shall have been completed within the previous seven (7) years of the proposal due date of this RFP. The design completion date shall be clearly stated on the Construction & Design Experience Project Data Sheet (Attachment C). The project will be deemed not relevant if the design completion date is not clearly provided.
6. Responses to PPIs 2-6
(End of Summary of Changes)
# Reference Inquiry Government Response
Page Section Paragraph
2 Amd3, 2.a. This paragraph instructs site visit participants to obtain passes at the Main Gate Visitor Center located at Building 818 adjacent to the Main Gate on Holcomb Boulevard, then later references a website for more information:
http://www.lejeune.marines.mil/Offices- Staff/Pass-Registration/. This website, under Visitor Passes, states that "All vetting for contractors has been moved to Building TT-13 (adjacent to the Wilson Boulevard Gate)..."
Please confirm that Contractors are to report to the Main Gate Visitor Center located at Building 818 adjacent to the Main Gate on Holcomb Boulevard to obtain passes for the site visit.
Contractors are to report to the Main Visitor Center located at Building 818.
3 SOL It is unclear to me based on the solicitation and amendments whether or not this is a set-aside for small business or a full and open procurement?
Can you clarify this for me?
This procurement is Full and Open competition.
The 1442 form says the bid date is 3 October and amendment 3 has set the site visit for 2 October.
We are respectfully requesting we have at least 4 weeks after the site visit to bid the work and are requesting the bid date be set for 30 October.
See Amendment 0001.
With the variety of past performance requested for this very diverse MACC can you extend the past project reach back from 5 years to 7 years?
See Amendment 0005.
RFP
of 57
5.3 Pre-
Proposal Inquiries
(PPIS)
This paragraph states: "All inquiries must be submitted in writing and received by the Contract Specialist fourteen calendar days prior to the solicitation closing date…" This deadline will occur only one day after the scheduled site visit of October 2nd, which will not allow sufficient time for proposers to process what is observed during the visit as compared to what is provided in the bid documents. Please consider revising the deadline for questions to the end of business on October 7th (10 days prior to the closing date).
See Amendment 0005.