19R9048_Amendment_0011.pdf

PDF 146 KB Posted

Attached to
IDIQ MACC LARGE CONSTRUCTION, MARINE CORPS, NORTH CAROLINA
Solicitation number
N4008519R9048
Issued by

About this file

This document is an amendment to a solicitation for an Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for large construction projects at Marine Corps installations in North Carolina. The amendment provides responses to contractor questions, revises attachments to reflect option year pricing, and clarifies the scope of work. Key details include that the Naval Facilities Engineering Command is seeking contractors to complete construction and renovation projects ranging from $500,000 to $5 million each. The small business subcontracting plan must be based on the total potential MACC value rather than just the initial task order. Contractors are to use assumed material types for underground utilities when specifications are unclear.

Amendment 0011

View the file

Other files

File Type Posted
19R9048_Amendment_0013.pdf PDF
19R9048_Amendment_0012.pdf PDF
MARSOC_MEC-A-3.2_CONTROL_ROOM.pdf PDF
MARSOC_MEC-A-1_FLOOR_PLAN.pdf PDF
MSART_LEAD_COLLECTION_BUCKET_17_OCT_2019.pdf PDF
Attachment_E_-_Small__Business_Participation_and_Commitment_Strategy_Rev_2.docx DOCX document
MSART_TRAP_OCT_17_2019.pdf PDF
MARSOC_MEC-A-3_INTERIOR_SNIPER.pdf PDF
Attachment_G_-_Small_Bus_Subcontract_Plan_Rev_2.docx DOCX document
Attachment_G_-_Small_Bus_Subcontract_Plan_Rev_1.docx DOCX document
Attachment_E_-_Small__Business_Participation_and_Commitment_Strategy_Rev_1.docx DOCX document
19R9048_Amendment_0010.pdf PDF
19R9048_Amendment_0009.pdf PDF
Wage_D.pdf PDF
19R9048_Amendment_0008.pdf PDF
SECNAV_5512.pdf PDF
Supplemental_Instructions_to_Offerors_N4008519R9048.pdf PDF
Sign_In_Q1394.pdf PDF
Attachment_E_-_Small__Business_Participation_and_Commitment_Strategy.docx DOCX document
19R9048_Amendment_0007.pdf PDF
19R9048_Amendment_0006.pdf PDF
Attachment_G_-_Small_Bus_Subcontract_Plan.docx DOCX document
Attachment_F_-_Small_Business_Subcontracting_Record.docx DOCX document
Supplemental_Instructions_to_Offerors_N4008519R9048.pdf PDF
19R9048_Amendment_0005.pdf PDF
19r9048_Amendment_0004_PPI_1.pdf PDF
19R9048_Amendment_0003.pdf PDF
Attachment_C_MARSOC_One_Day_Pass_Request.xlsx XLSX spreadsheet
N4008519R9048_Amendment_0002.pdf PDF
N4008519R9048_Amendment_0001.pdf PDF
1572053dwg01of10__GENERAL.pdf PDF
1572053dwg02of10__GEN-GEO.pdf PDF
Attachment_E_-_Small_Bus_Offeror_Small_Bus_Particip.docx DOCX document
N4008519R9048_RFP.pdf PDF
Attachment_F_-_Small_Bus_Subcontract_Plan.docx DOCX document
Attachment_D_PPI_form.xlsx XLSX spreadsheet
Attachment_B_Past_Performance_Questionnaire.pdf PDF
Attachment_A_Construction_and_Design_Experience_Project_Data_Sheet.pdf PDF
Attachment_C_One_Day_Visitor_Pass.xls XLS spreadsheet
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Continuation.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Oct-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9048

X 9B. DATED (SEE ITEM 11)

17-Sep-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Oct-2019

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008519R9048

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0011

1. Provides updated response to PPI 87.

2. Provides Attachment to Supplement PPI re: Lead Abatement, PPI 87 – MSART lead collection bucket 17

Oct 2019.jpg and MSART trap Oct 17 2019.jpg

3. Provides PPI response 190, 215, 216, 221, 223-225

4. Provides PDF for PPI 190 – MARSOC MEC-A-1 FLOOR PLAN.pdf, MARSOC MEC-A-3 INTERIOR

SNIPER.pdf, and MARSOC MEC-A-3.2 CONTROL ROOM.pdf

5. Provides Revised Attachment E – Small Business Participation and Commitment Strategy, Rev 2 to revise number of Columns for options to reflect Option Years.

6. Provides Updated response to PPI in Amendment 0009. Attachment G SHOULD BE BASED ON THE

TOTAL MACC VALUE and should NOT be specific to the Seed Project.

7. Provides Revised Attachment G – Small Business Subcontracting Plan, Rev 2 to revise number of Columns for options to reflect Option Years.

Reference Inquiry Government Response

Page Section Paragraph

CD-

101E

024100 n/a

Reference sheet CD101E. Demolition note "1" references removing the existing building. The building is shown as a small arms firing range.

Since these types of buildings typically have lead from the shooting exercises, will lead abatement be required for the building and the surrounding soils and the adjacent gravel lot?

Please advise.

Some lead abatement is required at the bullet trap and the bullet trap collection bucket. See attached JPG photos.

CU101B

Constructi on Notes #9 and

#11

Construction Notes #9 and #11 on Drawing CU101B call for work on existing underground Chilled Water Supply and Return lines. It asks the contractor to match the material of existing pipe. What type of material are the existing underground Chilled Water Supply and Return lines?

Assume the existing pipe is pre-insulated copper for bidding purposes.

CD101E

CD101E, demolition note 1; please provide photos of the inner contents of these range structures.

The range is currently being used for storage, but will be emptied by MARSOC prior to the start of demolition.

Photos are not available, but see attached PDFs for additional interior information.

13 34 19 , 07 42 63.

and 07 41

In 13 34 19 Metal Building Systems Section

2.4.1 Steel Sheet the profile of the metal panels

is indicated to be fy=24 gauge. The same section goes on to reference 07 42 63 Fabricated Wall Panel Assemblies. Are the metal panels for both the roof and the walls of the pre-engineered metal buildings to conform to 13 34 19, making 24 gauge sheet metal the required thickness? Or is it to conform to 07 42 63 and 07 41 63 respectively, which specifies the wall panels at 24 gauge and the roof panels at 22 gauge?

The metal panel thicknesses in Division 07 takes precedence.

Attachment E to follow the seed project base bid and 5 options. Attachment E is part of the Technical Proposal which is not to include any pricing information. On past proposal submissions NAVFAC has provided the contractors with a budget value to use in this plan submission. Can you please provide a price for all contractors to use in this plan so that technical can be evaluated independently of price? We would need to know how to distribute that budget between the Base and 5 bid options.

In accordance with Factor 4 - Small Business Utilization, (i) Solicitation Submittal Requirements, 2. Small Business Participation and Commitment, "All offerors shall submit a small business participation and commitment strategy including all data elements shown in Attachment E, Small Business Participation and Commitment Strategy." The Factor requires all data elements be completed.

Additionally, See Amendment 0011 for Attachment E, Small Business Participation and Commitment Strategy Rev 2.

33 11 23

LIQUID

PETRO

LEUM

PIPING

We have been unable to ascertain the utility company that performs the installation of Liquid Propane distribution on the various sites for this project on Stone Bay. Please provide the contact information the responsible party.

Propane system is owned by the base. Contractor is responsible for installation of all work related to propane utilities.

Amendme nt 8, Suppleme ntal

Instructio ns to

Offerors

Base Bid, CLIN 0001A lists to "Price for the entire work, complete to the 5 foot line outside the building for (1) Building RR620 and (2) East and West Additions to existing Building RR405, in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN)0001B, 0002, 0003, 0004, 0005 and 0006." Please confirm that the East addition referenced above, is just a storefront/vestibule addition and that there is not a true building addition (like the West side) being missed.

Confirmed

Varies

Amendme nt 8 and

9, Suppleme ntal Instructio ns to Offerors

There are contradicting answers for how to carry costs for the covered Canopies between RR535 and 536 as well as RR537 and 538.

Amendment 8 states to price with the sitework, CLIN 0002B, however Amendment 9 states to price with CLIN 0002 and CLIN 0004 respectively. Please clarify which is the correct response and what CLIN 0002 (A or B) if per Amendment 9 response? Additionally should the slab be carried with the canopies?

Follow Amendment 9. Slabs shall be included with the canopies.

Amendme nt 10

The RFI response/requirement for a full-time project manager is very unusual for a NAVAC specification/project. Thus please confirm that per this response; the project will require a minimum of 4 dedicated individuals filling the roles of PM, QCM, SSHO and Superintendent.

PM is not required to be on site or dedicated to this project.

Attachm ent G

An RFI response in Amendment 09 states "Attachment G is specific to the seed project, P1394. The dollar value used on Attachment G, Item 1, should the the total proposed amount for the seed project, P1394." This requirement is a deviation from what we have experienced on every previous seed project for a NAVFAC MACC solicitation that we have participated

in. Historically, the SB participation breakdowns have been based on the overall value of the MACC and not specific to the seed project. Please confirm that the SB participation bearkdown for this proposal must be based on this specific seed project.

See Amendment 0011.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .