N4008518R87160022.pdf
PDF 252 KB Posted
- Solicitation number
- N4008518R8716
About this file
N4008518R87160022.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_F_AMD23.pdf | ||
| N4008518R87160023.pdf | ||
| N4008518R87160021.pdf | ||
| N4008518R87160020.pdf | ||
| N4008518R87160019.pdf | ||
| N4008518R87160018.pdf | ||
| N4008518R87160017.pdf | ||
| N4008518R87160016.pdf | ||
| P293_RUBBER_COMPOUNDING_area.dwg | DWG drawing | |
| Attachment_F.pdf | ||
| N4008518R87160015.pdf | ||
| N4008518R87160014.pdf | ||
| N4008518R87160013.pdf | ||
| N4008518R87160012.pdf | ||
| N4008518R87160011.pdf | ||
| N4008518R87160010.pdf | ||
| N4008518R87160009.pdf | ||
| N4008518R87160008.pdf | ||
| N4008518R87160007.pdf | ||
| Site_Visit_Log.pdf | ||
| N4008518R87160006.pdf | ||
| N4008518R87160005.pdf | ||
| JAs_Redacted.pdf | ||
| N4008518R87160004.pdf | ||
| N4008518R87160003.pdf | ||
| Amendment_0002.pdf | ||
| SECNAV_5512_DBIDS_Individual.pdf | ||
| Amendment_0001.pdf | ||
| Local_Visitor_Request_Form.pdf | ||
| Attachment_B.pdf | ||
| Attachment_C.xls | XLS spreadsheet | |
| Attachment_A.docx | DOCX document | |
| N4008518R8716.pdf |
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
P-293 Paint, Blast and Rubber Consolidation Facility, Portsmouth Naval Shipyard, Kittery, ME
The purpose of this amendment is to provide responses to Pre-Proposal Inquiries, Provide for Design Revision 7, and provide an updated Attachment F - Price Proposal Form.
The proposal due date of 03 January 2019 remains unchanged.
See SF30 Block 14 Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Dec-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R8716
X 9B. DATED (SEE ITEM 11)
31-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Dec-2018
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008518R8716
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0022
CONTINUATION SHEET (Drawing Edits)
NAVFAC Dwg. Nos. 12776142, 12776146, 12776147, 12775911, 12775912, 12776156, 12776206, are revised as of December 14, 2018. These revised drawings accompany this amendment.
Volume 3 – Paint, Blast, and Rubber Facility:
On NAVFAC Dwg. No. 12776142 (A-512) Clarified vapor barrier detail in detail B2.
On NAVFAC Dwg. No. 12776146 (A-516) Clarified air vapor barrier at transition to EPDM roofing.
On NAVFAC Dwg. No. 12776147 (A-517) Clarified air vapor barrier at transition to EPDM roofing.
On NAVFAC Dwg. No. 12776156 (A-900) Clarified items to be “painted in field”.
On NAVFAC Dwg. No. 12775911 (M-502) Changed CLIN numbers for Temporary Paint Booth.
On NAVFAC Dwg. No. 12775912 (M-503) Changed CLIN numbers for Temporary Paint Booth.
On NAVFAC Dwg. No. 12776206 (M-701) Changed CLIN numbers for Rubber Compounding.
DOCUMENT 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
In CLIN 0002A Option Item No. 1A, the following have been removed:
0002A-5 Rubber Compounding System - Spec 11 20 01
0002A-6 Paint Booth in Building 96 (Temporary Facility)- Spec 11 30 01
The Rubber Compounding System has been changed to the following and is a standalone CIP:
CLIN 0001AA Option Item No. 1AA
The Paint Booth in Building 96 has been changed to the following Shipyard Equipment CLIN:
CLIN 0003F Option Item No. 2F
SECTION 11 30 01 PAINT BOOTH
In 2.1.1 Design Requirements, paragraph 3.
Deleted “minimum 12 ga. galvanized steel sheet,” and added “18-gauge, G90 galvanized sheet steel minimum.”
SECTION 05 50 13 MISCELLANEOUS METAL FABRICATIONS
In 2.12 Steel Plate Wainscots for Concrete or Masonry Columns
Changed steel plate bend radius to 1/8 inch; previously indicated as 1/4 inch.
SECTION 07 42 69 ACOUSTIC SCREEN
In 2.2.1 edits are made to reflect 5” thick panel as follows:
All acoustical screen panel shall be 5 inch thick with a solid exterior shell and a perforated interior shell
SECTION 07 42 63 METAL LINER WALL PANEL
Paragraph 2.1.1 c 2 edited to read as follows:
Profile to be a 1/4-inch or less, high rib at 4-inches O.C. or less, with smooth, flat surface, and exposed fasteners.
SECTION 08 60 45 TRANSLUCENT FIBERGLASS WALL PANEL SYSTEM
In 1.6 Warranty, the first sentence is edited to read as follows:
“Provide the manufacturer's complete warranty, 5 years minimum, for materials, workmanship, and installation”.
Also, “for twenty years” is removed from the second sentence.
In 1.6 Warranty, paragraph c reads as follows:
“Provide a 20 year warranty against fiber exposure on the panel face.
In 1.6 Warranty, paragraph e reads as follows:
Provide a single source warranty for the translucent fiberglass wall panels and the framing system. Third party warranty for the translucent fiberglass wall panel system will not be accepted.
In 2.4 d, THERMOPLASTIC POLYCARBONATE PANELS, paragraph d corrects panel psf and thickness and reads as follows:
“For longevity, the minimum ratio of panel weight to thickness must be 0.63 psf for 2 3/4 inch double glazed thick panel.”
In 2.5.2 Panel Fabrication Spelling correction of “must” in first sentence.
In 2.5.2 a.; light transmission corrected to 30 percent.
In 2.5.2 b.; panel thickness changed to 2 ¾” thick.
2.5.4 Condensation Index Rating is removed from spec.
2.6.b clarifies that interior panel faces are to be “crystal” in color; “white” is removed from sentence.
2.6.l Design criteria:
Edited (1) to read as follows:
Wind Load 121 mph ultimate.
Removed item (2) for Frame Blast Loads, and removed item (3) for Anchor Blast Loads.
Edited (4) to correct spelling (with) and to clarify Risk Category II (vs. IV); paragraph reads as follows:
“Impact-protective: Glazing to meet Risk Category II and shall comply with the "enhanced protection" requirements of Table 3 of ASTM E1996.”
(End of Summary of Changes)
SOLICITATION NO. N40085‐18‐R‐8716
PROJECT TITLE/LOCATION: P293 Paint, Blast and Rubber Consolidation Facility PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
90 10/4/2018 11 30
Specification Statement: “Overhead Door: The paint booth shall have a steel roll up door and be fabricated of weldments utilizing a combination of structural elements and minimum 12 ga. galvanized steel sheet.”
Does this include the coiling door curtain slats? Curtain slats are traditionally 18 ga. for a spray booth.
Revised specification to 18 gage galvanized steel rolling doors.
116 10/4/2018
11.00.0
1.1.1.8
Who is responsible for the waste, both hazardous and non hazardous, generated from the uninstalled equipment being processed for DRMO?
This will be a SY responsibility.
137 10/4/2018
11.50.0
2.1.1.7B Diaphragm values to be 1 1/2" with 110 volt solenoids? "values" is meant to be "valves" , vendor shall provide equipment sub components that meet the performance requirements of the specification.
195 10/4/2018
11.30.0
2.1.1
See previous comments concerning ‐ elevator ZERO SPEED indicators, 5 inch vent port with slide gate, bottom take ups, standard parts called out for bearings, shafts, drives.
Vendor must provide equipment sub components that meet the performance requirements of the specification .
REFERENCE
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on Amend No.
July 2011
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
206 10/4/2018
11.50.0
1.5.1.1
Contactor requires the mfg name, model and serial number of the Bake Off Oven, Nordson Spray guns / hopper, Powder Coat Spray Booth and Glove Blaster?
Bake Off Oven: An Ace Model 3168‐ RTm, Serial #12. Approximate weight 4000 lbs.
Nordson Spray guns / hopper: these are relocated items from B.285 to B.96. These are consumables. No information available.
Powder Coat Spray Booth: this is a relocated item from B.285 to B.96, Dimensions: 212"L x 224"L x 100" H.
No accessible serial number.
Glove Blaster: This is a relocated item from B.285 to B.96. Model PF3648 M‐ 13551.
207 10/4/2018
11.50.0
1.5.2.1
Contactor requires the mfg name, model and serial number of the Bake Off Oven, Nordson Spray guns / hopper, Powder Coat Spray Booth and Glove Blaster?
Bake Off Oven: An Ace Model 3168‐ RTm, Serial #12. Approximate weight 4000 lbs.
Nordson Spray guns / hopper: these are relocated items from B.285 to B.96. These are consumables. No information available.
Powder Coat Spray Booth: this is a relocated item from B.285 to B.96, Dimensions: 212"L x 224"L x 100" H.
No accessible serial number.
Glove Blaster: This is a relocated item from B.285 to B.96. Model PF3648 M‐ 13551.
217 10/4/2018
11 40
HH
Shelving cart to be what dimensions? Made from what type of material? What type of coating?
Dimensions:3'x4'x7' tall, steel, painted.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
219 10/4/2018
11 30 03 table 1 powder spray hopper shall be on separate carts with hoses for quick change out?
This is not necessary.
349 10/26/2018 Reference the Solicitation SF1442: Box 11 states the Contract is to be completed within 1700 calendar days after award. The total duration based on the Scheduled Start Date of Phase 1, the Scheduled Start Date of Phase 7, and the Duration of Phase 7 in the Phasing Schedule on page 31 of the Solicitation calculates to 1,792 calendar days. Please clarify.
See Amendment 0015 PPI Response number 6.
350 10/26/2018 Reference the Solicitation SF1442, page 31, Phasing Schedule: There are four periods with no construction slated‐ between Phases 2 and 3, between Phases 3 and 4, between Phases 5 and 6, and between Phases 6 and
7. Will suspension of work notices be issued and will the Contractor be required to demobilize and remobilize on site?
See updated schedule in Amendment
351 10/26/2018 Reference the Solicitation SF1442, page 31, Phasing Schedule, Paragraph d: Are the Schedule Start Dates in paragraph c considered "restricted"? In other words, when a particular phase is completed, can the following phase commence or does the contractor need to wait until the Schedule Start Date?
The phasing schedule is to be used an an example. As long as all necessary prerequisites for the following phase are complete, the next phase may be started.
352 10/26/2018 Reference the Solicitation SF1442, page 31, Phasing Schedule: The dates of performance do not align with the dates shown in Volume 1, GC‐100 and GC‐101.
Please clarify.
Please see amendment 0010 for an updated schedule.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
448 10/31/2018 352+34
8:351 The complexity of the work required for removal of existing blast booths and monster press (Tags 336, 338a, 338b, and 801) is such that an accurate estimate for removal cannot be made without detailed drawings indicating how the equipment is assembled. Please advise as to the Navy's proposed path forward on these items if drawings are not available.
The Shipyard will be responsible for the demolition of this equipment. The KTR will be responsible for removing the dismantled equipment from the building, and moving it to a location on the Shipyard as determined by the Shipyard.
452 10/31/2018 Reference Volume 3, Details B4 & D4/A‐413 and Detail D2/A‐507: We are unable to locate a manufacturer to provide horizontal panels with the 5/8" faux joint in the panels as shown on the details. We propose to offer the panels in shorter lengths with full joints as detailed in D1/A‐507. The location of the joints would not change. Please confirm this is acceptable.
There are manufacturers that can meet the design intent. Please meet the intent of the design per the current drawings and specification.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
485 11/13/2018 It is understood that the 365 day award timeframe allowance in General Note 1.3.e of Attachment F is to provide the Govt. flexibility relative to award and funds availability. It is noted that award of certain CLINs after initial contract award will affect the contractor's ability to adhere to the phasing schedule provided in Amendment 10. As one example, the work of CLIN 0029 is shown to occur in Phase 1 and if award of this CLIN is made after initial contract award the work is unlikely to be completed within the currently identified Phase 1 timeframe of 290 calendar days. Amendment 15, PPI #14 identifies the phasing schedule as an approximation. Please confirm that the phasing schedule will be adjusted based upon actual CLIN award timing. Additionally, 52.211‐12 Liquidated Damages ‐ Construction, included on page 51 of 67 of the Solicitation, identifies a Liquidated Damages Breakdown by Phase per calendar day. If the phasing schedule is an approximation and the phasing may need to be adjusted based upon CLIN award timing, please advise how will liquidated damages be applied.
It is the Government's intention to award options in accordance with the phasing schedule. In the event that this does not occur, these concerns will be addressed at that time.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
518 11/14/2018 41 22
13.30, 41 22 13.35
Appendix A
Due to the materials for the bridge wheels and availability the required materials the wheels will need the rails changed from 60 lb ASCE to 135 lb ASCE.
The revised configuration (rails etc.)
will need to fit within available envelope and be coordinated with other systems in space(s). We estimate that this change to 135 lb ASCE will add 1.5‐inches to the rail height.
519 11/14/2018 41 22 13.30, 41 22 13.35
Appendix A
Due to the materials for the bridge wheels and availability the required materials the wheels will need the rails changed from 60 lb ASCE to 135 lb ASCE.
The revised configuration (rails etc.)
will need to fit within available envelope and be coordinated with other systems in space(s). We estimate that this change to 135 lb ASCE will add 1.5‐inches to the rail height.
529 11/20/2018 Does the bag breaking / cutting area require a grated area with dust aspiration venting that allows low dust area for the operator of the Rubber compounding machine? A video of such an example is provided in the attached link.
https://www.youtube.com/watch?v=Vn6ivxICrbM
Manually breaking the bag over a bin/ hood attached to the dust collector system would be acceptable.
The desesign goal is to keep the carbon black dust contained and not be a housekeeping problem that get tracked around the production areas.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
530 11/20/2018 Sheet A‐005, Volume 3, shows the concept of the air/vapor barrier extending down the interior side of the concrete stem walls (Details A1, A2 & A3) and then transitioning to the exterior of the foundation (Detail A4). The details on the A‐500 series of drawings show the air/vapor barrier stopping at the top of the concrete stem wall with no additional barrier applied to the concrete stem wall. Are we correct to interpret the stem wall and the foundation wall as being the continuation of the air/vapor barrier with no additional barrier attached?
Spray insulation is applied to the backside of the stem wall providing continuation of the air vapor barrier.
A reglet with counter flashing over bituminous membrane and rigid insulation behind occurs below grade on the exterior of the stem wall. The perimeter of foundation is insulated and protected with a 3 ply 15 mil reinforced vapor barrier.
531 11/20/2018 Detail B2/ A‐512, Volume 3: Similar to the question above, this detail shows a 15mil reinforced vapor barrier on the exterior of the foundation wall. The dashed line only extends about a foot. This detail is not shown elsewhere; is it correct? How far down does the barrier extend? There is no specification for a 15 mil reinforced vapor barrier.
Specification 03 30 00, paragraph 2.4.6: Drawing adjusted to reflect specification Please reference amended drawings. The vertical material on exterior side of the foundation was changed in design revision 4 drawings .
532 11/20/2018 Detail B2/ A‐512, Volume 3: This detail further shows a 15mil reinforced vapor barrier on the underside of the concrete flor slab. Specification 03 30 00, paragraph
2.4.6 specifies a three ply vapor barrier with each ply a minimum of 15 mils for a total thickness of 45 mils.
Which is correct?
B2‐A512 has been adjusted to reflect the specification.
533 11/20/2018 Is the "sheet membrane" shown for the elevator pits (A1/S‐301), containment trenches (D1/S‐301), Very Large Parts wall (A3/S‐503) and the blast booths recovery pits (C3/S‐506) meant to be the Elastomeric Sheet Waterproofing specified in Section 07 13 53?
Yes
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
534 11/20/2018 Is the Monster Pit and the Mechanical pit adjacent to
Very Large Parts to receive a "sheet membrane" similar to the other below slab pits?
Yes
535 11/20/2018 Sheet A‐900, Volume 3: MP‐2 is defined as a 1/8" sheet steel metal panel and the Manufacturer is called out as "Refer to Spec". What spec are we to reference to?
05 50 13 2.12 SPECIFICATION
ADJUSTED TO REFLECT 1/8" STEEL
PLATE
536 11/20/2018 Sheet A‐900, Volume 3: MP‐2 is defined as a 1/8" sheet steel metal panel and the Color is called out as "Factory Finished". Please provide a basis of design on where to obtain a factory finished 1/8" steel plate. (See also dashed line note on Enlarged Plans A‐105 through A‐ 111 which suggests field painting).
SHEET A‐900 VOL. 3 MP‐2 AND
EXPOSED STRUCTURE CHANGED TO
PAINT IN FIELD; REFERENCE
SPECIFICATION FOR SPECIFIC METAL
FINISH
537 11/20/2018 Finish Schedules A‐901, A‐902, and A‐903, Volume 3, indicates walls to receive the MP‐2 steel plate wainscot.
Enlarged Plans A‐105 through A‐111 indicate by a heavy dash line the locations of an "1/8" x 4' high cont. sheet steel wainscot‐paint". Is this meant to be the MP‐2 plate?
YES, That is correct
538 11/20/2018 Finish Schedules A‐901, A‐902, and A‐903, Volume 3, indicates walls to receive the MP‐2 steel plate wainscot.
Enlarged Plans A‐105 through A‐111 indicate by a heavy dash line the locations of an "1/8" x 4' high cont. sheet steel wainscot‐paint. Note that all the locations shown on the Finish Schedules are not shown on the Enlarged Plans and all the locations on the Enlarged Plans are not shown on the Finish Schedules. The differences are significant. Which governs? Or are we to assume that wainscoting is to be carried if identified on either the Finish Schedules or on the Enlarged Plans?
ENLARGED PLANS A‐105 THROUGH A‐
111 DICTATE LOCATIONS OF
WAINSCOT.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
539 11/20/2018 Sheets A‐516 and A‐517: How is the integrity of the
IMP air vapor barrier to extend and transition to the EPDM roofing? There is an unidentified heavy line running from the backside of the IMP to the EPDM. Is this an extension of the EPDM membrane? How is it attached to the IMP?
DETAILS A4/ A‐516 AND D5/A‐517
ADJUSTED TO REFLECT CONTINUOUS
BUTYL SEAM AT TOP OF IMP WITH
BLOCKING. THE EPDM DOES INDEED
EXTEND BEYOND EDGE OF ROOF TO
COVER ALL BLOCKING AND IS
FASTENED WITH GALVANIZED
FASTENERS AT 6" OC.
540 11/20/2018 Sheets A‐514 and A‐515 indicate the acoustical screen as being 5" thick. Specification Section 07 42 69, paragraph 2.2.1, indicates 4" thick. Please clarify.
Section 07 42 69 2.2.1 has been adjusted to reflect the 5" thick panel.
541 11/20/2018 Reference Section 07 42 63: Can you provide a basis of design for the interior metal liner wall panel? The profile of a 1/4" high rib at 4 inches o.c. (paragraph 2.1.1.c.2) is making a product hard to locate.
Spec adjusted to state profile to be a 1/4‐inch or less high rib at 10 cm, 4 inches o.c. or less, 126.1 cm 122 cm 36 inch coverage and exposed fasteners. Smooth, flat surface
542 11/20/2018 Reference Sheet A‐606, Volume 3: Which specification governs the construction of windows W001 and W002 for Building 404, 08 41 13 Aluminum Storefronts or 08 51 13 Aluminum Windows?
08 51 13 Aluminum Windows
543 11/20/2018 Reference Section 08 60 45 Translucent Fiberglass Wall Panel System: Can you provide a basis of design? We are having difficulty finding a manufacturer who can meet the specifications as a whole.
Basis of desing is: Kalwall Vertical series 2 3/4 (or approved equal).
Specification 08 60 45 has been edited (see attached).
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
544 11/20/2018 Reference Section 08 60 45 Translucent Fiberglass Wall
Panel System: We are unable to locate a manufacturer who will supply a 20 year warranty as written. The maximum is a 10 year warranty with an adder for 20 years on fiberbloom only.
Specificaiton has been modified to clarify warranties:
‐ 5 years minimum, for materials, workmanship, and installation.
‐ 20 year warranty against fiber exposure on the panel face.
545 11/20/2018 Reference Section 08 60 45 Translucent Fiberglass Wall Panel System: We have been informed that the specification includes language for polycarbonate glazing and also for "crystal" reinforced polymer glazing. Manufacturers cannot meet both criteria accordingly. Please clarify.
Crystal has been clarified as a color in spec.
546 11/20/2018 Reference Section 08 60 45 Translucent Fiberglass Wall Panel System: We have been informed that the specified U factor of 0.50 and the light transmission of 60 cannot be met simultaneously. The best that can be offered is a U factor of 0.53 and a light transmission of 58%; close to but not in compliance with the specification. Improving one criteria decreases the other by a significant amount. Please clarify.
Spec has been adjusted to maintain thermal performance. Light transmission requirements have been adjusted.
547 11/20/2018 Reference Section 08 60 45 Translucent Fiberglass Wall Panel System: we have been informed that the maximum height of the TFGWP is 7'‐11" to meet the 130 mph wind load. The design load needs to be decreased or additional horizontal steel needs to be added to provide wind load support.
Specification has been adjusted to reflect 121 ultimate wind speed.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
548 11/20/2018 Reference Section 08 60 45 Translucent Fiberglass Wall
Panel System: Manufacturer takes exception to the 500 hour Oxygen Bomb by ASTM D‐1002 since it does not pertain to TFGWP components.
Reference to shear strength testing after 500 hour Oxygen Bomb has been removed.
549 11/20/2018 Reference Section 08 60 45 Translucent Fiberglass Wall Panel System: Manufacturer takes exception to the blast requirements and will not include in their pricing.
Blast Requirements have been removed and risk category downgraded to Risk Cat II.
550 11/19/2018 12 11.30.0
2.1.7 there is no clean room in this specification. On 1/14/2018, a vendor made a statement that a "clean room vestibule shall be provided at each mandoor‐ to enable the operator to blow off their outer blast suits before exiting the booth?" Are we to supply a total of eight (8) air showers? thats two (2) per booth...one (1) per door? Also, The question implies that the air shower(s) will be inside the booth to clean the operator before exiting the booth. This would not be practical and reduce the work space. Please clarify and advise exactly what is required.
Clean room/changing room is not required inside blast booths;
temporary clean/dirty changing tents will be provided by the Shipyard as required.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
551 11/19/2018 7 11.30.0 table 1
Are we to assume that the average seasonal outdoor temperatures are presented for our dust collector design? And the Temperatures for the indoor environment are stating the temperatures that will be regulated and both are for design purposes only?
Table 1 (on page 7) of SECTION 11 30 02 ABRASIVE BLAST BOOTHS indicates the following climatic design information:
Outdoor Design Data: Summer Cooling 89.6°F, 72.8°MCWB, Winter 2.8°F. This is the ambient design conditions for the project (based on 0.04% ASHRAE Weather Data for Pease, NH).
The equipment must provide the following indoor environment:
Summer 78°F, 50% RH, Winter 72°F, 50% RH. These ranges are environmental conditions for which these booths are to maintain.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
552 11/26/2018 In the Solicitation, Offer, and Award Standard Form
1442, you reference three separate Small Business Plans. On Page 19 of 67 you reference Attachment I, on page 22 of 67 you reference Attachment G, and on Page 28 of 67 you reference Attachment E, each suggesting that it be submitted with our bid. Additionally, Page 21 of 67, Evaluation Factors for Award, section 3.0 “Basis of Evaluation and Submittal Requirements for Each Factor”, “Additional Information to be submitted with Price Proposal Package” item 5 “Small Business Subcontracting Plan” would suggest that ONLY Attachment G is necessary with our bid submission.
Please clarify which of the Small Business plans we are to submit or if all three plans are to be submitted.
Attachment G and Attachment I are two copies of the same form. Please submit Attachment G and Attachment E in accordance with the RFP.
554 12/3/2018 Addendum #20 question #468 government response mentions Room 206 & 244 to receive WT‐1. The only window in those locations are the translucent panels.
Please advise.
Tanslucent panels in rooms 206 & 244 to receive window treatment shades
(WT‐1).
555 12/3/2018 Sheet A‐515 of Volume 3 shows typical details for both interior and exterior acoustic panels. It also has reference for Panel ID’s AI6060, BI8080, AE10080 and BE8080 in the Tactical Acoustic Panel Schedule below the details. I am unable to find a spec section that reference these panels. Is there a manufacturer who makes these panels or are these to be field fabricated per details A1 & A2 on A‐515?
These are field fabricated panels per the details.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
556 12/3/2018 1.Several of the addendums issued have the statement directed to vendor questions “take exception in your bid”. We are unsure how we are to document this as we were of the understanding that “no exceptions” are permitted. Please advise.
Previous responses have been revised and have been included in this amendment.
557 12/3/2018 Will or can building 404 drawings be issued in 2d cad or 3d cad, this answer will provide clues as to level of effort required for coordination drawings.
Unknown at this time.
558 12/3/2018 The following items are listed on the equipment list as "NEW" but have no associated specification to define them. Tags 104, 111, 128, & 129. They are a PC for a tester, and NMCI computer, scanner & printer. Please provide specification to define these items.
These items are provided by the government. All of this equipment is located in the Rubber Lab.
559 12/3/2018 We are inquiring the possibility of you to push the bid due date to Thursday January 3rd or possibly Friday January 4th. The due current due day only one day after a major holiday is creating vacation scheduling issues with not only our people but our suppliers as well. The one or two additional day’s will help us sort things out better.
Please see amendment 0021.
560 11/27/2018 2 19
14.21.13
Amendment 19 references changes to the landings for the freight elevator, but the drawings referenced are for the passenger elevator. Drawing No. 12776120, Sheet A‐405 for the freight elevator is not in the list of files. Please clarify and provide the revised drawings.
Refer to responses to PPIs 486 and 487.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Amend No.
561 12/17/2018 In Addendum 19, specification '14 26 13 Equipment Lift' was reissued, but it still does not state the desired weight capacity in Paragraph 2.1.2a. Please clarify the desired capacity.
The weight capacity of this lift is 1,000 lbs.
562 12/17/2018 In spec section 11 00 01 ‐ Attachment A, the tag #'s 61a, 61b, & 61c for "Mold Storage" references spec section 01 30 01.00 22. However the CLIN #'s referenced are 000E‐50, 000E‐51, 000E‐52 and can be found in Attachment F under CLIN 0009. Please clarify if these are to be provide by the furniture procurement contractor or the equipment contractor.
The mold storage items are equipment (not FF&E).
563 12/17/2018 HF Mixing Group would like to know if their facilities will be required to enforce the CTPAT rules during the manufacturing storage of the equipment for the US Navy.
No, that will not be required.
564 12/19/2018 7 14 21
2.1.2.b
Please clarify what is meant by "buck board wall protection".
In‐car horizontal buck‐board wall protection is a removable wall protection panel system with an integrated hook assembly that covers the entire wall during construction or any other activity that could damage the finish of the interior.