About this file

N4008518R87160018.pdf

View the file

Other files

File Type Posted
Attachment_F_AMD23.pdf PDF
N4008518R87160023.pdf PDF
N4008518R87160022.pdf PDF
N4008518R87160021.pdf PDF
N4008518R87160020.pdf PDF
N4008518R87160019.pdf PDF
N4008518R87160017.pdf PDF
N4008518R87160016.pdf PDF
P293_RUBBER_COMPOUNDING_area.dwg DWG drawing
Attachment_F.pdf PDF
N4008518R87160015.pdf PDF
N4008518R87160014.pdf PDF
N4008518R87160013.pdf PDF
N4008518R87160012.pdf PDF
N4008518R87160011.pdf PDF
N4008518R87160010.pdf PDF
N4008518R87160009.pdf PDF
N4008518R87160008.pdf PDF
N4008518R87160007.pdf PDF
Site_Visit_Log.pdf PDF
N4008518R87160006.pdf PDF
N4008518R87160005.pdf PDF
JAs_Redacted.pdf PDF
N4008518R87160004.pdf PDF
N4008518R87160003.pdf PDF
Amendment_0002.pdf PDF
SECNAV_5512_DBIDS_Individual.pdf PDF
Amendment_0001.pdf PDF
Local_Visitor_Request_Form.pdf PDF
Attachment_B.pdf PDF
Attachment_C.xls XLS spreadsheet
Attachment_A.docx DOCX document
N4008518R8716.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

P-293 Paint, Blast and Rubber Consolidation Facility, Portsmouth Naval Shipyard, Kittery, ME

The purpose of this amendment is to provide Pre-Proposal Responses.

The proposal due date of 27 November 2018 remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Nov-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R8716

X 9B. DATED (SEE ITEM 11)

31-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Nov-2018

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008518R8716

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

SOLICITATION NO. N40085-18-R-8716

PROJECT TITLE/LOCATION: P293 Paint, Blast and Rubber Consolidation Facility

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

522 11/16/2018 11 20

Is the Rubber Compounding Equipment supplier responsible for any ventilation equipment, especially relative to the Item 38A Storage Transfer System and

38C Weighing Table?

It is likely that ventilation associated with the rubber compounding is provided by the prime contractor's

HVAC subcontractor, however, this needs to be determined between the prime contractor and HF. Refer to drawing M-701 for clarification of

HVAC items that are to be included in

CLIN for Rubber Compounding System

(spec 11 20 01).

523 11/16/2018 11 20

What are the required construction materials (Stainless

Steel Bins?) and weld finish requirements? The current storage bins are

Rubbermaid (or equal), see http://www.rubbermaidcommercial.c om/rcp/products/detail.jsp?rcpNum=

3600-88 , they are 6.78 cubic ft. Weld

Finish requirements: * AWS1.1 for

Steel, AWS1.3 for Sheet Steel, ASW

1.6 for Stainless Steel.

524 11/16/2018 11 20

Does the government have a preferred vendor list for instruments? Vendor standard is acceptable in

English units.

REFERENCE

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Posted on

Amend No.

July 2011

SOLICITATION NO. N40085-18-R-8716

PROJECT TITLE/LOCATION: P293 Paint, Blast and Rubber Consolidation Facility

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Posted on

Amend No.

525 11/16/2018 11 20

What are the grounding requirements given the classified area and consideration of the dust as explosive.

Specs address grounding for the dust collectors. The following paragraph is in the Dust Collector spec sections:

"Grounding. All exposed, non-current carrying metal parts on the equipment shall be maintained at common, zero ground potential. None of the primary circuits in the equipment shall be connected to ground. A grounding stud/lug on the equipment shall provide a means for grounding the equipment."

526 11/16/2018 11 20

Please further define the intent of section 2.1.2 relative to the required explosion risk mitigation (rupture panels, suppression, isolation?)

Explosion mitigation should comply with NFPA 654

July 2011

N4008518R87160018
PPIs