About this file

N4008518R87160006.pdf

View the file

Other files

File Type Posted
Attachment_F_AMD23.pdf PDF
N4008518R87160023.pdf PDF
N4008518R87160022.pdf PDF
N4008518R87160021.pdf PDF
N4008518R87160020.pdf PDF
N4008518R87160019.pdf PDF
N4008518R87160018.pdf PDF
N4008518R87160017.pdf PDF
N4008518R87160016.pdf PDF
P293_RUBBER_COMPOUNDING_area.dwg DWG drawing
Attachment_F.pdf PDF
N4008518R87160015.pdf PDF
N4008518R87160014.pdf PDF
N4008518R87160013.pdf PDF
N4008518R87160012.pdf PDF
N4008518R87160011.pdf PDF
N4008518R87160010.pdf PDF
N4008518R87160009.pdf PDF
N4008518R87160008.pdf PDF
N4008518R87160007.pdf PDF
Site_Visit_Log.pdf PDF
N4008518R87160005.pdf PDF
JAs_Redacted.pdf PDF
N4008518R87160004.pdf PDF
N4008518R87160003.pdf PDF
Amendment_0002.pdf PDF
SECNAV_5512_DBIDS_Individual.pdf PDF
Amendment_0001.pdf PDF
Local_Visitor_Request_Form.pdf PDF
Attachment_B.pdf PDF
Attachment_C.xls XLS spreadsheet
Attachment_A.docx DOCX document
N4008518R8716.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide the for Design Revision 1.

See SF30 Block 14 Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 33

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Oct-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R8716

X 9B. DATED (SEE ITEM 11)

31-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Oct-2018

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008518R8716

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0006

CONTINUATION SHEET (Drawing Edits)

NAVFAC Dwg. Nos. 12775781, 12775791, 12775812, 12775813, 12775815, 12775832, 12775833, 12775954, 12775956, 12775957, 12775969, 12775970, 12775971, 12775972, 12775973, 12775975, 12775980, 12775981, 12775982, 12775983, 12775985, 12775986, 12775989, 12775994, 12775995, 12775996, 12775997, 12775998, 12775999, 12776000, 12776002, 12776003, 12776004, 12776005, 12776006, 12776007, 12776008, 12776009, 12776010, 12776015, 12776016, 12776017, 12776019, 12776020, 12776021, 12776022, 12776031, 12776032, 12776034, 12776036, 12776040, 12776041, 12776042, 12776043, 12776044, 12776045, 12776046, 12776053, 12776059, 12776064, 12776067, 12776068, 12776069, 12776070, 12776071, 12776072, 12776073, 12776074, 12776075, 12776076, 12776077, 12776078, 12776079, 12776080, 12776081, 12776082, 12776083, 12776084, 12776085, 12776086, 12776087, 12776088, 12776089, 12776090, 12776091, 12776092, 12776093, 12776094, 12776095, 12776096, 12776097, 12776098, 12776101, 12776103, 12776104, 12776108, 12776109, 12776110, 12776111, 12776112, 12776113, 12776114, 12776116, 12776117, 12776118, 12776119, 12776120, 12776121, 12776122, 12776123, 12776124, 12776125, 12776126, 12776127, 12776128, 12776129, 12776130, 12776131, 12776132, 12776134, 12776135, 12776136, 12776137, 12776138, 12776139, 12776140, 12776141, 12776142, 12776143, 12776144, 12776146, 12776147, 12776149, 12776150, 12776151, 12776152, 12776153, 12776154, 12776155, 12776157, 12776175, 12776176, 12776179, 12776180, 12776181, 12776182, 12776183, 12776186, 12776192, 12776193, 12776194, 12776196, 12776198, 12776199, 12776200, 12776202, 12776203, 12776204, 12776205, 12776207, 12776215, 12776216, 12776218, 12776224, 12776225, 12776246, 12776247, 12776249, 12776251, 12776252, 12776253, 12776254, 12776258, 12776260, 12776266, 12776267, 12776272, 12776274, 12776277, 12776278, 12776286, 12776291, 12776295, 12776296, 12776297, 12776300, 12776304, 12776306, 12776307, 12776309, 12776313, 12776314, 12776316, 12776317, 12776318, 12776320, 12776321, 12776322, 12776323, 12776324, 12776325, 12776326, 12776327, 12776328, 12776329, 12776330, 12776354, 12776423, 12776425, 12776517, 12776562, 12776636, 12776637, 12776638, 12776641, 12776642, 12776683, 12776684 are revised as of October 1, 2018. These revised drawings accompany this amendment.

Volume 1 – Temporary Facilities:

On NAVFAC Dwg. No. 12775954 (FF-910) Added furniture Key/Schedules.

Volume 2 – Phasing and Site Work:

On NAVFAC Dwg. No. 12775781 (CD-102) Revised Demolition Keyed Note 2 to clarify scope of work.

On NAVFAC Dwg. No. 12775791 (C-107) Revised Keyed Note 11 to clarify scope of work.

On NAVFAC Dwg. No. 12775812 (B-601) Removed "Preliminary" stamp from logs.

On NAVFAC Dwg. No. 12775813 (B-602) Removed "Preliminary" stamp from logs.

On NAVFAC Dwg. No. 12775815 (ES-101) Keyed Note #6 - added size of conduit; Keyed Note #11 - revised wording.

On NAVFAC Dwg. No. 12775832 (ES-610) Added Bldg 404 telephone cable.

On NAVFAC Dwg. No. 12775833 (ES-611)

Added Bldg 404 telephone cable.

Volume 3 – Paint, Blast, and Rubber Facility:

On NAVFAC Dwg. No. 12775956 (G-002) Added PWD-ME No. to Index of Drawings.

On NAVFAC Dwg. No. 12775956 (G-002) Added PWD-ME No. to Index of Drawings.

On NAVFAC Dwg. Nos. 12775969, 12775970, 12775971 (S-001, S-002, S-003) Clarification to General Notes.

On NAVFAC Dwg. Nos. 12775969, 12775970, 12775971, 12775972, 12775973 (S-101, S-102, S-103, S-104, S- 105)

Updates to section callouts; note clarifications.

On NAVFAC Dwg. Nos. 12775975 (S-110)

Added C12 flange bracing; shortened intermediate level platform in Shafts to allow 8’-0” rail car clearance; minor changes to member sizes

On NAVFAC Dwg. Nos. 12775980, 12775981, 12775986, 12776002 (S-115, S-116, S-125, S-311) Clarified member sizes on plans.

On NAVFAC Dwg. Nos. 12775982 (S-117) Clarified roof framing around AHU-10 curb; clarified deck fastening; updated bar joists.

On NAVFAC Dwg. Nos. 12775983 (S-118) Clarified roof girder end connection detail; removal of “in progress” notes.

On NAVFAC Dwg. Nos. 12775985 (S-120) Updated section references; clarified framing around roof openings; added roof bracing.

On NAVFAC Dwg. Nos. 12775989 (S-128) Clarified extent of galvanizing.

On NAVFAC Dwg. Nos. 12775994 (S-204) Updated member size.

On NAVFAC Dwg. Nos. 12775995 (S-206) Note clarifications.

On NAVFAC Dwg. Nos. 12775996, 12775997, 12775998 (S-210, S-211, S-212) Clarified girt framing.

On NAVFAC Dwg. Nos. 12775999 (S-301) Dimension clarification at rail attachment section.

On NAVFAC Dwg. Nos. 12776000 (S-302) Plan reference clarifications.

On NAVFAC Dwg. Nos. 12776003, 12776040, 12776002, 12776003, 12776004, 12776006, 12776032, 12776042

(S-320, S-518, S-311, S-320, S-321, S-323, S-510, S-520) Clarification of welds.

On NAVFAC Dwg. Nos. 12776005 (S-322) Added detail showing roof lift frame attachment to equipment platform; clarified locations requiring light gage framing.

On NAVFAC Dwg. Nos. 12776006 (S-323) Clarified W-shapes versus bar joists.

On NAVFAC Dwg. Nos. 12776007 (S-324) Clarified tube sizes.

On NAVFAC Dwg. Nos. 12776008 (S-330) Horizontal bracing added to fabric door header beams.

On NAVFAC Dwg. Nos. 12776009 (S-331) Clarified column connection detail.

On NAVFAC Dwg. Nos. 12776008, 12776010, 12776044 (S-330, S-332, S-530) Clarified light gage framing connections and plate thicknesses.

On NAVFAC Dwg. No. 12776015 (S-337) Updated stair framing.

On NAVFAC Dwg. No. 12776016 (S-338) Clarified HSS girt end connection details for acoustic screen.

On NAVFAC Dwg. No. 12776017 (S-339) Galvanizing notes.

On NAVFAC Dwg. No. 12776019 (S-401) Added note 3.

On NAVFAC Dwg. No. 12776021 (S-403) Clarified member sizing.

On NAVFAC Dwg. No. 12776022 (S-404) Clarified grating.

On NAVFAC Dwg. No. 12776031 (S-507) Added note clarifications.

On NAVFAC Dwg. No. 12776034 (S-512) Added missing typical details.

On NAVFAC Dwg. No. 12776036 (S-514) Clarified spacers for vertical bracing; added light gage.

On NAVFAC Dwg. No. 12776040 (S-518) Clarified guardrail detail.

On NAVFAC Dwg. No. 12776041 (S-519) Clarified ladder rails.

On NAVFAC Dwg. No. 12776043 (S-521) Updated typical joist details.

On NAVFAC Dwg. No. 12776045 (S-540) Clarified rooftop equipment framing details.

On NAVFAC Dwg. No. 12776046 (S-541) Added typical detail of pipe support resting on roof membrane.

On NAVFAC Dwg. No. 12776053 (S-561) Updated jamb detail.

On NAVFAC Dwg. No. 12776059 (S-602) Updated column sizes.

On NAVFAC Dwg. No. 12776064 (A-001) Fixed note cutoffs; corrected generic name for "rock wool"; general note edits (18 and 22).

On NAVFAC Dwg. Nos. 12776067, 12776068 (A-004 and A-005) Clarified continuous air/vapor.

On NAVFAC Dwg. Nos. 12776069, 12776070, 12776071, 12776072 (A-101, A-103, A-103, A-104) Added dimensions, added match line call-outs.

On NAVFAC Dwg. Nos. 12776073, 12776074, 12776075, 12776076, 12776077, 12776078, 12776079 (A-105, A-

106, A-107, A-108, A-109, A-110, A-111) Added dimensions

On NAVFAC Dwg. No. 12776080 (A-112) Added dimensions; Office 225 door swing adjustment

On NAVFAC Dwg. No. 12776081 (A-113) Added dimensions.

On NAVFAC Dwg. No. 12776082 (A-114) Added dimensions; fixed note cutoffs.

On NAVFAC Dwg. No. 12776083 (A-115) Fixed note cutoffs.

On NAVFAC Dwg. No. 12776084 (A-116) Fixed note cutoffs; clarified match lines.

On NAVFAC Dwg. No. 12776085 (A-117) Clarified match lines and ceiling ratings On NAVFAC Dwg. Nos. 12776086, 12776087, 12776088, 12776090, 12776093 (A-118, A-119, A-120, A-122, A-

125) Clarified ceiling ratings.

On NAVFAC Dwg. No. 12776094 (A-126) Clarified moisture resistant gypsum ceiling in shower rooms.

On NAVFAC Dwg. Nos. 12776095, 12776096, 12776097, 12776098, 12776101, 12776103, 12776104 (A-201, A- 202, A-203, A-204, A-207, A-209, A-210)

Added dimensions.

On NAVFAC Dwg. Nos. 12776108, 12776109, 12776110, 12776111, 12776112, 12776113, 12776114 (A-304, A-

305, A-306, A-307, A-308, A-309, A-310, A-311) Additional section references; added dimensions

On NAVFAC Dwg. No. 12776116 (A-401) Added dimensions.

On NAVFAC Dwg. No. 12776117 (A-402) Additional section references; added dimensions

On NAVFAC Dwg. No. 12776118 (A-403) Added dimensions.

On NAVFAC Dwg. No. 12776110 (A-404) Additional section references; added dimensions.

On NAVFAC Dwg. Nos. 12776120, 12776121 (A-405, A-406) Added dimensions.

On NAVFAC Dwg. No. 12776122 (A-407) Added dimensions; added blocking note.

On NAVFAC Dwg. Nos. 12776123, 12776124, 12776125, 12776126 (A-408, A-409, A-410, A-411) Added dimensions.

On NAVFAC Dwg. No. 12776127 (A-412) Handrail clarification.

On NAVFAC Dwg. No. 12776128 (A-413) Additional section references; added dimensions

On NAVFAC Dwg. No. 12776129 (A-414) Note edits.

On NAVFAC Dwg. No. 12776130 (A-415) Note edits; added dimensions.

On NAVFAC Dwg. No. 12776131 (A-501) Added dimensions.

On NAVFAC Dwg. Nos. 12776132 (A-502) Clarified acoustic ratings.

On NAVFAC Dwg. Nos. 12776134, 12776135 (A-504, A-505) Added dimensions.

On NAVFAC Dwg. No. 12776136 (A-506) Added dimensions; clarified IMP/masonry arrangement.

On NAVFAC Dwg. Nos. 12776137, 12776138 (A-507, A-508) Added dimensions; clarified air/vapor barrier

On NAVFAC Dwg. Nos. 12776139, 12776140 (A-509, A-510) Added dimensions.

On NAVFAC Dwg. No. 12776141 (A-511) Clarified notes on section B4.

On NAVFAC Dwg. Nos. 12776142, 12776143 (A-512, A-513) Added dimensions and note clarifications.

On NAVFAC Dwg. No. 12776144 (A-514) Added dimensions.

On NAVFAC Dwg. Nos. 12776146, 12776147 (A-516, A-517) Added notes.

On NAVFAC Dwg. No. 12776147 (A-518) Added dimensions.

On NAVFAC Dwg. No. 12776149 (A-601) Added fire labels; glass note; clarified door ratings

On NAVFAC Dwg. No. 12776150 (A-602) Added fire labels; clarified door ratings.

On NAVFAC Dwg. Nos. 12776151, 12776152, 12776153 (A-603, A-604, A-605)

Added dimensions.

On NAVFAC Dwg. No. 12776154 (A-606)

Added tempered glass call-outs; and note edits.

On NAVFAC Dwg. No. 12776155 (A-607)

Added tempered glass call-outs; added sealant notes.

On NAVFAC Dwg. No. 12776175 (M-001)

Added Abbreviations & symbols.

On NAVFAC Dwg. No. 12776176 (M-101)

Added 2 door grilles (T-10); corrected spec. section reference on Keyed note 13.

On NAVFAC Dwg. No. 12776179 (M-104)

Fix Typo & added isolation valves.

On NAVFAC Dwg. Nos. 12776180, 12776181 (M-105, M-106)

Added keyed note & edit duct size On NAVFAC Dwg. No. 12776182 (M-107)

Added 2 door grilles (T-10).

On NAVFAC Dwg. No. 12776183 (M-108)

Added keyed note & edit duct size.

On NAVFAC Dwg. No. 12776186 (M-111)

Edit duct size.

On NAVFAC Dwg. No. 12776192 (M-304)

Relocated AS-1, P-1, P-2, P-3, HX-1, & HX-2 in sections.

On NAVFAC Dwg. No. 12776193 (M-401)

Relocated AS-1, P-1, P-2, P-3, HX-1, & HX-2 in plan.

On NAVFAC Dwg. No. 12776194 (M-501)

Added note.

On NAVFAC Dwg. No. 12776196 (M-503)

Fix typing.

On NAVFAC Dwg. No. 12776198 (M-505)

Added note to A1 & adjust B4 diagram.

On NAVFAC Dwg. No. 12776199 (M-506)

Added 3 details: Heating coil, Chilled water coil, Steam coil.

On NAVFAC Dwg. No. 12776200 (M-507)

Add/corrected note.

On NAVFAC Dwg. No. 12776202 (M-601)

Added note 3 to pump schedule.

On NAVFAC Dwg. No. 12776203 (M-602)

Revise units on AHU schedule.

On NAVFAC Dwg. No. 12776204 (M-603)

Schedule revisions.

On NAVFAC Dwg. No. 12776205 (M-604)

Revised note 4 on Chiller schedule.

On NAVFAC Dwg. Nos. 12776207, 12776215, 12776216, 12776218 (M-702, M-710, M-711, M-713)

Minor text edits.

On NAVFAC Dwg. No. 12776224 (M-719)

Added keyed note & revised schematic.

On NAVFAC Dwg. No. 12776225 (M-720)

Revised Sequence of Operations.

On NAVFAC Dwg. No. 12776246 (FP-001)

Updated symbols and clarified notes on CO2 suppression.

On NAVFAC Dwg. No. 12776247 (FP-101)

Clarified contractor scope of work for supply of dust collector CO2 systems; updated reference to Structural drawings for Paint/Hazmat trench drain.

On NAVFAC Dwg. No. 12776251 (FP-401)

Added locations and design information for jockey pump and pump controllers in the Fire Pump room; relocated backflow preventer and fire pump to provide 10 pipe diameter clearance between them per NFPA 20; Relocated orientation of 8" wet pipe sprinkler main as it leaves the Fire Pump Room to avoid routing over electrical panels.

On NAVFAC Dwg. No. 12776252 (FP-501) Added clarifying notes to details, refer to drain locations for preaction and dry-pipe risers; added dry pipe riser drain reference.

On NAVFAC Dwg. No. 12776253 (FA-001) Added low temperature sensor and CO2 system trouble to matrix.

On NAVFAC Dwg. No. 12776254 (FA-101) Added low temperature sensor in the Fire Pump room.

On NAVFAC Dwg. No. 12776258 (E-001) Added HMI to abbreviations list.

On NAVFAC Dwg. No. 12776260 (E-100) Addressed spelling in note #3; edited Keyed note #4; conduit sizes/quantity changed as clouded on plan; added two new conduit routes as clouded for Buss A and Panel PD9.

On NAVFAC Dwg. No. 12776266 (EP-101) Circuit added for Bus Duct C; crane control panels added in corridor 131 for VLP & Shafts cranes.

On NAVFAC Dwg. No. 12776267 (EP-102) Crane control panel added in Main Aisle 120.

On NAVFAC Dwg. No. 12776272 (EP-107) Updated furniture layout in Office # 206.

On NAVFAC Dwg. No. 12776274 (EP-109) Added circuit for DC-20.

On NAVFAC Dwg. No. 12776277 (EP-401) Added circuit for EF-20 (A1/EP401); updated pump layout for mechanical room 125; added keyed note #8; added keyed note #8 (A3/EP401); added control panel for jockey pump in fire pump room 124 (B3/EP401).

On NAVFAC Dwg. No. 12776286 (EL-109) Revised keyed note #2; added light switch designation to lighting in Shaft Area 108 & Very Large Parts 107;

updated furniture layout in Office # 206.

On NAVFAC Dwg. No. 12776295 (EY-103) Updated furniture layout in Office # 206.

On NAVFAC Dwg. No. 12776296 (E-501) Added cable type 12; revised cable type 10; added 4000A rating to main bus bar; added 600A rating to bus Ducts;

keyed note #1 - added note to coordinate with sprinkler installer.

On NAVFAC Dwg. No. 12776297 (E-502) Added cable type 10; added 4000a rating to main bus bar.

On NAVFAC Dwg. No. 12776300 (E-600) Added Bus Duct Schedules for A, B, & C; sheet Title revised.

On NAVFAC Dwg. No. 12776304 (E-604) Added DC-20 to circuit PD7 #37, 39, 41.

On NAVFAC Dwg. No. 12776306 (E-606) Edited circuit PP2 #8 description from "Unit Heater - UH-10" to "Air curtain ACH-5".

On NAVFAC Dwg. No. 12776307 (E-607) Edited circuit PP3 #25, 27 description to add abbreviation "(SF-2)".

On NAVFAC Dwg. No. 12776309 (E-609) Added EF-20 to circuit PP8#2.

On NAVFAC Dwg. No. 12776313 (Q-102) Equipment tag 113 & 319 changed to equipment (vs FFE).

On NAVFAC Dwg. No. 12776314 (Q-103) Equipment tag 79 & 302 changed to equipment (vs FFE).

On NAVFAC Dwg. No. 12776316 (Q-105) Tag 55 is clarified to depict this as an FF&E desk.

On NAVFAC Dwg. No. 12776316 (Q-106) Equipment tags 115B and 68D changed to equipment (vs FFE).

On NAVFAC Dwg. No. 12776318 (Q-107)

Added crane clearance clarifications.

On NAVFAC Dwg. No. 12776320 (Q-602)

Equipment tag 68D & 79 changed to equipment (vs FFE).

On NAVFAC Dwg. No. 12776321 (Q-603)

Equipment tags 113, 115A, 115B, 302, and 319 changed to equipment (vs FFE).

On NAVFAC Dwg. No. 12776157 (A-901)

Added reference to freight elevator spec for floor finish.

On NAVFAC Dwg. No. 12776322 (A-911)

Added furniture Key/Schedules, added trash/recycle receptacles.

On NAVFAC Dwg. No. 12776323 (A-912)

Added furniture Key/Schedules, added trash/recycle receptacles; changed storage racks to equipment in CNC room.

On NAVFAC Dwg. No. 12776324 (A-913)

Added furniture Key/Schedules, added trash/recycle receptacles; changed pallet racks to equipment in laydown areas.

On NAVFAC Dwg. Nos. 12776325, 12776326 (A-914, A-915) Added furniture Key/Schedules, added trash/recycle receptacles.

On NAVFAC Dwg. No. 12776327 (A-916) Added furniture Key/Schedules, added trash/recycle receptacles; tag to T30/Q55 in plan view.

On NAVFAC Dwg. No. 12776328 (A-917) Added furniture Key/Schedules, added trash/recycle receptacles; changed pallet racks to equipment in Lino/Carpet area; added trash/recycle receptacles.

On NAVFAC Dwg. No. 12776329 (A-918) Added furniture Key/Schedules.

On NAVFAC Dwg. No. 12776330 (A-919) Added furniture Key/Schedules, added trash/recycle receptacles.

Volume 4 – Building 55:

On NAVFAC Dwg. No. 12776354 (Q-601) Equipment tags 228 and 234 changed to equipment (vs FFE).

On NAVFAC Dwg. No. 12776357 (FF-911) Added furniture Key/Schedules.

Volume 5 – Building 60:

On NAVFAC Dwg. No. 12776423, 12776423 (A-401, A-403) Sanitary napkin receptacles moved to within stalls; sanitary napkin dispenser added to women’s bathroom.

On NAVFAC Dwg. No. 12776517 (FF-912) Added furniture Key/Schedules.

Volume 6 – Building 74:

On NAVFAC Dwg. No. 12776562 (A-401) Sanitary napkin receptacles moved to within stalls; sanitary napkin dispenser added to women’s bathroom.

On NAVFAC Dwg. No. 12776636 (Q-101) Equipment tag 247 changed to equipment (vs FFE).

On NAVFAC Dwg. No. 12776637 (Q-102) Equipment tag 153 changed to equipment (vs FFE).

On NAVFAC Dwg. No. 12776638 (Q-601) Equipment tags 153 and 247 changed to equipment (vs FFE).

On NAVFAC Dwg. No. 12776641 (FF-910) Added furniture Key/Schedules.

On NAVFAC Dwg. No. 12776642 (FF-911) FF-911 Removed 4 pallet racks from FF&E (changed to equipment).

Volume 7 – Building 362:

On NAVFAC Dwg. No. 12776683 (Q-601) Equipment tag 285 changed to equipment (vs FFE).

On NAVFAC Dwg. No. 12776684 (FF-910)

Added furniture Key/Schedules.

PROJECT TABLE OF CONTENTS

Section 21 21 01.00 20 CARBON DIOXIDE FIRE EXTINGUISHING (HIGH PRESSURE), is added to the Table of Contents.

This Section accompanies this Addendum.

SECTION 05 40 00 COLD-FORMED METAL FRAMING

1.4 LOAD-BEARING COLD-FORMED METAL FRAMING

After second paragraph, added the following:

“Provide back-blocking to W-shapes, etc. as required for joist framing.”

09 68 00 CARPETING

2.2.2.1 Carpet Manufacturer

At the end of section, added:

“and Government” before “.” Then added:

“Modular tile 18" x 36" with 0.15 percent growth shrink rate in accordance with ISO 2551.”

Deleted section:

“2.2.2.2 Type Modular tile 18" x 36” with 0.15 percent growth/shrink rate in accordance with ISO 2551.”

2.2.2 Pile Type

Deleted “Loop”, replaced with: “Textile Composite”

2.2.6 Dye Method

Deleted “100%”

SECTION 11 10 01 2500 TON HYDRAULIC RUBBER PRESS

1.4 SUBMITTALS

Added the following to SD-05 Design Data:

“Process Control Architecture Flow Diagram; G, AE”

Deleted the following from SD-07 Certificates:

“Sample Warranty, G”

Added:

“Design Reviewed by a Professional Engineer (PE); G, AE

Nationally Recognized Test Lab (NRTL) Approval; G, AE”

Added the following to SD-08 Manufacturer’s Instructions:

“Manufacturer's Installation and Verification Instructions; G, AE”

Added the following to SD-11 Closeout Submittals:

PLC Control Software with as specialty cable for connection to external laptop; G Printed copy of all PLC Parameter and Control Files industry standard Documentation; G Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future control modifications; G

1.6 QUALITY CONTROL

After section title, deleted “t”

1.6.3.1 All items must meet all requirements of sections 2 and 3

After “h. Test Data Results…” added the following:

“i. The manufacturer shall have Design Reviewed by a Professional Engineer (PE) licensed in the State of Maine.”

2.4.1.2 PLC & HMI Controls Description

After last paragraph of section added the following:

“The Contractor shall submit <SUB>Process Control Architecture Flow Diagram</SUB> to be approved by the Government.”

3.5.1 Demonstration

Added the following to the end of the section:

“Manufacturer's Installation and Verification Instructions will be provided.”

3.5.2.1 Training Requirements

Added section to follow:

“3.5.2.2 Closeout Documentation

The contractor will provide the following controls related documentation and documentation and access hardware:

PLC Control Software with as specialty cable for connection to external laptop

Printed copy of all PLC Parameter and Control Files industry standard Documentation

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future control modifications”

SECTION 11 10 02 500 TON HYDRAULIC RUBBER PRESS

1.4 SUBMITTALS

Added the following to SD-05 Design Data:

“Process control architecture flow diagram; G”

Added the following to: SD-07 Certificates:

“Design Reviewed by a Professional Engineer (PE) licensed in the State of Maine.

Nationally Recognized Test Lab (NRTL) Approval”

Added the following to: SD-08 Manufacturer's Instructions:

“Manufacturer's Installation and Verification Instructions; G, AE”

Added the following to: SD-11 Closeout Submittals:

“PLC Control Software with specialty cable for connection to external laptop; G

Printed copy of all PLC Parameter and Control Files industry standard Documentation; G

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future control modifications; G”

1.6.3 Responsibility for Compliance

Added the following after last sentence of “i. OSHA Approved Certification…”:

“Nationally Recognized Test Lab (NRTL) Approval.”

Added the following after paragraph “j. Test Data Results…”:

k. The manufacturer will have Design Reviewed by a Professional Engineer (PE) licensed in the state of Maine.”

2.4.1.2 PLC & HMI Controls Description

Added the following after last sentence of section:

“The Contractor shall submit Process control architecture flow diagram to be approved by the Government.”

3.5.1 Demonstration

Added the following at the end of section:

“Manufacturer's Installation and Verification Instructions will be provided.”

3.5.2 Training

Added new section after “3.5.3 Closeout Documentation The contractor will provide the following controls related documentation and documentation and access hardware:

PLC Control Software with specialty cable for connection to external laptop

Printed copy of all PLC Parameter and Control Files industry standard Documentation

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future control modifications

11 10 03 75 TON HYDRAULIC RUBBER PRESS

Added the following to SD-05 Design Data:

“Process Control Architecture Flow Diagram; G”

“Calibration Standards; G

Nationally Recognized Test Lab (NRTL) Approval; G”

Added the following to: SD-08 Manufacturer's Instructions:

Added the following section:

“SD-11 Closeout Submittals:

“Final "as-built" contract drawings; G

PLC Control Software with specialty cable for connection to external laptop; G

Printed copy of all PLC Parameter and Control Files industry standard Documentation; G

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future

1.6.3.1 All items must meet all requirements of sections 2 and 3.

Added the following after last sentence of paragraph “h. OSHA Approved Certification.”

Nationally Recognized Test Lab (NRTL) Approval.”

2.4.1.2 Deleted title “PLC & HMI Controls Description”, Replaced with “PLC & HMI Controls Description”

Added the following below last sentence of section:

“The contractor shall submit PROGRAMMABLE LOGIC CONTROLLER (PLC) & HUMAN-MACHINE INTERFACE (HMI) CONTROLS DESCRIPTION & DESIGN. The contractor shall submit Process Control Architecture Flow Diagram to be approved by the Government.”

3.5.1 Demonstration

Added the following to end of section:

“Manufacturer's Installation and Verification Instructions will be provided.”

Added new section “3.5.3 Closeout Documentation

“The contractor will provide the following controls related documentation and documentation and access hardware:

PLC Control Software with specialty cable for connection to external laptop

Printed copy of all PLC Parameter and Control Files industry standard Documentation

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future control modifications”

11 20 01 RUBBER COMPOUNDING SYSTEM

1.7 SUBMITTALS

SD-05 Design Data, on the Fourth Submittal, Deleted “CS” and added “CS” before “architecture flow diagram”

“Nationally Recognized Test Lab (NRTL) Approval; G”

Added the following section:

“SD-08 Manufacturer's Instructions

Added the following to SD-09 Manufacturer's Field Reports:

“Final Acceptance Test Report; G”

“SD-11 Closeout Submittals

“Final As-Built Drawings on CD-ROM in AutoCAD 2016 or older format with DWG or DXF extensions; G, AE

PLC Control Software with specialty cable for connection to external laptop; G

Printed copy of all PLC Parameter and Control Files industry standard Documentation; G

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future

2.1.3 OSHA Approval Certification

Added the following after last sentence:

“Contractor will submit Nationally Recognized Test Lab (NRTL) approval”

2.2.5 Production Control System (PCS)

In the first paragraph, second sentence, deleted “CS”, added “CS” before “architecture flow diagram”

3.3.1 Demonstration

Added the following to section:

“Manufacturer's Installation and Verification Instructions will be provided.”

3.3.1.4 Operations and Acceptance Testing

Added at the end of the paragraph:

“The Contractor will provide Final Acceptance Test Report following satisfactory testing.”

3.3.1.5 Commissioning

At the end of the section, added the following:

“c) The Contractor will provide Final As-Built Drawings on CD-ROM in AutoCAD 2016 or older format with DWG or DXF extensions.”

Added new section:

“3.3.1.6 Closeout Documentation

The contractor will provide the following controls related documentation and documentation and access hardware:

PLC Control Software with specialty cable for connection to external laptop

Printed copy of all PLC Parameter and Control Files industry standard Documentation

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future

11 20 02 SPECIFICATION FOR WATERJET MACHINE

Added the following to SD-08 Manufacturer’s Instructions:

“Manufacturer's Installation and Verification Instructions; G, AE”

Added the following to SD-09 Manufacturer's Field Reports:

“Final Acceptance Test Report; G”

3.4.1 Demonstration

At the end of section, added the following:

“The Contractor will provide Final Acceptance Test Report following satisfactory testing. Manufacturer's Installation and Verification Instructions will be provided.”

11 20 03 SPECIFICATION FOR CNC MACHINE

1.4 SUBMITTALS

Added the following to SD-08 Manufacturer’s Instructions:

“Manufacturer's Installation and Verification Instructions; G, AE”

Added the following to SD-09 Manufacturer’s Field Reports:

“Final Acceptance Test Report; G”

3.4.1 Demonstration

Added the following at the end of the section:

“The Contractor will provide Final Acceptance Test Report following satisfactory testing. Manufacturer's Installation and Verification Instructions will be provided.”

11 20 04 COMBINATION SANDING / GRINDING & PAINT BOOTHS

Added the following to SD-03 Product Data:

“Sample Warranty; G”

Deleted the following from SD-06 Test Reports:

“Sample Warranty” and replaced with:

“Nationally Recognized Test Lab (NRTL) approval”

Added the following to SD-08 Manufacturer's Instructions:

“Manufacturer's Installation and Verification Instructions; G, AE”

Added the section:

“SD-09 Manufacturer's Field Reports

Manufacturers Commissioning Test Report; G

Final Acceptance Test Report; G”

Added the section:

“SD-11 Closeout Submittals PLC Control Software with specialty cable for connection to external laptop; G

Printed copy of all PLC Parameter and Control Files industry standard Documentation; G

Printed copy of all PLC Parameter and Control files in control Software Native Format for use to complete future

3.4 OSHA APPROVAL CERTIFICATION

Added the following to the end of the section:

“Contractor shall submit Nationally Recognized Test Lab (NRTL) approval.”

3.6.1 Demonstration

Added the following to end of section:

“The Contractor will provide Final Acceptance Test Report following satisfactory testing. Manufacturer's Installation and Verification Instructions will be provided.”

Added the following section:

“3.6.3 Closeout Demonstration

The contractor will provide the following controls related documentation and documentation and access hardware:

PLC Control Software with specialty cable for connection to external laptop

Printed copy of all PLC Parameter and Control Files industry standard Documentation

Printed copy of all PLC Parameter and Control files in control Software Native Format for use to complete future

11 20 05 SPECIFICATION FOR DUST COLLECTORS UNDER 10,000 CFM

Added the following to SD-08 Manufacturer's Instructions:

“Manufacturer's Installation and Verification Instructions; G, AE”

Added the following to SD-09 Manufacturer's Field Reports

“Final Acceptance Test Report; G”

Added the following section:

“SD-11 Closeout Submittals

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future control modifications; G”

3.4.1 Demonstration

Added the following to the end of the section:

“The Contractor will provide Final Acceptance Test Report following satisfactory testing. Manufacturer's

“3.4.3 Closeout Documentation

The contractor will provide the following controls related documentation and documentation and access hardware:

PLC Control Software with specialty cable for connection to external laptop

Printed copy of all PLC Parameter and Control Files industry standard Documentation

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future

11 20 06 SPECIFICATION FOR DUST COLLECTORS OVER 10,000 CFM

Added the following to SD-08 Manufacturer's Instructions:

“Manufacturer's Installation and Verification Instructions; G, AE”

Added the following to SD-09 Manufacturer's Field Reports:

“Final Acceptance Test Report; G”

Added the following section:

“SD-11 Closeout Submittals

PLC Control Software with specialty cable for connection to external laptop; G

Printed copy of all PLC Parameter and Control Files industry standard Documentation; G

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future

Deleted Section 3.3 SYSTEM STARTUP in entirety, replaced with:

“3.3 SYSTEM STARTUP

The Contractor working with the manufacturer's representative shall perform initial startup and checkout of the Grit Recovery Systems and Blast Pots.”

3.4.1 Demonstration

Added the following to the end of the section:

“The Contractor will provide Final Acceptance Test Report following satisfactory testing. Manufacturer's Installation and Verification Instructions will be provided.”

Added the following section:

“3.4.3 Closeout Documentation

The contractor will provide the following controls related documentation and documentation and access hardware:

PLC Control Software with specialty cable for connection to external laptop

Printed copy of all PLC Parameter and Control Files industry standard Documentation

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future

11 30 01 PAINT BOOTH

Added the following to SD-07 Certificates:

“Nationally Recognized Test Lab (NRTL) approval; G”

Added the following to SD-08 Manufacturer's Instructions:

“Manufacturer's Installation and Verification Instructions; G, AE”

Added the following to SD-09 Manufacturer's Field Reports:

“Final Acceptance Test Report; G”

Added the following section:

“SD-11 Closeout Submittals

PLC Control Software with specialty cable for connection to external laptop; G

Printed copy of all PLC Parameter and Control Files industry standard Documentation; G

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future control modifications; G”

2.1.1 Design Requirements

Added the following to the end of the first paragraph:

“All equipment shall be Nationally Recognized Testing Laboratory (NRTL) approved to any and all applicable Occupational Safety and Health Administration (OSHA) 29CFR 1910 standards. Contractor shall submit Nationally Recognized Test Lab (NRTL) Approval.”

3.5.1 Demonstration

Added the following to the end of the section:

“The Contractor will provide Final Acceptance Test Report following satisfactory testing. Manufacturer's

New spec: 21 21 01 Added the following section:

“3.5.3 Closeout Documentation

The contractor will provide the following controls related documentation and documentation and access hardware:

PLC Control Software with specialty cable for connection to external laptop

Printed copy of all PLC Parameter and Control Files industry standard Documentation

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future

11 30 02 ABRASIVE BLAST BOOTHS

Added the following section:

“SD-07 Certificates

Nationally Recognized Test Lab (NRTL) Approval; G”

Added the following to SD-08 Manufacturer's Instructions:

“Manufacturer's Installation and Verification Instructions; G, AE”

Added the following to SD-09 Manufacturer's Field Reports:

“Final Acceptance Test Report; G”

Added the following section:

“SD-11 Closeout Submittals

Final As-Built Drawings on CD-ROM in AutoCAD 2016 or older format with DWG or DXF extensions; G, AE PLC Control Software with specialty cable for connection to external laptop; G

Printed copy of all PLC Parameter and Control Files industry standard Documentation; G

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future

2.1.1 Design Requirements

Added the following to the end of paragraph “11. OSHA APPROVAL CERTIFICATION”:

“Contractor will submit Nationally Recognized Test Lab (NRTL) Approval.”

2.3 EQUIPMENT

In first sentence deleted “a” replaced with “two”; in “10” deleted “0” and added “2” making the number “12’ wide” and added immediately after “wide”: “double leaf”; after “hinged doors” added “(“; following “bogey wheels” added “) providing a 24’ opening,”

In second sentence, deleted: “with a 10’ wide hinged door with bogey wheels and two (2) 3’ personnel doors on opposite sides.” Replaced with: “with two 12’ wide double leaf hinged doors (with bogey wheels) providing a 24’ opening, and two (2) 3’ personnel doors on opposite sides.”

In third sentence, deleted: “with a 20’ wide hinged door with bogey wheels and two (2) 3’ personnel doors on opposite sides.”

In fourth sentence, deleted: “with a 20’ wide hinged door with bogey wheels and two (2) 3’ personnel doors on opposite sides.” Replaced with: “with two 12' wide double leaf hinged doors (with bogey wheels) providing a 24' opening, and two (2) 3' personnel doors on opposite sides.”

3.3.2 Initial/Startup Testing

Deleted “.” At end of first sentence, replaced with “, and Final Acceptance Test Report following satisfactory testing.”

3.5.1 Demonstration

Added following first sentence: “Final Acceptance Test Report. Manufacturer's Installation and Verification Instructions will be provided.”

Added new section: “3.5.3 Closeout Documents

The Contractor will provide Final As-Built Drawings on CD-ROM in AutoCAD 2016 or older format with DWG or DXF extensions

The contractor will provide the following controls related documentation and documentation and access hardware:

PLC Control Software with specialty cable for connection to external laptop

Printed copy of all PLC Parameter and Control Files industry standard Documentation

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future control modifications

11 30 03 SPECIFICATION FOR POWDER COAT SYSTEM

1.4 SUBMITTALS

Added an extra line of space below “SD-03 Product Data”

SD-08 Manufacturer's Instructions

Added: “Manufacturer's Installation and Verification Instructions; G, AE”

SD-09 Manufacturer's Field Reports Added: “Final Acceptance Test Report; G”

Added section:

“SD-11 Closeout Submittals Final As-Built Drawings on CD-ROM in AutoCAD 2016 or older format with DWG or DXF extensions; G, AE

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future

3.4.1 Demonstration

After first sentence, added “The Contractor will provide Final Acceptance Test Report following satisfactory testing.

Manufacturer's Installation and Verification Instructions will be provided.”

Added new section:

“3.4.3 Closeout Documents

The Contractor will provided Final As-Built Drawings on CD-ROM in AutoCAD 2016 or older format with DWG or DXF extensions

The contractor will provide the following controls related documentation and documentation and access hardware:

PLC Control Software with specialty cable for connection to external laptop

Printed copy of all PLC Parameter and Control Files industry standard Documentation

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future control modifications

11 30 04 SPECIFICATION FOR ABRASIVE MEDIA RECOVERY IN VLP & SHAFTS

1.4 SUBMITTALS

SD-05 Design Data, added:

“Sample Warranty; G”

Added section:

“SD-07 Certificates Nationally Recognized Test Lab (NRTL) Approval; G”

SD-08 Manufacturer's Instructions, added:

“Manufacturer's Installation and Verification Instructions; G, AE”

SD-09 Manufacturer's Field Reports, added:

“Final Acceptance Test Report; G”

Added section:

“SD-11 Closeout Submittals Final As-Built Drawings on CD-ROM in AutoCAD 2016 or older format with DWG or DXF extensions; G, AE”

1.5.2.1 Operating and Maintenance (O&M) Manuals

After last sentence of “i. All final "as-built"...”, added:

“. The Contractor will provide Final As-Built Drawings on CD-ROM in AutoCAD 2016 or older format with DWG or DXF extensions”; deleted “.”

2.1.1.1 Components

Added at the very end of the section: “Contractor shall submit Nationally Recognized Test Lab (NRTL) Approval.”

Added after first sentence:

“The Contractor will provide Final Acceptance Test Report following satisfactory testing. Manufacturer's

11 30 05 SPECIFICATION FOR GLOVE BLASTERS

SD-08 Manufacturer's Instructions Added:

“Manufacturer's Installation and Verification Instructions; G, AE”

SD-09 Manufacturer's Field Reports Added:

“Final Acceptance Test Report; G”

3.4.1 Demonstration

Added following first sentence:

“The Contractor will provide Final Acceptance Test Report following satisfactory testing. Manufacturer's Installation and Verification Instructions will be provided.”

11 40 01 SPECIFICATION FOR MISCELLANEOUS TOOLS

1.5 SUBMITTALS

SD-03 Product Data Added:

“Tag# 68D Pallet Rack Large Sheet Storage; G, AE Plastisol Booth; G, AE” “Tag# 79 Pallet Rack Large Sheet Storage; G, AE Plastisol Booth; G, AE” “Tag# 113 Pallet Rack Large Sheet Storage; G” “Tag# 115A Pallet Rack Lino / Carpet Storage; G” “Tag# 115B Pallet Rack Lino / Carpet; G” “Tag# 153 Metal Storage Rack; G” “Tag# 228 Metal Storage System; G, AE” “Tag# 234 Pallet Rack; G, AE” “Tag# 247 High Bay Rack; G, AE” “Tag# 302 Pallet Rack; G, AE” “Tag# 319 Storage Rack; G, AE”

SD-05 Design Data Added:

“Nationally Recognized Test Lab (NRTL) Approval; G”

Added new section:

“SD-08 Manufacturer's Instructions Manufacturer's Installation and Verification Instructions; G”

2.1.1 General Equipment Requirements

After first sentence in “F.”, added:

“The contractor will submit” deleted: “NRTL compliance certificate” replaced with: “Nationally Recognized Test Lab (NRTL) Approval”

3.3 SYSTEM STARTUP

In Table, made the following edits:

Changed “Tag #68A” to “Tag #68A” Changed “Tag #63” to “Tag #8D” Changed “Tag #75” to “Tag #79” Changed “Tag #110” to “Tag #113” Changed “Tag #114B – Pallet Rack Lino / Carpet Storage”” to “Tag #115A – Pallet Rack Lino / Carpet Storage” Changed “Tag #114B – Pallet Rack Lino / Carpet” to “Tag # 115B – Pallet Rack Lino / Carpet” Changed “Tag #123” to “Tag #153” Changed “Tag # 201 – Metal Storage System” to “Tag #228 – Metal Storage System” Changed “Tag # 201 – Pallet Rack” to “Tag #234 – Pallet Rack” Changed “Tag # 201 – High Bay Rack” to “Tag #247 – High Bay Rack” Changed “Tag # 246” to “Tag #302” Changed “Tag #318 – Storage Rack” to “Tag #319 – Storage Rack”

Added new section:

“3.4.2 Closeout Documentation

The Contractor shall provide Manufacturer's Installation and Verification Instructions.”

11 40 03 SPECIFICATION CURING OVENS

SD-07 Certificates Added:

“Nationally Recognized Test Lab (NRTL) Approval”

SD-08Manufacturer's Instructions Added:

“Manufacturer's Installation and Verification Instructions; G, AE”

SD-09 Manufacturer's Field Reports Added:

“Final Acceptance Test Report; G”

Added new section:

“SD-11 Closeout Submittals PLC Control Software with specialty cable for connection to external laptop; G

Printed copy of all PLC Parameter and Control Files industry standard Documentation; G

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future control modifications; G

2.1.1 General Equipment Requirements

Deleted contents of paragraph “F”: All equipment shall be Nationally Recognized Testing Laboratory (NRTL) approved to any and all applicable Occupational Safety and Health Administration (OSHA) 29 CFR 1910 standards. NRTL compliance certificate. The contractor shall provide signed, written certification of compliance of an NRTL approved electrical enclosure, as required in section 3. Failure to provide this certification will delay acceptance of the equipment, and could result in rejection for failure to comply with the terms of the contract.”

Replaced with:

“All equipment shall be Nationally Recognized Testing Laboratory (NRTL) approved to any and all applicable Occupational Safety and Health Administration (OSHA) <RID>29 CFR 1910.10</RID> standards. The contractor will submit <SUB>Nationally Recognized Test Lab (NRTL) Approval</SUB>. The contractor shall provide signed, written certification of compliance of an NRTL approved electrical enclosure, as required in section 3. Failure to provide this certification will delay acceptance of the equipment, and could result in rejection for failure to comply with the terms of the contract.”

3.4.1 Demonstration

Added after first sentence:

“The Contractor will provide Final Acceptance Test Report following satisfactory testing. Manufacturer's Installation and Verification Instructions will be provided.”

Added new section:

“3.4.3 Closeout Documentation The contractor will provide the following controls related documentation and documentation and access hardware:

PLC Control Software with specialty cable for connection to external laptop

Printed copy of all PLC Parameter and Control Files industry standard Documentation

Printed copy of all PLC Parameter and Control files in Control Software Native Format for use to complete future

11 50 01 TEMPORARY PAINT BOOTHS

SD-09 Manufacturer's Field Reports Added:

“Final Acceptance Test Report; G”

Added to the end of the section:

“The Contractor will provided<SUB>Final Acceptance Test Report</SUB> following satisfactory testing.”

11 50 02 TEMPORARY ABRASIVE BLAST BOOTHS

1.4 SUBMITTALS

Added new section:

“SD-09 Manufacturer's Field Reports Testing and Balancing (TAB) Report; G, AE Final Acceptance Test Report; G”

3.3.1 Tests

In second sentence, deleted: “TAB report” and replaced with: “Testing and Balancing (TAB) Report”

3.5.1 Demonstration

Added after first sentence:

“The Contractor will provided<SUB>Final Acceptance Test Report</SUB> following satisfactory testing.”

11 50 03 SPECIFICATION FOR TEMPORARY POWDER COAT SYSTEM

SD-09 Manufacturer's Field Reports Added:

“Final Acceptance Test Report; G”

3.2.1 Tests

At the end of the section, added:

The Contractor will provided<SUB>Final Acceptance Test Report</SUB> following satisfactory testing.”

12 48 13 ENTRANCE FLOOR MATS

2.2.5 Dye Method

Deleted “Millitron®”, replaced with: “100% Solution Dyed”

2.2.12 Standard Backing

Deleted “Comfort Plus® ES”

2.2.13 Deleted: “ES Backing: 37.5% Pre-Consumer, 0.0% Post-ConsumerESP Backing: 28.1% Pre-Consumer, 10.0% Post-Consumer” Replaced with:

“40% Post-Consumer recycled content”

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

2.11.1.1 Centrifugal Fans

At the end of the section, added:

“Provide fans RF-1 through 6 with arrangement 4, inlet box, inlet and outlet flex connectors, AMCA spark resistant type B construction, inertia base, vibration isolators, direct drive, and TEFC motor with standby motor heater.”

23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM

26 20 00 INTERIOR DISTRIBUTION SYSTEM

Added a new section:

“2.12 Low-Voltage Busways NEMA BU 1.1, UL 857. Provide the following:

a. Buses: copper

b. Busways: rated 480 volts, 600 continuous current amperes, three-phase, three-wire, and include integral or internal 50-percent ground bus.

c. Short circuit rating: 65,000 root mean square (rms) symmetrical amperes minimum.

d. Busway systems: suitable for use indoors.

e. Enclosures: steel.

f. Hardware: plated or otherwise protected to resist corrosion.

g. Joints: one-bolt type with through-bolts, which can be checked for tightness without deenergizing system.

h. Maximum hot spot temperature rise at any point in busway at continuous rated load: do not exceed 55 degrees C above maximum ambient temperature of 40 degrees C in any position.

i. Internal barriers to prevent movement of superheated gases.

j. Coordinate proper voltage phasing of entire bus duct system, for example where busway interfaces with transformers, switchgear, switchboards, motor control centers, and other system components.”

Added new section:

“2.12.1 Feeder Busways Provide unventilated, totally enclosed low-impedance busway. Provide bus bars fully covered with insulating material, except at stabs. Provide an entirely polarized busway system.”

Added new section:

“2.12.2 Plug-In Busways

Unventilated type. Provide the following:

a. Plug-in units: fusible, handle-operated, switch type, horsepower-rated.

b. Bus bars: covered with insulating material throughout, except at joints and other connection points.

c. A hook stick of suitable length for operating plug-in units from the floor.”

26 51 00 INTERIOR LIGHTING

1.1 REFERENCES

Deleted reference:

“CALIFORNIA ENERGY COMMISSION (CEC)

CEC Title 24 (2008; Effective Jan 2010) California's Energy Efficiency Standards for Residential and Nonresidential Buildings”

2.2.1 LED Luminaires

In “a.” deleted “5” replaced with “10”

2.3.2 Fluorescent Electronic Ballasts

In first sentence, deleted: “CEC Title 24”

2.5.3.1.4 High/Low-Bay Sensors

In “e.” deleted “CEC Title 24 and”

2.5.3.1.5 Power Packs for Sensors

In first sentence, deleted “CEC Title 24, “

Deleted sections:

“2.5.6 Lighting Control Panel Provide an electronic, programmable lighting control panel, capable of providing lighting control with input from internal programming, digital switches, time clocks, and other low-voltage control devices.

Enclose panel hardware in a surface-mounted, NEMA 1, painted, steel enclosure, with hinged, lockable access door and ventilation openings. Internal low-voltage compartment must be separated from line-voltage compartment of enclosure with only low-voltage compartment accessible upon opening of door.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.