About this file

N4008518R87160008.pdf

View the file

Other files

File Type Posted
Attachment_F_AMD23.pdf PDF
N4008518R87160023.pdf PDF
N4008518R87160022.pdf PDF
N4008518R87160021.pdf PDF
N4008518R87160020.pdf PDF
N4008518R87160019.pdf PDF
N4008518R87160018.pdf PDF
N4008518R87160017.pdf PDF
N4008518R87160016.pdf PDF
P293_RUBBER_COMPOUNDING_area.dwg DWG drawing
Attachment_F.pdf PDF
N4008518R87160015.pdf PDF
N4008518R87160014.pdf PDF
N4008518R87160013.pdf PDF
N4008518R87160012.pdf PDF
N4008518R87160011.pdf PDF
N4008518R87160010.pdf PDF
N4008518R87160009.pdf PDF
N4008518R87160007.pdf PDF
Site_Visit_Log.pdf PDF
N4008518R87160006.pdf PDF
N4008518R87160005.pdf PDF
JAs_Redacted.pdf PDF
N4008518R87160004.pdf PDF
N4008518R87160003.pdf PDF
Amendment_0002.pdf PDF
SECNAV_5512_DBIDS_Individual.pdf PDF
Amendment_0001.pdf PDF
Local_Visitor_Request_Form.pdf PDF
Attachment_B.pdf PDF
Attachment_C.xls XLS spreadsheet
Attachment_A.docx DOCX document
N4008518R8716.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

P-293 Paint, Blast and Rubber Consolidation Facility, Portsmouth Naval Shipyard, Kittery, ME

The purpose of this amendment is to provide responses to Pre-Proposal Inquiries. The proposal due date of 13 November 2018 remains unchanged. See attached PPI responses.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Oct-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R8716

X 9B. DATED (SEE ITEM 11)

31-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Oct-2018

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008518R8716

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

SOLICITATION NO. N40085-18-R-8716

PROJECT TITLE/LOCATION: P293 Paint, Blast and Rubber Consolidation Facility PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

9/12/2018 1 BOX 10 On the front page of the solicitation, box 10 states 'refer to section 00 21 16 for proposal delivery information'.

This section does not seem to be included in the specifications. Please provide.

The proposal delivery information is included in section 00 21 16 (Instructions to Proposers) of the solicitation on page 19.

9/13/2018 File R_1393766dwg03of08_B404a, “Volume 3: Paint, Blast, and Rubber Facility”, the document list goes up to 271 pages, there are only 220 in the file we received, can the additional drawings be provided?

The additional drawings are provided under the files R_1393766dwg03of08_B404b through g

9/14/2018 Given the large volume of bid documents we would like to request a bid extension of six (6) weeks from the current October 16, 2018 date.

Please see Amendment 0007. 8

9/17/2018 4 07-27- 10.00

2.1 A

Asking for approval for 3M Vapor Permeable Air Barrier 3015VP. Passes NFPA 285 Assemblies and may be left exposed for 12 months. Can be applied without the requirement of a Primer. May be applied down to 0 degrees over dry clean surface.

Contractor is to meet the requirements of the specifications and drawings. Alternative products may be approved provided products (and overall system) meet the specification requirements including related specification sections. Final approval and acceptance of products will be through submittal review process as set forth in Specification Section 01 33 00.

REFERENCE

QUESTION GOVERNMENT RESPONSEDate Received

Posted on Amend No.

July 2011

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

9/20/2018 Per specification section 11 40 01 1.7.1, miscellaneous tools shall meet the design standard as delineated in section B. However, section B of that specification does not appear to have any design standards listed. Can you provide design standards and or manufacturers specifications for miscellaneous tools?

Data Sheets are provided in Attachement B of spec. 11 40 01; data sheets indicate mfr./model, or provide link to item, and/or catelog cuts are provided, and/or supplemental accessory catelog cuts are provided.

The products indicated provide the basis for the minimum design standard, and submitted products must meet the minimum standards.

9/20/2018 Specification Section 01-62-00 "Acoustical Testing", page 5 "Attachment: Example Sound Attenuation Panel Assemblies", this attachment is missing, please provide copy.

Instead of reference to specification attachement, this reference is to drawing A-515 of Volume 3 drawings.

9/20/2018 Drawing Volume #3, Sheet 191 of 376, drawing Number A-515, "Tactical Acoustic Panel Notes", number 9 states this should be par of CLIN 011, please confirm this is in error and should read CLIN 0017.

CLIN #s referenced on drawings are in reference to Specification Section "00

22 13.00 20 SUPPLEMENTARY

INSTRUCTIONS TO OFFERORS"; CLIN

0011 under this specification section is for "Building 404 Sound Attenuation" - Note 9 is correct as shown. The solicitation document "N4008518R8716" does have this CLIN as Item No. 0017 Option.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

9/20/2018 Please confirm that the Acoustic Screen detailed on drawing A-514, is not part of the allowance in CLIN 0017.

Drawing A-514 depicts rooftop acoustic screens/panels; this is part of Base Bid.

9/25/2018 Please confirm that specification section 07-05-23 "pressure testing and air and vapor barrier system for air tightness" applies only to building 404.

Confirmed. Pressure testing and air and vapor barrier system for tightness applies only to Building 404.

9/25/2018 Drawing ES-505 details the new service for Building 362 as "2 sets [(3) 500KCMIL, 1/0 AWG GND]", but all vault drawings indicate this feed to remain as existing. Please confirm this circuit should be both temporarily fed from the Franklin Annex and permanently fed as 2 sets of [(6)

250KCMIL, 1/0 AWG GND].

Temporary circuit should be fed above ground through Franklin Annex yard by splicing existing circuit inside manhole 2014. Then after construction of new duct banks, circuit should be re-fed underground using new ductbanks as shown on ES-505, again splicing existing circuit insdie manhole 2014.

10/1/2018 23 00

Per B404b drawing number 12776225 page M-720 and dwg# 12776203 page M-602, please confirm is AHU-4 to have head pump operation. There is a discrepancy between the schedule and detail

AHU-4 shall have a built-in heat pump for heating and cooling, with auxiliary electric heat.

10/1/2018 23 00

Please confirm if AHU-7 is to have hot water heat or electric heat. There is discrepancy between schedule and detail.

AHU-7 shall have hot water heat. 8

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

10/4/2018

Volume 3, Page

Spec.

11 40

1.7.1

In Spec section 11 40 01, paragraph 1.7.1 titled Suggested Manufacturers, data sheets are said to be provided in Attachment B. Attachment B lists the new equipment but does not include any specifications on the equipment needed. Please provide technical specification that include the make and model of the desired equipment.

Data Sheets are provided in Attachement B of spec. 11 40 01; data sheets indicate mfr./model, or provide link to item, and/or catelog cuts are provided, and/or supplemental accessory catelog cuts are provided.

The products indicated provide the basis for the minimum design standard, and submitted products must meet the minimum standards.

9/28/2018 Please confirm the PVC conduit sizes for duct banks.

Drawing ES-500 details 5" conduits for all duct bank sections, while the ES-60X series for manhole specific details shows 3" conduits.

5" conduit as detailed in ES-500 is correct. With exeption of conduits G1 and H1 of manhole AC-2017. These should be 2" and 1" respectively as shown in Amendment 6 package dated 10/1/2018.

9/28/2018 Referencing Drawing “Volume 2, ED-101A Partial First Floor Demolition Plan” Demolition Keyed Note 1. Note indicates to remove all circuits from panel board completely and demolish panel board. Please provide existing panel schedules.

Panel PP-F, Panel PB, and Panel 8A-2 currently feed equipment that will be removed prior to this contract start.

Assume all spares.

Panel 8A-1 feeds Panel PP-F, PP-G, and PP-H. Panels PP-G and PP-H to be re-fed from MDP as shown in contract drawings.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

9/28/2018 Referencing Drawing “Volume 2, ED-101D Partial First

Floor Demolition Plan” Demolition Keyed Note 4. Note indicates to “Remove service entrance feeders back to source in Load center 7. See sheet E-501 for details”.

There does not appear to be any details on E-501. Please provide conduit and conductor size and quantities.

Load Center 7 is located off South East corner of B.96. See sheet CD-101 for location. Service is fed underground from B.96 to MH AC-19, then to LC-7 vault. Conductors are 3 sets of 3 500KCMIL, 3/0 AWG GND. Remove conductors only, leave underground conduits.

9/28/2018 Referencing Drawing “Volume 2, E-501 “Building One- Line Diagram” Keyed Note 1. Note indicates to provide new primary service entrance from substation 2. Please provide circuit information.

200A medium voltage circuit will be (3) 4/0 AWG MV-105 Type conductors, run in existing underground conduit. (A pathway has been tagged as reserved for this project) 2000A low voltage circuit will be 6 sets of (3) 400 KCMIL, (1)#3/0AWG ground in 2-1/2" Conduit.

9/28/2018 Referencing Drawing “Volume 2, E-501 “Building One- Line Diagram” Keyed Note 1. Is the 200-amp breaker in Substation 2 existing, or to be furnished by Electrical Contractor? If breaker is to be furnished by EC, please provide specification on existing Sub 2.

200A breaker in substation 2 is an existing breaker.

9/28/2018 Referencing Drawing “Volume 2, E-501 “Building One- Line Diagram” Keyed Note 3. Note indicates to replace existing 1000A circuit breaker with new 2000A rated compatible equipment. Please provide specification on existing MDP.

The switchboard is a I-Line switch board with serial #A16027707.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

9/28/2018 Referencing Drawing “Volume 2, E-501 “Building One-

Line Diagram” Are the 12 each circuit breakers in existing MDP to be furnished by Electrical Contractor? If so, please provide specification on existing MDP.

MDP has the following spares that can be used: 600A, 225A, 150A. Remaining circuit breakers to be provided by electrical contractor. The switchboard is a I-Line switch board.

9/28/2018 Referencing Drawing “Volume 5 E-502, Building 60 One- Line Diagram”. Drawings indicate new 70A and 400A breakers to be installed in existing MSB. Is the Electrical Contractor required to furnish these breakers? If so, please provide specifications of existing switchboard

MSB.

Breakers to be provided by electrical contractor. MSB is a I-Line Switch board.

9/28/2018 Drawing M-705 indicates S-1 associated with EF-21, drawing M-109 indicates SL-1 associated with EF-21. Please identify what S-1 and/or SL-1 are. Our assumption is a silencer/sound attenuator.

S-1 and S-2 are silencers. Basis of design is Ruskin model DM-60-30X36.

SL-1 and SL-2 should be S-1 and S-2.

10/3/2018 PC-3 contains 2 Vertical Micropile and six battered Micropile. Can you please provide the angle the battered piles will be inserted at?

Angle is assumed to be 30 degrees, but final angle shall be determined by pile submittal

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

10/3/2018 Multiple pile caps do not appear to have elevations to the bottom of cap footing. Can you please provide the elevations of the bottom of pile caps for the footings listed below?

o PC-1 (Quantity 3 missing elevations, see list below) o PC-2 (Quantity 11 missing elevations, see list below)

The bottom of pile cap elevations varies. The bottom of the pile cap elevations should match the bottom of footing elevations of the adjacent exterior walls.

10/3/2018 Building 74 Sheet A-112: Finish schedule calls for ACT-1 in rooms 203, 203A, 211, 212 and 213. The RCP doesn’t show anything to support this. Which should we go by?

The RCP accurately reflects the design intent: 1.) Rooms 203 & 203A will keep existing ceiling to remain. These ceilings will be repairs, and altered as required for new work, and finished with a ceiling paint to match wall paint in color. 2.) Room 211 will have exposed ceiling to above. 3.) Rooms 212 & 213 are to have new GYP BD ceilings with ceiling paint to match wall paint in color.

10/3/2018 Building 74 Sheet A-112: The RCP shows ACT in room 204, but the finish schedule doesn’t state ACT. Which should we go by?

There is no removal notes indicated on AD-112. Room 204 is to keep existing

ACT.

10/3/2018 Building 74 Sheet A-112: The RCP also shows 2’x4’ but the spec lists a 2’x2’. Which should we go by?

There is no new ACT being installed in B74. Disregard 2x2 ACT.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

10/3/2018 Paint, Blast & Rubber Sheet A-117: Finish Schedule calls for ACT-1 in room 114 but doesn’t show this on the RCP.

Which should we go by?

Underside of stair structure to be exposed painted steel. Room 114 and 216 referenced on RCPs A-117, A-120, and A-125 form a single multiple floor entry atrium. A-125 declares the ACT condition for the ceiling. Reference A- 404 for section through space.

10/3/2018 Building 60 Sheet A-111: Finish Schedule calls for ACT-1 in room 109. 109 doesn’t show a ceiling on the print.

Which should we go by?

Room 109 is to have an exposed ceiling to above. No ACT.

10/3/2018 one line diagram drawing E-501 dated 8/24/18 shows a 200 Amp disconnect for equipment LQ-200. The Power drawing EP-101 shows a 400 amp Disconnect. Please clarify

Disconnect should be 200A. 8

10/3/2018 the E-101 Code drawing for Building 404 show the Paint booth 149 to be a Class 1 Div 1 area. On Fire Alarm Drawing FA-101 there is a pull Station and Text sign for Mass notification in this room. Are these devices to be explosion Proof?

The pull station and text sign are outside of the paint booth, at the building exterior door in that vicinity.

10/3/2018 Drawing ES-501 shows pad mounted switchgear that is to feed building 404. Note 1 says to see electrical site plan for location. Drawing ES-101 shows concrete vault locations but does not specify which vault is to for which switch. Plese clarify the location of switch 404A and 404B.

The vault located near Franklin Substation will be the only vault used for both switchgear. The vault indicated to the West of B404 near MH 2589 should be removed from scope.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

10/3/2018 Drawing ES-501 shows a new line to feed Building 92.

Drawing ES-504 indicates we are to reuse the line from AC38 and AC38A to for circuit 92. It is unclear how this is to be accomplished. AC38A is not shown on ES-101.

Please clarify.

Refer to Diagram D1 on ES-504 and Keyed Note 4. New circuit conductors should be spliced to conductors currently feeding building 92 inside MH AC-38. AC-38A is located just to the West of B404 and is labled as "2589" on ES-101.

10/3/2018 The electrical Specifications contain the specifications for the Variable Frequency Drives (VFD) for mechanical equipment and some are shown on Drawing E-501 the one line for Building 404. On drawing M-602 Mechanical Schedule the air handling units and ERV-1 the VFDs are to be furnished by the mechanical contractor. Who is furnishing the VFD units?

The VFDs are intended to be by Mechanical, and meeting the Electrical specifications.

10/3/2018 Drawing M-601 Mechanical Schedule it shows SF-1 to be furnished with a VFD unit however this is a fractional horsepower single phase motor. Please confirm a VFD is needed for this unit.

Provide a speed control that is compatible with the motor. The basis of design is a Greenheck fan speed controller.

10/3/2018 Drawing E-101 Building 74 shows a 60 Amp Disconnect feeding equipment in Chain Wash 106 feed from MDP circuits 19,21,23. This is not shown on the MDP one line on DrawingE-502. Please confirm.

Circuit is for pressure washer inside Chain Wash area. See sheet E-602 for MDP panel schedule which shows the circuit information.

10/3/2018 Drawing E-101 Building 74 temp Mech enclosure shows VFD units, are these existing units? If not who is to furnish the VFD units?

VFDs are existing units relocated with other pump electrical equipment.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

10/3/2018 Drawing E-611 Building 404 Lighting Schedule shows a type C and Type G fixtures and shown as a lens strip light and a gasketed strip light respectively. On the lighting drawings such as EL-101 both fixtures are shown by two separate symbols either on the wall or on the ceiling. Is the intent of the different symbols for each type to show the mounting location of the fixture? Please clarify.

Correct. Symbol shows mounting location, annotation indicates fixture type.

10/3/2018 on Drawing E-502 Building 404 the one line has keyed Note 3 to supply a new VFI Switch but note 3 is not used on the drawing and it refers to the feed of Building 92.

Can this be clarified as to where the new Switch is and we are not overlapping something that is picked up elsewhere?

Note 3 on E-502 Building 404 can be ignored. VFI switches are shown in Site and Phasing Volume 1 drawing ES-501.

10/3/2018 Drawing E-501 Building 96 One line diagram notes that we are to replace the main circuit breaker and busbar for the existing MDP. Do we have manufacturer and model information on this MDP? Will it be made available so we can quote the correct equipment?

The switchboard is a I-Line switch board with serial #A16027707.

10/3/2018 . Drawing E-501 Building 96 One line diagram notes that we are to provide a new Primary service Entrance from Substation 2. I have reviewd the site plans and do not see the location of Substation 2. What is the location of substation 2? Also does substation 2 have an existing breaker for this feed or do we need to supply a new one?

See note 6 on C-101 of Building 96 drawings. Substation 2 has an existing breaker.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

10/4/2018 11 20

What is the arrangement of the of the paint / dust filters in these booths. Is it a full backwall filter plenum with the paint filter in front of a dust filter (in series), or is it a split backwall filter plenum with a portion of the backwall dedicated to paint and another portion dedicated to dust (in parrallel)?

The dust verses paint filter can be done either way with a common prefilter for dust and paint or separate dust and paint in a split back wall.

10/4/2018 11 20

Please clarify dust collector flow rates and static pressure requirements. Specification Table 1 lists: SHT DC = 5,000 CFM @ 2” w.c.; CNC DC = 1,300 CFM @ 2” w.c.; FIBER DC = 2,000 CFM @ 2” w.c.; RUBBER DC = 9,000 CFM @ 3” w.c. However, Dust Collector Schedule lists: SHT DC = 5,000 CFM @ 17” w.c.; CNC DC = 1,630 CFM @ 18.6” w.c.; FIBER DC = 1,950 CFM @ 15.3” w.c.;

RUBBER DC = 6,000 CFM @ 10” w.c.; BLDG.362 DC = 1,000 CFM @ 8.9” w.c.

Use the scheduled total static pressure values

10/4/2018 11 20

Specification Statement: “Equipment shall be capable of being off loaded from the delivery truck by fork lift.”

These units will require a crane for off-loading.

Off loading is the resposibility of the general contractor. General contractor will be required to manage off- loading equipment required with suppliers.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

10/4/2018 11 20

There does not appear to be any mechanism to divert ventilation air from the VLP / Shafts areas away from the make-up air units (AHU-5, AHU-6). Mechanical gates are incorporated to ventilate either thru the blast dust collectors or thru the paint plenums, but air appears to be 100% recirculated at all times. Please confirm.

The intent is to send air from the recirculation fan discharge header, through the air handler return air damper, past the air handler fans, and back into the main air header that feeds the supply diffusers. The ratio of recirculated air to outside air would be controlled by the air handler return air damper and outside air dampers.

10/4/2018 11 30

Specification Statement: “The paint booth shall be packaged with factory installed and tested ceiling sprinkler heads and branch piping to permit a single 4-inch field connection to a wet-pipe main by the building sprinkler contractor.” Pre-plumbing the spray booth sprinkler systems at the factory is not practical. Will be best to be locally engineered / designed and installed.

The general contractor is ultimately responsible to install fire suppression system as specified in accordance with

NFPA 33.

10/4/2018 11 30

Drawing M-103 appears to show one (1) media recovery system to service the two (2) central blast booths.

Assumed to be the steel grit blasting systems. Please confirm one (1) media recovery system.

Yes , the two steel blast booths have one media recovery system.

10/4/2018 11 30

Specification Statement: “ LIGHTING: Ceiling-mounted LED light fixtures, rated for hazardous location, shall be dust-tight enclosures serviceable from outside the booth.” What hazard Class / Division rating is required?

Lighting serviced inside the booth is CLass I Div I explosion proof. Ligjhting serviced from outside the the booth does not have to be explosion proof.

That deterimnation is the booth manufacturer responsibility to meet

NFPA 33.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

10/4/2018 11 30

Specification Statement: “The exterior and interior of all enclosures, and all components, shall be painted or fabricated of materials which are corrosion resistant.” Is G90 galvanized finish acceptable?

G90 is acceptable. 8

10/4/2018 11 30

Specification Statement: “ Blast Curtains - There shall be blast curtains lining the walls of the blast booth.” Please specify height of curtains.

Blast curtain will line the wall to the maximum extent possible.

10/4/2018 11 50

Specification Statement A: “ The ventilation rate will be a nominal 100,800 cfm with 100 percent outside air.” / Specification Statement B: “The paint booth will have PLC controls with three modes of operation, Unoccupied, maintain paint booth above 50°F, Painting Mode 20 percent outside air, Curing mode 5 percent outside air or 6 ACH in curing mode.” Please clarify whether paint booth will be 100% outside air (Paint Mode), or will there be reciculation in Paint Mode?

Temporary Paint booth is 100 percent outside air, no recirculation.

10/4/2018 11 50

Specification Statement: “The paint booth shall be packaged with factory installed and tested ceiling sprinkler heads and branch piping to permit a single 4-inch field connection to a wet-pipe main by the building sprinkler contractor.” Pre-plumbing the spray booth sprinkler systems at the factory is not practical. Will be best to be locally engineered / designed and installed.

The general contractor is ultimately responsible to install fire suppression system as specified in accordance with

NFPA 33.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

10/4/2018

1-15

Two combination sanding / grinding and painting booths - Please confirm that the combination booths are cross flow with air flowing from the 8’ h x 12’ w side down the 32’ length of the booth and exiting at the opposite 12’w x 8’h side

The air will flow from the 8'x32 foot side to the the opposite 8'x32"side.

10/4/2018

1-15

Two combination sanding / grinding and painting booths - Is the 32’ wide door a roll-up door?

See 2.1.2 Parag. 2 Overhead door. 8

10/4/2018

1-15

Two combination sanding / grinding and painting booths - Is dry chemical acceptable for FS?

Dry chemical is acceptable as long as it is designed and installed per NFPA 17 and NFPA 33.

10/4/2018

1-15

Two combination sanding / grinding and painting booths - What are the required climate conditions?

The climate is controlled by AHU-8&9 to less than 50% RH and 72-78F

10/4/2018

283-298

Temporary Paint Booth - The description looks very much like a standard paint booth, do you want this decommissioned in the future? Should that be included in pricing now?

Temporary Paint Booth is to remain for govenment disposition.

10/10/2018 Due to the volume of changes issued in Amendment 6 and magnitude and complexity of this project, we request that the PPI cut-off date be extended to 11/1/18 and the proposal due date be extended to 11/15/18, to allow for the prepration of comprehensive and cost effective proposals.

Please see Amendment 0007. 8

N4008518R87160008
Amendment 0008 PPIs