About this file

N4008518R87160017.pdf

View the file

Other files

File Type Posted
Attachment_F_AMD23.pdf PDF
N4008518R87160023.pdf PDF
N4008518R87160022.pdf PDF
N4008518R87160021.pdf PDF
N4008518R87160020.pdf PDF
N4008518R87160019.pdf PDF
N4008518R87160018.pdf PDF
N4008518R87160016.pdf PDF
P293_RUBBER_COMPOUNDING_area.dwg DWG drawing
Attachment_F.pdf PDF
N4008518R87160015.pdf PDF
N4008518R87160014.pdf PDF
N4008518R87160013.pdf PDF
N4008518R87160012.pdf PDF
N4008518R87160011.pdf PDF
N4008518R87160010.pdf PDF
N4008518R87160009.pdf PDF
N4008518R87160008.pdf PDF
N4008518R87160007.pdf PDF
Site_Visit_Log.pdf PDF
N4008518R87160006.pdf PDF
N4008518R87160005.pdf PDF
JAs_Redacted.pdf PDF
N4008518R87160004.pdf PDF
N4008518R87160003.pdf PDF
Amendment_0002.pdf PDF
SECNAV_5512_DBIDS_Individual.pdf PDF
Amendment_0001.pdf PDF
Local_Visitor_Request_Form.pdf PDF
Attachment_B.pdf PDF
Attachment_C.xls XLS spreadsheet
Attachment_A.docx DOCX document
N4008518R8716.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide Design Revision 3 and to provide responses to PPIs. The proposal due date of 27 November 2018 remains unchanged.

See SF30 Block 14 Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Nov-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R8716

X 9B. DATED (SEE ITEM 11)

31-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Nov-2018

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008518R8716

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0016

CONTINUATION SHEET (Drawing Edits)

NAVFAC Dwg. Nos. 12775821, 12775830, 12775831, 12775832, 12775833, 12775834, 12776064, 12776149, 12776211, 12776215, 12776727, 12776784, 12776729 are revised as of November 8, 2018. These revised drawings accompany this amendment.

Volume 2 – Site and Phasing:

On NAVFAC Dwg. No. 12775821 (ES-505) Clarified cabling diagrams.

On NAVFAC Dwg. No. 12775830 (ES-608) Clarified conduit table.

On NAVFAC Dwg. No. 12775831 (ES-609) Clarified conduit table.

On NAVFAC Dwg. No. 12775832 (ES-610) Clarified conduit table.

On NAVFAC Dwg. No. 12775833 (ES-611) Clarified conduit table.

On NAVFAC Dwg. No. 12775834 (ES-612) Clarified conduit table.

On NAVFAC Dwg. No. 12775835 (ES-613) Clarified conduit table.

Volume 3 – Paint, Blast, and Rubber Facility:

On NAVFAC Dwg. No. 12776064 (A-001) Clarified building envelope testing (note 16).

On NAVFAC Dwg. No. 12776149 (A-601) Door schedule clarifications.

On NAVFAC Dwg. No. 12776211 (M-706) RF control clarifications.

On NAVFAC Dwg. No. 12776215 (M-710) RF control clarifications.

Volume 8 – Demolition:

On NAVFAC Dwg. No. 12776727 (SD-111) Clarified final state slab condition.

On NAVFAC Dwg. No. 12776784 (SD-161) Clarified final state slab condition, and trench cover.

On NAVFAC Dwg. No. 12776729 (SD-311) Clarified final state slab condition.

SECTION 11 30 04

1.1 Scope Summary

First paragraph, second sentence edited to deleted: “511” and replaced with “704 and M708”. Sentence now reads:

“The Abrasive Media Recovery process and sequence is provided on Building 404 Drawing M-704 and M708.”

SECTION 11 50 02 TEMPORARY ABRASIVE BLAST BOOTHS

2.2 EQUIPMENT

The third line of text for Tag #189 has been edited, deleting “2” and “overhead”. Tag #189 now reads:

“Tag #189 Steel Grit Blast Booth, 25'x35'x20' with a 10' half wide hinged half doors and two (2) 3' personnel doors on opposite sides.”

The fourth line of text for Tag #190 has been edited, deleting “2” and “overhead”. Tag #190 now reads:

“Tag #190 Aluminum Oxide Blast Booth, 25'x35'x20' with a 00' half wide hinged half door and two (2) 3' personnel doors on opposite sides.”

SECTION 31 23 00.00 22 EXCAVATION AND FILL (PWD ME)

1.1 REFERENCES

Updated U.S. Army Corps of Engineers (USACE) reference EM 385-1-1 from 2008 version to “(2014; Errata 1- 2010; Changes 1-3 2010; Changes 4-6 2011; Change 7 2012) Safety and Health Requirements Manual”

Updated STATE OF MAINE (SHS)reference SHS MEDOT from 2002 version to 2014

1.2.1 Changed Subpart title, deleting “Underdrain Backfill,” new subpart title is “Capillary Barrier”

1.3 SUBMITTALS

Deleted first paragraph: “Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:”

Replaced with “Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES for Design-Bid-Build projects:”

SD-01 Preconstruction Submittals Added “,AE” to “Dewatering work plan; G” Added “Excavation and Trenching Plan; G” Added to “Excess Soil Disposal”: “& Soil Sampling” Added “Archeologists Qualifications; G”

SD-06 Test Reports Added “, AE” to “Pervious Granular Fill test” Changed “Borrow Site Testing; G” to be “Borrow Materials; G, AE” Added “, AE” to “Fill and backfill test; G” Added “, AE” to “Select material test; G” Added “, AE” to “Density tests; G” Added “Moisture Content Tests; G, AE”

1.5 CRITERIA FOR BIDDING

Before paragraph C. deleted “[“

In paragraph d. Deleted “and” and changed to read “Removal of soils, rock, and hard materials”

In paragraph e. added in first sentence after “include hoe ramming”: “or other including rock breakers, expansion jacks, feather wedges, or other similar methods.”

In paragraph f. added in the first sentence after “Excavation, handling and disposal requirements for excavated”:

“hazardous and”. After first sentence added:

“. For purposes of bidding and soil handling, two (2) soil zones have been designated on this site as indicated on the design drawings. The two soil zones are defined as follows;

1. Zone 1: Zone 1 demarcates an area that is assumed to contain hazardous soils. work conducted within Zone 1 shall comply with all requirements specified in EM 385-1-1 and OSHA, with special attention given to 29 CFR Parts 1910 and 1926. These requirements include implementation of a Health and Safety Plan (HASP) and Hazardous Waste Operations and Emergency Response (HAZWOPER) site control. See specification Section 01 35 29.13 for Health, Safety & Emergency Response Procedure & requirements.

There shall be no reuse of soils excavated from Zone 1 for this project. The Contractor shall be responsible for all costs associated with the excavation, onsite handling, and loading of all soils within Zone 1, however, the Contractor shall not be responsible for the costs of transport and disposal. Transport and disposal costs shall be the responsibility of the Government. Soils excavated in Zone 1 shall be stockpiled within the limits of the Zone 1 Boundary as shown on the plans.

2. Zone 2: Zone 2 demarcates an area that is assumed to contain non-hazardous soils. Work conducted within Zone 2 shall comply with all applicable EM 385-1-1 and OSHA requirements.”

In paragraph g. deleted “backfill” and added “placement.” After material to end first sentence.

Deleted paragraphs j. and k.:

“j. All excess soils shall be transported directly to Building 357 for Government disposal of the soils. Under no circumstances shall any

k. For purpose of bidding, assume the soils within the limits of work”

Added paragraph j. “The Contractor shall sample, test, load, transport and dispose of excess non-hazardous soils (unsuitable for reuse as backfill material) excavated from the site at a pre-approved licensed disposal facility in accordance with the requirements specified in paragraph entitled "Excavated Materials Unsuitable for Backfill."

Added new subpart: “1.7.5 Archaeological Monitoring”:

“Provide archeological monitoring by a qualified archeologist for excavation. If significant archeological resources, including human remains, are encountered, stop work within the surrounding area immediately. Do not proceed until direction is provided by the COR. Qualified archeologist shall be an historic archeologist meeting the Secretary of the Interior's professional guidelines for archeologist's and shall be included in the State of Maine level II list of approved historic archeologists. Submit archeologist’s qualifications.”

Added new subpart “1.7.6 Special Inspection”:

“Perform special inspections and testing in accordance with Section 01 45 35 SPECIAL INSPECTIONS.”

Added a new subpart: “2.1.1.1 On-site Soils Suitable for Reuse” “Existing fill classified by ASTM D 2488 as SP, SP-SM, GP, GP-GM, or GM and meeting recommended compaction criteria may remain in place. Similarly, excavated fill with the same classifications may be re-used on-site as compacted fill below ground floor slabs or paved areas, but not as base or subbase materials.”

Deleted Subpart “2.1.3 Cohesionless and Cohesive Materials”:

“Cohesionless materials include materials classified in ASTM D 2487 as GW, GP, SW, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH. Materials classified as GM, GP-GM, GW-GM, SW- SM, SP-SM, and SM shall be identified as cohesionless only when the fines are nonplastic (plasticity index equals zero). Materials classified as GM and SM will be identified as cohesive only when the fines have a plasticity index greater than zero.”

Added a new subpart: “2.1.3 Backfill and Fill Material”: Select Material shall meet the SHS MEDOT, Section

703.19 Granular Borrow (Embankment Construction) specification.

Deleted subpart “2.1.4 NOT USED” and subpart “2.1.4 Backfill and Fill Material”: “ASTM D 2487, classification GW, GP, GM, SW, SP, SM, with a maximum ASTM D 4318 liquid limit of 35, maximum ASTM D 4318 plasticity index of 12, and a maximum of 25 percent by weight passing ASTM D 1140, No. 200 sieve or meet the SHS MEDOT, Section 703.19 Granular Borrow (Embankment

Construction)specification.”

Added a new subpart “2.3 STRUCTURAL FILL”:

“Structural fill shall be a clean, well-graded, low to non-frost susceptible, and free-draining sand and gravel mixture meeting the following gradation requirements:

Screen Number or Sieve Size Percent Passing

6 inches 100

3 inches 70-100

Number 4 35 to 70

Number 40 5 to 35

Number 200 0 to 5

Added new subpart “2.3.1 Crushed Stone”:

“Crushed stone may be used as backfill in confined areas or below foundations as a substitute for structural fill.

Crushed stone shall meet the material and gradation requirements of the State of Maine DOT Standard Specifications, Section 703.22 Underdrain Stone Type C.”

The addition of the new subparts changed the numbering to the following:

2.4 GRAVEL

2.5 BORROW

2.6 BURIED WARNING AND IDENTIFICATION TAPE

2.6.1 Warning Tape for Metallic Piping

2.6.2 Detectable Warning Tape for Non-Metallic Piping

2.7 DETECTION WIRE FOR NON-METALLIC PIPING

2.8 FILTER FABRIC

3.1.2.2 Dewatering

In section b., 3rd paragraph, added a space before the second sentence: “The Geotechnical Engineer…”

In section c., Added a space before 3rd sentence: “Control measures shall…”

In section e., added a space before 3rd sentence: “The size and number…”

In third paragraph of section e., added space before second sentence starting with “Under” and also space added before third sentence starting with “All groundwater”

In fifth paragraph of section e., Capitalized “Under”, which is the start of the last sentence of that section.

In section f., added a space before the second, third, and fourth sentences.

3.2.1 General

In second paragraph, added a space before the second sentence, and before the third sentence. Edited end of third sentence deleting “unsatisfactory” before material, and added after material “that are unsuitable”. In fourth sentence deleted the beginning of the sentence “Unsatisfactory m”, and capitalized “Material” then added following it “s that are unsuitable”. Added a space before the fifth sentence, and deleted “structural fill” adding in “granular borrow”.

Added a space before sentence beginning “Determination of elevations…” Deleted the last sentence of this subpart:

“No extra payment will be made for removal of unsuitable soils and replacement with satisfactory material or select fills as may be directed by the Contracting Officer.”

3.2.4 Excavated Materials

Added a space before the second sentence.

3.3 CONTROL OF EXCAVATIONS AND EXCAVATED MATERIALS

Added a space before sentence beginning “all excavation activities…” and added a space before sentence beginning “Excavated materials and space added before the rest of the sentences in this paragraph.

3.3.2 Hazardous Excavated Materials

Added the following text after first sentence of subpart:

“Truck availability and access will be impacted by security requirements for entering the Shipyard and gaining access into the CIA. Trucks and roll-off containers will need to visit B-357 (HWSF) for inspection and weighing prior to leaving the Shipyard. Coordinate with Contracting Officer a minimum of 7 days in advance of planned excavations in the IR Zone to schedule roll-off containers or trucks.”

3.3.4 Excavated Materials from Zone 2 Unsuitable for Backfill In the first paragraph, added a space before the second sentence.

In the sixth paragraph, added a space before second and third sentences. In the seventh paragraph, added spaces before the third, fourth, and fifth sentences.

Deleted the last paragraph of subpart:

“All excess soils shall be transported directly to Building 357 for Government disposal of the soils. Under no circumstances shall any excavated soils leave the Shipyard.”

Subpart 3.6 FILLING AND BACKFILLING numbering was changed to 3.5

Subpart 3.6.2 Backfill and Fill Material Placement numbering was changed to be 3.5.1 In first sentence deleted “structural fill” and added in “granular borrow”. Added in a new third sentence: “In confined areas or within 4 feet of foundation walls place fill in lifts not exceeding 4 inches.”

Added a new subpart: 3.5.2 Structural Fill Placement:

“Compacted structural fill shall be placed within 3 feet of footings, piers, and foundations, and as fill below foundations and new ground floor slabs. Place in 6 inch lifts. Do not place over wet or frozen areas. Backfill adjacent to structures shall be placed as structural elements are completed and accepted. Place and compact material to avoid loading upon or against adjacent structures.”

Subpart 3.6.3 Structural Fill Placement, edited to be “3.5.3 Granular Borrow Placement” Deleted “not pile supported” in the first sentence.

Subpart 3.6.4 Backfill and Fill Material Placement Over Pipes and at Walls, numbering changed to be 3.5.4

Subpart 3.6.6 Trench Backfilling, numbering changed to be 3.5.5

Subpart 3.7 BORROW numbering changed to be 3.6

Subpart 3.8 BURIED WARNING AND IDENTIFICATION TAPE numbering changed to be 3.7

Subpart 3.9 BURIED DETECTION WIRE numbering changed to be 3.8

Subpart 3.10 COMPACTION numbering changed to be 3.9

Subpart 3.10.1 General Site numbering changed to be 3.9.1

Subpart 3.10.2 Utility Trenches numbering changed to be 3.9.2

Subpart 3.10.3 Adjacent Area numbering changed to be 3.9.3

Subpart 3.10.4 Paved Areas numbering changed to be 3.9.4

Subpart 3.15 FINISH OPERATIONS numbering changed to be 3.10

Subpart 3.15.1 Grading, numbering changed to be 3.10.1

Subpart 3.15.2 Topsoil and Seed changed to be 3.10.2

Subpart 3.15.3 Protection of Surfaces numbering changed to be 3.10.3

Subpart 3.16 FIELD QUALITY CONTROL numbering changed to be 3.11

Subpart 3.16.1 Sampling, numbering changed to be 3.11.1

Subpart 3.16.2 Testing, numbering changed to be 3.11.2

Subpart 3.16.2.1 Fill and Backfill Material Testing numbering changed to be 3.11.2.1

Subpart 3.16.2.2 Select Material Testing numbering changed to be 3.11.2.2

Subpart 3.16.2.3 Pervious Granular Fill Testing, numbering changed to be 3.11.2.3

Subpart 3.16.2.4 Density Tests numbering changed to be 3.11.2.4

(End of Summary of Changes)

SOLICITATION NO. N40085‐18‐R‐8716

PROJECT TITLE/LOCATION: P293 Paint, Blast and Rubber Consolidation Facility PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

24 9/25/2018 Under unit pricing on bid form, there’s a line item for pipe insulation. Due to various pipe sizes and insulation requirements dependent on each system, please advise as to a pipe size and system to properly base a LF unit price.

The bid form is requesting unit cost as basis of unit pricing for potential/additional removals.

Provided LF cost for 4" pipe insulation remediation. Bidder may qualify basis for type of insulation priced.

275 10/19/2018 Per B404b drawing number 12776203 page M‐602, and spec section 23 00 00, page 26: specification calls for copper fins on coils, with electrofin coating. This construction in addition to the coil coating is redundant. Would aluminum fin coils with electrofin coating for corrosion protection meet the intent of the specification?

Aluminum fin coils with electrofin coating would meet the intent of the specification for the energy recovery ventilation unit.

282 10/19/2018

AD‐151

Demolition Keyed Note 1 on Drawing AD‐151 indicates that the B74A slab and foundation are to be removed and points to the Site and Phasing Drawing Package for details. Please identify the slab and foundation detail drawing.

Slab and foundation of B74A slab are to be demolished. Assume 12" thick slab on grade, plus 12" haunch at perimeter.

287 10/19/2018

GC‐102

Mechanical Utility Phasing Note M1 on Drawing GC‐102 calls for the continuation of Phase 2A utilities terminated south of B74 to continue to B362. This route is shown to run through the temporary mechanical enclosure west of B74, to be installed prior to the B74 West Wing demolition. It is our understanding that the temporary mechanical enclosure will remain in use until after Shop 06 vacates B74 which will not be until Phase 6. Please advise if this routing is to be revised to allow for installation of these utilities while the temporary mechanical enclosure is in place.

Routing will not be revised;

construction of mechanical utilities under the temporary mechanical enclosure will need to to be installed prior to temporary mechanical enclosure slab installation. Contractor to provide temporary caps as needed beyond footprint of slab.

REFERENCE

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Posted on Amend No.

July 2011

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

290 10/19/2018

Vol. 4 M‐

Drawing M‐109 shows duct work tagged SL‐1 & SL‐2, this equipment can not be found in any of the schedules provided. Please identify and add to the mechanical equipment schedule.

Added Silencer Schedule to M‐603 17

292 10/19/2018 If Item 0024, Option, Temporary CIA Fence, is exercised, will commercial vehicles traveling to the B285/B404 area thereby removed from the CIA be exempted from CVIS inspection?

If temporary CIA fence option is exercised, Contractor vehicles will be inspected at Main Gate(s);

access into CIA via the Commercial Vehicle Inspection Station (CVIS) at Building 386 will not be required to gain access to construction area around B.404 and B.285 (as this will not be in CIA with temporary CIA fence configuration). If temporary CIA fence option is not exercised and/or when permanent CIA fence is operational, Contractor vehicles will require inspection at Main Gate(s) as well as at Commercial Vehicle Inspection Station (CVIS) for access into CIA.

295 10/19/2018

Vol. 5 pg 11

Detail C1, Please confirm steel guardrail shown should actually be steel guiderail and shall be installed through segmental block retaining blocks via core & grout posts as shown on detail B1 on S‐501 (pg 30 of 163)

Steel guardrail shown through segmental block retaining wall per detail C1 on dwg C‐502 and Keyed note 17 on dwg C‐101 is correct.

Detail B1 on dwg S‐501 is related to fall protection railings.

298 10/19/2018 Vol. 8 pg 99 (C‐ 161)

Please provide trench and trench cover detail for mechanical utility connections to Learning Center per note 3.

A trench cover detail is added to SD‐

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

301 10/19/2018 Please clarify the scope of B151 slab and foundation demolition. CD‐111 and C‐111 seem to indicate that all of the slab remains in place, except for the steam/condensate and electrical utilities that impact it.

AD‐111, AD‐311, SD‐111 and SD‐311 seem to call for slab and foundation removals.

Refer to drawings SD-111 and SD- 311 for clarification of final state of slab.

303 10/19/2018

Vol. 3 A‐515

Drawing A‐515 classsifies the "Tactical Acoustical Panels" to be under bid option: CLIN 0011 Option Item NO. 10. However the bid form shows bid option: CLIN 0011 as "Building 149 Demolition", and then lists the acoustical panels as a unit price item. Please clarify.

Drawings reference spec section 00 22

13.00 20; on page 19, this is CLIN 0024‐ A and CLIN 0024‐B. Refer to solictionation document "N4008518R8716N4008518R8716.pdf ", "Section 00 10 00 ‐ Solicitation" for clarifications to spec section 00 22

13.00 20.

304 10/19/2018 The Solicitation, Offer, and Award, Section 11 identifies the contract duration as 1700 days from award. Factor 2 (i) identifies the contract duration as 1700 calendar days and identifies an anticipated award date of 12/31/18. This would result in a CCD of 8/27/23. The phasing schedule provided in Additional Information (c) on page 31 of 67 of the Solicitation identifies an 8/2/23 start for Phase 7 with a 117 day duration. This would result in Phase 7 completion by 11/27/23. Please confirm the correct contract duration and phasing schedule.

See question 6, posted on Amendment 0015

316 10/19/2018 Spec section 09 84 20 Acoustic Wall Panels is included but nothing is listed on the interior finish schedule.

Please advise.

Refer to Volume 6, drawing A‐402;

this drawing indicates "WP‐full height on the wall", with Note 12 "direct mounted acoustical curtain". These curtains in Building 74 are direct mounted as indicated.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

317 10/19/2018 CLIN 001 Option Item No 10 listed on VOL#3 A‐515 is incorrect. The Building Sound Attenuation optoin on the bid form reads CLIN 0017 ‐ Option 7, BLD 404 Sound Attenuation Allowance.

Drawings reference spec section 00 22

13.00 20; on page 19, this is CLIN 0024‐ A and CLIN 0024‐B. Refer to solictionation document "N4008518R8716N4008518R8716.pdf ", "Section 00 10 00 ‐ Solicitation" for clarifications to spec section 00 22

13.00 20.

347 10/26/2018 Plan set volume 8, sheet CD‐101, note 13 references detail A5 on sheet C‐503. This detail is not provided on sheet C‐503 of this volume. Please provide detail A5 or tell us on which sheet we can find the detail for the monitoring well concrete vaults.

The detail has been added to sheet C‐ 503 per the 10/30/18 changes.

356 10/26/2018 Reference Volume 4, Building 55, Sheet A‐001: General Note 10 states to paint all exposed new and existing pipes, conduits, ductwork, structures, etc. unless otherwise noted. The documents do not provide a basis to quantify the work. Please provide additional information.

This note no longer applies as there is minimal to no new/existing exposed piping that requires paint.

357 10/26/2018 Reference Volume 4, Building 55: Other than the painting of pipes, conduits, ductwork, structures, etc., the documents do not address any painting or other finishes of walls, floors, ceilings, doors, and other surfaces. Is it correct to assume the building does not receive new finishes?

Correct, the building does not receive new finishes, unless needed to do so to repair/refinish existing materials damaged or disturbed during any work occuring within the building.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

359 10/26/2018 The finish schedule for BLD 404 calls for window treatments in room 101, 103, 104, 134, 135, 206, 244 & stair 205. Is the intent to have window treatments full height at the transluscent panels?

Rooms 101,103,104,134,135, & Stair 205 will not receive window treatments. Finish schedule will be updated. Window treatments in Office 206 & 244 will be floor to ceiling.

360 10/26/2018 The finish schedule for BLD 404 calls for window treatments in Stair 216 & roof access 217 but no windows exist in that area. Please clarify

Stair 216 and 217 do not require window treatments. Finish schedule will updated

394 10/29/2018

11.30.0

1.1

"Blast booths will have dust collectors on the outside of Building 404" and on page 12 7a, it states "No outside area is available for equipment" Does the Dust Collector go outside?

Specification has been modified to have dust collectors outside building 404.

395 10/29/2018 11.30.0

Amend 8

Amendment 8 indicates Drawing M‐103 Shares Media Recovery System with two booths. Is this correct?

Yes, the steel blast booths share a recovery system.

396 10/29/2018 11.30.0

Amend 8

Drawing M‐103 shows 3 booths, Matchline sheet M‐102 shows another complete separate booth with reclaim.

Will there be 4 complete reclaim systems?

The two steel blast booth share a recovery system. the plastic bead and aluminum oxide booths have independent reclaim systems.

397 10/29/2018 11.30.0

Amend 9

"Explosion hazards…." Blast booth dust analysis kst values were NOT explosive. This is for each specific booth application, steel, Alox, and plastic?

Yes. 17

398 10/29/2018

11.30.0

7D

Return air to general space. Dust collector is outside building 404, air is to be returned back to building via a Merv 17 HEPA filter?

Yes. 17

399 10/29/2018 11.30.0

Elevator to be vented to reclaim dust collector? Refer to B‐404, M‐704 & M‐708, Elevator should be vented to DC‐16 &

DC‐18.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

400 10/29/2018 11.30.0

Vacuum to discharge media to either grit bin or waste dumpster that is controlled by whom and where?

Refer to Parag. 2.3 Controls. Vacuum discharge is controled by the PLC HMI panels located on EP‐101.

401 10/29/2018 11.30.0

Air wash fines are discharged to where? Refer to B‐404, M‐704 & M‐708, Elevator should be vented to DC‐16 &

DC‐18.

402 10/29/2018 11.30.0

Rotary screen trash is discharged to where? Refer to B‐404, M‐704 & M‐708, Elevator should be vented to DC‐16 &

DC‐18.

403 10/29/2018 11.30.0

What is the size (cubic) of the grit bin? See 2.1.1.1 Design Performance Table, Grit Bin and Grit Hopper are +192 Cubic Feet.

404 10/29/2018 11.30.0

What is the size (cubic) of the waste dumpster? Waste Bin is based on WasteQuip C1127 15. 5 cubic yard.

405 10/29/2018 11.30.0

What is the size of the grit hopper? See 2.1.1.1 Design Performance Table, Grit Bin and Grit Hopper are +192 Cubic Feet.

406 10/29/2018 11.30.0

Should the grit hopper have an extra discharge outlet with manual slide gate to facilitate abrasive evacuation without going to the blast pot?

See M‐704 and M‐708 for process arrangement.

407 10/29/2018 11.30.0

How is the waste dumpster emptied? Waste Bin is based on WasteQuip C1127 15. 5 cubic yard and will be hauled by PNS.

409 10/29/2018 11.30.0

Hour meter to be added where and to read what? See 2.1.1.2 h. Electrical disconnect Panel for V‐1 V‐1 and reads hours when vacuums are running.

410 10/29/2018 11.30.0

Where is drawing M‐511 and M‐404 for Building 404? M‐511 should be replaced with M‐704 and M‐708

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

411 10/29/2018

11.50.0

2B

Cart doors "double hinged steel…" 24' Wide x 20" High.

Page 11 2.2 Tag 189 and 190 20" Wide overhead door.

Is the requirement for an overhead door? If so, manufacturer recommendation as it is a leased unit?

The blast booth door are half width hindged doors per 2.1.1, 2B. Spec corrected to remove overhead reference.

412 10/29/2018 11.50.0

Drawing M‐100 shows cross screw at the rear of the booth. Is there a reason it can not be located in the center of the booth? (16' feed screws vs. 35' feed screws will eliminate hanger bearing high maintenance items)

No. Manufacturer can optimize design.

413 10/29/2018 11.50.0

Shaft and VLP reclaim systems have dust collectors dedicated and in addition to main area dust collector. Is there a reason the temporary and permanent blast booths don't have dedicated reclaim dust collectors?

The Blastbooths can have reclaim dust collectors or use the main dust collector, it is up to the manufacturer to optimize their design.

414 10/29/2018 11.30.0

Drawing M‐601: RF1 RF2 RF3 ‐ are one of the fans a redundant backup for th VLP 90,000 cfm dust collector?

Similar question for RF 4 RF 5 RF 6 for the shaft collector?

For fans RF‐1, RF‐2, and RF‐3, all three fans operate at the same time, on individual VF drives. Per the sequence on drawing M‐706, if one fan fails, the damper for that fan closes, and the other fans increase speed to satisfy the air flow requirement. The fans are sized so that two fans can provide the full air flow and pressure required.

Three fans operate when possible, for reduced electrical energy consumption. The same is true for fans RF‐4, RF‐5, and RF‐6.

415 10/29/2018 11.30.0

Drawing M‐704: Control panel for VLP shall be located where?

Drawing M‐101 shows an HMI panel in the corridor, with keyed note 11.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

416 10/29/2018 11.30.0

Drawing M‐708: Control panel for Shaft shall be located where?

Drawing M‐101 shows an HMI panel in the corridor, with keyed note 11.

417 10/29/2018 11.30.0

General

Control panels for both Shaft and VLP shall be NEMA 12 stainless steel explosion proof?

Correct, for panels located within hazardous areas as shown on drawings E‐101 through E‐103.

418 10/29/2018 11.30.0

General

Disconnect to blast control panels to be explosion proof?

A panel is required to be explosion proof if it is in a hazardous area as shown on E‐101 thru E‐103

419 10/29/2018 11.30.0

General

All motor starters for Blast to be located in a remote MCC ‐ motor control center?

No, a MCC is not planned. Motor starters to be installed local to equipment or equipment disconnects.

420 10/29/2018 11.30.0

General

Blast operations to have a physical disconnect vs. blast enable/disable?

Per drawings M‐704 and M‐708, the blast pot is enabled by an automated valve that admits compressed air to the blast pot. This is not a substitute for proper lock‐out tag‐out procedures, that would require a lockable ball valve.

421 10/29/2018 11.30.0

General

Dampener closed for blast must have a mechanical validation before 'paint enabled' is activated?

Yes. For Very Large Parts, drawing M‐ 706, Paint Mode, item 2, "Following dampers shall be proven closed: ID‐ 520, ID‐521." On drawing M‐705, these dampers are shown to serve the blast return air plenums. Shafts has a similar arrangement.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

422 10/29/2018 11.30.0

General

10 cube blast pots to be provided as a redundant back up, installed and plumbed for both Shaft and VLP operations?

No, the blast pot for VLP are separate from Very Large Parts.

423 10/29/2018 11.30.0

General

Vacuum to be provided as a redundant back up, installed and pped for both Shaft and VLP operations?

No, the vacuum for VLP are separate from Very Large Parts.

424 10/29/2018 11.30.0

General

HDMI panel wit NAVFAC reporting points to be separate but integrated into blast ccontrol system?

Yes. 17

425 10/29/2018 11.30.0

General

Blast control panel can not be remotely activated or operated. ONLY floor operations shall be allowed, to ensure strict enable and disable safeguads are not compromised when operating a combined blast/paint operation.

PNS Question. Suggested answer: HMI Control panels are located per the customer. If additional controls are needed, such as a "Kill Press Button", it should be provided to meet code.

426 10/29/2018 11.30.0

General

None of the blast booth dust collectors have explosve dust mitigation requirements?

Correct. Testing was conducted per ASTM E1226, on 7/3/2017.

427 10/31/2018 11.50.0

2.1

System Description Table 1: "must fit within a 40' W x 115'L x 24'…" Booth is 20' H, with elevated reclaim floor (approx. 3'6"H) plus amendment 11 handrails (42" around top of booth approx. Can we change dimensions of the area to be 27' H?

Yes the height can be higher however the bridge crane must allowed to pass, the cab elevation is +29 feet above concrete floor.

428 10/31/2018 11.50.0

2.1.1

Design Requirements Blast Booth: "skin cover with panels 11 gauge.." Can we allow booth manufacturer to provide a cover and sound attenuation solution without specifying 11 gauge?

Yes. 17

429 10/31/2018 11.50.0

2.4.1

Blast Pots: :Blast continuously for not less than 6 hours" Hopper size impacts the elevator height. This is a full floor reclaim continuous blast pot system. Can booth manufacturer define the abrasive hopper size?

Yes. 17

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

430 10/31/2018 Is there a specific material required for the rubber curtains? i.e. gum rubber, Neoprene, EPDM ?

Per SECTION 11 30 02, Page 9, rubber matting to withstand abrasive blast ricochet that meets a flame spread of less than 25 and smoke developed less than 450 (Class A interior finish) per ASTM E84.

431 10/31/2018 11 30

Is there an area allocated for the air compression system required to operate the Glove Blaster? What are the dimensions and how far away?

The air is provided from yard compressed air piped thoughout the building 404, see Plumbing drawings.

432 10/31/2018 11 30

Is there an area allocated for the air compression system required to operate the four (4) Blast Booths?

What are the dimensions and how far away?

The air is provided from yard compressed air piped thoughout the building 404, see Plumbing drawings.

433 10/31/2018 11 30

It is ambiguous as to where the Dust Collectors for the Blast Booths will be placed… indoors or outdoors?

What are the dimensions and how far away?

Dust Collectors are outside for Building 404.

434 10/31/2018 11 30

The SOW states that the dust collection is to be placed within the foot print shown for the blast booths on Q‐

101. There are no blast booths on Q‐101, they are on Q‐ 103 and do not allow for dust collectors for each booth on the interior of the building. Please advise.

Dust Collectors are outside for Building 404.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

435 10/31/2018 RE DWG M709: M709 Shafts Area operating schematic shows a 3rd fan capable of an additional 100,500cfm over the requirement for the space. Is there anything in the control scheme that prevents the dust collectors and ducting system from being run over the specified air volumes? VLP operating scheme is the same.

Under normal circumstances, all three fans run at the same rotational speed to provide the required air flow rate, based on feedback from the air flow sensors. This will require programming the sequence of operations as written, into the control system. If one fan fails, its damper closes and the remaining two fans operate at higher speed to provide the required flow rate. This is the same control scheme as the air handlers, which have extra fan capacity and backdraft dampers in case one fan fails. The control sytem shall be programmed to not allow manual fan speed settings.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

436 10/31/2018 RE SPECIFICATION 11 50 02 PARAGRAPH D: This paragraph describes the "clean air side" dust collector particulate monitor as: The duct between the dust collector clean side and HEPA filter inlet shall have a particle detector.

The Air Particle Monitor (APM) is an infrared optical monitor. This appears in other sections of the spec as well. M302 keyed note 2 States dust detectors are to be Auburn Systems, or equivelant. Auburn Systems produces a Tribo Electric technology as stated in 23 09 13, not IR Optical. Please confirm that Auburn Systems is acceptable and provide a series number if possible.

Auburn systems is acceptable.

TRIBO.dsp‐U3600‐QAL1 for single‐ channel applications, TRIBO.dsp‐ U3800 for multi‐channel applications.

Both could be connected to the building management system.

TRIBO.dsp‐U3200 Integral also meets the specification, with no display, and only analog and relay outputs.

437 10/31/2018 RE SPECIFICATION 11 20 063 PARAGRAPH F: States NEMA 4 Outdoor Motor Controller. Please verify where motor Controller(s)/ Panel will reside. If inside, please verify that NEMA12 is acceptable

Motor controllers should be located interior near equipment being served.

NEMA 12 is acceptable inside.

438 10/31/2018 RE SPECIFICATION 11 20 06 PARAGRAPH C: These Collectors are too large to be off‐loaded by a fork lift.

Please verify that this is understood.

The General Contractor will be responsible for off loading shipments of all equipment.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

439 10/31/2018 RE DWG M601: Column labeled "filtration MERV" on dust collector schedule states MERV 17 for 11 entries and HEPA for the remainder. MERV15 & 14 are stated and numerous places throughout the specifications.

Please confirm that MERV 15 is acceptable for the primary/cartridge filters on the project. Also, please confirm if MERV15 is the minimum requirement for primary/cartridge filters

The Dust Collector Schedule on drawing M‐601 lists the final filtration requirement for the dust collector. If the dust collector has two stages of filtration, MERV‐15 is acceptable for the first stage. If the dust collector does not have a second stage of filtration, such as DC‐8 through 11, the dust collector will need to meet the MERV rating as scheduled.

440 10/31/2018 RE DWG M601: DC 1 thru 4, blast booth dust collectors state an air to media ratio of 1.8:1. This will result in a selction of a much larger dust collector than necessary for this application based on currently available technology. Can this AMR be deviated from?

PNS Action, Suggested Response:

AMR may be greater than 1.8 but must meet requirements of 11 30 02.

441 10/31/2018 RE DWG M601: DC 5 is stated to be 5,000 cfm @ 17" w.g. with a 25hp belt drive fan. Can this be a machine mount, direct drive fan, so long as the volume and static requirements are met?

YES. 17

442 10/31/2018 RE DWG M601: DC5 is listed as a model DFO2‐8. The DFO & DFE filters are not interchangeable. Can a DFE model be selected for this application to resolve this specification conflict? Also, air to media ratio for this selection is incorrect based on model and total filter area. An AMR of 6.6:1 would likeley be problematic in this application

Yes a DFE model can be use as a basis of design.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

443 10/31/2018 RE DWG M601: DC6 is stated to be a model DFO3‐3 rated for 1,630cfm@ 18.6" w.g. with a 10hp Belt drive fan. This would be an unusual/non‐conventional fan selection for this collector. This rating is also stretching the limits of this collector. Can an alternate selection of a DFE2‐4 be made to better fit the application? It would also comply with the filter interchangeability requirement. The stated air to media ratio on this entry is erroneous also.

Yes a DFE model can be use as a basis of design.

444 10/31/2018 RE DWG M601: DC 7 ‐ Parameters are slightly different than the previous question on DC6, but the very same questions exist as in prior entry.

Yes a DFE model can be use as a basis of design.

445 10/31/2018 RE DWG M601: DC12 is stated to be a model DFE2‐ 8,rated for 6,000cfm @10" w.g. serviced by belt drive fan EF ‐ 13. The volume rating of 6,000cfm in typical rubber compunding operations would be pushing the limits of this collector. A 12 cartridge collector would be a more appropriate selection if filter life is a concern.

Air to media on this entry is erroneous also.

A 12 cartridge DFE can be used as a design basis.

446 10/31/2018 RE DWG M708: Schematic shows DC18 paired with fan EF19. Fan schedule staes this fan to be rated at a TSP of .5"w.g. . This does not seem correct. Assuming that the 5" TSP listed on the DC schedule, is it okay to provide an alternate fan selection that will work?

Yes, the Fan Schedule will be corrected.

447 10/31/2018 RE DWG M704: Same question as prior entry, but with DC16 & fan EF18

Yes, the Fan Schedule will be corrected.

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

449 10/31/2018 Will the contractor or the owner be responsible for

Unitil’s installation crew and material costs associated with the new natural gas line?

Unitil's scope of work will be the Contractor’s responsibility.

451 10/31/2018 Reference Volume 3, Sheets A‐001 and A‐004: General Note 16 on Sheet A‐001 references a 0.2" water column vacuum load whereas Note 3 on A‐004 references 0.03". Please clarify.

Note 16 on Sheet A‐001 is amended to refer to Note 3 on page A‐004

452 10/31/2018 Reference Volume 3, Details B4 & D4/A‐413 and Detail D2/A‐507: We are unable to locate a manufacturer to provide horizontal panels with the 5/8" faux joint in the panels as shown on the details. We propose to offer the panels in shorter lengths with full joints as detailed in D1/A‐507. The location of the joints would not change. Please confirm this is acceptable.

The design presented can be acheived with the Centria Formawall Graphix Series with Type Y Faux reveals.

Vendor should state exceptions they are taking to the specification and state their scope of supply.

453 10/31/2018 On the ES drawings there are several mentions of Manhole AC‐6A. it is also listed on drawing ES‐602. I cannot locate it on the Site Drawing of Civil drawings.

Can a sketch be issued showing the location of Manhole

AC‐6A?

Manhole AC‐6A is located inside of BLDG 234. Just to the South of AC‐ 331.

454 10/31/2018 On Drawing ES‐504A Conductor Pathway diagram shows ckt LC4‐25 for Building 74. It shows two paths with Cable Schedule Symbol #3. On the cable schedule there are (2) #3 listings, one is for 3‐ 500KCML and 1/0 GND and the other for 2 sets of 6‐250KCML and 1/0 ground, which #3 on the cable schedule is to be used?

(3) 500KCMIL and #1/0 GND is the correct #3. The other #3 should be #4 and should be used for the circuit for B.362. See corrected sheet ES‐505 in revision #1 dated 11/8/18

PNSY, Kittery, ME

PREAWARD INQUIRY FORM (TEMPLATE)

Page Section Para.

Question No. QUESTION GOVERNMENT RESPONSEDate Received

Amend No.

455 10/31/2018 Volume

3 A‐ 601&60

Door schedule: What is the difference between Frame Type 1 & 2? They both seem to be used in interior and exterior wall types. For instance, doors 104C, 105A, 107B, 122C, 147A, 217A, 301, 302, 303A, 304 and 306 are the only frame type 1 doors that are in exterior walls – should they be frame type 2?

Type 2 Frame has been amended to reflect a frame for a single door in a brick masonry wall assembly. Door scheduled for type 2 have been adjusted.

456 10/31/2018 spec 08 34 73

2.1.2.1

Does Spec 08 34 73 Sound Control Door Assemblies only apply to doors with an STC rating shown in the ‘Remarks’ column of the door schedules?

Yes That is a correct statement. 17

457 10/31/2018 Volume 3 A‐

601&60

Door schedule: Should door 125 be Frame Type 2 instead of 3?

Type 3 is the correct Frame It occurs in a brick masonry wall.

458 10/31/2018 Volume 3 A‐

601&60

Door schedule: Should doors 202, 202A, 203, 204, 204A, 207 and 209 be Frame Type 1 instead of 3?

Yes Door schedule has been amended 17

459 10/31/2018 Volume 3 A‐

601&60

Door schedule: Should door 118B be Door Type ‘G’ instead of the undefined ‘W’?

Yes Door schedule has been amended 17

460 10/31/2018 Volume 3 A‐

601&60

Door schedule: Should door 207 be Door Type ‘E’ instead of the undefined ‘T’?

Yes Door schedule has been amended 17

461 10/31/2018 Volume 3 A‐

601&60

Door schedule: Should door 302 be Door Type ‘A' instead of the undefined ‘M’?

Yes Door schedule has been amended 17

462 10/31/2018 Volume 3 A‐

601&60

Door schedule: Should there be a 2‐hour fire rating at door #124? Addendum #6 door schedule 'remarks' indicate a rated door.

Door 124 is an exterior door. No rating is required. Life safety plan has been amended to reflect correct wall rating at exterior.