N4008518R87160015.pdf
PDF 461 KB Posted
- Solicitation number
- N4008518R8716
About this file
N4008518R87160015.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_F_AMD23.pdf | ||
| N4008518R87160023.pdf | ||
| N4008518R87160022.pdf | ||
| N4008518R87160021.pdf | ||
| N4008518R87160020.pdf | ||
| N4008518R87160019.pdf | ||
| N4008518R87160018.pdf | ||
| N4008518R87160017.pdf | ||
| N4008518R87160016.pdf | ||
| P293_RUBBER_COMPOUNDING_area.dwg | DWG drawing | |
| Attachment_F.pdf | ||
| N4008518R87160014.pdf | ||
| N4008518R87160013.pdf | ||
| N4008518R87160012.pdf | ||
| N4008518R87160011.pdf | ||
| N4008518R87160010.pdf | ||
| N4008518R87160009.pdf | ||
| N4008518R87160008.pdf | ||
| N4008518R87160007.pdf | ||
| Site_Visit_Log.pdf | ||
| N4008518R87160006.pdf | ||
| N4008518R87160005.pdf | ||
| JAs_Redacted.pdf | ||
| N4008518R87160004.pdf | ||
| N4008518R87160003.pdf | ||
| Amendment_0002.pdf | ||
| SECNAV_5512_DBIDS_Individual.pdf | ||
| Amendment_0001.pdf | ||
| Local_Visitor_Request_Form.pdf | ||
| Attachment_B.pdf | ||
| Attachment_C.xls | XLS spreadsheet | |
| Attachment_A.docx | DOCX document | |
| N4008518R8716.pdf |
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
P-293 Paint, Blast and Rubber Consolidation Facility, Portsmouth Naval Shipyard, Kittery, ME
The purpose of this amendment is to provide responses to Pre-Proposal Inquiries and to provide an updated Attachment F - Price Proposal Form, reflecting the updated period of performance.
The proposal due date of 27 November 2018 remains unchanged.
See SF30 Block 14 Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Nov-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R8716
X 9B. DATED (SEE ITEM 11)
31-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Nov-2018
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008518R8716
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0015
CONTINUATION SHEET (Drawing Edits)
NAVFAC Dwg. Nos. 12775772, 12776145, 12776297, 12776001, 12776356, and 12776521 are revised as of October 30, 2018. These revised drawings accompany this amendment.
Volume 2 – Site and Phasing:
On NAVFAC Dwg. No. 12775772 (G-107) Clarified Phase 7 building demolitions.
Volume 3 – Paint, Blast, and Rubber Facility:
On NAVFAC Dwg. No. 12776145 (A- 515) Clarified bid option for sound attenuation panels.
On NAVFAC Dwg. No. 12776297 (E-502) One-line diagram clarification – removed keyed note 3.
On NAVFAC Dwg. No. 12776001 (S-310) Dimension clarification.
Volume 5 – Building 60:
On NAVFAC Dwg. No. 12776356 (G-001) Clarified that window AC Units are provided by Govt.; infrastructure as shown on dwgs/specs is by Contractor.
Volume 6 – Building 74:
On NAVFAC Dwg. No. 12776521 (G- 101) Clarified Shop 06 moves from annex (by Shipyard).
(End of Summary of Changes)
SOLICITATION NO. N40085-18-R-8716
PROJECT TITLE/LOCATION: P293 Paint, Blast and Rubber Consolidation Facility
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
6 9/20/2018 Attachment F - Price Proposal Form, Section 1.3 -
General Notes, Item f. "The performance period for the work required by base price shall be 1,271 calendar days from the date of award (includes 15 days for submission and approval of required bonds and insurance)." This statement is in conflice with
"Standard Form 1442" item 11, which states "The
Contractor shall begin performance within 15 calendar days and complete it within 1,700 dalendar days after receiving award." Please clarify which contract duration is correct.
Attachment F has been revised and provided attached to this amendment. The Contractor shall begin performance within 15 calendar days and complete it within 1,765 calendar days after receiving award.
11 9/25/2018 Volume
2, Sheet S-
Keyed Note #2: Please clarify the intent of this note -
Which CLIN does the MAU platform go in?
Per spec section 00 22 13.00 20, page
4, this is part of CLIN 0002A-6, Paint
Booth in Bldg. 96
14 9/25/2018 The Solicitation, Offer, and Award, Section 11 identifies the contract duration as 1700 days from award. Factor
2 (i) identifies the contract duration as 1700 calendar days and identifies an anticipated award date of
12/31/18. This would result in a CCD of 8/27/23. The phasing schedule provided in Additional Information (c) on page 31 of 67 of the Solicitation identifies an 8/2/23 start for Phase 7 with a 117 day duration. This would result in Phase 7 completion by 11/27/23. Please confirm the correct contract duration and phasing schedule.
The phasing schedule provided is an approximation - NAVFAC will evaluate non-price factors including "Factor 2 –
Management Approach and
Schedule"; "project schedule shall illustrate the offeror’s ability to achieve or improve on the contract completion date set out in the RFP
(1,765 calendar days)."
REFERENCE
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
July 2011
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
17 9/25/2018 Specification Section 31-21-13 "Radon Mitigation", Part
1.4.2, "For purposes of uniformly pricing diagnostic testing and the number of suction points to be constructed, base prices on the minimum requirements specified in Attachment B, locted at the end of this section." Attachment B is blank, are we to assume therefore no testing will be required?
Diagnostic testing shall be done at each of the permanently installed suction points as shown on the design drawings.
21 9/25/2018 Spec 22 00 00 – Table 1 allows PVC & ABS underground vent, above ground vent, and interior rainwater conductors to be utilized. Typically only cast iron is allowed, please advise.
Do not utilize PVC or ABS for these services.
22 9/25/2018 Spec 22 00 00 – Please provide specification and/or basis of design for breathing air filters and quick disconnects.
All units, breathing and shop air shall have a regulator and filter combination unit. Metal body with gauge and 5 micron filter, sight glass, automatic drain. 250 psi rating, with a range of 0-140 psi. Breathing air filter is included on the users breathing air masks. Quick connect fittings per answer on item 23.
23 9/25/2018 Spec 22 00 00 – Please provide spec and/or basis of design for standard air quick disconnects.
Sliding spring loaded female sleeve coupler with ball locking mechanize and nitrile seals and brass body. 300
PSI pressure rating.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
30 10/1/2018 23 00
Per Temporary Facilities drawing number 12775915 page M-602 and dwg# 12775912 page M-503, please confirm CFM, cooling coil design, steam coil design and
PSI, quantity of fans, and unit tag for AHU-1 (also referred to as AHU-2). Schedule and detail page contain discrepancies.
M-503, incorrectly calls out AHU-1 as
AHU-2 in A3.
46 9/28/2018 In order to allow accurate assessment of removal and relocation costs, please provide vendor information, drawings, and/or data sheets on the equipment listed in the attached file titled "Exist Equipment Req Details
R1.pdf".
No Reference. See Equipment List attached to Specification 11 00 00.
50 9/28/2018 Specification 22 15 14.00 40 paragraph 2.1, Accompany drawings with curves indicating that an essentially flat reduced pressure curve for the capacity demand of the system is met by the proposed valves.
A. Please clarify the intent of this paragraph. Are the referenced valves the manual isolation valves, equipment control valves, or regulating valves for compressed air entrance and/or equipment connections?
B. Where the compressed air system is already designed, is this requirement needed?
C. If this is required, and all valves provided comply with specification requirements, but pressure curve is not acceptable, is the contractor responsible for re-design and installation costs?
The second paragraph in section 2.1 should be restricted to submitting pressure drop for regulators and filters.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
51 9/28/2018 Specification 22 15 14.00 40 paragraph 2.1.1, Provide equipment and performance data submitted for piping systems showing conformance with ASME Code.
A. Please clarify this only relates to specific equipment specified to be ASME rated which typically relates to pressure vessels
Confirmed, provide within submittal info ASME conformance for pressure related items such as gages, piping and all other products requiring ASME ratings within the specification.
52 9/28/2018 Specification 22 15 14.00 40 paragraph 2.1.1, Provide design analysis and calculations for low-pressure compressed air systems that consist of flow rates, air distribution, pressure requirements and insulation requirements meeting requirements for referenced standards contained in this section.
A. Where the compressed air system is already designed, is this requirement needed?
B. If required, is the intent to contract an independent engineer to review the DOR’s design, or is this requirement incorporated in the commissioning firms scope.
C. If required, is the contractor responsible for re-design and installation costs to remedy issues that may arise with the system?
Compressed air design analysis and calculations not required to be submitted with installation/shop drawings for review by DOR.
58 9/28/2018 Drawing CD-101 sheet 18 of 73, FAC-YR-NUM, in
Volume 1, Demolition Keyed Notes number 17 indicates
"Relocate bldg 74a to bldg 151 slab. See drawings in temporary facilities drawing set. Please provide drawing number, we cannot find this reference in the temporary facilities drawings. Also please define "relocate", does this mean erection of building 74A on the slab? If so, please provide CLIN number to accept these costs.
Keyed note 17 is not correct. Bldg
74A is to be dismantled and turned over to the Shipyard (unassembled).
Final Location on the Shipyard is TBD.
Refer to Volume 8 drawings for disassembly and demo.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
60 10/3/2018 Volume 5, Drawing G-001, sheet 1 of 163; Summary of
Work, references CLIN 0001AB-2. We did not find this bid item in Attachment F, is it still necessary to break out costs for this item.
New through wall air conditioners are to be furnished by Govt. Bidders are to include (in base bid) infrastructure require to accept these units per drawing and specs. Reference to
CLIN 0001AB-2 will be removed from this dwg.
88 10/4/2018 11 30
Specification Statement: “The paint booth will have a makeup air unit sized to dehumidify and heat the outside air to summer and winter environmental conditions list in Table 1. The make up air unit will be supplied with a dedicated chilled water system.” We assume this requires the equipment vendor to supply the chiller, pumps and associated controls. This will likely require approx. 700-ton chiller. This is larger than any packaged unit, and will require a water-cooled chiller and a cooling tower (air-cooled is doable, but would be very large).
The chiller system will feed MAU, but is a separate system specified in section 23 64 10. This is CLIN 0002B-
13 per section 00 22 13.00 20, Page 5.
94 10/4/2018 11 30
Specification Statement: “ The dust collection system shall be integrated into the footprint shown for the blast booths on Q-101. The dust extraction design shall limit the size of the dust collector to fit within the space provided. No outside area is available for equipment.”
However, Drawing M-102 and M-103 show the dust collectors outside the building. Please clarify.
Yes , Building 404 has Dust Collectors located outside. The foot print limitations inside (between booths) are for the media recovery equipment. Contractor will provide general arrangement submittals.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
100 10/4/2018 11 30
Seismic statements: "The paint booth shall stand by its own structural support and comply with ASCE 7-10 seismic design requirements". Also stated that this facility is a Risk Category IV, which is the most critical type of facility. There are generally two levels of seismic requirement - the first requires equipment to remain structurally sound in a seismic event but doesn't need to remain operational, the second requires equipment to remain structurally sound AND must be able to continue to operate. Risk category IV would indicate that we need to continue operation after a seismic event. We'll need to better understand these requirements, as this can mean very different values for engineering and equipment costs. We are expecting all booth structures and equipment must be engineered to meet this requirement. Especially with the MAUs and
Large Dust Collectors of the roof.
Seismic parameters in section 2.2 should be updated to:
Risk Category II
Site Class B
Sds = 0.216
Sd1 = 0.091
113 10/4/2018
11.00.0
1.1.1.8
To what extent is the equipment to be protected and preserved for reuse?
For relocated equipment, Contractor is responsible for care of all equipment and parts to proper installation/use at final location.
117 10/4/2018
11.50.0
1.1
"contractor to remove blast booths and related systems", this equipment becomes the property of whom?
This temporary equipemnt is provided, installed, and removed by the Contractor. It is the Contractor's property.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
198 10/4/2018
11.30.0
2.1.1.1e
Consolidating and upgrading blasting operations is an excellent opportunity to standardize on replacement components. It is encouraging to see amendments that define exactly what the customer wants. The
'Thompson valve" is a good start. Would more replacement components be considered, i.e. Screw augers - motor /gear boxes, stub shafts, end bearings, hanger bearings. Elevators - motor / gearboxes, head and boot pulleys, belts, buckets. Blast pots - donuts / pop up, combo valves, deadman, twinlines, helmets, lenses, cool air tubes. Dust Collectors - filters, solenoids, diaphragm valves, pulse boards. Control Panels - motor starters, fuses, transformers, disconnects?
For bidding purposes, replacement components are not to be considered.
Bid in accordance with drawings and specs.
229 10/4/2018
41 22
13.30, 41 22
13.35, 2.1.1
Due to the explosion proof requirements we cannot find any motor supplier (tried over 5) who can make a motor with these features in an explosion proof environment: ductile/elongation requirement of "5% in
2 inches minimum." Suggest removing ductile requirements
Remove the following requirement from the specifications: Section 2.1.1
Ductile Material-All components directly supporting the load shall be of ductile material.
230 10/4/2018
41 22
13.30, 41.22.1
3.35, 2.3.2.2
Due to the explosion proof requirements we cannot find any motor supplier (tried over 5) who can make a motor with these features in an explosion proof environment: "Motor rotors, armatures, and commutators of hoist motors shall be press fitted and keyed to motor shafts. Suggest removing keyed requirements.
Remove the following requirement from the specifications: Section
2.3.2.20 Fits-Motor rotors, armatures, and commutators of hoist motors shall be press fitted and keyed to motor shafts.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
238 10/10/2018
Volume
5, Drawing
M-101
& Q-101
Drawing M-101 keyed notes #12 ask that we "provide self contained filtered soldering fume extractor mounted 7' AFF. Support from unistrut off workbench.
Basis of design Sentry SS-300-SKY, 115v/1/60. See sheet
Q-101 Item 168." Q-101 identifies 5 fume extractors where M-101 only shows 1. How many fume extractors are required?
One fume extractor required per basis of design and does not have a specific equipment number. Item 168 rack/bench are referenced for coordination purposes.
240 10/14/2018
11.30.0
1.5.1.1
Spare parts pricing should be included with proposal to determine net cost of equipment? Often replacement parts pricing are extreme and should be considered when making the initial purchase decision.
Please clarify question. 15
271 10/19/2018 Per Temporary Facilities Drawing number 12775914
Page M-602 and dwg# 12775912 Page M-503, Schedule shows AHU-1 and MAU-1 having the same coil performances. Please confirm cooling coil capacity, steam coil capacity and PSI (schedule shows entering and leaving water temps instead of wet bulb temps), and quantity of fans and VFDs for MAU-1
MAU-1 is to be coordinated with the paint booth specification 11 50 01.
AHU-1 is scheduled to be a rental air handler with Trane Rental Model
RSAU0062F1 as the basis of design.
The Scheulde on M602 and Tag call outs on M-503 will be corrected in the
Addendum Rev 2.
272 10/19/2018 Per Temporary Facilities Drawing number 12775914
Page M-602 and dwg# 12775912 Page M-503, will AHU-
1 and MAU-1, serving the temporary blast and paint building, require explosion proof motors and spark proof fans?
Explosion proof fans are not required for the AHU-1 and MAU-1
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
273 10/19/2018 Per Temporary Facilities Drawing number 12775914
Page M-602 and dwg# 12775912 Page M-503, MAU-1 shows external and total static prressures to be the same. Please confirm external static pressure for AHU-
1 and MAU-1.
MAU-1 is to be coordinated with the paint booth specification 11 50 01.
AHU-1 is scheduled to be a rental air handler with Trane Rental Model
RSAU0062F1 as the basis of design.
The Schedule on M601 and Tag call outs on M-503 will be edited.
274 10/19/2018 Per Temporary Facilities Drawing number 12775914
Page M-602 and dwg# 12775912 Page M-503, please provide required buffer tank sizes for temporary facility chiller pump skids.
Chillers and buffer tanks are intended to be rented and the buffer tank requirements should be determined by manufacturer's requirements of the rental units.
276 10/19/2018 Per B404b drawing number 12776203 page M-602, and spec section 23 00 00, pg 31: The specification calls for
AMCA Class B spark resistant fans. AMCA no longer allows fans to be classified as spark resistant if the motor or other electrical sensors or components are in the airstream. Will a standard direct drive plenum fan with an explosion proof motor meet the intent of specifications?
Per NFPA 33, section 6.5.4.2(a), the interior of any recirculation path is
Class I, Division 2. The motor is not in the air stream. This is why a TEFC motor is scheduled. A direct drive fan with an explosion proof motor would meet and exceed the intent of the specifications. A plenum fan would be required to meet the scheduled flow rate, horsepower, and other values, while fitting in the allotted space.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
277 10/19/2018 Where the equipment schedules show a 'DRMO' under the 'Condition' column, beside the paperwork submittals, what is the limit of responsibility for the
General Contractor? Do we assume that the DRMO department will send a truck to the building for the GC to load the equipment on?
DRMO dept will not provided truck;
GC will load equipment and deliver to location on the Shipyard using their own construction equipment.
278 10/19/2018
Vol. 3 A-
On the East Area Floor Plan for Building 404, near column line A.1/4.7, there's a detail callout D1/A-508 that is for the transition between brick veneer and metal panel siding. The detail on S-508 does not appear to be applicable. Please advise.
The detail callout has been amended to D3/A-507. Diagramatic detail represented on A-004 D3 added to A-
279 10/19/2018
M-503
A3 Please clarify the reference to AHU-2 in A3/M-503. It appears that this should read AHU-1.
Yes, it should read AHU-1, corrections are being made.
280 10/19/2018
GC-101
Ref. Water Utility Phasing Note W1. Please identify the source of the water connections to be made to B74 prior to the demolition of a portion of B74, as the new water service shown on C-105 cannot be installed until after the portion of B74 is demolished.
Refer to Volume 1, dwg C-105, and to
Volume 6 drawings for phasing of B.74 demo/renovation.
281 10/19/2018
CD-101
Demolition Keyed Note 17 on Drawing CD-101 indicates that B74A is to be relocated to the B151 slab. This is to occur in Phase 1. B151 is potentially demolished (Bid
Option) in Phase 7. Please clarify the scope of relocation of disassembled B74A and confirm whether the building will need to be relocated multiple times.
Keyed note 17 is not correct. Bldg
74A is to be dismantled and turned over to the Shipyard
(unassembled). Final Location on the Shipyard is TBD. Refer to
Volume 8 drawings for disassembly and demo.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
283 10/19/2018
Vol. 4
M-107
Please provide duct support detail for vertical flat/oval and rectangular duct in the Shaft Area and Very Large
Parts area.
Duct supports to be designed in accordance with SMACNA Industrial
Contruction Standards for Round and
Rectangular Duct. Supplementary steel to pickup prescriptive SMACNA duct hanger designs is the responsibility of the duct designer.
284 10/19/2018
Spec. 23
00 00
Please provide a schedule for all sound attenuator equipment. Please include size, length, and design manufacturer.
Added Silencer Schedule to M-603.
MBD
285 10/19/2018
Vol. 4
M-104
Drawing M-104 identifies manual volume dampers that have thermostats wired to them. Are these "volume dampers" actually zone dampers? Please provide clarification.
Yes, they are modulating air flow zone dampers. MBD
286 10/19/2018
Spec. 23
00 00
3.11
Please confirm specification section 23 00 00 3.11, Damper Acceptance Test is applicable to this project and will be required as written.
Confirmed. NFPA 90A, Chapter 7, includes testing under normal operating conditions.
288 10/19/2018
G-101
Phasing Keyed Note 1 on Drawing G-101 states “Portion of Shop 06 moves to B74A (performed by KTR).
Requires that B74A temp facility is established.” Please clarify the full scope of work associated with B74A.
Note to be corrected. A portion of
Shop 06 will move to a temporary facility. This is to be performed by the
Shipyard.
289 10/19/2018
GC-103
Please clarify General Utility Phasing Note 6 on Drawing
GC-103. This note indicates that B55 will be empty in
Phase 2B with Shop 06 moving to B151. Other phasing documents indicate that Shop 06 vacates B55 in Phase
6.
Disregard note: Shop 06 will occupy this building until Phase 6; Shop 06 will not move until Bldg 60 renovation is complete.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
291 10/19/2018 41 22
13.30
The option 30 ton crane is classified as a Class 1, Div. 1, Group D, operation environment. Per amendment 006 the tandem base cranes allow the panels to be installed in an adjacent room that is not classified as a hazardous location. In order to meet the requirements of section
2.3.3.5 Data recorder and Drive faults, the enclosures
must be installed in a non-hazardous location. It is not possible to install such equipment that can be swapped or activated within this working Class I, Div I, Group D environment. Please advise.
Please see revised crane specification
41 22 13.30 that was issued under
Revision 0001.
293 10/19/2018 Vol. 8 pg 19
(CD-
101)
Note 13 references detail A5/C-503. Please provide the detail as it does nto exist on sheet C-503?
The detail has been added to sheet C-
503 for reference.
294 10/19/2018
Vol. 8 pg 57
(CD-
121)
Please provide depth of sewer pipe being demolished? The depth of the sewer pipe is unknown. For the purposes of bidding, assume that sewer pipe is approximately 6 feet deep, plus or minus. The contractor should include test pits to field verify the depths.
296 10/19/2018
Vol. 8 pg 100
(SD-161)
Please confirm "Note: scope on this sheet is associated with bid option: Building 400 Demolition CLIN 0007" should be CLIN 0014
Drawings reference spec section 00 22
13.00 20; on page 12, this is CLIN 0007
Building 400 Demolition. Refer to solictionation document
"N4008518R8716N4008518R8716.pdf
", "Section 00 10 00 - Solicitation" for clarifications to spec section 00 22
13.00 20.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
297 10/19/2018 Vol. 8 pg 98 &
99 (CD-
161 & C-
161)
Please clarify which bid option note 13 on CD-161 and note 3 on C-161 relates too?
Include this cost/scope in B.400 Bid
Option (CLIN 0007 Option Item No. 6, per spec. section 00 22 13.00 20)
299 10/19/2018 Please provide details for the retaining wall at Building
55 called out in Keyed Note 2 on G-101 (Vol. 4) and
Keyed Note 14 on C-103 (Vol. 1).
The retaining wall detail is included as
Detail C5 on sheet C-502.
300 10/19/2018 Please confirm in which phase B149/149A demolition and B168 work is to occur. Will B168 be vacant during this work?
B149/149A demolition will occur in
Phase 7; B168 will be occupied.
302 10/19/2018 A hazardous materials plan has not been provided for
Building 400. Please confirm that hazardous materials are not present.
Please refer to the hazardous materials report for addtional information. Testing was performed in
B. 400 and there were no suspect materials identifed containing
ACM/PCB and lead paint testing came back negative.
306 10/19/2018 Specification 112003 section 2.1.1 B states that machine must run from single power source.
Thermwood's product has two power connections one for the vacuum pump and one for the machine itself.
Please advise if this is acceptable.
Two power supply point is acceptable.
The General Contrctor is ultimately responsible to provide power to both locations.
307 10/19/2018 Specification 112003 section 2.1.1 Y states that machine must arrive in one piece. Thermwood's product cannot be delivered in a single piece. Please advise if this is acceptable.
This acceptable. 15
308 10/19/2018 Specification 112003 section 3.6.1 Extra Materials states that supplier should provide first year of filters.
What filters are being referred to?
If the machine does not have filters not filter are required.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
310 10/19/2018 Volume 3, drawing M-702, schematic A1. CLIN 0003AA is called out for HVAC work. This CLIN is not located on the bid form. Where should this work be captured on the bid form?
CLIN 0003AA is not a valid CLIN. All items depicted on the "2ND FLOOR
PLASTISOL, AIR CONDITIONING &
VENTILATION - SCHEMATIC" are associated with CLIN 0002B-13, with the exception of HV-2 (and it's isolation damper) which is part of
CLIN 0001AA-4. CLINs referenced in this response are relative to spec section 00 22 13.00 20; refer to solictionation document
"N4008518R8716N4008518R8716.pdf
" for modification to spec section 00
22 13.00 20.
311 10/19/2018 The Pilot Wires for CKT F-13 are shown directly between F-13A and MH-2014 on the Conductor
Pathway DWG ES-502. MH-2014 DWG ES-608 shows the NEW Pilot Wires being installed in Conduit M1, which runs to MH-331. Please confirm if the new pilot wires for CKT F-13 should utilize Conduit M1 of MH-
2014, or utilize a conduit in rows N, O, P, or Q going to the Franklin Annex Vault as shown on the Conductor
Pathway drawings.
Pilot wire circuits for F-13 and F-15 should use conduit O3 to route to the
Franklin Annex Vault. Pilot wires for F-
6 and F-11 should use conduit M1 to route to MH-331. "Correlating conduit" for conduit C5 should read
"M1, O3"
312 10/19/2018 One Line Drawings E-501 and E-502 show the 404A and
404B feeds from the B.404 Vault as (3) 500KCMIL while the ES-501 One Line Diagram shows these feeds as (3)
#4/0 cables. Please confirm which cable size should be used.
#4/0 cable should be used. See
Amendment 6 package dated
10/1/2018.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
313 10/19/2018 Please confirm the path of Circuit F-18. The Conductor
Pathway drawing ES-505 indicates the circuit runs through MH-2014, but this circuit is not found on MH-
2014 drawing ES-608. Instead MH AC-331 drawing ES-
603 seems to indicate this circuit runs directly from MH
AC-331 to the Franklin Substation.
The conductor pathway drawing ES-
505 is correct. The circuit needs to route through MH-2014. Conduits N3 and H5 should be utilized through MH-
2014.
314 10/19/2018 Paint Blast & Rubber Interior Legend states WP1 & WP4 are not used but they are shown on the Interior Finish
Schedule. Please clarify
WP1 and WP4 stricken from the schedule Schedule amended.
315 10/19/2018 Keyed Note #4 on AD-102 VOL2 states to repair floor to match existing and the interior finish schedule states existing flooring to remain. What is the currently flooring product?
This is a concrete floor to remain; any anchor bolt holes (or other deficiencies) resulting from demo must be repaired.
318 10/19/2018 The listed CLIN information on the drawing sets do not match the CLIN information on the bid form. Please advise
Please provide specific reference. 15
319 10/19/2018 Drawing E-100 Building 404 Addendum #6 dated
10/01/18 Slab Conduit Plan several of the conduit runs do not match the one line Drawing E501 and E502 feeder schedule conduits. Are we to follow the one line schedule? one example is Item 4 which shows (2) 3” runs per paint and Blast booth but doesn’t not show the feeder run for each booth which are shown as 2” on the feeder schedule. Please clarify.
Conduit sizes shown on one-line can be used for any above grade conduit of the circuit. Conduit sizes shown on
E-100 should be used for below grade portions of the circuit. One correction to E-100 is (2) 2" for SHAFT CRANES.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
320 10/19/2018 HF Mixing Group have requested drawing/s in auto cad form that shows installation area of the rubber compounding equipment including all building services?
This is required to compare available space with the space requirements of the rubber compounding equipment and for designing and quoting mixer mezzanine, operator platform, stairs etc.?
Per spec section 01 78 00.00 22:
1.2.1.1 Government Furnished
Materials.
One set of electronic CADD files in the specified software and format of the contract drawings will be provided by the Government at the preconstruction conference.
321 10/19/2018 HF Mixing Group requests clarification that their personnel be allowed to charge time, material, and per diem for travel to the site beyond the required time lines prescribed by document
N400851*R87161393766spc03of04.pdf Section 11 10
01 page 35. Please confirm that this is the case.
Subcontractor time and expenses are to be carried in Prime Contractor Bid for all work per plans and specifications.
322 10/19/2018 Is Cathodic Protection required for any of the underground utilities? If so, please provide details.
Provide cathodic protection system for ductile iron, cast iron, and steel per 22 00 00-3.1.4.
323 10/19/2018 Please provide details or a Manufacturer and Catalog number for the Deadbreak Junction Bar required in the
B.404 Vault.
Cooper Power JBY325C1W3B or equal. 15
324 10/19/2018 WP-1 on Interior Finish Legends list common corridors for wainscot but the Interior Finish Schedule only list paint to occur or existing to remain at corridors. The
Interior Finish Schedule calls for metal panels at corridors. Please clarify
Scope of metal panel Wainscot is defined on Enlarged Plans A-105 through A-107 Legend defines a heavy dashed line and describes wainscot
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
325 10/19/2018 Sheet A-411 keyed note #1 references an industrial containment curtain at the changing room locations but there are no specifications for this. Please clarify
Reference Keyed Note 7 on A-105 and
Keyed Note 1 on A-411; Amended for clarification
326 10/19/2018 It's not clear if all doors or a select few are to receive door protection as specified in Specification 10 26 00
Section 2.3 Door Protection. Please clarify
Reference Door Hardware Sets in 08
71 00 for all door protection ie kick plates Door protection stricken from
10 26 00
327 10/19/2018 Specification 09 22 00 Section 3.1.2.4 states to install Z-furring channels vertically with wall insulation but none of the wall details in the drawings set show any furring.
Details show rigid insulation installed against the vapor barrier. Please clarify
Reference Partition Types
Descriptions 4a on A-501 9B 13A 14 on A-502
328 10/19/2018 Ref. Paint, Blast and Rubber Facility Volumne 3, Drwg. A-
901 and A-903 Finish Schedules, reference Solid Surface
Sills for selected Rooms. Example: A-901 Room 103
Rubber Moulding Window Sill SS3. Yet at A-105 north wall of Rm 103 there are three P2 TFWPS panels and all refrenced sections (A-607) for the TFWPS indicate sheet metal returns at Head, Jambs and SIlls. Is it the intent to provide SS Sills for these designated openings as well as the Exterior Windows (WOO) designated even though their sill sections (A-606) show sheet metal returns?
B1 & B3 A-606 Drawing amended to reflect solid surface at sill
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
329 10/19/2018 When doing the cleaning in Bldg 60 does a containment need to be built in the work areas. It is a very congested area with lots of duct work and wiring. The cleaning would require lifts and people working in and around the areas. Would work be required for 2nd shift if they do not run multiple shits in the areas.
Bldg 60 will not be occupied during process-induced cleanup. Cleanup to be coordinated with other P293
Contractor activities.
330 10/26/2018 Per Temporary Facilities Drawing number 12775914
Page M-602, What are the basis of design fans and motor model number for AHU-1 and MAU-1
MAU-1 should be selected by the paint booth supplier or coordinated with the paint booth supplier per specification 11 50 01. AHU-1 basis of design is Trane Rental Model
RSAU0062F1.
331 10/26/2018 Per Temporary Facilities Drawing number 12775914
Page M-602, Won AHU-1 and MAU-1, is the fan required to be spark resistant?
These fans are do not require spark resistant fans.
332 10/26/2018 Per Temporary Facilities Drawing number 12775914
Page M-602, Won AHU-1 and MAU-1, is the motor explosion proof?
Motors do not need to be explosion proof.
333 10/26/2018 Per Temporary Facilities Drawing number 12775914
Page M-602, Won AHU-1 and MAU-1, is the motor located in the air stream?
MAU-1 should be selected by the paint booth supplier or coordinated with the paint booth supplier per specification 11 50 01. AHU-1 basis of design is Trane Rental Model
RSAU0062F1.
334 10/26/2018 Per Temporary Facilities Drawing number 12775914
Page M-602, Won AHU-1 and MAU-1, what is the formal requirement for the classification of entire fan assemblies?
MAU-1 provides 100% outside air so spark proof fans and eplosion proof motors are not required. AHU-1 is a rental and the basis of design is Trane
RSAU0062F1. AHU-1 will not handle explosive air.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
335 10/26/2018 Per Temporary Facilities Drawing number 12775914
Page M-602, Won AHU-1 and MAU-1, do the dampers require spark proof/explosion proof construction or any special characteristics?
MAU-1 provides 100% outside air so spark proof fans and eplosion proof motors are not required. AHU-1 is a rental and the basis of design is Trane
RSAU0062F1. AHU-1 will not handle explosive air.
337 10/26/2018 Per B404b drawing number 12776203 page M-602, what is the steam coil psi for AHU-10?
See M-719, AHU-10 steam pressure is designed at 7.5 psig.
338 10/26/2018 Per B404b drawing number 12776203 page M-602, what are the basis of design fan and motor model number for AHU-5, 6, and 10?
All B404 air handlers have direct drive plenum fans with one VFD per fan, and a backdraft damper on each fan, and 2" and 4" filters (Merv 8 and Merv
14). AHU-5 and 6 each have four 15 hp fans for 100% redundancy, with
VFDs shipped loose for explosion proof wiring. AHU-10 is provided by the paint booth vendor. AHU-1 has two 10 hp fans for 75% redundancy.
AHU-2 has two 10 hp fans for 85% redundancy. AHU-3 has two 10 hp fans for 75% redundancy. AHU-8 and
9 each have four 10 hp fans for 90% redundancy.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
339 10/26/2018 Per B404b drawing number 12776203 page M-602, on
AHU-5, 6, and 10, is the fan required to be spark resistant?
Yes. Note 3 on the air handler schedule on drawing M-602 calls for the fans for AHU-5, 6, and 10 to be spark resistant. AHU-10 is 100% outside air, so this is being changed to not require spark resistant construction. Note that AHU-10 is to be provided by the paint booth contractor.
340 10/26/2018 Per B404b drawing number 12776203 page M-602, on
AHU-5, 6, and 10, is the motor explosion proof?
Yes. Note 3 on the air handler schedule on drawing M-602 calls for the fan motors for AHU-5, 6, and 10 to be explosion proof. AHU-10 is 100% outside air, so this is being changed to not require explosion proof motors.
341 10/26/2018 Per B404b drawing number 12776203 page M-602, on
AHU-5, 6, and 10, is the motor located in the air stream?
Yes. The design calls for the fan motors to be located in the air stream for air handlers 5, 6, and 10.
342 10/26/2018 Per B404b drawing number 12776203 page M-602, on
AHU-5, 6, and 10, what is the formal requirement for the classification of entire fan assemblies?
The fans for AHU-5 and 6 are required to be AMCA Spark Resistant Type B, with explosion proof motors, as indicated on note 3 of the air handler schedule. AHU-10 is 100% outside air, so this is being changed to not require special fans and motors.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
343 10/26/2018 Per B404b drawing number 12776203 page M-602, on
AHU-5, 6, and 10, do the dampers require spark proof/explosion proof construction or any special characteristics?
The dampers do not require spark resistant construction, as currently designed. The actuators were addressed previously.
353 10/26/2018 Reference Volume 1, Sheet CD-101: Note 17 states to relocate Building 74A to Building 151 slab. The removal of Building 74A is in Phase 1, the removal of Building
151 is Phase 7. Furthermore, CLIN 0001A1 identifies
Building 74A to be turned over to the Shipyard and not erected. Please clarify.
Keyed note 17 is not correct. Bldg
74A is to be dismantled and turned over to the Shipyard
(unassembled). Final Location on the Shipyard is TBD. Refer to
Volume 8 drawings for disassembly and demo.
354 10/26/2018 Reference Volume 1, Sheet C-101: Keyed Note 31 is labeled Bid Option. Where is this cost to be included in the Price Proposal Form?
This is not a bid option; disregard this keyed note. Use of this gate during construction must not be considered in bid. Use of this gate may be permitted, but this will only be determined after award.
355 10/26/2018 Reference Document 00 22 13.00 20, Supplementary
Instructions to Offerors, paragraph 1.2, page 14: How is providing a Temporary CIA Fence anticipated to be a cost deduct? What is offsetting the cost of the fence?
The contractor will not need to enter into the CIA to gain access to the
Building 404 constuction area; this could result in more effecient material deliveries, etc.
358 10/26/2018 What is the wall type for Vol#2 sheet A-310 detail A2? Wall type is 5A. Drawing has been amended to reflect this. Reference
Amended A-501 for desciption of 5A.
361 10/26/2018
11 30
"Operational Makeup Air Requirement", "5%, or +/-
1,500 CFM" Is this Heated make up air? Where is the
MAU to be located?
The operational makeup air for the blast booth will be supplied by the
AHU-8 & 9, see M-712 & M-713.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
363 10/26/2018
11 30
2.1.1.3
50000lbs evenly distributed equals +/- 142 pounds per square foot. is that an acceptable measurement to use when designing cart decking?
The carts will run on rail not supported by decking.
364 10/26/2018
11 30
02 2.1.1.3
Is the deck to be solid or grating? Grating. 15
365 10/26/2018
11 30
2.1.1.3
We feel that a pneumatic drive would have significantly greater lifespan expectation with fewer maintenance challenges. Would pneumatic drive carts be an acceptable alternate?
Yes. 15
366 10/26/2018
11 30
2.1.1.5
What size grating sections? This would be determined by manufacturer's design.
367 10/26/2018
11 30
02 2.1.1.5
Is the deck to be solid or grating? Grating see 2.1.1, 5 15
372 10/26/2018
11 30
2.1.1.5.F
We beleive this 4000lb start weight is a fantastic requirement for ensuring a robust recovery system and preventing damage and breakdowns over the life of the equipment. Can you please describe the testing that will be completed during commissioning that will ensure this requirement is met?
This requirement would be incorporated into the design through the machine designer's calculations, moter and gear selections.
373 10/26/2018
11 30
2.1.1.7
Please confirm this means that a single non-powered tray or valve, able to be emptied by a single operator on the bottom of the collector is the intent
This intent here is that one person could perform the operation without taking the dust collector offline.
374 10/26/2018
11 30
2.1.1.7.A
Please confirm this is a typo and the DC's for building
404 are to be located outside the building and ducted through the wall.
Yes, spec will be revised. Dust collector are located outside building
404 as shown of M-102, & M-103.
375 10/26/2018
11 30
2.1.1.7.B please describe "down flow" design for clarification. The preferred dust collection would employ downflow air pattern.
376 10/26/2018
11 30
02 2.1.1.8 what construction of cover is acceptable? Lexan?
Tempered glass?
Clear sheet polycarbonate would be exceptable.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
377 10/26/2018
11 30
02 2.1.1.12.B
Are abrasive metering plates above screws required for screw recovery systems?
The design of augers is by the booth designer.
378 10/26/2018
11 30
2.1.1.12.E
Can this word screw be replaced with the word conveyor to be more in line with the rest of the specification?
In this case use of the word "screw" indicated the use of an auger to move media. This intent seems clear.
379 10/26/2018
11 30
2.1.2.1 is this a manual ramp-up operation or PLC controlled system that detects when filters start to load and ramps up then?
See 2.1.2 Performance Requirements, PLC ramp up to 60 fpm.
380 10/26/2018
11 30
02 2.5.1 shall to dual chamber pot cycling be controlled by timers, or level sensors or both?
Level sensors. 15
382 10/26/2018
11 30
2.1.1.1.e how many points of adjustment are required on the airwash for fine tuning of abrasive working mix?
Two, see 2.1.1, 5,G. 15
383 10/26/2018
11 30
04 2.1.1.1.f
Shall the pot cycling be controlled by timers, level sensors or both?
Level Sensors. 15
385 10/26/2018
11 50
2.1.1.3
50000lbs evenly distributed equals +/- 142 pounds per square foot. is that an acceptable measurement to use when designing cart decking?
The carts will run on rail not supported by decking.
386 10/26/2018
11 50
02 2.1.1.3
Is the deck to be solid or grating? Grating see 2.1.1, 5 15
388 10/26/2018
11 50
02 2.1.1.5
What size grating sections? This would be determined by manufacturer's design.
390 10/26/2018
11 50
2.1.1.5.F
We beleive this 4000lb start weight is a fantastic requirement for ensuring a robust recovery system and preventing damage and breakdowns over the life of the equipment. Can you please describe the testing that will be completed during commissioning that will ensure this requirement is met?
This requirement would be incorporated into the design through the machine designer's calculations, moter and gear selections.
PNSY, Kittery, ME
PREAWARD INQUIRY FORM (TEMPLATE)
Page Section Para.
Question No. QUESTION GOVERNMENT RESPONSEDate Received
Posted on
Amend No.
391 10/26/2018
11 50
2.1.1.7.A we noticed on an earlier question that using dust collectors integrated into the back wall was NOT required. If that is the case, what footprint area is available near the booth to allow for a standalone DC?
The dust collectors for the the two temporary blast booths can be stand alone however they need to be located to the noth of the blast booths, see M-101 and Q-101.
392 10/26/2018
11 50
2.1.1.7.B
Describe "down flow" please or remove this requirement. The dust collectors drawn into the drawings are integrated into the booth and are side flow. I know this from previous conversations with
Colby Company.
Downflow dust collector for the temporary blast booth is not a requirement.