Part_3_Chapter_4,_4th_Floor_Space_Tabulation.pdf
PDF 8 KB Posted
- Attached to
- P257- Design-Build, Ship Repair Training Facility, Norfolk Naval Shipyard, Portsmouth, Virginia
- Solicitation number
- N4008518R1107
About this file
Part_3_Chapter_4,_4th_Floor_Space_Tabulation.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT_14.pdf | ||
| NAVADMIN_026.18.pdf | ||
| ITG_2018-02_NAVADMIN_Message_for_AT_Standards.pdf | ||
| AMENDMENT_13.pdf | ||
| P257_NAVADMIN_026_18_Checklist.pdf | ||
| Amendment_12.pdf | ||
| Amend_11.pdf | ||
| AMENDMENT_10.pdf | ||
| AMENDMENT_009.pdf | ||
| Amendment_0008.pdf | ||
| Section_00_22_13_00_20_revised_4.20.18.pdf | ||
| SBSP_(Template).doc | DOC document | |
| AMENDMENT_07.pdf | ||
| AMENDMENT_06.pdf | ||
| p257SiteVisitLog.pdf | ||
| AMENDMENT_05.pdf | ||
| AMENDMENT_04.pdf | ||
| NAVSEA_Visitor_Request.xlsx | XLSX spreadsheet | |
| AMENDMENT_03.pdf | ||
| 1._180202_Vol_I_of_XI_Parts_1_thru_3-1395851.pdf.pdf | ||
| 2._180202_Vol_II_of_XI_Parts_4_and_5-1395851.pdf.pdf | ||
| AMENDMENT_02.pdf | ||
| 3._180202_Vol_III_of_XI_Part_6_Att_A_thru_E_with_photo_edits-1395851.pdf.pdf | ||
| AMENDMENT_01.pdf | ||
| ATTACHMENT_D_Past_Performance.pdf | ||
| PPI_AMENDMENT_01.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P-257 Ship Repair Training Facility Norfolk Naval Shipyard, Portsmouth, Virginia eProjects Work Order No. 1395851
FOURTH FLOOR
401 - Elevator Lobby 1 312 312 28.99 402 - Janitor's Closet 1 100 100 9.29 403 - Open Office 1 10854 10854 1008.37 404 - Staff Break Room 1 343 343 31.87 405 - VTC Room 1 500 500 46.45 406 - Electrical Room 1 84 84 7.80 407 - Telecommunications Room 1 84 84 7.80 408A - Women's Restroom 1 257 257 23.88 408B - Men's Restroom 1 257 257 23.88 409 - Office 1 143 143 13.29 410 - Office 1 143 143 13.29 411 - Office 1 143 143 13.29 412 - Office 1 143 143 13.29 413 - Office 1 143 143 13.29 414 - Office 1 143 143 13.29 415 - Office 1 143 143 13.29 416 - Office 1 143 143 13.29 417 - Office 1 143 143 13.29 418 - Office 1 143 143 13.29 419 - Office 1 143 143 13.29 420 - Office 1 143 143 13.29 421 - Office 1 143 143 13.29 422 - Office 1 143 143 13.29 423 - Office 1 143 143 13.29 424 - Office 1 143 143 13.29 425A - Women's Restroom 1 257 257 23.88 425B - Men's Restroom 1 257 257 23.88 426 - Electrical Room 1 84 84 7.80 427 - Telecommunications Room 1 84 84 7.80 428 - Exam Work Room 1 514 514 47.75 429 - Print/Copy Room 1 254 254 23.60 ST01 - Stair 1 1 277 277 25.73 ST02 - Stair 2 1 277 277 25.73
ROOF
R01 - Elevator Machine Room 1 850 850 78.97 ST02 - Stair 2 1 277 277 25.73
140306 13034.85
1.12 1.12
157143 14599.04 The design build contractor shall provide actual area in both square feet and square meters in proposals.
Subtotal Net Area Net to Gross Factor
TOTAL GROSS AREA
PART 3 - CHAPTER 4 - Page 6-A
File details come from the government source that posted it.