About this file

Amend_11.pdf

View the file

Other files

File Type Posted
AMENDMENT_14.pdf PDF
NAVADMIN_026.18.pdf PDF
ITG_2018-02_NAVADMIN_Message_for_AT_Standards.pdf PDF
AMENDMENT_13.pdf PDF
P257_NAVADMIN_026_18_Checklist.pdf PDF
Amendment_12.pdf PDF
AMENDMENT_10.pdf PDF
AMENDMENT_009.pdf PDF
Amendment_0008.pdf PDF
Section_00_22_13_00_20_revised_4.20.18.pdf PDF
Part_3_Chapter_4,_4th_Floor_Space_Tabulation.pdf PDF
SBSP_(Template).doc DOC document
AMENDMENT_07.pdf PDF
AMENDMENT_06.pdf PDF
p257SiteVisitLog.pdf PDF
AMENDMENT_05.pdf PDF
AMENDMENT_04.pdf PDF
NAVSEA_Visitor_Request.xlsx XLSX spreadsheet
AMENDMENT_03.pdf PDF
1._180202_Vol_I_of_XI_Parts_1_thru_3-1395851.pdf.pdf PDF
2._180202_Vol_II_of_XI_Parts_4_and_5-1395851.pdf.pdf PDF
AMENDMENT_02.pdf PDF
3._180202_Vol_III_of_XI_Part_6_Att_A_thru_E_with_photo_edits-1395851.pdf.pdf PDF
AMENDMENT_01.pdf PDF
ATTACHMENT_D_Past_Performance.pdf PDF
PPI_AMENDMENT_01.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

DESIGN-BUILD FOR P-257 SHIP REPAIR TRAINING FACILITY, NORFOLK NAVAL SHIPYARD, PORTSMOUTH, VIRGNIA

The purpose of this Amendment is to:

1.Revisions to RFP Package 2.Responses to PPIs 29, 34, 38, 74, 99, 110, 112, 190, 191, and 211-276

See SF30 Block 14 Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 15

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-May-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R1107

X 9B. DATED (SEE ITEM 11)

03-Nov-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-May-2018

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008518R1107

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

CONTINUATION PAGE

The purpose of this Amendment is to provide the following:

1. Revisions to RFP Package

2. Responses to PPIs 29, 34, 38, 74, 99, 110, 112, 190, 191, and 211-276

1. Revisions to RFP Package

Continuation sheet Amendment Items

BASIS OF DESIGN

Basis of Design Volumes I, II and III

3.1.3 Geotechnical Information and Requirements: EXISTING GEOTECHNICAL INFORMATION AND DATA Before first paragraph, add the following: “Please note, the information presented in the Geotechnical Data Report for P-991 MCSFR Bachelor Enlisted Quarters Naval Weapons Station Yorktown, Virginia prepared by Geo Environmental Resources, Inc. dated January 12, 2015 is subsurface information for the P-995 project site and is referenced as P-991.”

PART 3 PROJECT PROGRAM

B10 SUPERSTRUCTURE

System Description Immediately following "Provide two (2) crane maintenance access zones … and vertical support for a hoisting pulley as follows:" Delete “the building from which workers can step onto the crane trolley and bridge catwalk.”

And replace with "At each zone, provide an OSHA-compliant ladder and access landing permanently attached to the building from which workers can step onto the crane trolley and bridge catwalk.”

PART 1 PROPOSAL FORMS & DOCUMENTS

SECTION 00100 BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO OFFERORS

Paragraph 2: Delete in its entirety and replace with: “The project constructs a new 4-story, approximately 157,000 gross square foot, consolidated training facility at Norfolk Naval Shipyard (“NNSY”) in Portsmouth, Virginia. The facility will consist of academic classrooms, applied instruction spaces, administrative offices, mock-up shop areas, conference rooms, student break rooms, NEXCOM micro-mart, training aid storage rooms, a loading dock, a high-bay with a 20-ton overhead bridge crane, and other support spaces. The project also consists of removal of temporary modular buildings, located within the NNSY Controlled Industrial Area (“CIA”).”

PART 3 PROJECT PROGRAM

E20 FURNISHINGS

E201004 Interior Landscape (Fixed) Immediately following the header E201004 Interior Landscape (Fixed), add “Not applicable.”

PART 3 PROJECT PROGRAM

C10 INTERIOR CONSTRUCTION

C101001 Fixed Partitions Change description of “(Type A)” to: “Metal studs with gypsum wall board on both sides. Depth, spacing, and number of rows of studs vary with conditions."

PART 6 ATTACHMENTS

IF101B FIRST FLOOR FURNITURE PLAN B

Change “Elevator Equip 128” to “Janitorial Storage 129”.

D30 HVAC

GENERAL SYSTEM REQUIREMENTS

Dedicated Electric DX air conditioning system (split system AC) Delete “1st Floor: Elevator Equipment Room 128” and replace with “Roof: Elevator Machine Room R01”

PART 4 PERFORMANCE TECHNICAL SPECIFICATIONS

C30 INTERIOR FINISHES

C301003 GYPSUM WALLBOARD FINISHES

C301003 1.3 Foil Backed Gypsum Board Following the first sentence of the first paragraph, add: “Use foil backed gypsum board in locations that require a vapor retarder.”

PART 4 PERFORMANCE TECHNICAL SPECIFICATIONS

C30 INTERIOR FINISHES

C301003 GYPSUM WALLBOARD FINISHES

C301003 1.3 Foil Backed Gypsum Board Delete in its entirety the second sub-paragraph of 1.3 (“Alternative to foil backed gypsum board … in accordance with manufacturer’s instructions.”) in both C301003 and C303002.

PART 5 PRESCRIPTIVE SPECIFICATIONS

SECTION 23 35 19.00 20 INDUSTRIAL VENTILATION AND EXHAUST

Part 1 General

1.1 References

At LEED NC reference, change “(2009)” to “Most recent version as of date of this RFP.”

PART 3 PROJECT PROGRAM

D20 PLUMBING

D209006 Decompressed Air System (Breathing) Second paragraph, delete content in its entirety and replace with: "Feed breathing air from the NNSY site loop, with direct-bury HDPE coated steel pipe, from a location across Marshall Avenue to Building P-257; refer to Part 6 Attachment "Compressed Air Site Plan". Route breathing air to the Applied industrial areas where required. Provide 120 psig supply air pressure and regulators at each drop to reduce working pressure, Test system with Nitrogen at

1.5 times system pressure."

PART 3 PROJECT PROGRAM

G30 SITE CIVIL/MECHANICAL UTILITIES

G306003 Liquid Fuel Storage Tanks Add: “Fuel Storage tank is to have 24 hour fuel run time capacity.”

PART 2 GENERAL REQUIREMENTS

SECTION 01 22 29.05 20 SUSTAINABILITY REPORTING FOR DESIGN-BUILD

Section III. Protect and Conserve Water, item 7.B. Indoor Water Meter, Goals:

Change checkbox mark from “N/A” to “In Compliance”

PART 4 PERFORMANCE TECHNICAL SPECIFICATIONS

D20 PLUMBING

D201003 LAVATORIES

D201003 1.1 Countertop Lavatories Delete the first sentence and replace with: “Unless integral bowl is specified elsewhere, lavatories are to be ASME A112.19.3 20-gauge stainless steel. Lavatories shall have minimum dimensions of 19 inches (483 mm) wide x 18 inches (457 mm) front to rear. For countertop locations, lavatory shall have integral self-rim for drop-in installation.

For wall-mounted conditions, lavatory shall have nominal 4” high integral backsplash.”

PART 4 PERFORMANCE TECHNICAL SPECIFICATIONS

D20 PLUMBING

D209005 COMPRESSED AIR SYSTEM (NON-BREATHING)

D209005 1.2 Refrigerated Air Dryer

Delete content in its entirety and replace with “Not Used”.

D20 PLUMBING

D209005 COMPRESSED AIR SYSTEM (NON-BREATHING)

First paragraph, delete content in its entirety and replace with: “Provide a compressed air system for tool operation.

The compressed air system must be equipped with oil/water separator and receiver and/or storage tank with sufficient capacity, to be determined by end-user compressed air requirements but not less than 800 gallons in capacity, to provide 120 psig air (adjusted) to drops.”

PART 3 PROJECT PROGRAM

D30 HVAC

D303001 CONDENSER WATER SYSTEMS

First sentence in last paragraph: Delete “Provide factory assembled stainless steel closed circuit coolers to serve the water-source heat pump condenser water loop.” And replace with “Provide factory assembled stainless steel or FRP closed circuit coolers to serve the water-source heat pump condenser water loop."

PART 3 PROJECT PROGRAM

D30 HVAC

D304006 CONDENSER WATER DISTRIBUTION SYSTEMS

Last sentence in third paragraph: Delete “Insulate piping with cellular glass insulation.” And replace with “Insulate piping with cellular glass or fiberglass insulation.”

PART 3 PROJECT PROGRAM

D30 HVAC

D304008 OTHER SPECIAL MECHANICAL SYSTEMS, INDUSTRIAL VENTILATION

Third paragraph from end of section: Delete “Provide 100% outdoor make-up air unit. Refer to Section D304008 for make-up air handling unit (MAU) requirements. Total Enthalpy recovery wheel not required. MAU not to be used for building pressure relief.” And replace with: “Provide 100% outdoor air make-up air unit. Refer to Section D304008 for make-up air handling unit (MAU) requirements. Units are to have the same requirements as Dedicated Outdoor Air Systems (DOAS). Total enthalpy recovery wheel is not required. MAU not to be used for building pressure relief.”

PART 3 PROJECT PROGRAM

D50 ELECTRICAL

D503001 TELECOMMUNICATION SYSTEMS

Second paragraph, add to the end of the paragraph: “Wall mounted swing-out racks may be used for SECNET and Legacy networks. Final design, to include telephone rooms that are large enough and of correct geometry to support network infrastructure, is responsibility of the Designer of Record.”

PART 3 PROJECT PROGRAM

G40 SITE ELECTRICAL UTILITIES

G403001 TELECOMMUNICATION SYSTEMS

Delete: “Provide two empty 4 inch conduits with pull strings for future Government provided cables.” And replace with: “Provide two spare 4” conduits with pull strings from the main telecom room to a point 5 feet outside the building, 24” below grade, and capped for future use by Government.”

PART 6 ATTACHMENTS

DRAWINGS ES-100, ES-101, ES-102

Note 11, change to read: “Terminate the cables inside the building as directed by the Contracting Officer.”

PART 6 ATTACHMENTS

DRAWINGS ES-100, ES-101, ES-102

Note 15, change to read: “24 Strand SM Fiber Optic Cable, dedicated and labeled for AM/ICS.”

Note 16, change to read: “24 Strand SM Fiber Optic Cable, dedicated and labeled for AM/ICS.”

PART 1 PROPOSAL FORMS & DOCUMENTS

SECTION 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS

1.2.1 CLIN-SPECIFIC BID NOTES, ITEM a

Delete “Unsuitable subgrade soil determinations will be made by the Contracting Officer.” And replace with:

Unsuitable subgrade soil determinations will be made by a NAVFAC Geotechnical Engineer and approved by the Contracting Officer.”

PART 1 PROPOSAL FORMS & DOCUMENTS

SECTION 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS

1.2.1 CLIN-SPECIFIC BID NOTES, ITEM a

Delete “Soils disturbed by the contractor’s construction activities, or that are excessively wet and soft due to lack of proper site drainage or excavation dewatering, will not be considered unsuitable.” And replace with “Soils disturbed by the contractor’s construction activities, or that are excessively wet or softened due to lack of proper site drainage during construction or lack of proper excavation dewatering, will not be considered unsuitable for the purpose of this CLIN. Only soils that are excessively wet and soft prior to the start of construction activities will be considered unsuitable for the purpose of this CLIN.”

PART 1 PROPOSAL FORMS & DOCUMENTS

SECTION 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS

1.2.1 CLIN-SPECIFIC BID NOTES, ITEM a

Add to both sub-paragraphs i and j: “Intent of this Bid Option is permit PEMB framing economy. Mainframe and girts are expected to be PEMB construction. Wall construction veneer type (masonry) prescribed in the RFP is required to satisfy ATFP criteria, as well as for aesthetic reasons. While a metal roof is not specifically excluded, it is neither described in the RFP nor the intended design aesthetic. Deviation from the design intent will be subject to Government approval (including SHPO and other authorities having jurisdiction).”

PART 3 PROJECT PROGRAM

C10 INTERIOR CONSTRUCTION

C103003 MARKER BOARDS AND TACK BOARDS

Delete paragraph two and replace with "Provide Visual Communication System consisting of the following in one assembly: 1) upper track rail with continuous tackable insert, to support track mounted markerboards and 2) continuous presentation rail, approximately 5” deep at 36” above finished floor. Provide one 36”w x 48”h double sided, porcelain markerboard for every 5 LF of track."

PART 3 PROJECT PROGRAM

D50 INTERIOR CONSTRUCTION

D503001 TELECOMMUNICATIONS SYSTEMS

As the first sentence in this section, add: “Comply with UFC 3-580-01, and -3-580-10 and the requirements of this section.”

2. Responses to PPIs Please note PPI responses to PPIs (29, 34, 99, 110, 112, 190, and 191) are being revised from the original Amendment 0008 answers. See below responses:

Count Reference Inquiry Responses

Page

Section Paragraph

What is the intent of the PEMB options (Options 8 & 9) for the high bay areas?

Are we to change the exterior veneer and roof systems to receive the full benefit or efficiencies of a PEMB system? If not, we do not believe that this will produce a cost savings and if anything will over-complicate the structure and envelope systems (resulting in higher costs). Please consider deleting these options.

See Amendment

26 Basis Of Design Ext. Wall Framing

The Basis of Design section of the RFP states that the exterior wall system shall be non-loadbearing reinforced CMU back-up for the exterior skin components. Would the government consider the use of heavy gauge metal stud framing for the back-up wall, instead of CMU? This would result in substantial time savings for the project schedule.

See Amendment

Factor 6 - Energy Design Reduction

Please confirm that there are no higher ratings that are possible within any of the Factors within this Phase 2 response. Also, please confirm that no betterments are allowed to be provided by the Offeror(s).

See Amendment

74 379 of 488

Part 5 - 25 50 00.00 20 Cybersecurity of Facility-Related Control Systems

What level (low, moderate, or high) in NIST 800-82, Appendix G will be used for the design/build criteria?

Bid per RFP

(Amendment 002)

Section 00010 Solicitation Contract Form

Para 1

CLIN 0009 - Change to PEMB. What are the exterior finishes on the PEMB structure? Are they to be a metal panel system or maintain the existing finishes as shown?

See Amendment

110 4 Part 3, Ch 3

ESR G40,

G403001

The paragraph states to provide 24 strand OS2 cable between B 1500 and the new building. RFP drawings ES100, ES101, and ES102 show a 48 strand OS2 cable and a 24 pair fiber optic cable between B1500 and the new building. Please clarify which is correct.

See Amendment

112 4 Part 3, Ch 3

ESR G40,

G403001

The paragraph states to provide two empty 4 inch conduits with pull strings for future Government-provided cables.

RFP drawing ES100 only shows a 2-way ductbank. (a) Please clarify if a 2-way or 4-way ductbank is required. (b) Please clarify if only the ductbank between CMH-6015 is required to have 2 spare conduits or if we are required to provide 2 spare conduits for all communication ductbanks shown on RFP drawings ES100, ES101, and

ES102.

See Amendment

134 & 152;

AE107 &

AE108

Part 3 - Chapter 5 Room Requirements;

Part 6 - Attachments

303 & 403 Open Office;

Attachment

AD -

Drawings:

Architecture, Interiors

The Room Requirements for the Open Office spaces indicate C3010 Wall finishes Gypsum Board. Sheets AE107 and AE108 do NOT indicate furring at the exterior CMU walls. Please confirm that Gypsum Board furring IS REQUIRED at these walls.

See

7, 10, 13, 90;

AE107 &

AE108

Part 3 - Chapter 5 Room Requirements;

Part 6 - Attachments

All Classrooms;

Attachment

AD -

Drawings:

Architecture, Interiors

The Room Requirements for the Classroom spaces indicate C3010 Wall finishes Gypsum Board. Sheet AE105 and AE106 do NOT indicate furring at the exterior CMU walls. Please confirm that Gypsum Board furring IS REQUIRED at these walls.

See Amendment

211 705 & 706 RFP Vol I of XI Part 3 Chap

6 ESR

G403001

ESR G403001 for

TELECOMMUNICATIONS

SYSTEMS states connection points for site telecommunication systems shall be underground at bldg 276A and bldg 1500. We assume this to mean the manhole outside of each building. Yet drawings ES100 and ES102 show telecommunications cabling extending into each building. Will new site communications cables splice into existing cables entering these buildings or extend unspliced into each building?

See Amendment

212 706 RFP Vol I of XI Part 3 Chap

6 ESR

G403001

If new site communications cables extend into bldg. 276A and bldg. 1500, where in each building will these new cables land and is there an approximate distance from the entrance point that should be used?

See Amendment

213 706 RFP Vol I of XI Part 3 Chap

6 ESR

G403001

ESR G403001 for

TELECOMMUNICATIONS

SYSTEMS states that a 24-strand SM fiber is to be installed from bldg 1500.

Yet drawing ES102 shows a 48 strand SM and a “24-pair” SM (48-strand, as well) being installed. Is there one or two 48-strand SM fibers being installed between these two locations? Please advise.

See Amendment

214 650 RFP Vol I of XI Paragraph 1 Part 3 ESR D503001

ESR D503001 for

TELECOMMUNICATIONS

SYSTEMS states that a SECNET outlet shall consist of two fiber connectors. Is this two Duplex LC connectors for a total of 4 fiber strands to be terminated at each outlet location or 2 fiber strands to be terminated with one Duplex LC connector?

Bid per RFP

(PDF)

Part 3, Section 2.3.6 Para 7

The base perimeter will be altered during construction, decreasing the standoff distance for three (3) buildings.

The RFP says that these buildings will be vacated and/or staff will be relocated during the work. Later on (Section 3.1, Paragraph 1) it says that the security fences are not to be disturbed. Confirm the contractor will not be responsible for ensuring these buildings stay in a “Low Occupancy” state and that no analysis or hardening of any structures impacted by the relocated fence is included in the proposal.

See Amendment

(PDF)

Part 3, Chapter 6, ESR B19

N/A Appears to be missing text between pages 3 and 4 of ESR B10. Please confirm if text is missing.

See Amendment

(PDF)

Part 3, Chapter 6, ESR

B201002 LOW

SLOPE ROOFING

Para 5

Paragraph specifies a three-ply mod-bit roof as the “roof of choice” but section 00100 - Bidding Schedule/Instructions to Bidders says standing seam. Please verify.

See Amendment

(PDF)

Part 3, Chapter 6 E201004 n/a Confirm Interior Landscape (Fixed) is not required, per the RFP.

See Amendment

(PDF)

Part 3, Chapter 6

EC102007

Table:

Lockset Group Schedule

Confirm the DOR is responsible for developing the specification for the High Security Electromechanical Combination Lock for the Secure Storeroom. A specification is not provided per the RFP part 4.

See Amendment

220 378 of 488 Section 25 50 00.00 20 Para 1.2.3 c

The paragraph indicates that information is contained in 21 30 00 Fire Pumps. The noted specification is not included in the RFP. Please provide the noted section.

Bid per RFP

221 47 of 240 Basis of Design XIII Para B

The third paragraph indicates that "An RFI was submitted to determine if reliable power is available at the project site. If reliable power is available, an electric drive horizontal split case pump will be provided." Confirm that the power is considered reliable.

Bid per RFP

222 5 of 30 (PDF) Attachment AD, Sheet

AE101

N/A

It appears that the expansion joint called for in Part 3, Chapter 6, ESR B10 SUPERSTRUCTURE between grids N9 and 1 is not accounted for in the building dimensions. Please confirm that it is acceptable to increase the north-south dimension of the building to account for this expansion joint.

223 5 of 30 (PDF) Attachment AD, Sheet

AE101

N/A

The steel columns are shown conflicting with CMU partition walls. If the intent of the CMU walls is to provide a specific STC rating or fire rating, having the walls interrupted by steel columns will require additional furring. Please confirm that it is acceptable to adjust the layout of the steel frame and/or partition walls to prevent this conflict.

See Amendment

(PDF)

Part 3, Chapter 5 N/A Confirm the requirement for a Janitorial Storage Room as required by RFP Room Requirement Sheet.

See Amendment

(PDF)

Part 3, Chapter 5 N/A Provide Room Requirement Sheet for Elevator Equipment Room 128.

See Amendment

226 20 of 30 (PDF) Part 6, IF101B N/A Confirm position of Elevator Equipment Room 128 and Janitor Room 128 as indicated on the drawings.

See Amendment

227 22 of 30 (PDF) Part 6, IF101D N/A Confirm waiver for NAVFAC washer and dryer 1:2 ratio requirements.

Bid per RFP

(PDF)

Part 3, Chapter 5 N/A Confirm acoustical wall panels are not required in Conference Rooms per RFP, Part 4.

Bid per RFP

(PDF)

Part 3, Chapter 5 N/A Confirm the requirement for a loose lay mat in stairwells.

Bid per RFP

(PDF)

Part 4, C301003 Para 1 Confirm the requirement for foil back gypsum board is only for locations which require a vapor retarder.

See Amendment

231 130 of 488 Part 4, C303002 1.3 Para 2

The areas contained within the Secure Areas of the project are primarily the open office area with Acoustical Ceiling Tile. Confirm the location of the foil-backed gypboard for shielding.

Confirm the requirement for Shielding effectiveness tested in accordance with

IEEE 299/ ASTM D4935.

See Amendment

232 416 of 722 Part 3-Project Program Acoustics Clarify the acoustics requirement for Room 122 - Student Break Room, sheet states 12'-0".

Bid per RFP

233 126 of 488 Part 4-C302010 1.1

Confirm the DOR is responsible for developing the specification for Densified Concrete Sealer. A specification is not provided per the RFP part 4.

Bid per RFP

234 645 of 722 Vol 1-Chapter 6 N/A Confirm LEED NC 2.2 is required as a newer version is available.

See Amendment

(PDF)

Part 3, Chapter 6 ESR D20

D209006 Please confirm pipe type is to be used for underground breathing air.

See

(PDF)

Part 4 G30 G306003 1.1

It is understood that an aboveground fuel tank is required for generator mock

up. What is the expected run time or fuel storage required for this application? Is fuel polishing required?

See Amendment

(PDF)

Sustainability Checklist

Indoor water metering is listed as N/A, however in Part 3 chapter 6 section D306001 1.1 DDC, indoor water meters are required. Please confirm indoor water meters are required.

See Amendment

(PDF)

Part 3, Chapter 6 ESR D20

D201003

States all lavatories shall be stainless steel. Section D201003 1.1 lavatories in Part 4 state lavatories shall be vitreous china. Confirm if lavatories shall be china or stainless steel.

See Amendment

(PDF)

Space characteristics D201006

Bottle filling stations are listed on space requirements; however, bottle filling drinking fountains are not mentioned in Part 4 section D20 page 163 of 488 (D201006 1.2). Please confirm bottle filling stations are required.

Bid per RFP

(PDF)

Part 4 section D20 D209005 1.2

States a refrigerated air drier is required. What is the quality and pressure of the site compressed air systems?

See Amendment

(PDF)

Part 6 ESR D20 D209005 and D209006

State an "oil water separator and receiver tank" are required for both breathing and non-breathing air systems. Please confirm receiver tank sizing criteria since air is being supplied from the site system.

See Amendment

(PDF)

Sustainability Checklist

Renewable energy part B

States solar hot water is not life cycle cost effective; however, Part 4 D301005 states to "design and build each domestic hot water heating system." Confirm solar hot water heating is not LCCE and thus not required.

See Amendment

243 356 of 488 Vol 2, 23 35 19.00 20 1.1 Confirm version of LEED. Para 1.1 lists version 2009.

See Amendment

244 253 of 584 Vol 4, 09 90 00.00 22 1.1 Confirm version of LEED. Para 1.1 lists version 2002; R 2005.

See Amendment

245 448 of 584 Vol 4, 32 10 00.00 22 1.1 Confirm version of LEED. Para 1.1 lists version 2009.

See Amendment

246 N/A N/A N/A Is there a LEED Scorecard provided to indicate the proposed credits?

Bid per RFP

(PDF)

Part 3, Chapter 6 ESR D30

D303001

Section indicates stainless steel closed circuit cooling towers. Will Fiberglass Reinforced Polyester (FRP) closed circuit cooling towers be acceptable?

See

(PDF)

Part 3, Chapter 6 ESR D30

D304006

Section indicates cellular glass insulation for condenser water distribution piping. Will fiberglass insulation be acceptable for interior piping?

See Amendment

(PDF)

Part 3, Chapter 6 ESR D30

D309090

Requirements of Make-up Air handling Units (MAU) are referenced to section D304008. Section D304008 does not indicate the requirements for MAUs.

Please provide requirements for MAUs.

See Amendment

(PDF)

Attachment B N/A Some equipment listed may require filtered water (I.E. Film processor). Is water quality data available for the site?

Bid per RFP

251 33 of 54 (PDF) Attachment AA N/A Existing compressed air pressure not listed. Can the existing pressure data be provided?

See Amendment

252 34 of 54 (PDF) Attachment AA N/A

Breathing air piping is not shown on site plan. Please provide information (pressure and routing) on site breathing air system as listed in part 3 chapter 6

ESR D20 (D209006).

See Amendment

(PDF)

Part 3, Chapter 6 D503001

Section requires providing separate racks for NMCI, SECNET, NIPR, and legacy systems. Per the building program, the standard Telecom Room size is 84SF. This room size may not accommodate the required number of racks for the layout in compliance with ANSI/TIA-569-D and BICSI TDMM.

Confirm that Telecom Rooms and area allocated in the RFP are sized to accommodate the required number of racks.

See Amendment

(PDF)

Part 3, Chapter 6 D503001

Section requires SECNET outlets to be physically separated from WSO outlets by a minimum of 6-inches. What is the minimum separation between SECNET and other network equipment racks?

This is required in order to allocate sufficient space for the Telecom Room.

See Amendment

(PDF)

Part 3, Chapter 6 D503001

Section identifies a typical WSO outlet as having two data and one voice outlet.

Are the two data networks NMCI and/or NIPR? If not, please provide outlet configurations for NMCI, NIPR, and Legacy Systems

See Amendment

(PDF)

Part 3, Chapter 6 D503001

Identify whether the voice system is analog or Voice over Internet Protocol (VoIP). If analog, provide termination requirements for cabling inside the Telecom Room.

See

(PDF)

Part 3, Chapter 6 D503001

If voice system is analog, 25- pair copper backbone cable from the Entrance Facility to each Telecom Room may not be sufficient. If voice system is analog, how many pairs should be reserved for each voice outlet plus spare so backbone can be appropriately sized?

See Amendment

(PDF)

Part 3, Chapter 6 D503001 Provide information Fiber Optic cable termination requirements.

See Amendment

(PDF)

Part 3, Chapter 6 D503001

Section requires for the fiber optic cable backbone to be 12-strand multi-mode.

There are several types of fiber optic multimode cables. Which type should be used?

See Amendment

(PDF)

Part 3, Chapter 6 D503001

Provide information for telecommunication horizontal cabling Category rating for both Data and Voice.

See Amendment

(PDF)

Part 3, Chapter 6 D503001 Provide information for SECNET horizontal cable requirements as well as the required termination type.

See Amendment

(PDF)

Part 3, Chapter 6 D503001

Drawing ES100; confirm the Ship Training Facility will be served by a 2-way duct bank as shown on the drawing. Per ANSI/TIA-569, it is recommended to have at least (2) plus an additional spare duct as spare. A facility of this size is typically served by a minimum of (4) 4-inch duct bank.

See Amendment

(PDF)

Part 3, Chapter 6 D503001

Drawing ES100; confirm fiber optic cable identified by keynote 16 originates from manhole CMH-601S to the new Ship Repair Training Facility.

See Amendment

(PDF)

Part 3, Chapter 6 D503005

Confirm scope of Electronic Security System (Access Control) is pathways only. Confirm access control equipment and cabling will be provided by others.

Bid per RFP

(PDF)

Part 3, Chapter 6 N/A Confirm there are no requirements for Electronic Security System Closed Circuit Television (CCTV).

Bid per RFP

(PDF)

Part 3, Chapter 6 N/A Confirm there are no requirements for Electronic Security System Intrusion Detection Systems (IDS).

Bid per RFP

(PDF)

Section 00100 - Bidding Schedule/Instructions to Bidders

Para 2

Paragraph specifies a standing seam metal roof, but Part 3, Chapter 6, ESR

B201002 LOW SLOPE ROOFING

specifies modified bitumen roofing.

Please verify.

See

Factor 6 - Energy Design Reduction

Please confirm that there are no higher ratings that are possible within any of the Factors within this Phase 2 response. Also, please confirm that no betterments are allowed to be provided by the Offeror(s).

See Amendment

Specification section 00 22

13.00 20

1.2.1 Clin- Specific

Bid Items

Instructions related to CLIN 0001AE indicate that the Contracting Officer will make the determination on unsuitable soils. Please confirm that the determination made by the Contracting Officer will be based on the recommendation of a geotechnical engineer.

See Amendment

Specification section 00 22

13.00 21

1.2.1 Clin- Specific

Bid Items

Instructions related to CLIN 0001AE indicate that excessively wet soil due to lack of proper site drainage will not be considered as unsuitable soils to be replaced under CLIN 0001AE. Please confirm whether this applies to soil experiencing improper site drainage prior to the start of construction (existing conditions.)

See Amendment

Specification section 00 22

13.00 21

1.2.1 Clin- Specific

Bid Items

Instructions related to CLIN 0001AE indicate that soil that is wet due to excavation dewatering will not be considered as soil to be replaced under CLIN 0001AE. The fact that excavations require dewatering would seem to indicate the presence of wet soils. Please clarify.

See Amendment

Specification section 00 22

13.00 21

1.2.1.l. Clin-Specific Bid Items

Due to ATFP requirements and the setback conditions at the site, we do not see a PEMB replacing the sections of the building described. Please give the design requirements for the desired PEMB portions of the building.

See Amendment

Specification section 00 22

13.00 21

1.2.1.l. Clin-Specific Bid Items

Please clarify whether the options for PEMBs are intended to replace the entire wall system, including the brick veneer and other exterior finishes as shown on the elevations, with a PEMB metal skin.

See

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 15-May-2018 02:00 PM to 24-May-2018 02:00 PM.

The Issued By organization has changed from

NAVFAC MID ATLANTIC

HAMPTON ROADS IPT

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

to

COMMANDING OFFICER

Part 3 - Ch.

6/ESR C10,

C103003 Marker Boards And Tack Boards

The Visual Communication System states that it must have "upper track rails with continuous tackable insert…Provide continuous presentation rail at 36" above finish floor." It is not clear as to how this system is configured. Is the Government requesting a 2-track system, one for the porcelain maker boards that is installed every 5 LF and one for the a the continuous tack board that will go behind the procelain marker boards?

See Amendment

Part 3, Ch. 5 Room Requirements

C103003 Marker Boards And Tack Boards

For the 24-person classroom, it calls out for 50 LF of the Visual Communication System (VCS) to be installed in the room. However, none of the wall lengths for this room type are shorter than 50 LF. The longest wall span in this room is about 33'-8" which is a side wall for the classroom and the front wall span is approximately 20'-6" long.

Please provide the location of the 50 LF requirement in the room. Is the intent to have the VCS span across multiple walls in the classroom? Or is the intent for the VCS only across the front of the classroom?

Bid per RFP

Part 3 - Chapter 5 Room Requirements;

Part 6 Attachments

303 Open Office;

Attachment AD - Drawings:

Architecture, Interiors

134; AE201,

AE201

There is a conflict between the RFP elevations, structural layout, and code requirements for the construction of the third floor roof areas. Given the required floor to floor height between the third and fourth floor, the required step down between fourth floor and the roof, minimum roof slope requirements, minimum parapet heights, and the column-free span being requested, the requested ceiling height of 12' is not attainable. Please confirm that the ceiling heights on the 3rd floor can be reduced to accommodate this criteria.

NAVFAC MID-ATLANTIC

9742 MARYLAND AVENUE

NORFOLK VA 23511-3095

(End of Summary of Changes)