About this file

AMENDMENT_13.pdf

View the file

Other files

File Type Posted
AMENDMENT_14.pdf PDF
NAVADMIN_026.18.pdf PDF
ITG_2018-02_NAVADMIN_Message_for_AT_Standards.pdf PDF
P257_NAVADMIN_026_18_Checklist.pdf PDF
Amendment_12.pdf PDF
Amend_11.pdf PDF
AMENDMENT_10.pdf PDF
AMENDMENT_009.pdf PDF
Amendment_0008.pdf PDF
Section_00_22_13_00_20_revised_4.20.18.pdf PDF
Part_3_Chapter_4,_4th_Floor_Space_Tabulation.pdf PDF
SBSP_(Template).doc DOC document
AMENDMENT_07.pdf PDF
AMENDMENT_06.pdf PDF
p257SiteVisitLog.pdf PDF
AMENDMENT_05.pdf PDF
AMENDMENT_04.pdf PDF
NAVSEA_Visitor_Request.xlsx XLSX spreadsheet
AMENDMENT_03.pdf PDF
1._180202_Vol_I_of_XI_Parts_1_thru_3-1395851.pdf.pdf PDF
2._180202_Vol_II_of_XI_Parts_4_and_5-1395851.pdf.pdf PDF
AMENDMENT_02.pdf PDF
3._180202_Vol_III_of_XI_Part_6_Att_A_thru_E_with_photo_edits-1395851.pdf.pdf PDF
AMENDMENT_01.pdf PDF
ATTACHMENT_D_Past_Performance.pdf PDF
PPI_AMENDMENT_01.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

DESIGN-BUILD FOR P-257 SHIP REPAIR TRAINING FACILITY, NORFOLK NAVAL SHIPYARD, PORTSMOUTH, VIRGNIA

The purpose of this Amendment is to provide the follow ing:

1. Revisions to the RFP package.

2. Attachments

SEE BLOCK 14 CONTINUATION PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 31-May-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R1107

X 9B. DATED (SEE ITEM 11)

03-Nov-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

31-May-2018

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008518R1107

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

CONTINUATION PAGE

The purpose of this Amendment is to provide the following:

1) Revisions to RFP Package

2) Attachments

1. Revisions To RFP Package

CONTINUATION SHEET

Part 3 PROJECT PROGRAM

2.0 PROJECT OBJECTIVES

2.3.6 Antiterrorism Criteria

Following the first sentence add…;

“Incorporate throughout the RFP documents NAVADMIN 026/18 Exceptions per the Validation Checklist for Applicability of NAVADMIN 026/18 Policy and Exceptions to Minimum Antiterrorism UFC Standards for Navy Projects dated 29 MAY 18.

The concept plan shall remain as sited in the RFP documents with the new facility at least 50 feet inside of the Installation Controlled Perimeter.

See attachments included in this amendment.”

Part 3 PROJECT PROGRAM

2.3.6 Antiterrorism Criteria

Delete the sixth paragraph stating “Provide a minimum unobstructed space…” in its entirety and replace with…, “Unobstructed space as defined in UFC 4-010-01 and NAVADMIN 026/18 must extend out to 33 feet from the building perimeter. Roadways and parking are allowed within this space. See Part 3, Chapter, section 3.2.14 for requirements of equipment located within the unobstructed space.”

Part 3 PROJECT PROGRAM

2.3.6 Antiterrorism Criteria

Delete the seventh paragraph stating “Develop the site based on the requirements of…” in its entirety and replace with…, “The Site plan design does not need to incorporate minimum standoff distance requirements as defined in UFC 4-010-01 pursuant to NAVADMIN 026/18.

Part 3 PROJECT PROGRAM

2.3.6 Antiterrorism Criteria

Delete the eighth and ninth paragraphs starting with “During construction, the contractor must temporarily relocate the effective base perimeter…, and ending with “No other alterations, such as building hardening, are required to the existing buildings subject to base perimeter encroachment.” in their entireties and replace with…;

“During construction, the contractor must temporarily relocate the effective base perimeter to the south side of the site. This shifts the construction site, including site access, to outside of the ATFP controlled perimeter. (See Part 3, Chapter 6, ESR G10 for additional information about the temporary perimeter fence.) All procedures and sequence of construction chosen must be coordinated with NNSY Security for final approval. All existing buildings located at least 50 feet from the temporary perimeter fence will not require hardening as defined in UFC 4-010-01 (bldgs. 1531, 280, and 1567). The temporary perimeter fence construction must be complete prior to use of a construction gate. The temporary fence will require a clear zone on either side in accordance with

NTTP 3-07.2.3.”

Part 3 PROJECT PROGRAM

3.2.14 Anti-Terrorism/Force Protection (ATFP)

At the end of the first sentence add…, “and NAVADMIN 026/18.”

Part 3 PROJECT PROGRAM

B20 EXTERIOR ENCLOSURE

B2020 EXTERIOR WINDOWS

Add to the last sentence of the second paragraph as follows, “Standard 10, Subparagraph B-3.1.7 in accordance with NAVADMIN 026/18.”

Part 3 PROJECT PROGRAM

B20 EXTERIOR ENCLOSURE

B202002 STOREFRONTS

Add to the last sentence as follows, “Standard 10, Subparagraph B-3.1.7 in accordance with

NAVADMIN 026/18.”

Part 3 PROJECT PROGRAM

B20 EXTERIOR ENCLOSURE

B202003 CURTAIN WALLS

Add to the eighth paragraph stating “Curtain walls must meet AT/FP requirements specified in UFC 4- 010-01” the following, “Standard 10, Subparagraph B-3.1.7 in accordance with NAVADMIN 026/18.”

Part 3 PROJECT PROGRAM

B20 EXTERIOR ENCLOSURE

B202004 GLAZING

Add to the last paragraph as follows, “Standard 10, Subparagraph B-3.1.7 in accordance with

NAVADMIN 026/18.”

Part 3 PROJECT PROGRAM

B20 EXTERIOR ENCLOSURE

B2030 EXTERIOR DOORS

Delete the last paragraph in its entirety and replace with, “All exterior doors must comply with ATFP requirements of UFC 4-010-01 and NAVADMIN 026/18.”

Part 3 PROJECT PROGRAM

B20 EXTERIOR ENCLOSURE

B203006 BLAST RESISTANT DOORS

Add the following to the end of the sentence “and NAVADMIN 026/18.”

Part SIX ATTACHMENTS

ATTACHMENT AF - NAVFAC Interim Technical Guidance (ITG 2018-02) – Implementation of NAVADMIN 026/18 Policy and Exceptions to Minimum Antiterrorism UFC Standards for Navy Projects dated 12 March 2018

ATTACHMENT AG - NAVADMIN 026/18, Policy and Exceptions to Minimum Antiterrorism Unified Facilities Criteria Standards for Navy Projects dated 7 February 2018.

ATTACHMENT AH - Validation Checklist for Applicability of NAVADMIN 026/18 Policy and Exceptions to Minimum Antiterrorism UFC Standards for Navy Projects dated 29 MAY 18.

2. Attachments provided in this Amendment (0013)

1. ITG 2018-02 NAVADMIN Message for AT Standards

2. NAVADMIN 026.18

3. P257 NAVADMIN 026.18 Checklist

(End of Summary of Changes)

File details come from the government source that posted it.