About this file

AMENDMENT_02.pdf

View the file

Other files

File Type Posted
AMENDMENT_14.pdf PDF
NAVADMIN_026.18.pdf PDF
ITG_2018-02_NAVADMIN_Message_for_AT_Standards.pdf PDF
AMENDMENT_13.pdf PDF
P257_NAVADMIN_026_18_Checklist.pdf PDF
Amendment_12.pdf PDF
Amend_11.pdf PDF
AMENDMENT_10.pdf PDF
AMENDMENT_009.pdf PDF
Amendment_0008.pdf PDF
Section_00_22_13_00_20_revised_4.20.18.pdf PDF
Part_3_Chapter_4,_4th_Floor_Space_Tabulation.pdf PDF
SBSP_(Template).doc DOC document
AMENDMENT_07.pdf PDF
AMENDMENT_06.pdf PDF
p257SiteVisitLog.pdf PDF
AMENDMENT_05.pdf PDF
AMENDMENT_04.pdf PDF
NAVSEA_Visitor_Request.xlsx XLSX spreadsheet
AMENDMENT_03.pdf PDF
1._180202_Vol_I_of_XI_Parts_1_thru_3-1395851.pdf.pdf PDF
2._180202_Vol_II_of_XI_Parts_4_and_5-1395851.pdf.pdf PDF
3._180202_Vol_III_of_XI_Part_6_Att_A_thru_E_with_photo_edits-1395851.pdf.pdf PDF
AMENDMENT_01.pdf PDF
ATTACHMENT_D_Past_Performance.pdf PDF
PPI_AMENDMENT_01.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION N40085-18-R-1107, DESIGN-BUILD PROJECT FOR CONSTRUCTION OF P-257, SHIP REPAIR TRAINING FACILITY, NORFOLK

NAVAL SHIPYARD, PORTSMOUTH, VIRGNIA

PHASE II ANNOUNCEMENT. THIS INFORMATION PERTAINS TO ONLY THOSES OFFERORS NOTIFIED IN WRITING THAT THEY HAVE

ADVANCED TO PHASE II.

PHASE II PROPOSAL DUE DATE IS TUESDAY, 10 APRIL 2018 AT 1400 EDT.

See Continuation Sheet

1. CONTRACT ID CODE PAGE OF PAGES

J 1 16

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R1107

X 9B. DATED (SEE ITEM 11)

03-Nov-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Mar-2018

CODE

COMMANDER NAVFAC ATLANTIC

6506 HAMPTON BLVD

NORFOLK VA 23508-1278

N62470 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008518R1107

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 05-Dec-2017 02:00 PM to 10-Apr-

2018 02:00 PM.

The required performance has changed from DESIGN BUILD PROJECT FOR P-257

SHIP REPAIR TRAINING FACILITY, NORFOLK NAVAL SHIPYARD, PORTSMOUTH,

VIRGNIA . THIS RFP IS FOR FACTORS 1 - 3 ONLY. OFFERORS WHO ARE SELECTED

FOR PHASE II WILL BE NOTIFIED.COMPETITION REQUIRMENTS: FULL AND OPEN

COMPETITIONPROCUREMENT METHOD: CONTRACTING BY

NEGOTIATIONSOURCE SELECTION PROCESS: BEST VALUE, TRADE-OFF, TWO-

PHASETYPE OF CONTRACT: FIRM FIXED PRICEESTIMATED COST OF

CONSTRUCTION: $63,000,000.00NAICS CODE: 236220; SIZE STANDARD: 36.5M;

FEDERAL SUPPLY CODE: Y1AZALL PRE PROPOSAL INQUIRIES (PPI'S) MUST BE

MADE IN WRITING AND EMAILED TO ANDREW.DORSEY@NAVY.MIL NO LATER

THAN 14 CALENDAR DAYS PRIOR TO THE PROPOSAL DUE DATE. to DESIGN BUILD

PROJECT FOR P-257 SHIP REPAIR TRAINING FACILITY, NORFOLK NAVAL

SHIPYARD, PORTSMOUTH, VIRGNIA . THIS RFP IS FOR FACTORS 1 - 3 ONLY.

OFFERORS WHO ARE SELECTED FOR PHASE II WILL BE NOTIFIED.COMPETITION

REQUIRMENTS: FULL AND OPEN COMPETITIONPROCUREMENT METHOD:

CONTRACTING BY NEGOTIATIONSOURCE SELECTION PROCESS: BEST VALUE,

TRADE-OFF, TWO-PHASETYPE OF CONTRACT: FIRM FIXED PRICEESTIMATED

COST OF CONSTRUCTION: $63,000,000.00NAICS CODE: 236220; SIZE STANDARD:

36.5M; FEDERAL SUPPLY CODE: Y1AZALL PRE PROPOSAL INQUIRIES (PPI'S) MUST

BE MADE IN WRITING AND EMAILED TO MICHELLE.GOODEN@NAVY.MIL NO

LATER THAN 14 CALENDAR DAYS PRIOR TO THE PROPOSAL DUE DATE..

CLIN 0001

The CLIN extended description has changed from:

Price includes the following or the P-257Ship Repair Training Facility (CLIN 0001AA – CLIN0001AE): CLIN 0001AA – Facility complete to the line 5 feet outside the building perimeter; CLIN 0001AB – Site Work; CLIN 0001AC – Design; CLIN 0001AD – Remove geotechnically unsuitable soils; CLIN 0001AE – Remove petroleum contaminated soils.

To:

Price includes the following or the P-257 Ship Repair Training Facility (CLIN 0001AA – CLIN0001AE): CLIN 0001AA – Facility complete to the line 5 feet outside the building perimeter; CLIN 0001AB – Site Work; CLIN 0001AC – Design; CLIN 0001AD – Remove temporary modular buildings; CLIN 0001AE - Remove geotechnically unsuitable soils; CLIN 0001AE – Remove petroleum contaminated soils; CLIN 0001AF - Remove petroleum contaminated soils; and CLIN 0001AG - Demo and excavate buried concrete and debris.

CLIN 0002

Price for providing all work in connection with 12” water main segment, from existing 12” water main at Gate 18 to new fire hydrant tee at the southwest corner of the building, complete in accordance with the drawings and specifications.

Price to DELETE all work associated with 12" water main segment, from existing 12" water main at Gate 18 to new fire hydrant tee at the southwest corner of the building, complete in accordance with the drawings and specifications.

The option status has changed from No Status to Option.

CLIN 0003

Price to design and provide Fall Protection Mock Up described as Contractor Furnished/Contractor Installed (CFCI) in “Equipment, Mock-Ups/Training Aids” Attachment in Part 6, as shown on “Fall Protection Mock Up Schematic” Attachment in Part 6, and in location shown on the drawings.

Price to DELETE CLIN 0001AD.

CLIN 0004

Price to design and provide Welding Booths described as Contractor Furnished/Contractor

Installed (CFCI) in “Equipment, Mock-Ups/Training Aids” Attachment in Part 6, as shown on “Typical Weld Booth Schematic” Attachment in Part 6, and per layout shown on the drawings.

Price to DELETE design and constructionof Fall Protection Mock Up described as ContractorFurnished/Contractor Installed (CFCI) in "Equipment, Mock-ups/Training Aids" Attachment in Part 6, as shown on "Fall Protection Mock Up Schematic" Attachment in Part 6, and in location shown in Part 6 Attachment "Drawings."

CLIN 0005

Price for design and construction work to remove temporary modular building and features associated with modular structures. Original construction drawings are included in Party 6 Attachment “Modular Building Drawings.” Work to remove modular buildings is described in Part 3 and 4, and shown on Drawing GI001 in Part 6 Attachment “Drawings.”

Price to DELETE design and construction of Welding Booths described as Contractor Furnished/Contractor Installed (CFCI) in "Equipment, Mock-ups/Training Aids" Attachment in Part 6, as shown on "Typical Weld Booth Schematic" Attachment in Part 6, and per layout shown in Part 6 Attachment "Drawings."

CLIN 0006

The CLIN description has changed from PLANNED MODIFICATION 1 to OPTION

ITEM 5.

The CLIN extended description has changed from:

Price to procure and install the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the plans and specifications and in accordance with the attached price proposal form.

Price to DELETE design and construction of rooftop Metal Panel Mechanical Screen Wall, as described in the RFP, and as shown on drawings in Part 6 Attachment "Drawings."

CLIN 0007

The CLIN description has changed from PLANNED MODIFICATION 2 to OPTION

ITEM 6.

The CLIN extended description has changed from:

Price to procure and install the Audio/Visual (A/V) systems complete in accordance with the plans and specifications in the attached schedule.

Price to REDUCE extent of curtainwall, design and construction, as described in the RFP, and as shown on drawings in Part 6 Attachment "Drawings."

CLIN 0008 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

OPTION OPTION ITEM 7

FFP

Price to REDUCE Crane run lengthh to 81 feet (grid NP to NV), and reduce the floor slab area that is subject to crane test weight and forklift loading, design and construction, as described in the RFP, and as shown on drawings in Part 6 Attachment "Drawings."

FOB: Destination

NET AMT

CLIN 0009 is added as follows:

OPTION OPTION ITEM 8

FFP

Price to CHANGE structural steel building structure to Pre-Engineered Metal Building (PEMB) structure, between column lines N1 through N9, NA through NV, design and construction, as described in the RFP, and as shown on drawings in Part 6 Attachment "Drawings."

CLIN 0010 is added as follows:

OPTION OPTION ITEM 9

FFP

Price to CHANGE structural steel building structure to Pre-Engineered Metal Building (PEMB) structure, between only column lines N1 through N4, NA through NV, design and construction, as described in the RFP, and as shown on drawings in Part 6 Attachment "Drawings."

CLIN 0011 is added as follows:

OPTION OPTION ITEM 10

FFP

Price to REDUCE the building finish floor to finish floor height, design and construction, as described in the RFP, and as shown on drawings in Part 6 Attachment "Drawings."

CLIN 0012 is added as follows:

PLANNED MODIFICATION ITEM 1

FFP

Price to procure and install the Ship Repair Training Facility Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications and in accordance with the following schedule.

Government FF&E Estimate: $4,553,050.00

HAR (NTE 5%): ______%

HAR Amount (GOV FF&E Estimate x HAR %): $__________ TOTAL FF&E Estimated Amount (FF&E Estimate + HAR Amount): $________

CLIN 0013 is added as follows:

PLANNED MODIFICATION ITEM 2

FFP

Price to procure and install the Ship Repair Training Facility AudioVisual (AV) systems complete in accordance with the drawings and specifications and the following schedule:

Government AV Estimate: $2,071,000.00

AV HAR (NTE 5%): ______%

HAR Amount (GOV AV Estimate x HAR %): $__________ TOTAL AV Estimated Amount (AV Estimate + HAR Amount): $________

INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0008:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

The following Acceptance/Inspection Schedule was added for CLIN 0009:

The following Acceptance/Inspection Schedule was added for CLIN 0010:

The following Acceptance/Inspection Schedule was added for CLIN 0011:

The following Acceptance/Inspection Schedule was added for CLIN 0012:

The following Acceptance/Inspection Schedule was added for CLIN 0013:

The following have been added by full text:

AMENDMENT 0002

This information pertains to only those offerors notified in writing that they have advanced to Phase II.

The purpose of this amendment is to provide the following:

1. Issue Phase II Solicitation Requirements to ONLY those offerors notified in writing that they they have advanced to Phase II.

2. Phase II proposal due date is: 10 April 2018 at 1400 EDT

3. Specification Pacakge WO# 1395851

4. Site Visit Information

5. Updated Wage Determination

6. Attachments

7. Pre-Proposal Inquiries (PPIs) Due Date

1. The evaluation factors, and non-price and price submittal requirements, are available in the solicitation and have not been reproduced in this amendment.

See Solicitation # N40085-18-R-1107 for Phase II Submission Requirements.

2. Phase II Proposal due date is 10 April 2018 at 1400 EDT

3. Specification Package WO# 1395851 and Supplementary Attachments (attached hereto):

1. 180202 Vol I of XI_Parts 1 thru 3-1395851.pdf

2. 180202 Vol II of XI_Parts 4 and 5-1395851.pdf

3. 180202 Vol III of XI_Part 6_Att A thru E_with photo edits-1395851.pdf

4. 180202 Vol IV of XI_Part 6_Att F thru N-1395851.pdf

5. 180202 Vol V of XI_Part 6_Att O thru Q-1395851.pdf

6. 180202 Vol VI of XI_Part 6_Att R thru V - reduced-1395851.pdf

7. 180202 Vol VII of XI_Part 6_Att W - reduced-1395851.pdf

8. 180202 Vol VIII of XI_Part 6_Att X thru AB-1395851.pdf

9. 180202 Vol IX of XI_Part 6_Att AC-1395851.pdf

10. 180202 Vol X of XI_Part 6_Att AD-1395851.pdf

11. 180202 Vol XI of XI_Part 6_Att AE-1395851.pdf 180202 Volume I of III_BOD MASTER_6798-1395851.pdf 180202 Volume II of III_BOD MASTER_6798-1395851.pdf 180202 Volume III of III_BOD MASTER_6798 - electronic only-1395851.pdf SECTION 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS-1395851.pdf

4. Site Visit Information: to be posted in future amendment.

5. This amendment hereby incorporates General Decision Number: VA180172 02/16/2018 VA172

6. The following attachments are provided:

NNSY Temporary Pass Request

7. Pre Proposal Inquiries (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. Additionally, all inquiries shall be submitted using the Pre-Proposal Inquiries form attached to this solicitation. All inquiries shall be submitted via email to Michelle Gooden, michelle.gooden@navy.mil no later than 14 days before the proposal due date. A response will be published as an amendment to the solicitation.

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

WAGE DETERMINATION

General Decision Number: VA180172 02/16/2018 VA172

Superseded General Decision Number: VA20170172

State: Virginia

Construction Type: Building

County: Portsmouth* County in Virginia.

* INDEPENDENT CITY OF PORTSMOUTH

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/16/2018

ASBE0024-006 10/01/2017

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 35.13 16.22

BOIL0045-003 01/01/2017

Rates Fringes

BOILERMAKER......................$ 32.72 25.26

* BRVA0008-001 02/01/2018

Rates Fringes

BRICKLAYER.......................$ 20.59 8.13

ELEC0080-010 06/01/2016

Rates Fringes

ELECTRICIAN (Includes Low Voltage Wiring and Alarm Installation)....................$ 27.49 14.67%+5.55+a

a. Workmen shall take off 2 hours with pay, at the discretion of the employer, on State and National Election days;

Tuesday following the first Monday in November, provided they are qualified and vote.

ELEV0052-005 01/01/2018

Rates Fringes

ELEVATOR MECHANIC................$ 40.06 32.645+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

b. VACATIONS: 6% men under 5 years based on regular hourly rate and 8% men over 5 years based on regular hourly rate for all hours worked.

ENGI0147-019 11/01/2013

Rates Fringes

POWER EQUIPMENT OPERATOR

Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100

ft. above ground............$ 28.30 8.69%+8.15 Cranes under 90 tons........$ 27.38 8.69%+8.15

IRON0079-012 05/01/2017

Rates Fringes

IRONWORKER, STRUCTURAL AND

ORNAMENTAL.......................$ 25.50 14.80

IRON0079-013 05/01/2017

Rates Fringes

IRONWORKER, RIGGER...............$ 25.50 14.80

PLUM0110-006 11/01/2017

Rates Fringes

PIPEFITTER (Includes HVAC Pipe, Unit and Temperature Controls Installations)..........$ 27.57 16.13

PLUM0540-010 05/01/2016

Rates Fringes

PLUMBER..........................$ 26.75 15.38

SUVA2013-045 01/11/2016

Rates Fringes

CARPENTER, Includes Acoustical Ceiling Installation, Drywall Hanging, and Form Work...........$ 17.00 0.00

CAULKER..........................$ 18.49 1.33

CEMENT MASON/CONCRETE FINISHER...$ 17.48 0.00

GLAZIER..........................$ 19.36 4.68

IRONWORKER, REINFORCING..........$ 27.18 4.13

LABORER: Mason Tender - Brick...$ 13.48 3.27

LABORER: Mason Tender - Cement/Concrete..................$ 12.96 3.12

LABORER: Common or General, Including Demolition and Pipelaying.......................$ 12.06 2.49

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 20.69 1.35

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03

OPERATOR: Bulldozer.............$ 18.07 3.50

OPERATOR: Forklift..............$ 19.40 7.00

OPERATOR: Loader................$ 21.28 3.17

OPERATOR: Roller................$ 16.25 4.88

PAINTER (Brush and Roller).......$ 16.87 0.00

PAINTER: Spray..................$ 18.10 5.43

ROOFER...........................$ 18.40 2.31

SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 19.24 2.80

SPRINKLER FITTER (Fire Sprinklers)......................$ 18.91 4.67

TILE FINISHER....................$ 23.40 0.00

TILE SETTER......................$ 27.80 10.25

TRUCK DRIVER: Dump Truck........$ 15.50 0.75

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION