View the file

Other files

File Type Posted
AMD0003.pdf PDF
23B0405 (SDs) ELINs in Excel SS.xlsx XLSX spreadsheet
AMD0001.pdf PDF
23B0405B (SDs)_Part7.pdf PDF
23B0405B (SDs)_Part6.pdf PDF
23B0405B (SDs)_Part9.pdf PDF
23B0405B (SDs)_Part5.pdf PDF
23B0405B (SDs)_Part10.pdf PDF
23B0405B (SDs)_Part1.pdf PDF
23B0405B (SDs)_Part2.pdf PDF
23B0405A (SF1449).pdf PDF
23B0405B (SDs)_Part8.pdf PDF
23B0405B (SDs)_Part4.pdf PDF
23B0405C (NOTICE).pdf PDF
23B0405B (SDs)_Part3.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5969918

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See revised SOW attached IAW specification SR#21828261/ePro#1740518 for PREVENTIVE MAINTENANCE (PM) AND SERVICE ORDERS FOR VARIOUS ELECTRIC SYSTEMS AT KANTO PLAIN BY COMBINATION CONTRACT OF RECURRING WORK & NON-RECURRING WORK /

INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) CONTRACT.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Jun-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008423B0405

X 9B. DATED (SEE ITEM 11)

18-May-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Jun-2023

CODE

NAVFAC FAR EAST

FEAD YOKOSUKA

PSC 473 BOX 13

FPO AP 96349-0013

N40084 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008423B0405

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMD#0002

1. The purpose of this amendment issuance is to provide the Government responses to the Bidder’s inquiries IAW revised SOW attached.

2. FAR Clause 52.216-19 ORDER LIMITATIONS (a) Minimum order amount revised as shown in this

AMD#0002.

3. The bid proposal due date (June 20, 2023, 10:30 AM) will be unchanged.

4. All other terms & conditions remain unchanged.

SECTION SF 1449 - CONTINUATION SHEET

TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 AMD#0001-S 139 19-MAY-2023 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 AMD#0002-S 164 05-JUN-2023 Attachment 2 Responses for

PBI_N4008423B0405

3 02-JUN-2023

Attachment 3 23B0405 (SDs) ELINs in Excel SS

64 05-JUN-2023

The following have been modified:

52.216-19 ORDER LIMITATIONS (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of

N4008423B0405 less than ¥300,000, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor -

(1) Any order for a single item in excess of ¥15,000,000;

(2) Any order for a combination of items in excess of ¥20,000,000; or

(3) A series of orders from the same ordering office within fifteen (15) days that together call for quantities exceeding the limitation in paragraph (b) (1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within seven (7) days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of clause)

(End of Summary of Changes)

Section C – 1502000 Facility Investment

1502000 – Facility Investment Table of Content Spec Item Title 1 General Information

1.1 Concept of Operations

2 Management and Administration

2.1 Definitions and Acronyms

2.2 Personnel

2.2.1 Certification, Training, and Licensing

2.3 Special Requirements

2.3.1 Workmanship and Material Standards

2.3.2 Historical Preservation

2.4 References and Technical Documents

3 Recurring Work

3.1 Service Orders

3.1.1 Emergency Service Orders

3.1.2 Urgent Service Orders

3.1.3 Routine Service Orders

3.2 Preventive Maintenance (PM) Program

3.2.1 Electric Power Distribution Systems

3.2.1.1 Extra High Voltage Receiving & Distribution Systems

3.2.1.2 Extra High Voltage Sub-station (Transformer)

3.2.1.3 Transformer (6600V High Voltage Cubicle Panel)

3.2.1.4 Auxiliary Generator Systems Including Permanent Generators

3.2.1.5 UPS Systems

3.2.2 Security Systems

3.2.2.1 Security Camera Systems

3.2.2.2 Information Systems including Emergency Calling Systems

3.2.2.3 Access Control Systems

3.2.2.4 Electric Card Lock Systems

3.2.3 Other Building Electric System

3.2.3.1 Emergency Light Systems

3.2.3.2 Lightning Arrestors and Grounding Devices

3.2.3.3 Electric Hot Water Supply Systems

3.2.3.4 Power Receiving System of Land Cranes

3.3 Actual Accumulated Repair Record

3.4 Detail Breakdown of ELIN /Sub ELIN Items

4 Non-Recurring Work

1502000 – Facility Investment Spec Item

Title Description

1 General Information

The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform Facility Investment services for various electrical equipment at Navy Region Japan to include the U.S. Naval Installations in Kanto Plain.

1.1 Concept of

Operations

The intent of 1502000 Facility Investment is to specify the requirements for Sustainment, Restoration, and Modernization (SRM) sub-functions only. The Facility Investment requirements within this sub-annex primarily consist of infrastructure sustainment and minimal restoration and modernization work.

Sustainment is the maintenance and repair necessary to keep an inventory of facilities and other assets in good working order. Restoration and modernization normally consists of major rehabilitation and capital improvements that is accomplished through other Navy programs. Some major repair, minor construction and stand-alone demolition may be accomplished as part of Facility Investment.

The Contractor shall perform maintenance, repair, alteration, demolition and minor construction for the following:

Building Systems -Electric Power Distribution Systems

• Extra High Voltage Receiving & Distribution Systems

• Extra High Voltage Sub-station (Transformer)

• Transformer (6600V High Voltage Cubicle Panel)

• Auxiliary Generator Systems including Permanent Generators

• Uninterruptible Power Supply (UPS) Systems

-Security Systems

• Security Camera Systems

• Information Systems including Electric Clock System and Emergency

Calling Systems

• Access Control Systems

• Electric Card Lock Systems

-Other Building Electric Systems

• Emergency Light Systems

• Lightning Arrestors and Grounding Devices

• Electric Hot Water Supply Systems

• 6600V High Voltage Power Receiving Systems of Land Cranes

Item

Title Description

2 Management and Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in J-1502000-01.

2.2 Personnel The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required for efficient operations within the FI function.

2.2.1 Certification, Training, and Licensing

Personnel working on systems, equipment or components containing chlorofluorocarbons (CFCs) and/or hydro-chlorofluorocarbons (HCFCs) must be certified under an Environmental Protection Agency (EPA) approved technical certification program per OPNAVINST 5090.1 Chapter 6.

a. Extra High Voltage Receiving & Distribution Systems: Preventive Maintenance

(PM) work for Extra High Voltage Receiving & Distribution Systems shall be performed under direction of “Dai-2-Syu Denki Shunin Gijyutsu-Sya” based on “Denki-Jigyou-Hou” in accordance with Japanese Law.

b. Transformer: Preventive Maintenance (PM) work for Transformer shall be performed under direction of “Dai-3-Syu Denki Shunin Gijyutsu-Sya” based on “Denki-Jigyou-Hou” in accordance with Japanese Law.

c. Auxiliary generator Systems:

(1) Personnel who are performed PM work at job site shall be technical personnel of

Original Equipment Manufacturer (OEM), or certified personnel by OEM and/or Agency of OEM.

(2) Leak test for fuel distribution systems of Auxiliary Generator Systems and repairing for fuel distribution piping: Person who is performing at job site shall have “Kikenbutsu-Toriatsukai-Syunin-Gijyutsu-Sya Otsu 4” certified “Zaidan- Houzin-Zenkoku-Kikenbutsu-Anzen-Kyoukai” in accordance with Japanese Law.

Note:

1) Personnel who perform repairing, replacement and cleaning work for other equipment connecting to Auxiliary Generator such as piping, wiring, dike wall, ventilation fan of room and/or access ladder are exempt of the above certification.

d. UPS Systems: Personnel who are performed PM work at job site shall be technical personnel of OEM, or certified personnel by OEM and/or Agency of OEM.

e. Emergency Light Systems: Personnel who is performed PM work at job site shall have “Kenchiku-Setsubi-Tenken-Shikaku” in accordance with Japanese Law “Kenchiku-Kijyun-Hou”.

f. Personnel working with or on electrical or electronic equipment must be trained and certified per NAVFAC MO-200 or the electricians who have license of first grade electrician, "Dai-1-syu Denki Kohjishi", or second grade electrician, "Dai-2-syu Denki Kohjishi", shall perform electrical work.

g. Power Receiving System of Land Cranes: PM, Quality Manager or on-site supervisor shall have license per JEAC 8021.

Item

Title Description

All maintenance trade personnel certifying or inspecting repair or maintenance work that does not require an inspector certified by a governing directive shall be qualified at the journeyman level.

The Contractor shall submit proof of all certification, training, and licensing requirements per Section F.

2.3 Special

Requirements

2.3.1 Workmanship

and Material Standards

The Contractor shall be responsible for maintaining all facilities, systems, and equipment, identified in this technical sub-annex, to a standard that prevents deterioration beyond that which results from normal wear and tear and corrects deficiencies in a timely manner to assure full life expectancy of the facilities, systems, and equipment. Best commercial practices shall be applied in the performance of work. All work shall be completed per approved and accepted industry and equipment manufacturers’ standards and shall comply with building and safety codes, applicable activity, local, state, and federal regulations, and other technical requirements identified within this technical sub-annex.

Workmanship for maintenance and repair shall include all work necessary to complete facility and system restoration, including touch-up painting and operational checks.

Upon completion of work, the Contractor shall ensure all facilities, systems, and equipment are free of missing components or defects which would affect the safety, appearance, or habitability of the facilities and structures or would prevent any electrical, mechanical, plumbing or structural system from functioning in accordance with design intent. Repairs shall be made in accordance with the manufacturers’ specifications and guidelines, and standard building codes. The quality of repairs shall meet the applicable standards and shall prevent any malfunction reoccurrences caused by poor workmanship or other contractor inadequacies. The quality of the repaired areas shall be fully compatible with adjacent surfaces or equipment. Except where otherwise specified, replacements shall match existing in dimensions, finish, color, design, and functionality and shall have an appearance similar to the original finished appearance with only minor unobjectionable deterioration resulting from normal use.

The Contractor shall not allow debris to spread unnecessarily into adjacent areas nor accumulate in the work area. All such debris, excess material, and parts shall be cleaned up and removed at the completion of the job and at the end of each day work is in progress. Upon completion of work, any stains and other unsightly marks shall be removed.

2.3.2 Historical

Preservation

Buildings and facilities designated as historical sites shall be maintained in accordance with Federal, state, and local historical policies and regulations.

2.4 References and

Technical Documents

References and Technical Documents are listed in J-1502000-02.

CUI // FEDCON

SECTION C – 1502000

FACILITY INVESTMENT

Item

Title Performance Objective

Related Information Performance Standard

3 Recurring Work The Contractor shall maintain, repair, and alter Building Systems to ensure they are fully functional and in normal working condition.

The Contractor shall develop, implement, and execute a Service Order, Maintenance Program, Inspection, Testing, and Certification Program, and Other Recurring Service Program to maintain and repair Building Systems.

The Contractor shall maintain all maintenance, repair, and alteration data and warranty records in the technical library in accordance with Annex 2.

Unless otherwise specified herein after, the Contractor shall perform any repairs including replacement work discovered during one scheduled Preventive Maintenance (PM) work and one service order for one system by each facility up to a total of ¥300,000 in total cost of direct material cost, labor cost and overhead profit under recurring portion of the contract at no additional cost to the Government.

The following items are exception of the Contractor’s responsibilities of recurring work limits for the building systems and miscellaneous.

• Loss or damage caused by the fault or negligence of the Government.

• Loss or damage caused by natural disaster.

The Contractor shall maintain all maintenance, repair, and alteration data and warranty records in the technical library in accordance with Annex 2.

The Contractor shall provide all necessary test instruments, equipment, and tools required to perform maintenance and repair.

Building Systems are in normal working condition and function properly in accordance with specified standards.

Spec Item

Title Performance Objective

Related Information Performance Standard

Location maps are provided in J-1502000-03.

Historical minor repair record is provided in J-1502000-04.

Historical major repair record is provided in J-1502000-05.

3.1 Service Orders The Contractor shall

perform service order work in a timely manner and ensure Building Systems are restored to a safe, normal working condition and function properly.

The Contractor shall receive service orders in accordance with the work reception requirements in Annex 2.

The Contractor shall schedule and perform service orders in a way that minimizes disruptions to customers and Government operations.

The Government may issue service orders for work requirements at any location within the defined boundaries of this contract for any reason at the discretion of the KO.

Service order work will be issued for the listed inventories of this Contract.

Historical service order workload are provided in J- 1502000-04. Historical data and supporting information provided is intended to illustrate the volume of service orders issued and examples of work that has been performed in the past and is not to be construed as a limiting factor to services ordered and performed in the future.

Descriptions of the classifications of service orders (emergency, urgent, and routine) are provided in the Definitions and Acronyms in J- 1502000-01. These descriptions are provided for reference and the Contractor shall perform service orders per

Service order work is responded to and completed within the specified time.

Building Systems are restored to normal working condition, including recertification if applicable.

When repair is complete the Building Systems does not present danger to personnel or equipment.

Spec Item

Title Performance Objective

Related Information Performance Standard the requirements below based on the classification assigned by the Government.

The Contractor shall maintain sufficient materials and equipment on hand to support service order work requirements. Lack of availability of material or equipment will not relieve the Contractor from the requirement to complete service order work within the time limits specified.

The Government may combine multiple repair requirements received for the same trade in the same building or structure at the same time into one service order as long as the service order threshold is not exceeded.

The Contractor shall notify the KO upon identification that the service order will exceed the liability limits specified below in accordance with reporting requirements in Annex 2.

The Contractor shall submit a monthly summary of completed service orders per Section F.

3.1.1 Emergency

Service Orders

The Contractor shall respond to emergency service orders and arrest emergent conditions to minimize and mitigate damage to Building Systems and danger to personnel.

The Contractor shall respond to emergency service orders with the appropriate service personnel and equipment to commence work within two hours during the normal government hours and 4 hours after Government hours.

The Contractor shall remain at the work site until the emergency has been arrested.

The emergency service order is complete once the emergency has been arrested. The Government may issue an urgent or routine service order

The Contractor shall perform emergency service orders 24 hours a day, seven days a week throughout the contract period after receiving emergency service order.

Emergency service orders responded to within two hours of receipt of call.

Emergency service orders are arrested within 24 hours of receipt of call.

Spec Item

Title Performance Objective

Related Information Performance Standard or non-recurring work task order for the follow-on work required to repair/restore the facility, ground structure, personal property equipment or installed equipment and system.

Work is continued without interruption until emergent condition is arrested.

3.1.2 Urgent Service

Orders

The Contractor shall complete urgent service orders in a timely manner and ensure Building Systems are restored to a safe, normal working condition and function properly.

The Contractor shall perform urgent service orders to repair deficiencies without extended delay, therefore preventing further damage to Building Systems.

Urgent service orders are completed within five working days.

3.1.3 Routine Service

Orders

The Contractor shall complete routine service orders in a timely manner and ensure Building Systems are restored to a safe, normal working condition and function properly.

The Contractor shall perform routine service orders to repair deficiencies and return Building Systems to normal working condition.

Performance of routine service orders is not required outside of Government regular working hours.

Routine service orders are completed within 30 calendar days.

3.2 Preventive

Maintenance (PM) Program

The Contractor shall develop and implement a PM program for Building Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

The Contractor shall develop and submit a PM program for each building and each system per Section F.

Notification of repair work exceeding the incidental repairs limit shall be submitted to the KO per Section F. A service order or non-recurring work task order may be issued for repairs exceeding the incidental repairs limit.

The Contractor shall not use breakdown maintenance as part of the PM program.

The PM program shall provide an economical approach manufacturers’ recommended procedures, OEM standards, and maintenance required to satisfy equipment warranties and keep Building Systems in normal working condition.

Maintenance is accomplished in accordance with the Contractor’s PM program and work schedule.

PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.

Spec Item

Title Performance Objective

Related Information Performance Standard

Excessive or repeated system or equipment breakdowns or deficiencies may indicate the need to adjust or modify the Contractor’s PM program.

These changes will be made at no additional cost to the Government.

Site condition information is provided in J-1502000-06.

Detail attachment list is provided in J-1502000-07.

The Contractor shall submit a monthly PM work schedule.

The Contractor shall submit result of PM work report for each building and each system per section F.

3.2.1 Electric Power

Distribution Systems

The Contractor shall maintain Extra High Voltage Receiving & Distribution Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

PM work shall be performed in accordance with Japanese Law and OEM recommended procedure and maintenance manual.

performed in accordance with Contractor's PM program and work schedule.

3.2.1.1 Extra High

Voltage Receiving & Distribution Systems

The Contractor shall maintain Extra High Voltage Receiving & Distribution Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

PM work shall be performed in accordance with OEM recommended procedure and maintenance manual.

Note:

1) The Government will perform electrical main power shut down and start up prior to the Contractor starting the PM work and after completion of the PM work.

Maintenance is performed in accordance with Contractor's PM program and work schedule.

3.2.1.2 Extra High

Voltage Sub-station (Transformer)

The Contractor shall maintain Extra High Voltage Sub-station (Transformer) to ensure proper operation, to minimize breakdowns, and to maximize useful life.

PM work shall be performed in accordance with OEM recommended procedure and maintenance manual.

Note:

1) The Government will perform electrical main power shut down and start up prior to the Contractor

Maintenance is performed in accordance with Contractor's PM program and work schedule.

Spec Item

Title Performance Objective

Related Information Performance Standard starting the PM work and after completion of the PM work.

3.2.1.3 Transformer

(6600V High Voltage Cubicle Panel)

The Contractor shall maintain Transformer to ensure proper operation, to minimize breakdowns, and to maximize useful life.

PM work shall be performed in accordance with “Preservation Regulation (HOANKITEI) of Japanese Law (DENKI JIGYO- HO) and shall be performed under direction of the certified personnel specified in Spec Item 2.2.1 in this Annex.

Maintenance is performed in accordance with Contractor's PM program and work schedule.

3.2.1.4 Auxiliary

Generator Systems Including Permanent Generators

The Contractor shall maintain Auxiliary Generator Systems including Permanent Generators to ensure proper operation, to minimize breakdowns, and to maximize useful life.

PM work shall be performed in accordance with OEM recommended procedure, maintenance manual and Japanese Law.

Maintenance is performed in accordance with Contractor's PM program and work schedule.

3.2.1.5 UPS Systems The Contractor shall

maintain UPS Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

PM work shall be performed in accordance with Japanese Law and OEM maintenance procedure.

Maintenance is performed in accordance with Contractor's PM program and work schedule.

3.2.2 Security Systems The Contractor shall

maintain Security Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

PM work shall be performed in accordance with Japanese Law and OEM maintenance procedure.

accordance with Contractor's PM program and work schedule.

3.2.2.1 Security Camera

Systems

The Contractor shall maintain Security Camera Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

PM work shall be performed in accordance with Japanese Law accordance with Contractor's PM program and work schedule.

3.2.2.2 Information

Systems including Emergency Calling Systems

The Contractor shall maintain Information Systems including Emergency Calling Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

PM work shall be performed in accordance with Japanese Law and OEM maintenance procedure.

The Information Systems including Emergency calling Systems are composed with the following systems.

1. Public Address (PA)

Systems

2. Electric Clock Systems

3. Emergency Calling Systems

Maintenance is performed in accordance with Contractor's PM program and work schedule.

Spec Item

Title Performance Objective

Related Information Performance Standard

4. LED Message Board Systems

3.2.2.3 Access Control

Systems

The Contractor shall maintain Access Control Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

PM work shall be performed in accordance with Japanese Law accordance with Contractor's PM program and work schedule.

3.2.2.4 Electric Card

Lock Systems

The Contractor shall maintain Electric Card Lock systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

PM work shall be performed in accordance with Japanese Law and OEM maintenance procedure.

Maintenance is performed in accordance with Contractor's PM program and work schedule.

3.2.3 Other Building

Electric System

The Contractor shall maintain Other Building Electric System to minimize breakdowns, and to maximize useful life.

PM work shall be performed in accordance with Japanese Law accordance with Contractor's PM program and work schedule.

3.2.3.1 Emergency Light

Systems

The Contractor shall maintain Emergency Light Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

PM Work shall be performed at Annually and in accordance with Japanese Law “Kenchiku- Kijyun-How”.

accordance with Contractor's PM program and work schedule.

3.2.3.2 Lightning

Arrestors and Grounding Devices

The Contractor shall maintain Lightning Arrestors and Grounding Devices to ensure proper operation, to minimize breakdowns, and to maximize useful life.

PM Work shall be performed at Annually and in accordance with JIS A 4201 4.2 (Inspection and Maintenance).

accordance with Contractor's PM program and work schedule.

3.2.3.3 Electric Hot

Water Supply Systems

The Contractor shall maintain electric hot water supply systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

PM work shall be performed in accordance with Japanese Law accordance with Contractor's PM program and work schedule.

3.2.3.4 Power Receiving

System of Land Cranes

The Contractor shall maintain power receiving system to ensure proper operation, to minimize breakdowns, and to maximize useful life.

The Contractor shall maintain, inspect, and test Power Receiving System in accordance with approved PM program.

The work shall be done under supervised person who is

Maintenance is performed in accordance with Contractor's PM program and work schedule.

Tsutomu.Toriyama.JA Line

Spec Item

Title Performance Objective

Related Information Performance Standard licensed conforming to JEAC 8021.

Note:

1) The Government will perform electrical main power shut down and start up prior to the Contractor starting the PM work and after completion of the PM work.

3.3 Actual

Accumulated Repair Record

The Contractor shall submit accumulated repair record.

The Contractor shall submit actual accumulated minor repair (Within prescribed limit) record including service order record that is same form as J- 1502000-04, and actual accumulated major work record that is same form as J-1502000- 05 per section F.

Submittal shall be submitted in the time frame.

3.4 Detail

Breakdown of ELIN /Sub ELIN Items

The Contractor shall submit detail bid price breakdown of ELIN /Sub ELIN Items.

The Contractor shall submit detail breakdown of bid prices for Exhibit Line Item Number (ELIN) /Sub ELIN Items by each period per Section F.

Sample detail breakdown sheet is provided in J-1502000-08.

Submittal shall be submitted in the time frame.

Item

Title Performance Objective

Related Information Performance Standard

4 Non-Recurring Work

Non-recurring work may be ordered utilizing Fed-Mall in accordance with Section C or on a task order in accordance with the

PROCEDURES FOR

ISSUING ORDERS

clause in Section C.

The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.

Refer to Non-recurring work ELINs for task listings, descriptions and related requirements. All periods of performance are measured from issue date of order to acceptance of the work.

Non-recurring work orders may be placed for Various Electrical Systems not originally identified on the equipment list.

Performance Standards for Non-recurring work will be the same as those in Spec Item 3 where applicable.

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON

Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

A001 CNIC Funding Portion

A001-001 NDK-100134

A001-001-01 Transformer

A001-001-01-1 Monthly PM Work 12 TM -¥ -¥ A001-001-01-2 Annual PM Work 1 TM -¥ -¥ A001-001-01-3 Service Order 12 MO -¥ -¥

A001-001-02 Electric Hot Water Supply System

A001-001-02-1 Semiannual PM Work 2 TM -¥ -¥ A001-001-02-2 Service Order 12 MO -¥ -¥

A001-002 YSK-1397

A001-002-01 Auxiliary Generator System

A001-002-01-1 Semiannual PM Work 2 TM -¥ -¥ A001-002-01-2 Annual PM Work 1 TM -¥ -¥ A001-002-01-3 Service Order 12 MO -¥ -¥

A001-003 YSK-1805

A001-003-01 Security Camera System

A001-003-01-1 Annual PM Work 1 TM -¥ -¥ A001-003-01-2 Service Order 12 MO -¥ -¥

A001-004 YSK-1922

A001-004-01 Emergency Light System

A001-004-01-1 Annual PM Work 1 TM -¥ -¥ A001-004-01-2 Service Order 12 MO -¥ -¥

SOLICITATION/CONTRACT #

EXHIBIT A - CLIN 9000

Line Item 0001 Recurring - Base Period

ELINs A001 through A007

NDK-100134 Total

Transformer Total

Electric Hot Water Supply System Total

Security Camera System Total YSK-1805 Total

Emergency Light Systems Total YSK-1922 Total

Auxiliary Generator System Total YSK-1397 Total

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

A001-005 YSK-1942

A001-005-01 Auxiliary Generator System (D825D5A)

A001-005-01-1 Quarterly PM Work 4 TM -¥ -¥ A001-005-01-2 Semiannual PM Work 2 TM -¥ -¥ A001-005-01-3 Annual PM Work 1 TM -¥ -¥ A001-005-01-4 Service Order 12 MO -¥ -¥

A001-005-02 Auxiliary Generator System (DQCA1339512)

A001-005-02-1 Quarterly PM Work 4 TM -¥ -¥ A001-005-02-2 Semiannual PM Work 2 TM -¥ -¥ A001-005-02-3 Annual PM Work 1 TM -¥ -¥ A001-005-02-4 Service Order 12 MO -¥ -¥

A001-006 YSK-1969

A001-006-01 Electric Card Lock System

A001-006-01-1 Annual PM Work 1 TM -¥ -¥ A001-006-01-2 Service Order 12 MO -¥ -¥

A001-006-02 Security Camera System

A001-006-02-1 Semiannual PM Work 2 TM -¥ -¥ A001-006-02-2 Service Order 12 MO -¥ -¥

A001-007 YSK-2043

A001-007-01 Emergency Light System

A001-007-01-1 Annual PM Work 1 TM -¥ -¥ A001-007-01-2 Service Order 12 MO -¥ -¥

A001-008 YSK-2046

A001-008-01 Emergency Light System

A001-008-01-1 Annual PM Work 1 TM -¥ -¥ A001-008-01-2 Service Order 12 MO -¥ -¥

A001-008-02 UPS System

A001-008-02-1 Annual PM Work 1 TM -¥ -¥ A001-008-02-2 Service Order 12 MO -¥ -¥

Auxiliary Generator System (D825D5A) Total

Auxiliary Generator System (DQCA1339512) Total

Emergency Light Systems Total

YSK-2046 Total

Electric Card Lock System Total

YSK-2043 Total

Emergency Light Systems Total

YSK-1969 Total

YSK-1942 Total

UPS System Total

Security Camera System Total

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

A001-009 YSK-2067

A001-009-01 Emergency Light System

A001-009-01-1 Annual PM Work 1 TM -¥ -¥ A001-009-01-2 Service Order 12 MO -¥ -¥

A001-010 YSK-2068

A001-010-01 Emergency Light System

A001-010-01-1 Annual PM Work 1 TM -¥ -¥ A001-010-01-2 Service Order 12 MO -¥ -¥

A001-011 YSK-2078

A001-011-01 Emergency Light System

A001-011-01-1 Annual PM Work 1 TM -¥ -¥ A001-011-01-2 Service Order 12 MO -¥ -¥

A001-012 YSK-3014

A001-012-01 Emergency Light System

A001-012-01-1 Annual PM Work 1 TM -¥ -¥ A001-012-01-2 Service Order 12 MO -¥ -¥

A001-013 YSK-3128

A001-013-01 Auxiliary Generator Systems

A001-013-01-1 Annual PM Work 1 TM -¥ -¥ A001-013-01-2 Service Order 12 MO -¥ -¥

A001-014 YSK-3154

A001-014-01 Auxiliary Generator System

A001-014-01-1 Annual PM Work 1 TM -¥ -¥ A001-014-01-2 Service Order 12 MO -¥ -¥

A001-015 YSK-3169

A001-015-01 Auxiliary Generator System

A001-015-01-1 Semiannual PM Work 2 TM -¥ -¥ A001-015-01-2 Annual PM Work 1 TM -¥ -¥ A001-015-01-3 Service Order 12 MO -¥ -¥

YSK-3154 Total

Auxiliary Generator System Total

Auxiliary Generator System Total

Auxiliary Generator System Total

YSK-2068 Total

Emergency Light Systems Total YSK-2078 Total

Emergency Light Systems Total YSK-3014 Total

YSK-2067 Total Emergency Light Systems Total

Emergency Light Systems Total

YSK-3128 Total

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC A001-015-02 UPS System

A001-015-02-1 Annual PM Work 1 TM -¥ -¥ A001-015-02-2 Service Order 12 MO -¥ -¥

A001-016 YSK-3365

A001-016-01 PA Systems

A001-016-01-1 Semiannual PM Work 2 TM -¥ -¥ A001-016-01-2 Service Order 12 MO -¥ -¥

A001-016-02 Electric Clock Systems

A001-016-02-1 Semiannual PM Work 2 TM -¥ -¥ A001-016-02-2 Service Order 12 MO -¥ -¥

A001-016-03 Emergency Calling Systems

A001-016-03-1 Annual PM Work 1 TM -¥ -¥ A001-016-03-2 Service Order 12 MO -¥ -¥

A001-017 YSK-3391

A001-017-01 Auxiliary Generator System

A001-017-01-1 Annual PM Work 1 TM -¥ -¥ A001-017-01-2 Service Order 12 MO -¥ -¥

A001-018 YSK-3816

A001-018-01 Auxiliary Generator System

A001-018-01-1 Annual PM Work 1 TM -¥ -¥ A001-018-01-2 Service Order 12 MO -¥ -¥

A001-018-02 UPS System

A001-018-02-1 Semiannual PM Work 2 TM -¥ -¥ A001-018-02-2 Service Order 12 MO -¥ -¥

A001-019 YSK-5229

A001-019-01 Lightning Arrestors and Grounding Devices

A001-019-01-1 Annual PM Work 1 TM -¥ -¥ A001-019-01-2 Service Order 12 MO -¥ -¥

PA Systems Total

Electric Clock Systems Total

YSK-3169 Total

Auxiliary Generator System Total

Lightning Arrestors and Grounding Devices Total

YSK-3816 Total

YSK-3365 Total

Auxiliary Generator System Total YSK-3391 Total

UPS System Total

UPS System Total

YSK-5229 Total

Emergency Calling Systems Total

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

A001-020 YSK-F69

A001-020-01 Auxiliary Generator System

A001-020-01-1 Quarterly PM Work 4 TM -¥ -¥ A001-020-01-2 Semiannual PM Work 2 TM -¥ -¥ A001-020-01-3 Annual PM Work 1 TM -¥ -¥ A001-020-01-4 Service Order 12 MO -¥ -¥

A001-021 YSK-561

A001-021-01 Auxiliary Generator System

A001-021-01-1 Quarterly PM Work 4 TM -¥ -¥ A001-021-01-2 Annual PM Work 1 TM -¥ -¥ A001-021-01-3 Service Order 12 MO -¥ -¥

A001-022 YSK-4818

A001-022-01 Permanent Generator System (DCA-60LSIB)

A001-022-01-1 Semiannual PM Work 2 TM -¥ -¥ A001-022-01-2 Annual PM Work 1 TM -¥ -¥ A001-022-01-3 Service Order 12 MO -¥ -¥

A001-022-02 Permanent Generator System (DCA-300SPK3)

A001-022-02-1 Quarterly PM Work 4 TM -¥ -¥ A001-022-02-2 Semiannual PM Work 2 TM -¥ -¥ A001-022-02-3 Annual PM Work 1 TM -¥ -¥ A001-022-02-4 Service Order 12 MO -¥ -¥

Auxiliary Generator System Total YSK-561 Total

Auxiliary Generator System Total YSK-F69 Total

Permanent Generator System (DCA-60LSIB) Total

Permanent Generator System (DCA-300SPK3) Total YSK-4818 Total

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

A001-023 YSK-2053

A001-023-01 Auxiliary Generator System

A001-023-01-1 Annual PM Work 1 TM -¥ -¥ A001-023-01-2 Service Order 12 MO -¥ -¥

A001-024 YSK-1997

A001-024-01 Auxiliary Generator System

A001-024-01-1 Quarterly PM Work 4 TM -¥ -¥ A001-024-01-2 Annual PM Work 1 TM -¥ -¥ A001-024-01-3 Biennial PM Work 1 TM -¥ -¥ A001-024-01-4 Service Order 12 MO -¥ -¥

A001-025 IKE-843

A001-025-01 UPS System

A001-025-01-1 Simple PM Work 1 TM -¥ -¥ A001-025-01-2 Detail PM Work 1 TM -¥ -¥ A001-025-01-3 Service Order 12 MO -¥ -¥

A001-026 Extra High Voltage Receiving & Distribution Systems A001-026-01 Yokosuka Area

A001-026-01-1 YSK-B94 C-GIS Regular inspection, etc. 1 TM -¥ -¥ A001-026-01-2 YSK-1278 Power distribution panel Insulation degradation diagnosis, etc. 1 TM -¥ -¥ A001-026-01-3 YSK-1923 Power distribution panel Insulation degradation diagnosis, etc. 1 TM -¥ -¥ A001-026-01-4 YSK-1805 Power distribution panel Insulation degradation diagnosis, etc. 1 TM -¥ -¥ A001-026-01-5 YSK-1805 FC Facilities On-line Diagnosis 1 TM -¥ -¥ A001-026-01-6 YSK-1805 FC Facilities Full-fledged Inspection, Panel Inspection for #4 FC 1 TM -¥ -¥ A001-026-01-7 Service Order 12 MO -¥ -¥

A001-026-02 Ikego Area

A001-026-02-1 Preparing Work 1 LS -¥ -¥ A001-026-02-2 Service Order 12 MO -¥ -¥

-¥ Extra High Voltage Receiving & Distribution Systems Total

Yokosuka Area Total

Auxiliary Generator System Total YSK-2053 Total

UPS System Total IKE-843 Total

Ikego Area Total

YSK-1997 Total

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

A001-027 AZU-8600376

A001-027-01 Electric Hot Water Supply System

A001-027-01-1 Semiannual PM Work 2 TM -¥ -¥ A001-027-01-2 Service Order 12 MO -¥ -¥

A001-028 Extra High Voltage Sub-station (Transformer) A001-028-01 Yokosuka Area

A001-028-01-1 Detail Inspection Work for VCB 1 TM -¥ -¥ A001-028-01-2 LDS Replacement Work 1 LS -¥ -¥ A001-028-01-3 Service Order 12 MO -¥ -¥

A002 USNH Funding Portion

A002-001 YSK-1400

A002-001-01 Security Camera System

A002-001-01-1 Semiannual PM Work 2 TM -¥ -¥ A002-001-01-2 Service Order 12 MO -¥ -¥

A002-002 YSK-1400, 1407, 3201 & 3219

A002-002-02 Electric Card Lock System

A002-002-02-1 Semiannual PM Work 2 TM -¥ -¥ A002-002-02-2 Annual PM Work 1 TM -¥ -¥ A002-002-02-3 Service Order 12 MO -¥ -¥

Security Camera System Total

CNIC Funding Portion Total Extra High Voltage Sub-station (Transformer) Total

AZU-8600376 Total

USNH Funding Portion Total

Electric Card Lock System Total YSK-1400 & 1407 Total

YSK-1400 Total

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC A003 DLA ENERGY / FUEL (FLCY) Funding Portion

A003-001 AZU-8600441

A003-001-01 Auxiliary Generator System

A003-001-01-1 Annual PM Work 1 TM -¥ -¥ A003-001-01-2 Service Order 12 MO -¥ -¥

A003-002 AZU-15F

A003-002-01 Auxiliary Generator System (2 Sets of Auxiliary Generator Units)

A003-002-01-1 Annual PM Work w/ Replacement Work 1 TM -¥ -¥ A003-002-01-2 Service Order 12 MO -¥ -¥

A003-003 TSU-4200200

A003-003-01 Auxiliary Generator System

A003-003-01-1 Annual PM Work w/ Replacement Work 1 TM -¥ -¥ A003-003-01-2 Service Order 12 MO -¥ -¥

A003-004 TSU-4300394

A003-004-01 Auxiliary Generator System

A003-004-01-1 Annual PM Work w/ Replacement Work 1 TM -¥ -¥ A003-004-01-2 Service Order 12 MO -¥ -¥

A004 SRF Funding Portion

A004-001 YSK-2046

A004-001-01 Access Control Systems System

A004-001-01-1 Semiannual PM Work 2 TM -¥ -¥ A004-001-01-2 Service Order 12 MO -¥ -¥

A004-002 YSK-B12

A004-002-01 Power Receiving System of Land Cranes LC-47 & 48

A004-002-01-1 Annual PM Work (Type B) 1 TM -¥ -¥ A004-002-01-2 Initial Repair Work 1 TM -¥ -¥ A004-002-01-3 Service Order 12 MO -¥ -¥

YSK-2046 Total

Auxiliary Generator System Total AZU-8600441 Total

Access Control Systems Total

YSK-B12 Total Power Receiving System of Land Cranes Total

SRF Funding Portion Total

Auxiliary Generator System Total TSU-4300394 Total

DLA ENERGY / FUEL (FLCY) Funding Portion Total

Auxiliary Generator System Total AZU-15F Total

TSU-4200200 Total

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC A005 DODDS Funding Portion A005-001 YSK-1292 (Sullivan School) A005-001-01 LED Massage Board System

A005-001-01-1 Annual PM Work 1 TM -¥ -¥ A005-001-01-2 Service Order 12 MO -¥ -¥

A005-002 YSK-1901 (Kinnick High School) A005-002-01 Electric Card Lock System

A005-002-01-1 Annual PM Work 1 TM -¥ -¥ A005-002-01-2 Service Order 12 MO -¥ -¥

A005-002-02 LED Massage Board System

A005-002-02-1 Annual PM Work 1 TM -¥ -¥ A005-002-02-2 Service Order 12 MO -¥ -¥

A005-003 IKE-774

A005-003-01 Security Camera System

A005-003-01-1 Annual Semiannual PM Work 1 2 TM -¥ -¥ A005-003-01-2 Service Order 12 MO -¥ -¥

A005-004 IKE-824S

A005-004-01 Security Camera System

A005-004-01-1 Annual Semiannual PM Work 1 2 TM -¥ -¥ A005-004-01-2 Service Order 12 MO -¥ -¥

A005-004-02 PA Systems

A005-004-02-1 Semiannual PM Work 2 TM -¥ -¥ A005-004-02-2 Service Order 12 MO -¥ -¥

A005-004-03 Electric Clock Systems

A005-004-03-1 Semiannual PM Work 2 TM -¥ -¥ A005-004-03-2 Service Order 12 MO -¥ -¥

A005-004-04 Emergency Calling Systems

A005-004-04-1 Annual PM Work 1 TM -¥ -¥ A005-004-04-2 Service Order 12 MO -¥ -¥

Security Camera System Total

PA Systems Total

Electric Clock Systems Total

Emergency Calling Systems Total

Electric Card Lock System Total

YSK-1901 Total

YSK-1292 Total LED Massage Board System Total

LED Massage Board System Total

IKE-774 Total

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC A005-004-05 Interphone Systems

A005-004-05-1 Annual PM Work 1 TM -¥ -¥ A005-004-05-2 Service Order 12 MO -¥ -¥

A005-004-06 LED Massage Board System

A005-004-06-1 Annual PM Work 1 TM -¥ -¥ A005-004-06-2 Service Order 12 MO -¥ -¥

A005-004-07 Eco Hot Water Supply System

A005-004-07-1 Semiannual PM Work 2 TM -¥ -¥ A005-004-07-2 Annual PM Work 1 TM -¥ -¥ A005-004-07-3 Service Order 12 MO -¥ -¥

A005-005 IKE-827

A005-005-01 Electric Water Heater Tank System

A005-005-01-1 Semiannual PM Work 2 TM -¥ -¥ A005-005-01-2 Service Order 12 MO -¥ -¥

A006 HOUSING Funding Portion

A006-001 YSK-3849 (SHOBU)

A006-001-01 Auxiliary Generator System

A006-001-01-1 Annual PM Work 1 TM -¥ -¥ A006-001-01-2 Service Order 12 MO -¥ -¥

A006-002 YSK-3853 (TSUBAKI)

A006-002-01 Auxiliary Generator System

A006-002-01-1 Annual PM Work 1 TM -¥ -¥ A006-002-01-2 Service Order 12 MO -¥ -¥

Electric Hot Water Supply System Total IKE-827 Total

Interphone Systems Total

Auxiliary Generator System Total YSK-3849 Total

Auxiliary Generator System Total YSK-3853 Total

LED Massage Board System Total

DODDS Funding Portion Total

IKE-824S Total Electric Hot Water Supply System Total

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

A006-003 YSK- 4401 (BARA)

A006-003-01 Auxiliary Generator System

A006-003-01-1 Annual PM Work 1 TM -¥ -¥ A006-003-01-2 Service Order 12 MO -¥ -¥

A006-004 YSK- 4402 (UME)

A006-004-01 Auxiliary Generator System

A006-004-01-1 Annual PM Work 1 TM -¥ -¥ A006-004-01-2 Service Order 12 MO -¥ -¥

A007 DLA DISTRIBUTION

A007-001 YSK-1907

A007-001-01 Auxiliary Generator System

A007-001-01-1 Annual Dummy Load Test 1 TM -¥ -¥ A007-001-01-2 Annual PM Work 1 TM -¥ -¥ A007-001-01-3 Service Order 12 MO -¥ -¥

TOTAL RECURRING LINE ITEMS -¥

MO=Month, TM=Time

Auxiliary Generator System Total YSK-1907 Total

DLA DISTRO / DDYJ Portion Total

HOUSING Funding Portion Total

Auxiliary Generator System Total YSK- 4401 Total

YSK- 4402 Total

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON

SPEC ITEM 4

ELIN Product Name (120 Characters)

Description Extended Estimated Quantity

Unit of Issue

Unit Price Extended Price IMAP

CAC

A700 Major Repair Work (Negotiated)

Major Repair Work is consists of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in IDIQ work. Performance of specific maintenance, repair, and alteration work that exceeds the FFP limitations of a service call or PM repair. Task order completion times will be specified in task order.

1 LS ¥ 200,000,000

TOTAL NON-RECUURRING PRICE ¥ 200,000,000

HR = Hour LS = Lump Sum EA = Each

SOLICITATION/CONTRACT #

EXHIBIT A - CLIN 9000

ELINs A700

Line Item 0002 Non-Recurring Price - Base Period PROVIDE PRICES FOR FACILITY INVESTMENT - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON

Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

B001 CNIC Funding Portion

B001-001 NDK-100134

B001-001-01 Transformer

B001-001-01-1 Monthly PM Work 12 TM -¥ -¥ B001-001-01-2 Annual PM Work 1 TM -¥ -¥ B001-001-01-3 Service Order 12 MO -¥ -¥

B001-001-02 Electric Hot Water Supply System

B001-001-02-1 Semiannual PM Work 2 TM -¥ -¥ B001-001-02-2 Service Order 12 MO -¥ -¥

B001-002 YSK-1397

B001-002-01 Auxiliary Generator System

B001-002-01-1 Semiannual PM Work 2 TM -¥ -¥ B001-002-01-2 Annual PM Work 1 TM -¥ -¥ B001-002-01-3 Service Order 12 MO -¥ -¥

B001-003 YSK-1805

B001-003-01 Security Camera System

B001-003-01-1 Annual PM Work 1 TM -¥ -¥ B001-003-01-2 Scheduled Replacement Work 1 TM -¥ -¥ B001-003-01-3 Service Order 12 MO -¥ -¥

B001-004 YSK-1922

B001-004-01 Emergency Light System

B001-004-01-1 Annual PM Work 1 TM -¥ -¥ B001-004-01-2 Service Order 12 MO -¥ -¥

SOLICITATION/CONTRACT #

EXHIBIT B - CLIN 9001

Line Item 0003 Recurring - First Option Period

ELINs B001 through B007

Transformer Total

Emergency Light Systems Total YSK-1922 Total

Electric Hot Water Supply System Total NDK-100134 Total

Auxiliary Generator System Total YSK-1397 Total

YSK-1805 Total

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

B001-005 YSK-1942

B001-005-01 Auxiliary Generator System (D825D5A)

B001-005-01-1 Quarterly PM Work 4 TM -¥ -¥ B001-005-01-2 Semiannual PM Work 2 TM -¥ -¥ B001-005-01-3 Annual PM Work 1 TM -¥ -¥ B001-005-01-4 Service Order 12 MO -¥ -¥

B001-005-02 Auxiliary Generator System (DQCA1339512)

B001-005-02-1 Quarterly PM Work 4 TM -¥ -¥ B001-005-02-2 Semiannual PM Work 2 TM -¥ -¥ B001-005-02-3 Annual PM Work 1 TM -¥ -¥ B001-005-02-4 Service Order 12 MO -¥ -¥

B001-006 YSK-1969

B001-006-01 Electric Card Lock System

B001-006-01-1 Annual PM Work 1 TM -¥ -¥ B001-006-01-2 Service Order 12 MO -¥ -¥

B001-006-02 Security Camera System

B001-006-02-1 Semiannual PM Work 1 TM -¥ -¥ B001-006-02-2 Service Order 12 MO -¥ -¥

B001-007 YSK-2043

B001-007-01 Emergency Light System

B001-007-01-1 Annual PM Work 1 TM -¥ -¥ B001-007-01-2 Service Order 12 MO -¥ -¥

B001-008 YSK-2046

B001-008-01 Emergency Light System

B001-008-01-1 Annual PM Work 1 TM -¥ -¥ B001-008-01-2 Service Order 12 MO -¥ -¥

B001-008-02 UPS System

B001-008-02-1 Annual PM Work 1 TM -¥ -¥ B001-008-02-2 Service Order 12 MO -¥ -¥

YSK-1942 Total

Electric Card Lock System Total

YSK-1969 Total

Emergency Light Systems Total YSK-2043 Total

Emergency Light Systems Total

Auxiliary Generator System (D825D5A) Total

Auxiliary Generator System (DQCA1339512) Total

UPS System Total YSK-2046 Total

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

CUI // FEDCON

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

B001-009 YSK-2067

B001-009-01 Emergency Light System

B001-009-01-1 Annual PM Work 1 TM -¥ -¥ B001-009-01-2 Service Order 12 MO -¥ -¥

B001-010…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .