AMD0002.pdf
PDF 29 MB Posted
- Solicitation number
- N4008423B0405
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMD0003.pdf | ||
| 23B0405 (SDs) ELINs in Excel SS.xlsx | XLSX spreadsheet | |
| AMD0001.pdf | ||
| 23B0405B (SDs)_Part7.pdf | ||
| 23B0405B (SDs)_Part6.pdf | ||
| 23B0405B (SDs)_Part9.pdf | ||
| 23B0405B (SDs)_Part5.pdf | ||
| 23B0405B (SDs)_Part10.pdf | ||
| 23B0405B (SDs)_Part1.pdf | ||
| 23B0405B (SDs)_Part2.pdf | ||
| 23B0405A (SF1449).pdf | ||
| 23B0405B (SDs)_Part8.pdf | ||
| 23B0405B (SDs)_Part4.pdf | ||
| 23B0405C (NOTICE).pdf | ||
| 23B0405B (SDs)_Part3.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5969918
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See revised SOW attached IAW specification SR#21828261/ePro#1740518 for PREVENTIVE MAINTENANCE (PM) AND SERVICE ORDERS FOR VARIOUS ELECTRIC SYSTEMS AT KANTO PLAIN BY COMBINATION CONTRACT OF RECURRING WORK & NON-RECURRING WORK /
INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) CONTRACT.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Jun-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008423B0405
X 9B. DATED (SEE ITEM 11)
18-May-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jun-2023
CODE
NAVFAC FAR EAST
FEAD YOKOSUKA
PSC 473 BOX 13
FPO AP 96349-0013
N40084 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008423B0405
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMD#0002
1. The purpose of this amendment issuance is to provide the Government responses to the Bidder’s inquiries IAW revised SOW attached.
2. FAR Clause 52.216-19 ORDER LIMITATIONS (a) Minimum order amount revised as shown in this
AMD#0002.
3. The bid proposal due date (June 20, 2023, 10:30 AM) will be unchanged.
4. All other terms & conditions remain unchanged.
SECTION SF 1449 - CONTINUATION SHEET
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 AMD#0001-S 139 19-MAY-2023 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 AMD#0002-S 164 05-JUN-2023 Attachment 2 Responses for
PBI_N4008423B0405
3 02-JUN-2023
Attachment 3 23B0405 (SDs) ELINs in Excel SS
64 05-JUN-2023
The following have been modified:
52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of
N4008423B0405 less than ¥300,000, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor -
(1) Any order for a single item in excess of ¥15,000,000;
(2) Any order for a combination of items in excess of ¥20,000,000; or
(3) A series of orders from the same ordering office within fifteen (15) days that together call for quantities exceeding the limitation in paragraph (b) (1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within seven (7) days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of clause)
(End of Summary of Changes)
Section C – 1502000 Facility Investment
1502000 – Facility Investment Table of Content Spec Item Title 1 General Information
1.1 Concept of Operations
2 Management and Administration
2.1 Definitions and Acronyms
2.2 Personnel
2.2.1 Certification, Training, and Licensing
2.3 Special Requirements
2.3.1 Workmanship and Material Standards
2.3.2 Historical Preservation
2.4 References and Technical Documents
3 Recurring Work
3.1 Service Orders
3.1.1 Emergency Service Orders
3.1.2 Urgent Service Orders
3.1.3 Routine Service Orders
3.2 Preventive Maintenance (PM) Program
3.2.1 Electric Power Distribution Systems
3.2.1.1 Extra High Voltage Receiving & Distribution Systems
3.2.1.2 Extra High Voltage Sub-station (Transformer)
3.2.1.3 Transformer (6600V High Voltage Cubicle Panel)
3.2.1.4 Auxiliary Generator Systems Including Permanent Generators
3.2.1.5 UPS Systems
3.2.2 Security Systems
3.2.2.1 Security Camera Systems
3.2.2.2 Information Systems including Emergency Calling Systems
3.2.2.3 Access Control Systems
3.2.2.4 Electric Card Lock Systems
3.2.3 Other Building Electric System
3.2.3.1 Emergency Light Systems
3.2.3.2 Lightning Arrestors and Grounding Devices
3.2.3.3 Electric Hot Water Supply Systems
3.2.3.4 Power Receiving System of Land Cranes
3.3 Actual Accumulated Repair Record
3.4 Detail Breakdown of ELIN /Sub ELIN Items
4 Non-Recurring Work
1502000 – Facility Investment Spec Item
Title Description
1 General Information
The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform Facility Investment services for various electrical equipment at Navy Region Japan to include the U.S. Naval Installations in Kanto Plain.
1.1 Concept of
Operations
The intent of 1502000 Facility Investment is to specify the requirements for Sustainment, Restoration, and Modernization (SRM) sub-functions only. The Facility Investment requirements within this sub-annex primarily consist of infrastructure sustainment and minimal restoration and modernization work.
Sustainment is the maintenance and repair necessary to keep an inventory of facilities and other assets in good working order. Restoration and modernization normally consists of major rehabilitation and capital improvements that is accomplished through other Navy programs. Some major repair, minor construction and stand-alone demolition may be accomplished as part of Facility Investment.
The Contractor shall perform maintenance, repair, alteration, demolition and minor construction for the following:
Building Systems -Electric Power Distribution Systems
• Extra High Voltage Receiving & Distribution Systems
• Extra High Voltage Sub-station (Transformer)
• Transformer (6600V High Voltage Cubicle Panel)
• Auxiliary Generator Systems including Permanent Generators
• Uninterruptible Power Supply (UPS) Systems
-Security Systems
• Security Camera Systems
• Information Systems including Electric Clock System and Emergency
Calling Systems
• Access Control Systems
• Electric Card Lock Systems
-Other Building Electric Systems
• Emergency Light Systems
• Lightning Arrestors and Grounding Devices
• Electric Hot Water Supply Systems
• 6600V High Voltage Power Receiving Systems of Land Cranes
Item
Title Description
2 Management and Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-1502000-01.
2.2 Personnel The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required for efficient operations within the FI function.
2.2.1 Certification, Training, and Licensing
Personnel working on systems, equipment or components containing chlorofluorocarbons (CFCs) and/or hydro-chlorofluorocarbons (HCFCs) must be certified under an Environmental Protection Agency (EPA) approved technical certification program per OPNAVINST 5090.1 Chapter 6.
a. Extra High Voltage Receiving & Distribution Systems: Preventive Maintenance
(PM) work for Extra High Voltage Receiving & Distribution Systems shall be performed under direction of “Dai-2-Syu Denki Shunin Gijyutsu-Sya” based on “Denki-Jigyou-Hou” in accordance with Japanese Law.
b. Transformer: Preventive Maintenance (PM) work for Transformer shall be performed under direction of “Dai-3-Syu Denki Shunin Gijyutsu-Sya” based on “Denki-Jigyou-Hou” in accordance with Japanese Law.
c. Auxiliary generator Systems:
(1) Personnel who are performed PM work at job site shall be technical personnel of
Original Equipment Manufacturer (OEM), or certified personnel by OEM and/or Agency of OEM.
(2) Leak test for fuel distribution systems of Auxiliary Generator Systems and repairing for fuel distribution piping: Person who is performing at job site shall have “Kikenbutsu-Toriatsukai-Syunin-Gijyutsu-Sya Otsu 4” certified “Zaidan- Houzin-Zenkoku-Kikenbutsu-Anzen-Kyoukai” in accordance with Japanese Law.
Note:
1) Personnel who perform repairing, replacement and cleaning work for other equipment connecting to Auxiliary Generator such as piping, wiring, dike wall, ventilation fan of room and/or access ladder are exempt of the above certification.
d. UPS Systems: Personnel who are performed PM work at job site shall be technical personnel of OEM, or certified personnel by OEM and/or Agency of OEM.
e. Emergency Light Systems: Personnel who is performed PM work at job site shall have “Kenchiku-Setsubi-Tenken-Shikaku” in accordance with Japanese Law “Kenchiku-Kijyun-Hou”.
f. Personnel working with or on electrical or electronic equipment must be trained and certified per NAVFAC MO-200 or the electricians who have license of first grade electrician, "Dai-1-syu Denki Kohjishi", or second grade electrician, "Dai-2-syu Denki Kohjishi", shall perform electrical work.
g. Power Receiving System of Land Cranes: PM, Quality Manager or on-site supervisor shall have license per JEAC 8021.
Item
Title Description
All maintenance trade personnel certifying or inspecting repair or maintenance work that does not require an inspector certified by a governing directive shall be qualified at the journeyman level.
The Contractor shall submit proof of all certification, training, and licensing requirements per Section F.
2.3 Special
Requirements
2.3.1 Workmanship
and Material Standards
The Contractor shall be responsible for maintaining all facilities, systems, and equipment, identified in this technical sub-annex, to a standard that prevents deterioration beyond that which results from normal wear and tear and corrects deficiencies in a timely manner to assure full life expectancy of the facilities, systems, and equipment. Best commercial practices shall be applied in the performance of work. All work shall be completed per approved and accepted industry and equipment manufacturers’ standards and shall comply with building and safety codes, applicable activity, local, state, and federal regulations, and other technical requirements identified within this technical sub-annex.
Workmanship for maintenance and repair shall include all work necessary to complete facility and system restoration, including touch-up painting and operational checks.
Upon completion of work, the Contractor shall ensure all facilities, systems, and equipment are free of missing components or defects which would affect the safety, appearance, or habitability of the facilities and structures or would prevent any electrical, mechanical, plumbing or structural system from functioning in accordance with design intent. Repairs shall be made in accordance with the manufacturers’ specifications and guidelines, and standard building codes. The quality of repairs shall meet the applicable standards and shall prevent any malfunction reoccurrences caused by poor workmanship or other contractor inadequacies. The quality of the repaired areas shall be fully compatible with adjacent surfaces or equipment. Except where otherwise specified, replacements shall match existing in dimensions, finish, color, design, and functionality and shall have an appearance similar to the original finished appearance with only minor unobjectionable deterioration resulting from normal use.
The Contractor shall not allow debris to spread unnecessarily into adjacent areas nor accumulate in the work area. All such debris, excess material, and parts shall be cleaned up and removed at the completion of the job and at the end of each day work is in progress. Upon completion of work, any stains and other unsightly marks shall be removed.
2.3.2 Historical
Preservation
Buildings and facilities designated as historical sites shall be maintained in accordance with Federal, state, and local historical policies and regulations.
2.4 References and
Technical Documents
References and Technical Documents are listed in J-1502000-02.
CUI // FEDCON
SECTION C – 1502000
FACILITY INVESTMENT
Item
Title Performance Objective
Related Information Performance Standard
3 Recurring Work The Contractor shall maintain, repair, and alter Building Systems to ensure they are fully functional and in normal working condition.
The Contractor shall develop, implement, and execute a Service Order, Maintenance Program, Inspection, Testing, and Certification Program, and Other Recurring Service Program to maintain and repair Building Systems.
The Contractor shall maintain all maintenance, repair, and alteration data and warranty records in the technical library in accordance with Annex 2.
Unless otherwise specified herein after, the Contractor shall perform any repairs including replacement work discovered during one scheduled Preventive Maintenance (PM) work and one service order for one system by each facility up to a total of ¥300,000 in total cost of direct material cost, labor cost and overhead profit under recurring portion of the contract at no additional cost to the Government.
The following items are exception of the Contractor’s responsibilities of recurring work limits for the building systems and miscellaneous.
• Loss or damage caused by the fault or negligence of the Government.
• Loss or damage caused by natural disaster.
The Contractor shall maintain all maintenance, repair, and alteration data and warranty records in the technical library in accordance with Annex 2.
The Contractor shall provide all necessary test instruments, equipment, and tools required to perform maintenance and repair.
Building Systems are in normal working condition and function properly in accordance with specified standards.
Spec Item
Title Performance Objective
Related Information Performance Standard
Location maps are provided in J-1502000-03.
Historical minor repair record is provided in J-1502000-04.
Historical major repair record is provided in J-1502000-05.
3.1 Service Orders The Contractor shall
perform service order work in a timely manner and ensure Building Systems are restored to a safe, normal working condition and function properly.
The Contractor shall receive service orders in accordance with the work reception requirements in Annex 2.
The Contractor shall schedule and perform service orders in a way that minimizes disruptions to customers and Government operations.
The Government may issue service orders for work requirements at any location within the defined boundaries of this contract for any reason at the discretion of the KO.
Service order work will be issued for the listed inventories of this Contract.
Historical service order workload are provided in J- 1502000-04. Historical data and supporting information provided is intended to illustrate the volume of service orders issued and examples of work that has been performed in the past and is not to be construed as a limiting factor to services ordered and performed in the future.
Descriptions of the classifications of service orders (emergency, urgent, and routine) are provided in the Definitions and Acronyms in J- 1502000-01. These descriptions are provided for reference and the Contractor shall perform service orders per
Service order work is responded to and completed within the specified time.
Building Systems are restored to normal working condition, including recertification if applicable.
When repair is complete the Building Systems does not present danger to personnel or equipment.
Spec Item
Title Performance Objective
Related Information Performance Standard the requirements below based on the classification assigned by the Government.
The Contractor shall maintain sufficient materials and equipment on hand to support service order work requirements. Lack of availability of material or equipment will not relieve the Contractor from the requirement to complete service order work within the time limits specified.
The Government may combine multiple repair requirements received for the same trade in the same building or structure at the same time into one service order as long as the service order threshold is not exceeded.
The Contractor shall notify the KO upon identification that the service order will exceed the liability limits specified below in accordance with reporting requirements in Annex 2.
The Contractor shall submit a monthly summary of completed service orders per Section F.
3.1.1 Emergency
Service Orders
The Contractor shall respond to emergency service orders and arrest emergent conditions to minimize and mitigate damage to Building Systems and danger to personnel.
The Contractor shall respond to emergency service orders with the appropriate service personnel and equipment to commence work within two hours during the normal government hours and 4 hours after Government hours.
The Contractor shall remain at the work site until the emergency has been arrested.
The emergency service order is complete once the emergency has been arrested. The Government may issue an urgent or routine service order
The Contractor shall perform emergency service orders 24 hours a day, seven days a week throughout the contract period after receiving emergency service order.
Emergency service orders responded to within two hours of receipt of call.
Emergency service orders are arrested within 24 hours of receipt of call.
Spec Item
Title Performance Objective
Related Information Performance Standard or non-recurring work task order for the follow-on work required to repair/restore the facility, ground structure, personal property equipment or installed equipment and system.
Work is continued without interruption until emergent condition is arrested.
3.1.2 Urgent Service
Orders
The Contractor shall complete urgent service orders in a timely manner and ensure Building Systems are restored to a safe, normal working condition and function properly.
The Contractor shall perform urgent service orders to repair deficiencies without extended delay, therefore preventing further damage to Building Systems.
Urgent service orders are completed within five working days.
3.1.3 Routine Service
Orders
The Contractor shall complete routine service orders in a timely manner and ensure Building Systems are restored to a safe, normal working condition and function properly.
The Contractor shall perform routine service orders to repair deficiencies and return Building Systems to normal working condition.
Performance of routine service orders is not required outside of Government regular working hours.
Routine service orders are completed within 30 calendar days.
3.2 Preventive
Maintenance (PM) Program
The Contractor shall develop and implement a PM program for Building Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.
The Contractor shall develop and submit a PM program for each building and each system per Section F.
Notification of repair work exceeding the incidental repairs limit shall be submitted to the KO per Section F. A service order or non-recurring work task order may be issued for repairs exceeding the incidental repairs limit.
The Contractor shall not use breakdown maintenance as part of the PM program.
The PM program shall provide an economical approach manufacturers’ recommended procedures, OEM standards, and maintenance required to satisfy equipment warranties and keep Building Systems in normal working condition.
Maintenance is accomplished in accordance with the Contractor’s PM program and work schedule.
PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.
Spec Item
Title Performance Objective
Related Information Performance Standard
Excessive or repeated system or equipment breakdowns or deficiencies may indicate the need to adjust or modify the Contractor’s PM program.
These changes will be made at no additional cost to the Government.
Site condition information is provided in J-1502000-06.
Detail attachment list is provided in J-1502000-07.
The Contractor shall submit a monthly PM work schedule.
The Contractor shall submit result of PM work report for each building and each system per section F.
3.2.1 Electric Power
Distribution Systems
The Contractor shall maintain Extra High Voltage Receiving & Distribution Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.
PM work shall be performed in accordance with Japanese Law and OEM recommended procedure and maintenance manual.
performed in accordance with Contractor's PM program and work schedule.
3.2.1.1 Extra High
Voltage Receiving & Distribution Systems
The Contractor shall maintain Extra High Voltage Receiving & Distribution Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.
PM work shall be performed in accordance with OEM recommended procedure and maintenance manual.
Note:
1) The Government will perform electrical main power shut down and start up prior to the Contractor starting the PM work and after completion of the PM work.
Maintenance is performed in accordance with Contractor's PM program and work schedule.
3.2.1.2 Extra High
Voltage Sub-station (Transformer)
The Contractor shall maintain Extra High Voltage Sub-station (Transformer) to ensure proper operation, to minimize breakdowns, and to maximize useful life.
PM work shall be performed in accordance with OEM recommended procedure and maintenance manual.
Note:
1) The Government will perform electrical main power shut down and start up prior to the Contractor
Maintenance is performed in accordance with Contractor's PM program and work schedule.
Spec Item
Title Performance Objective
Related Information Performance Standard starting the PM work and after completion of the PM work.
3.2.1.3 Transformer
(6600V High Voltage Cubicle Panel)
The Contractor shall maintain Transformer to ensure proper operation, to minimize breakdowns, and to maximize useful life.
PM work shall be performed in accordance with “Preservation Regulation (HOANKITEI) of Japanese Law (DENKI JIGYO- HO) and shall be performed under direction of the certified personnel specified in Spec Item 2.2.1 in this Annex.
Maintenance is performed in accordance with Contractor's PM program and work schedule.
3.2.1.4 Auxiliary
Generator Systems Including Permanent Generators
The Contractor shall maintain Auxiliary Generator Systems including Permanent Generators to ensure proper operation, to minimize breakdowns, and to maximize useful life.
PM work shall be performed in accordance with OEM recommended procedure, maintenance manual and Japanese Law.
Maintenance is performed in accordance with Contractor's PM program and work schedule.
3.2.1.5 UPS Systems The Contractor shall
maintain UPS Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.
PM work shall be performed in accordance with Japanese Law and OEM maintenance procedure.
Maintenance is performed in accordance with Contractor's PM program and work schedule.
3.2.2 Security Systems The Contractor shall
maintain Security Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.
PM work shall be performed in accordance with Japanese Law and OEM maintenance procedure.
accordance with Contractor's PM program and work schedule.
3.2.2.1 Security Camera
Systems
The Contractor shall maintain Security Camera Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.
PM work shall be performed in accordance with Japanese Law accordance with Contractor's PM program and work schedule.
3.2.2.2 Information
Systems including Emergency Calling Systems
The Contractor shall maintain Information Systems including Emergency Calling Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.
PM work shall be performed in accordance with Japanese Law and OEM maintenance procedure.
The Information Systems including Emergency calling Systems are composed with the following systems.
1. Public Address (PA)
Systems
2. Electric Clock Systems
3. Emergency Calling Systems
Maintenance is performed in accordance with Contractor's PM program and work schedule.
Spec Item
Title Performance Objective
Related Information Performance Standard
4. LED Message Board Systems
3.2.2.3 Access Control
Systems
The Contractor shall maintain Access Control Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.
PM work shall be performed in accordance with Japanese Law accordance with Contractor's PM program and work schedule.
3.2.2.4 Electric Card
Lock Systems
The Contractor shall maintain Electric Card Lock systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.
PM work shall be performed in accordance with Japanese Law and OEM maintenance procedure.
Maintenance is performed in accordance with Contractor's PM program and work schedule.
3.2.3 Other Building
Electric System
The Contractor shall maintain Other Building Electric System to minimize breakdowns, and to maximize useful life.
PM work shall be performed in accordance with Japanese Law accordance with Contractor's PM program and work schedule.
3.2.3.1 Emergency Light
Systems
The Contractor shall maintain Emergency Light Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.
PM Work shall be performed at Annually and in accordance with Japanese Law “Kenchiku- Kijyun-How”.
accordance with Contractor's PM program and work schedule.
3.2.3.2 Lightning
Arrestors and Grounding Devices
The Contractor shall maintain Lightning Arrestors and Grounding Devices to ensure proper operation, to minimize breakdowns, and to maximize useful life.
PM Work shall be performed at Annually and in accordance with JIS A 4201 4.2 (Inspection and Maintenance).
accordance with Contractor's PM program and work schedule.
3.2.3.3 Electric Hot
Water Supply Systems
The Contractor shall maintain electric hot water supply systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.
PM work shall be performed in accordance with Japanese Law accordance with Contractor's PM program and work schedule.
3.2.3.4 Power Receiving
System of Land Cranes
The Contractor shall maintain power receiving system to ensure proper operation, to minimize breakdowns, and to maximize useful life.
The Contractor shall maintain, inspect, and test Power Receiving System in accordance with approved PM program.
The work shall be done under supervised person who is
Maintenance is performed in accordance with Contractor's PM program and work schedule.
Tsutomu.Toriyama.JA Line
Spec Item
Title Performance Objective
Related Information Performance Standard licensed conforming to JEAC 8021.
Note:
1) The Government will perform electrical main power shut down and start up prior to the Contractor starting the PM work and after completion of the PM work.
3.3 Actual
Accumulated Repair Record
The Contractor shall submit accumulated repair record.
The Contractor shall submit actual accumulated minor repair (Within prescribed limit) record including service order record that is same form as J- 1502000-04, and actual accumulated major work record that is same form as J-1502000- 05 per section F.
Submittal shall be submitted in the time frame.
3.4 Detail
Breakdown of ELIN /Sub ELIN Items
The Contractor shall submit detail bid price breakdown of ELIN /Sub ELIN Items.
The Contractor shall submit detail breakdown of bid prices for Exhibit Line Item Number (ELIN) /Sub ELIN Items by each period per Section F.
Sample detail breakdown sheet is provided in J-1502000-08.
Submittal shall be submitted in the time frame.
Item
Title Performance Objective
Related Information Performance Standard
4 Non-Recurring Work
Non-recurring work may be ordered utilizing Fed-Mall in accordance with Section C or on a task order in accordance with the
PROCEDURES FOR
ISSUING ORDERS
clause in Section C.
The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.
Refer to Non-recurring work ELINs for task listings, descriptions and related requirements. All periods of performance are measured from issue date of order to acceptance of the work.
Non-recurring work orders may be placed for Various Electrical Systems not originally identified on the equipment list.
Performance Standards for Non-recurring work will be the same as those in Spec Item 3 where applicable.
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON
Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
A001 CNIC Funding Portion
A001-001 NDK-100134
A001-001-01 Transformer
A001-001-01-1 Monthly PM Work 12 TM -¥ -¥ A001-001-01-2 Annual PM Work 1 TM -¥ -¥ A001-001-01-3 Service Order 12 MO -¥ -¥
A001-001-02 Electric Hot Water Supply System
A001-001-02-1 Semiannual PM Work 2 TM -¥ -¥ A001-001-02-2 Service Order 12 MO -¥ -¥
A001-002 YSK-1397
A001-002-01 Auxiliary Generator System
A001-002-01-1 Semiannual PM Work 2 TM -¥ -¥ A001-002-01-2 Annual PM Work 1 TM -¥ -¥ A001-002-01-3 Service Order 12 MO -¥ -¥
A001-003 YSK-1805
A001-003-01 Security Camera System
A001-003-01-1 Annual PM Work 1 TM -¥ -¥ A001-003-01-2 Service Order 12 MO -¥ -¥
A001-004 YSK-1922
A001-004-01 Emergency Light System
A001-004-01-1 Annual PM Work 1 TM -¥ -¥ A001-004-01-2 Service Order 12 MO -¥ -¥
SOLICITATION/CONTRACT #
EXHIBIT A - CLIN 9000
Line Item 0001 Recurring - Base Period
ELINs A001 through A007
NDK-100134 Total
Transformer Total
Electric Hot Water Supply System Total
Security Camera System Total YSK-1805 Total
Emergency Light Systems Total YSK-1922 Total
Auxiliary Generator System Total YSK-1397 Total
ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
A001-005 YSK-1942
A001-005-01 Auxiliary Generator System (D825D5A)
A001-005-01-1 Quarterly PM Work 4 TM -¥ -¥ A001-005-01-2 Semiannual PM Work 2 TM -¥ -¥ A001-005-01-3 Annual PM Work 1 TM -¥ -¥ A001-005-01-4 Service Order 12 MO -¥ -¥
A001-005-02 Auxiliary Generator System (DQCA1339512)
A001-005-02-1 Quarterly PM Work 4 TM -¥ -¥ A001-005-02-2 Semiannual PM Work 2 TM -¥ -¥ A001-005-02-3 Annual PM Work 1 TM -¥ -¥ A001-005-02-4 Service Order 12 MO -¥ -¥
A001-006 YSK-1969
A001-006-01 Electric Card Lock System
A001-006-01-1 Annual PM Work 1 TM -¥ -¥ A001-006-01-2 Service Order 12 MO -¥ -¥
A001-006-02 Security Camera System
A001-006-02-1 Semiannual PM Work 2 TM -¥ -¥ A001-006-02-2 Service Order 12 MO -¥ -¥
A001-007 YSK-2043
A001-007-01 Emergency Light System
A001-007-01-1 Annual PM Work 1 TM -¥ -¥ A001-007-01-2 Service Order 12 MO -¥ -¥
A001-008 YSK-2046
A001-008-01 Emergency Light System
A001-008-01-1 Annual PM Work 1 TM -¥ -¥ A001-008-01-2 Service Order 12 MO -¥ -¥
A001-008-02 UPS System
A001-008-02-1 Annual PM Work 1 TM -¥ -¥ A001-008-02-2 Service Order 12 MO -¥ -¥
Auxiliary Generator System (D825D5A) Total
Auxiliary Generator System (DQCA1339512) Total
Emergency Light Systems Total
YSK-2046 Total
Electric Card Lock System Total
YSK-2043 Total
Emergency Light Systems Total
YSK-1969 Total
YSK-1942 Total
UPS System Total
Security Camera System Total
ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
A001-009 YSK-2067
A001-009-01 Emergency Light System
A001-009-01-1 Annual PM Work 1 TM -¥ -¥ A001-009-01-2 Service Order 12 MO -¥ -¥
A001-010 YSK-2068
A001-010-01 Emergency Light System
A001-010-01-1 Annual PM Work 1 TM -¥ -¥ A001-010-01-2 Service Order 12 MO -¥ -¥
A001-011 YSK-2078
A001-011-01 Emergency Light System
A001-011-01-1 Annual PM Work 1 TM -¥ -¥ A001-011-01-2 Service Order 12 MO -¥ -¥
A001-012 YSK-3014
A001-012-01 Emergency Light System
A001-012-01-1 Annual PM Work 1 TM -¥ -¥ A001-012-01-2 Service Order 12 MO -¥ -¥
A001-013 YSK-3128
A001-013-01 Auxiliary Generator Systems
A001-013-01-1 Annual PM Work 1 TM -¥ -¥ A001-013-01-2 Service Order 12 MO -¥ -¥
A001-014 YSK-3154
A001-014-01 Auxiliary Generator System
A001-014-01-1 Annual PM Work 1 TM -¥ -¥ A001-014-01-2 Service Order 12 MO -¥ -¥
A001-015 YSK-3169
A001-015-01 Auxiliary Generator System
A001-015-01-1 Semiannual PM Work 2 TM -¥ -¥ A001-015-01-2 Annual PM Work 1 TM -¥ -¥ A001-015-01-3 Service Order 12 MO -¥ -¥
YSK-3154 Total
Auxiliary Generator System Total
Auxiliary Generator System Total
Auxiliary Generator System Total
YSK-2068 Total
Emergency Light Systems Total YSK-2078 Total
Emergency Light Systems Total YSK-3014 Total
YSK-2067 Total Emergency Light Systems Total
Emergency Light Systems Total
YSK-3128 Total
ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC A001-015-02 UPS System
A001-015-02-1 Annual PM Work 1 TM -¥ -¥ A001-015-02-2 Service Order 12 MO -¥ -¥
A001-016 YSK-3365
A001-016-01 PA Systems
A001-016-01-1 Semiannual PM Work 2 TM -¥ -¥ A001-016-01-2 Service Order 12 MO -¥ -¥
A001-016-02 Electric Clock Systems
A001-016-02-1 Semiannual PM Work 2 TM -¥ -¥ A001-016-02-2 Service Order 12 MO -¥ -¥
A001-016-03 Emergency Calling Systems
A001-016-03-1 Annual PM Work 1 TM -¥ -¥ A001-016-03-2 Service Order 12 MO -¥ -¥
A001-017 YSK-3391
A001-017-01 Auxiliary Generator System
A001-017-01-1 Annual PM Work 1 TM -¥ -¥ A001-017-01-2 Service Order 12 MO -¥ -¥
A001-018 YSK-3816
A001-018-01 Auxiliary Generator System
A001-018-01-1 Annual PM Work 1 TM -¥ -¥ A001-018-01-2 Service Order 12 MO -¥ -¥
A001-018-02 UPS System
A001-018-02-1 Semiannual PM Work 2 TM -¥ -¥ A001-018-02-2 Service Order 12 MO -¥ -¥
A001-019 YSK-5229
A001-019-01 Lightning Arrestors and Grounding Devices
A001-019-01-1 Annual PM Work 1 TM -¥ -¥ A001-019-01-2 Service Order 12 MO -¥ -¥
PA Systems Total
Electric Clock Systems Total
YSK-3169 Total
Auxiliary Generator System Total
Lightning Arrestors and Grounding Devices Total
YSK-3816 Total
YSK-3365 Total
Auxiliary Generator System Total YSK-3391 Total
UPS System Total
UPS System Total
YSK-5229 Total
Emergency Calling Systems Total
ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
A001-020 YSK-F69
A001-020-01 Auxiliary Generator System
A001-020-01-1 Quarterly PM Work 4 TM -¥ -¥ A001-020-01-2 Semiannual PM Work 2 TM -¥ -¥ A001-020-01-3 Annual PM Work 1 TM -¥ -¥ A001-020-01-4 Service Order 12 MO -¥ -¥
A001-021 YSK-561
A001-021-01 Auxiliary Generator System
A001-021-01-1 Quarterly PM Work 4 TM -¥ -¥ A001-021-01-2 Annual PM Work 1 TM -¥ -¥ A001-021-01-3 Service Order 12 MO -¥ -¥
A001-022 YSK-4818
A001-022-01 Permanent Generator System (DCA-60LSIB)
A001-022-01-1 Semiannual PM Work 2 TM -¥ -¥ A001-022-01-2 Annual PM Work 1 TM -¥ -¥ A001-022-01-3 Service Order 12 MO -¥ -¥
A001-022-02 Permanent Generator System (DCA-300SPK3)
A001-022-02-1 Quarterly PM Work 4 TM -¥ -¥ A001-022-02-2 Semiannual PM Work 2 TM -¥ -¥ A001-022-02-3 Annual PM Work 1 TM -¥ -¥ A001-022-02-4 Service Order 12 MO -¥ -¥
Auxiliary Generator System Total YSK-561 Total
Auxiliary Generator System Total YSK-F69 Total
Permanent Generator System (DCA-60LSIB) Total
Permanent Generator System (DCA-300SPK3) Total YSK-4818 Total
ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
A001-023 YSK-2053
A001-023-01 Auxiliary Generator System
A001-023-01-1 Annual PM Work 1 TM -¥ -¥ A001-023-01-2 Service Order 12 MO -¥ -¥
A001-024 YSK-1997
A001-024-01 Auxiliary Generator System
A001-024-01-1 Quarterly PM Work 4 TM -¥ -¥ A001-024-01-2 Annual PM Work 1 TM -¥ -¥ A001-024-01-3 Biennial PM Work 1 TM -¥ -¥ A001-024-01-4 Service Order 12 MO -¥ -¥
A001-025 IKE-843
A001-025-01 UPS System
A001-025-01-1 Simple PM Work 1 TM -¥ -¥ A001-025-01-2 Detail PM Work 1 TM -¥ -¥ A001-025-01-3 Service Order 12 MO -¥ -¥
A001-026 Extra High Voltage Receiving & Distribution Systems A001-026-01 Yokosuka Area
A001-026-01-1 YSK-B94 C-GIS Regular inspection, etc. 1 TM -¥ -¥ A001-026-01-2 YSK-1278 Power distribution panel Insulation degradation diagnosis, etc. 1 TM -¥ -¥ A001-026-01-3 YSK-1923 Power distribution panel Insulation degradation diagnosis, etc. 1 TM -¥ -¥ A001-026-01-4 YSK-1805 Power distribution panel Insulation degradation diagnosis, etc. 1 TM -¥ -¥ A001-026-01-5 YSK-1805 FC Facilities On-line Diagnosis 1 TM -¥ -¥ A001-026-01-6 YSK-1805 FC Facilities Full-fledged Inspection, Panel Inspection for #4 FC 1 TM -¥ -¥ A001-026-01-7 Service Order 12 MO -¥ -¥
A001-026-02 Ikego Area
A001-026-02-1 Preparing Work 1 LS -¥ -¥ A001-026-02-2 Service Order 12 MO -¥ -¥
-¥ Extra High Voltage Receiving & Distribution Systems Total
Yokosuka Area Total
Auxiliary Generator System Total YSK-2053 Total
UPS System Total IKE-843 Total
Ikego Area Total
YSK-1997 Total
ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
A001-027 AZU-8600376
A001-027-01 Electric Hot Water Supply System
A001-027-01-1 Semiannual PM Work 2 TM -¥ -¥ A001-027-01-2 Service Order 12 MO -¥ -¥
A001-028 Extra High Voltage Sub-station (Transformer) A001-028-01 Yokosuka Area
A001-028-01-1 Detail Inspection Work for VCB 1 TM -¥ -¥ A001-028-01-2 LDS Replacement Work 1 LS -¥ -¥ A001-028-01-3 Service Order 12 MO -¥ -¥
A002 USNH Funding Portion
A002-001 YSK-1400
A002-001-01 Security Camera System
A002-001-01-1 Semiannual PM Work 2 TM -¥ -¥ A002-001-01-2 Service Order 12 MO -¥ -¥
A002-002 YSK-1400, 1407, 3201 & 3219
A002-002-02 Electric Card Lock System
A002-002-02-1 Semiannual PM Work 2 TM -¥ -¥ A002-002-02-2 Annual PM Work 1 TM -¥ -¥ A002-002-02-3 Service Order 12 MO -¥ -¥
Security Camera System Total
CNIC Funding Portion Total Extra High Voltage Sub-station (Transformer) Total
AZU-8600376 Total
USNH Funding Portion Total
Electric Card Lock System Total YSK-1400 & 1407 Total
YSK-1400 Total
ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC A003 DLA ENERGY / FUEL (FLCY) Funding Portion
A003-001 AZU-8600441
A003-001-01 Auxiliary Generator System
A003-001-01-1 Annual PM Work 1 TM -¥ -¥ A003-001-01-2 Service Order 12 MO -¥ -¥
A003-002 AZU-15F
A003-002-01 Auxiliary Generator System (2 Sets of Auxiliary Generator Units)
A003-002-01-1 Annual PM Work w/ Replacement Work 1 TM -¥ -¥ A003-002-01-2 Service Order 12 MO -¥ -¥
A003-003 TSU-4200200
A003-003-01 Auxiliary Generator System
A003-003-01-1 Annual PM Work w/ Replacement Work 1 TM -¥ -¥ A003-003-01-2 Service Order 12 MO -¥ -¥
A003-004 TSU-4300394
A003-004-01 Auxiliary Generator System
A003-004-01-1 Annual PM Work w/ Replacement Work 1 TM -¥ -¥ A003-004-01-2 Service Order 12 MO -¥ -¥
A004 SRF Funding Portion
A004-001 YSK-2046
A004-001-01 Access Control Systems System
A004-001-01-1 Semiannual PM Work 2 TM -¥ -¥ A004-001-01-2 Service Order 12 MO -¥ -¥
A004-002 YSK-B12
A004-002-01 Power Receiving System of Land Cranes LC-47 & 48
A004-002-01-1 Annual PM Work (Type B) 1 TM -¥ -¥ A004-002-01-2 Initial Repair Work 1 TM -¥ -¥ A004-002-01-3 Service Order 12 MO -¥ -¥
YSK-2046 Total
Auxiliary Generator System Total AZU-8600441 Total
Access Control Systems Total
YSK-B12 Total Power Receiving System of Land Cranes Total
SRF Funding Portion Total
Auxiliary Generator System Total TSU-4300394 Total
DLA ENERGY / FUEL (FLCY) Funding Portion Total
Auxiliary Generator System Total AZU-15F Total
TSU-4200200 Total
ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC A005 DODDS Funding Portion A005-001 YSK-1292 (Sullivan School) A005-001-01 LED Massage Board System
A005-001-01-1 Annual PM Work 1 TM -¥ -¥ A005-001-01-2 Service Order 12 MO -¥ -¥
A005-002 YSK-1901 (Kinnick High School) A005-002-01 Electric Card Lock System
A005-002-01-1 Annual PM Work 1 TM -¥ -¥ A005-002-01-2 Service Order 12 MO -¥ -¥
A005-002-02 LED Massage Board System
A005-002-02-1 Annual PM Work 1 TM -¥ -¥ A005-002-02-2 Service Order 12 MO -¥ -¥
A005-003 IKE-774
A005-003-01 Security Camera System
A005-003-01-1 Annual Semiannual PM Work 1 2 TM -¥ -¥ A005-003-01-2 Service Order 12 MO -¥ -¥
A005-004 IKE-824S
A005-004-01 Security Camera System
A005-004-01-1 Annual Semiannual PM Work 1 2 TM -¥ -¥ A005-004-01-2 Service Order 12 MO -¥ -¥
A005-004-02 PA Systems
A005-004-02-1 Semiannual PM Work 2 TM -¥ -¥ A005-004-02-2 Service Order 12 MO -¥ -¥
A005-004-03 Electric Clock Systems
A005-004-03-1 Semiannual PM Work 2 TM -¥ -¥ A005-004-03-2 Service Order 12 MO -¥ -¥
A005-004-04 Emergency Calling Systems
A005-004-04-1 Annual PM Work 1 TM -¥ -¥ A005-004-04-2 Service Order 12 MO -¥ -¥
Security Camera System Total
PA Systems Total
Electric Clock Systems Total
Emergency Calling Systems Total
Electric Card Lock System Total
YSK-1901 Total
YSK-1292 Total LED Massage Board System Total
LED Massage Board System Total
IKE-774 Total
ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC A005-004-05 Interphone Systems
A005-004-05-1 Annual PM Work 1 TM -¥ -¥ A005-004-05-2 Service Order 12 MO -¥ -¥
A005-004-06 LED Massage Board System
A005-004-06-1 Annual PM Work 1 TM -¥ -¥ A005-004-06-2 Service Order 12 MO -¥ -¥
A005-004-07 Eco Hot Water Supply System
A005-004-07-1 Semiannual PM Work 2 TM -¥ -¥ A005-004-07-2 Annual PM Work 1 TM -¥ -¥ A005-004-07-3 Service Order 12 MO -¥ -¥
A005-005 IKE-827
A005-005-01 Electric Water Heater Tank System
A005-005-01-1 Semiannual PM Work 2 TM -¥ -¥ A005-005-01-2 Service Order 12 MO -¥ -¥
A006 HOUSING Funding Portion
A006-001 YSK-3849 (SHOBU)
A006-001-01 Auxiliary Generator System
A006-001-01-1 Annual PM Work 1 TM -¥ -¥ A006-001-01-2 Service Order 12 MO -¥ -¥
A006-002 YSK-3853 (TSUBAKI)
A006-002-01 Auxiliary Generator System
A006-002-01-1 Annual PM Work 1 TM -¥ -¥ A006-002-01-2 Service Order 12 MO -¥ -¥
Electric Hot Water Supply System Total IKE-827 Total
Interphone Systems Total
Auxiliary Generator System Total YSK-3849 Total
Auxiliary Generator System Total YSK-3853 Total
LED Massage Board System Total
DODDS Funding Portion Total
IKE-824S Total Electric Hot Water Supply System Total
ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
A006-003 YSK- 4401 (BARA)
A006-003-01 Auxiliary Generator System
A006-003-01-1 Annual PM Work 1 TM -¥ -¥ A006-003-01-2 Service Order 12 MO -¥ -¥
A006-004 YSK- 4402 (UME)
A006-004-01 Auxiliary Generator System
A006-004-01-1 Annual PM Work 1 TM -¥ -¥ A006-004-01-2 Service Order 12 MO -¥ -¥
A007 DLA DISTRIBUTION
A007-001 YSK-1907
A007-001-01 Auxiliary Generator System
A007-001-01-1 Annual Dummy Load Test 1 TM -¥ -¥ A007-001-01-2 Annual PM Work 1 TM -¥ -¥ A007-001-01-3 Service Order 12 MO -¥ -¥
TOTAL RECURRING LINE ITEMS -¥
MO=Month, TM=Time
Auxiliary Generator System Total YSK-1907 Total
DLA DISTRO / DDYJ Portion Total
HOUSING Funding Portion Total
Auxiliary Generator System Total YSK- 4401 Total
YSK- 4402 Total
ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON
SPEC ITEM 4
ELIN Product Name (120 Characters)
Description Extended Estimated Quantity
Unit of Issue
Unit Price Extended Price IMAP
CAC
A700 Major Repair Work (Negotiated)
Major Repair Work is consists of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in IDIQ work. Performance of specific maintenance, repair, and alteration work that exceeds the FFP limitations of a service call or PM repair. Task order completion times will be specified in task order.
1 LS ¥ 200,000,000
TOTAL NON-RECUURRING PRICE ¥ 200,000,000
HR = Hour LS = Lump Sum EA = Each
SOLICITATION/CONTRACT #
EXHIBIT A - CLIN 9000
ELINs A700
Line Item 0002 Non-Recurring Price - Base Period PROVIDE PRICES FOR FACILITY INVESTMENT - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON
Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
B001 CNIC Funding Portion
B001-001 NDK-100134
B001-001-01 Transformer
B001-001-01-1 Monthly PM Work 12 TM -¥ -¥ B001-001-01-2 Annual PM Work 1 TM -¥ -¥ B001-001-01-3 Service Order 12 MO -¥ -¥
B001-001-02 Electric Hot Water Supply System
B001-001-02-1 Semiannual PM Work 2 TM -¥ -¥ B001-001-02-2 Service Order 12 MO -¥ -¥
B001-002 YSK-1397
B001-002-01 Auxiliary Generator System
B001-002-01-1 Semiannual PM Work 2 TM -¥ -¥ B001-002-01-2 Annual PM Work 1 TM -¥ -¥ B001-002-01-3 Service Order 12 MO -¥ -¥
B001-003 YSK-1805
B001-003-01 Security Camera System
B001-003-01-1 Annual PM Work 1 TM -¥ -¥ B001-003-01-2 Scheduled Replacement Work 1 TM -¥ -¥ B001-003-01-3 Service Order 12 MO -¥ -¥
B001-004 YSK-1922
B001-004-01 Emergency Light System
B001-004-01-1 Annual PM Work 1 TM -¥ -¥ B001-004-01-2 Service Order 12 MO -¥ -¥
SOLICITATION/CONTRACT #
EXHIBIT B - CLIN 9001
Line Item 0003 Recurring - First Option Period
ELINs B001 through B007
Transformer Total
Emergency Light Systems Total YSK-1922 Total
Electric Hot Water Supply System Total NDK-100134 Total
Auxiliary Generator System Total YSK-1397 Total
YSK-1805 Total
ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
B001-005 YSK-1942
B001-005-01 Auxiliary Generator System (D825D5A)
B001-005-01-1 Quarterly PM Work 4 TM -¥ -¥ B001-005-01-2 Semiannual PM Work 2 TM -¥ -¥ B001-005-01-3 Annual PM Work 1 TM -¥ -¥ B001-005-01-4 Service Order 12 MO -¥ -¥
B001-005-02 Auxiliary Generator System (DQCA1339512)
B001-005-02-1 Quarterly PM Work 4 TM -¥ -¥ B001-005-02-2 Semiannual PM Work 2 TM -¥ -¥ B001-005-02-3 Annual PM Work 1 TM -¥ -¥ B001-005-02-4 Service Order 12 MO -¥ -¥
B001-006 YSK-1969
B001-006-01 Electric Card Lock System
B001-006-01-1 Annual PM Work 1 TM -¥ -¥ B001-006-01-2 Service Order 12 MO -¥ -¥
B001-006-02 Security Camera System
B001-006-02-1 Semiannual PM Work 1 TM -¥ -¥ B001-006-02-2 Service Order 12 MO -¥ -¥
B001-007 YSK-2043
B001-007-01 Emergency Light System
B001-007-01-1 Annual PM Work 1 TM -¥ -¥ B001-007-01-2 Service Order 12 MO -¥ -¥
B001-008 YSK-2046
B001-008-01 Emergency Light System
B001-008-01-1 Annual PM Work 1 TM -¥ -¥ B001-008-01-2 Service Order 12 MO -¥ -¥
B001-008-02 UPS System
B001-008-02-1 Annual PM Work 1 TM -¥ -¥ B001-008-02-2 Service Order 12 MO -¥ -¥
YSK-1942 Total
Electric Card Lock System Total
YSK-1969 Total
Emergency Light Systems Total YSK-2043 Total
Emergency Light Systems Total
Auxiliary Generator System (D825D5A) Total
Auxiliary Generator System (DQCA1339512) Total
UPS System Total YSK-2046 Total
ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
B001-009 YSK-2067
B001-009-01 Emergency Light System
B001-009-01-1 Annual PM Work 1 TM -¥ -¥ B001-009-01-2 Service Order 12 MO -¥ -¥
B001-010…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .