23B0405B (SDs)_Part5.pdf
PDF 20 MB Posted
- Solicitation number
- N4008423B0405
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMD0003.pdf | ||
| AMD0002.pdf | ||
| 23B0405 (SDs) ELINs in Excel SS.xlsx | XLSX spreadsheet | |
| AMD0001.pdf | ||
| 23B0405B (SDs)_Part7.pdf | ||
| 23B0405B (SDs)_Part6.pdf | ||
| 23B0405B (SDs)_Part9.pdf | ||
| 23B0405B (SDs)_Part10.pdf | ||
| 23B0405B (SDs)_Part1.pdf | ||
| 23B0405B (SDs)_Part2.pdf | ||
| 23B0405A (SF1449).pdf | ||
| 23B0405B (SDs)_Part8.pdf | ||
| 23B0405B (SDs)_Part4.pdf | ||
| 23B0405C (NOTICE).pdf | ||
| 23B0405B (SDs)_Part3.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI // FEDCON
ATTACHMENT J-1502000-001-025-01-01
SITE PLAN FOR UPS SYSTEM AT IKE-843
ATTACHMENT J-1502000-001-025-01-01
ATTACHMENT J-1502000-001-025-01-01
ATTACHMENT J-1502000-001-025-01-01
ATTACHMENT J-1502000-001-025-01-01
ATTACHMENT J-1502000-001-025-01-01
ATTACHMENT J-1502000-001-025-01-01
ATTACHMENT J-1502000-07-001-025-01-02
INVENTORY FOR UPS SYSTEM AT IKE-843
1. UPS SYSTEM:
Model No. Capacity QTY OEM Serial No. Year
BA-PTT2030 (UPS Panel) 30 KVA 1 SET GS Uasa Co., Ltd 30079921 (UPS Panel)
MSE-100-6 (Battery) 180 Cell 1 SET GS Uasa Co., Ltd 30079922 (Battery) 2014
ATTACHMENT J-1502000-07001-025-01-03
REFERENCE PM REQUIREMENT FOR UPS SYSTEM AT IKE-843
1. Simple PM Work:
UPS:
(1) Check working condition at control panel.
(2) Check existing conditions for voltage, current and frequency.
(3) Check exterior condition
Batteries:
(1) Check exterior condition of batteries under their covers.
(2) Check total voltage for batteries.
(3) Check existing voltages, resistances and temperature between terminals by each battery,
2. Detail PM Work:
Conditions:
(1) Batteries::
(a) Check floating charge voltages.
(b) Check cell voltages.
(c) Check room temperature.
(2) UPS:
(a) Check input charge voltage.
(b) Check output charge voltage.
(c) Check output current.
(d) Check impedance voltage.
(e) Check inverter input voltage (DC).
(f) Check direct supply voltage (AC).
(g) Check inverter output voltage (DC).
(h) Check output voltage (AC).
UPS System:
(1) Check sign wave.
(2) Check changing at no load.
(3) Check voltage level.
(4) Tighten terminals.
(5) Clean component parts.
(6) Perform simulation fail test and check alarms working conditions.
(7) Perform no load distribution test.
(8) Check total working conditions for floating voltage and current, load voltage and current, and inverter output voltage.
INSPECTION 1, 2
CUI // FEDCON
ATTACHMENT-J-1502000-07-001-026-01-01
SITE PLAN FOR YOKOSUKA EXTRA HIGH VOLTAGE RECEIVING & DISTRIBUTION SYSTEMS
INSPECTION 3
CUI // FEDCON
INSPECTION 4
CUI // FEDCON
INSPECTION 5
CUI // FEDCON
INSPECTION 6
CUI // FEDCON
INSPECTION 7
CUI // FEDCON
ATTACHMENT J-1502000-07-001-026-01-02
INVENTORY FOR YOKOSUKA EXTRA HIGH VOLTAGE RECEIVING & DISTRIBUTION SYSTEMS
Bldg. No. Equipment QTY YSK-B94 Cubicle-type Gas Insulated Switchgear(C-GIS)
• 66kV Breaker: 6 Unit
• 66kV Disconnecting Switch: 16 Unit
• 66kV Grounding Disconnector: 14 Unit
1 Set
DC power supply 1 Set Extra High Voltage Monitoring Panel 1 Set
YSK-1278 Open-air-type Switchgear
• 66kV Gas Circuit Breaker: 4 EA
1 Unit
6.6kV Power Distribution Panel 25 Panel DC Power Supply 1 Set Extra High Voltage Monitoring Panel 1 Set
YSK-1923 Open Air Type Switchgear
• 66kV Gas Circuit Breaker: 3 EA
1 Set
6.6kV Power Distribution Panel 18 Panel Extra High Voltage Monitoring Panel 1 Set
YSK-1805 6.6kV/13.2kV Power Distribution Panel 99 Panel Frequency Converter (#1-6 FC) Note: Full-fledged inspection for #6 FC is out of scope
6 Unit
ATTACHMENT J-1502000-07-001-026-01-03
REFERENCE PM REQUIREMENT FOR YOKOSUKA EXTRA HIGH VOLTAGE RECEIVING &
DISTRIBUTION SYSTEMS
TABLE CONTENT FOR REFERENCE PM WORK
C-GIS = Cubicle type Gas Insulated Switchgear, FC = Frequency Converter, GCB = Gas Circuit Breaker.
VCB = Vacuum Circuit Breaker, VC = Vacuum Contactor
PM
No.
Facility No.
SOW Performance Period Base
(2024th) 1st
(2025th) 2nd
(2026th) 3rd
(2027th) 4th
(2028th) 1 YSK-B94 C-GIS Regular inspection, etc. X X X X 2 YSK-B94 C-GIS Detailed inspection, etc. X
3 YSK-1278,
YSK-1923,
YSK-1805
Power distribution panel Insulation degradation diagnosis, etc.
X X X X X
4 YSK-1278 GCB Regular Inspection X 5 YSK-1923 GCB Regular Inspection X 6 YSK-1805 FC Facilities On-line Diagnosis X X X X X 7 YSK-1805 FC Facilities Full-fledged
Inspection, Panel Inspection
#4 FC #1 FC #2 FC #5 FC #3 FC
Note:
1) Onsite work and work needed to take electric outage are not allowed during the Carrier stay at YSK-B12.
REFERENCE PM REQUIREMENT FOR YOKOSUKA EXTRA HIGH VOLTAGE RECEIVING & DISTRIBUTION SYSTEMS
Detail PM requirement
1. PM No.1: YSK-B94 C-GIS Regular inspection, etc (FY24-FY27) / Onsite Work: Six (6) days, Required Power Outage: six (6) days
No Equipment Subject to Inspection QTY Inspection Outline
1. C-GIS
(Power Receiving Unit & Feeder Unit)
Breaker
(52-O1, 52-O2, 52-11 52-22, 52-F1, 52-F2)
Regular inspection
6 Unit • Measurement of the main contact wipe.
• Inspection of tightening condition.
• Oil replenishment and grease application.
• Measurement of insulation resistance of control circuit.
• Switching test
Disconnecting switch
(89-O1, 89-O2, 89-1, 89-2, 89-11, 89-12, 89- 13, 89-14, 89-21, 89-22, 89B11, 89B21, 89B12, 89B22, 89-F1, 89-F2)
Regular inspection
16 Unit • Inspection of tightening condition
• Oil replenishment and grease application
• Measurement of insulation resistance of control circuit
• Switching test
Grounding disconnector
(89DE1, 89RE1,
89DE2, 89RE2, 89E11,
89E12, 89E13, 89E21, 89EB11, 89EB21,
89EB12, 89EB22,
89EF1, 89EF2)
Regular inspection
14 Unit
Matters related to the panel
Regular inspection
1 Set • Inspection of tightening condition
• Cleaning and inspection
2. B94 DC power supply Inspection 1 Set • Visual inspection
• Voltage test
• Protective device test
• Check operating state
• Measurement of insulation resistance
• Measurement of storage battery voltage
• Measurement of storage battery internal resistance
• Measurement of storage battery temperature
No Equipment Subject to Inspection QTY Inspection Outline
3. B94 Extra high voltage monitoring panel Simple inspection
1 Set • Visual inspection
• Check for abnormal smell
• Check for discoloration
• Check for abnormal sound
2. PM No. 2: YSK-B94 C-GIS Detailed inspection, etc. (FY28) / Onsite Work: six (6) days, Required Power Outage: six (6) days
1. C-GIS
(Power Receiving Unit) (Feeder Unit)
Breaker (52-O1, 52-O2, 52-11, 52-22, 52-F1, 52-F2)
Detailed inspection
6 Unit • Measurement of the main contact wipe
• Inspection of tightening condition
• Check the contact conditions and operation of switches
• Check engagement and operation of link
• mechanism
• Oil replenishment and grease application
• Measurement of insulation resistance of control circuit
• Switching test
Disconnecting switch (89-O1, 89-O2, 89-1, 89-2, 89-11, 89-12, 89-13, 89-14, 89-21, 89-22, 89B11, 89B21, 89B12, 89B22, 89-F1, 89-F2)
Detailed inspection
16 Unit • Inspection of tightening condition
• Check the contact conditions, operation and
• installation position of micro switches
• Check operation of interlock
• Check engagement and operation of link
• mechanism
• Oil replenishment and grease application
• Measurement of insulation resistance of control circuit
• Switching test
Grounding disconnector
(89DE1, 89RE1,
89DE2, 89RE2,
89E11, 89E12, 89E13, 89E21, 89EB11, 89EB21,
89EB12, 89EB22,
89EF1, 89EF2)
Detailed inspection
14 Unit
Matters related to the panel
Detailed inspection
1 Set • Inspection of tightening condition
• Cleaning and inspection
• Measurement of insulation of main circuit
2. B94 DC power supply Inspection 1 Set • Visual inspection
• Voltage test
• Protective device test
• Check operating state
• Measurement of insulation resistance
• Measurement of storage battery voltage
• Measurement of storage battery internal resistance
• Measurement of storage battery temperature
3. B94 Extra high voltage monitoring panel
Simple inspection
1 Set • Visual inspection
• Check for abnormal smell
3. PM No.3: YSK-1278, 1923 and 1805 Power distribution panel Insulation degradation diagnosis, etc. (FY24-FY28) /
Onsite Work: YSK-1278 one (1) days, YSK-1923 one (1) days, YSK-1805 two (2) days, Required Power Outage: None No Equipment Subject to Inspection QTY Inspection Outline
1. YSK-1278 Power distribution panel Diagnosis 25 Panels • Measurement of local heating
• Insulation degradation diagnosis YSK-1923 Power distribution panel Diagnosis 18 Panels YSK-1805 Power distribution panel Diagnosis 99 Panels
2. YSK-1278 DC power supply Inspection 1 Set • Visual inspection
• Voltage test
• Protective device test
• Check operating state
• Measurement of insulation resistance
• Measurement of storage battery voltage
• Measurement of storage battery internal resistance
• Measurement of storage battery temperature
3. YSK-1278
YSK-1923
Extra high voltage monitoring panel
Simple inspection
1 Set • Visual inspection
• Check for abnormal smell
4. PM No.4: YSK-1278 Gas circuit breaker inspection (FY26) / Onsite Work: five (5) days, Required Power Outage: four (4) days
1. Gas circuit breaker Breaker
(52R1, 52T1), (52R2, 52T2)
Regular Inspection
4 Unit • Oil replenishment of the mechanical subsystem.
• Inspection of the external condition of the mechanical subsystem.
• Measurement of insulation resistance
• Operation Test
5. PM No.5: YSK- 1923 Gas circuit breaker Detailed inspection (FY26) / Onsite Work: four (4) days, Required Power Outage: three (3) days
1. Gas circuit breaker Breaker
(52R3, 52R4, 52T3) Regular Inspection
3 Unit • Oil replenishment of the mechanical subsystem.
• Inspection of the external condition of the mechanical subsystem.
• Measurement of insulation resistance
• Operation Test
6. PM No. 6: YSK- 1805 FC on-line diagnosis (FY24-FY28) / Onsite Work: 12 days, Required Power Outage: None
1. Frequency converter #1 - 6FC Diagnosis 6 Unit • On-line insulation diagnosis.
7. PM No. 7: YSK- 1805 FC facilities Full-fledged inspection, panel inspection (FY24-FY27) / Onsite Work: 18 days, Required Power Outage: 18 Days
#4FC(FY24),#1FC(FY25),#2FC(FY26),#5FC(FY27),#3FC(FY28)
No Equipment Subject to Inspection QTY Inspection Outline
1. 1) Synchronous motor TAKL-KCP-10P-
2950kW-6600V 1 Unit 1) Inspect and clean the main unit.
2) Remove the coil protection cover and perform air dusting.
3) Pull out the rotor and perform air dusting, and inspect the stator and rotor coil.
4) Measure each section.
• Measure insulation resistance
• Shaft levelness
• Side gap
• End play
• Dye penetrant test on the metal
5) Disassemble, inspect and clean the standard.
2) Synchronous generator TAKL-KEP-12P- 3500kVA- 13800V
1 Unit
3) AC exciter for motors TAA-8P-31kVA 1 Unit 1) Inspect and clean the main unit.
2) Remove the coil protection cover and perform air dusting.
3) Measure each section.
• Air gap
• Measure spacing in the shaft through-hole
• Insulation resistance
4) Inspect the rotating rectifier
4) AC exciter for generators
TAA-8P-61kVA 1 Unit
5) Permanent magnet generator TAY-14P-4kVA 1 Unit 1) Inspect and clean the main unit.
2) Remove the coil protection cover and perform air dusting.
3) Measure each section.
• Air gap
• Measure spacing in the shaft through-hole
• Insulation resistance
6) Motor for rolling devices
3Φ-200V 1 Unit 1) Inspect and clean the main unit.
2) Measure insulation resistance.
7) On-site test, adjustment 1 Set 1) Test measurement (before start).
• Check the start-up status (Use memory hicorder)
• Vibration
• Voltage, current
• Bearing temperature
• Winding temperature
2) Test measurement (after assembly)
• Inching
• Check the start-up status (Use memory hicorder)
• Vibration
• Voltage, current
• Bearing temperature
• Winding temperature
8) Insulation diagnosis 1 Set 1) Off-line insulation diagnosis
9) Other
1) Coating on the outside.
2) Replacement of lubricating oil.
Note: Performed partially.
2. 1) Motor control panel 1 Panel 1) Inspect and clean the outside.
2) Check tightening.
3) Check for overheating and damage.
4) Static characteristics test of the automatic power factor regulator.
5) Measurement of insulation resistance.
2) Generator control panel 1 Panel 1) Inspect and clean the outside.
2) Check tightening.
3) Check for overheating and damage.
4) Static characteristics test of the automatic voltage regulator.
5) Measure insulation resistance
3) Generator panel 1 Panel 1) Inspect and clean the outside.
4) Motor panel 1 Panel 2) Check tightening.
3) Check for overheating and damage.
4) Measure insulation resistance. 5) Korndorfer panel 1 Panel
6) NGR master panel 1 Panel 1) Visual inspection
7) Suppressor 2 Unit 1) Inspect and clean the outside.
2) Check tightening.
3) Check for overheating and damage.
4) Measure insulation resistance.
8) Dry transformer 1 Unit
9) Instrument transformer 2 Unit
3. 1) Protective relay 1 Set 1) Inspect and clean the outside.
2) Check tightening.
3) Check set point value.
4) Characteristic test.
5) Protective interlocking test.
4. 2) VCB 1 Set 1) Inspection of tightening condition.
2) Cleaning and application of grease for the disconnector.
3) Measurement of the main contact wipe.
4) Check the contact conditions of switches.
5) Oil replenishment and grease application.
6) Switching test.
7) Measurement of insulation resistance.
200/5
F11
WH
F11
100/5
C1
400/5
F12
WH
F12
200/5
F13
WH
F13
200/5
F15
F15
200/5
F14
WH
F14
200/5
F16
F16
4000KVA 6600V 50Hz
TIE TR(NO.2)
T-A-2-ADMINT-B-2-1T-C-2-1 T-A-1-1T-B-1-1
(NARA)
T-C-1-1
(KAMAKURA)
T-B-1-2-B
FG2
WH
FG2
FG3
WH
FG3
FG1
WH
FG1
T-G-1-1
100/5
(SEWAGE)
T-B-1-1
(NARA)
SW/STA
(#724)
B3-BUS
100/5100/5
B2-BUSB2-BUS B1-BUS B1-BUS
R19.1
KVA
SR
KVA
SC
R19.1
KVA
SR
KVA
SC
R19.1
KVA
SR
KVA
SC
250 60200 250 6020038 38
222238
WHWH
ZCT
200mA/1.5mA
51 51 51
67 67 67
51 51 51 51 51 51 51
67 67 67 67 67 67 67
C1
3/3
30KVA
NAT1
F-10A
(G)
1/3
30KVA
NAT2
F-20A (G)
I L
GTR1
38.1
KVA
6600/190
NGTR1
10/5
NGR
0.95Ω 200A 30sec30sec
F-10A (G)
一次側換算抵抗値 380Ω
F-10A (G)
NGTR2
10/5
GTR2
38.1
KVA
6600/190
NGR
0.95Ω 200A 30sec30sec
一次側換算抵抗値 380Ω
VCB
52BT1
600A
VCB
52BT2
600A
VCB
52GB
600A
VCB
600A
52F23 C-2
VCB
600A
52C1
SC1
VCB
600A
52F11 A-1
VCB
600A
52F12 B-1
VCB
600A
52F13 C-1
VCB
600A
52F14 D-1
VCB
600A
52F15 E-1
VCB
600A
52F16 F-1
VCB
600A
52S2
(12.5kA)
VCB
600A
52F21 A-2
VCB
600A
52F22 B-2
VCB
600A
52F24 D-2
VCB
600A
52F25 E-2
VCB
600A
52F26 F-2
VCB
600A
52C2
SC2
VCB
600A
52FG3
G-2
VCB
600A
52FG2
G-1
VCB
600A
52FG1
SW/S
VCS
200A
88C11
F-50A (M)
VCS
200A
88C12
F-50A (M)
VCS
200A
88C13
F-50A (M)
I L
屋外タンク5000L 燃費209L/h
(23時間) 実負荷
100L/200KWH
(50時間)
S2 500/5
500/5
6600/110
P2
P2 51
87 4000KVA 6600V 50Hz
TIE TR(NO.1)
27S1
WHV W
S1 500/5
500/5
6600/110
P1
P151
VCB
600A
52S1
(12.5kA)
AAAAAAA
200/5
F21
WH51
A
400/5
F22
WH51
A
200/5
F23
WH51
A
200/5
F24
WH51
A
200/5
F25
WH51
A
200/5
F26
WH51
A
100/5
C2
A
A
AAA
PFVar
27 S2
WH VW
APF Var
C2
F26
F25
F24
F23
F22
F21
100/5
G G G 27 59 84
WH RH
PF
V
A
FW
SA
G
ENG
50Hz
875KVA
6600V
1050PS
1500RPM
SG
VCB
600A
52G
SA
R19.1
KVA
SR
KVA
SC
R19.1
KVA
SR
KVA
SC
R19.1
KVA
SR
KVA
SC
VCS
200A
88C21
F-50A (M)
VCS
200A
88C22
F-50A (M)
VCS
200A
88C23
F-50A (M)
BUSDUCT
600A
100/5
52P1GCB
800A
DS 89P1
DS 89RA12
52RA1GCB
800A
RA1
GRA1
100/5
DS
89LA11LA
LA
BUSDUCT
600A
LA
100/5
52P2
GCB
800A
DS89P2
DS89RA22
52RA2
GCB
800A
100/5
RA2
GRA2
DS89RA21
89LA21
LA
VD RA2
※D
※B
※C
※A
V
B1
B1
B1
(SC1)
59Vo
B2 64
Vo
B2
(BT2)
B2
(SC2)
V
B3
B3
B3
V
Vo
100/5 R2251
51 GR22
ESR24
ESR25
52R22GCB
800A
89R23
ESB 2
89B22 89B12
89R22 (R2)
52R21GCB
800A (O2)
ESR23
ESR22
89R11 (2)
ESR21
200/5 R2151
51 GR21
A
VD R2
66000V 50Hz
(北鎌倉2号線)
※ 米海軍池子線2号
ESB 1
89B21 89B11
89R12 (R1)
52R11GCB
800A (O1)
ESR13
ESR12
89R11 (1)
ESR11
200/5 R1151
51 GR11
A
VD R1
66000V 50Hz
(北鎌倉1号線)
※ 米海軍池子線1号
89RA11
VD RA1
100/5 R1251
51 GR12
ESR14
ESR15
52R12GCB
800A
89R13
LA89LA2 LA89LA1
IKE‐724 SW/STA
EVTRA HIGH VOLTAGE
SWITCH STATION
IKE‐690 SW/STA
SUB‐STATION
89M2
ESM2
66000/110V 200/5AVCT
ESM1
89M1
89B (ALWAYS OFF)
I L I L ロックフリー
I L I L
I L I L
I L I L
IKE-724
PLC
IKE-690
PLC
池子(#690)
テレメーター
(東芝)
#1805
SCADA
(東芝)
ISDN回線
Optical Fiber Cable to be Replaced
IKE-724
Control & Indication
横須賀(#1805)
テレメーター
(東芝)
O/I
Terminal
O/I
Terminal
66000V系
6600V系
66000V系
CUI // FEDCONCUI // FEDCON
CUI // FEDCON
ATTACHMENT-J-1502000-07-001-026-02-01
SITE PLAN FOR IKEGO EXTRA HIGH VOLTAGE RECEIVING & DISTRIBUTION SYSTEMS AT IKE
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Typewritten Text
IKEGO EXTRA HIGH VOLTAGE RECIEVING DISTRIBUTION SINGLE CONNECTING WIRING PLAN
Line
TITLE/TRANS,/SWICH ST
Power Switching Station
SKETCHED BY DATE
IKE-724
FILE,NO, BLDG,NO,
10 11
Multi-power Transformer Panel (MC-01)
Internal Transformer Panel (MC-02)
Extra High Voltage Monitoring Panel (ECB-03)
Extra High Voltage Protection Relay Panel (ECB-04)
Remote Station Panel (ECB-05)
取引用計量器盤(積算電力量計他)(ECB-06)
Storage Battery Panel
52R21 Gas Insulated Switchgear Panel (GIS) (GIS-12)
52R22 Gas Insulated Switchgear Panel(GIS) (GIS-18)
16 16
MOFバイパス用DS盤 (GIS-15)
No.1 Bus Line Panel (GIS-14)
No.2 Bus Line Panel (GIS-16)
52R11 Gas Insulated Switchgear (GIS) (GIS-11)
52R12 Gas Insulated Switchgear (GIS) (GIS-17)
MOF盤 (GIS-13)
EARTH TERMINAL BOX
TELPHONE TERMINAL BOX
IKE-724 EQUIPMENT PLAN
The existing PLC in the Remote Station Panel to be replaced.
CUI // FEDCONCUI // FEDCON
CUI // FEDCON
Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Rectangle
Tsutomu.Toriyama.JA Rectangle
CUI // FEDCONCUI // FEDCON
Typewritten Text
IKE-724 AS-BUILT PLAN
The existing PLC in the Remote Station Panel to be replaced.
CUI // FEDCONCUI // FEDCON
CUI // FEDCON
Typewritten Text
IKE-724 AS-BUILT PLAN
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Rectangle
Tsutomu.Toriyama.JA Rectangle
Tsutomu.Toriyama.JA Rectangle
The existing PLC in the Remote Station Panel to be replaced.
IKE-690 EQUIPMENT PLAN
CUI // FEDCONCUI // FEDCON
CUI // FEDCON
Line
Tsutomu.Toriyama.JA Rectangle
Tsutomu.Toriyama.JA Rectangle
Tsutomu.Toriyama.JA Rectangle
Tsutomu.Toriyama.JA Line
UNDERGROUND CABLE PLAN & FIBER CABLE PLAN
CUI // FEDCONCUI // FEDCON
CUI // FEDCON
F12 F14
T-A-1-1-C T-A-1-1-A
T-A-1-1-B
T-B-1-2 T-B-1-3
R31
F17
G6
R85
R86
R87
R82
OVERHEAD LINE
R84
R27
F4
F5
R13
R16
T-B-2-1
E4
T-B-2-2 R10
R11
D2
T-B-2-3
R23 E2
T-A-1-3
R24
T-B-2-4
T-B-2-5 T-B-2-6
T-A-2-1
R8
D4
R25 B12
R21
R20R18
A6
R19
B1
I3I6
R28R53
I10
I14
R37
R42
R44
R48
R49
R50
R47
R57R59
H8
H5
T-B-1-ELEM
K2
R81 K3
R3 R5 R7
R22
TITLE/TRANS./SWICH ST
IKEGO HILLS HIGH VOLTAGE
UNDER GRUNG NETWORK
SKETCHED BY DATE
SHEET NO. BLDG NO.
R1
C1
J2
J3
J7
H17
R39 H12
G4
G3
R17
B6
I9
R56
T-C-1-3 T-C-1-2 T-C-1-1
T-A-1-1
T-B-2-8
T-B-2-7
T-B-2-10 T-B-2-9
T-B-1-4
T-A-1-2
T-C-2-5
T-C-2-4
T-C-2-3 T-C-2-1
T-C-2-2
T-B-1-1
SS-B-1
T-B-1-2-B T-B-1-2-C
T-B-1-2-A
#724
T-G-1-1
K-10
K9 R83
R32 R33 R34 R35
遠方操作用光ケーブル
#690
TEL
TEL
TELTELTELTEL
G13
690-1 690-2
R114
R112
R113
G14
R119
A12
A18
A15 T-A-1-4
T-A-1-5
SS-A-2
T-A-2-ADMIN
A10
R74 R78
T-A-2-North
L3E
L2E
L1E
R126
R125
R76
R124
R79
L6E
L7E
L5E
L4E
L9
T-A-2-2
逗
子
市
共
同
使
用
エ
リ
ア
R120
R121
R122
R123
PB1
R69
R67
R63
R61
I36
I50
I28
横浜側
Optical Fiber Cable
CUI // FEDCONCUI // FEDCON
CUI // FEDCON
Rectangle
7 8
C C
D D
A A
B B
1 2 3 4 5 6
7 8
E E
F F
1 2 3 4 5 6
SUB/STA
Bldg690
TITLE/TRANS./SWICH ST
SKETCHED BY DATE
SHEET NO. BLDG NO.
SW/STA
Bldg724
「特高」 FEEDER NETWORK図
15m15m 90m 292m 220m 248m 302m 60m 46m 56m 14m 30m
SUB/STA
Bldg690
SW/STA
Bldg724
TEL
70m
TEL TEL TEL TEL TEL R35 R34 R33 R32 690-2
15m 310m 220m 250m 193m 104m 60m 46m 56m 14m 30m
SUB/STA~SW/STA光ケーブル
K10 R87 R86 R85 R84 R82 R35 R34 R33 R32 690-2
横浜側
横浜側 現行
施工
Existing
SUB/STA~SW/STA Optical Fiber cable
New
Yokohama City Side
Yokohama City Side
CUI // FEDCONCUI // FEDCON
CUI // FEDCON
Remove the existing optical fiber cable, and provide new optical fiber cable.
CUI // FEDCONCUI // FEDCON
CUI // FEDCON
optical fiber cable, and provide new optical fiber cable.
CUI // FEDCONCUI // FEDCON
CUI // FEDCON
optical fiber cable, and provide new optical fiber cable.
CUI // FEDCONCUI // FEDCON
CUI // FEDCON
Remove the existing optical fiber cable.
Provide new optical fiber cable
CUI // FEDCONCUI // FEDCON
CUI // FEDCON
Line
Tsutomu.Toriyama.JA Line
Provide new optical fiber cable
CUI // FEDCONCUI // FEDCON
CUI // FEDCON
Line optical fiber cable
CUI // FEDCONCUI // FEDCON
CUI // FEDCON
Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
Provide new optical fiber cable
CUI // FEDCONCUI // FEDCON
CUI // FEDCON
Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line optical fiber cable
CUI // FEDCONCUI // FEDCON
CUI // FEDCON
Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line optical fiber cable
CUI // FEDCONCUI // FEDCON
CUI // FEDCON
Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
Provide new optical fiber cable
The existing optical fiber cable to be avondoned.
CUI // FEDCONCUI // FEDCON
CUI // FEDCON
Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
824S
613615
S514
800362
818 820
799784
607 671
825AR
Legend AccessControlP
") Structure
Coordinate Grid
AccessControl
Fence
Wall
RecreationFeatureLine
RailTrack
Building
Structure
Storage Tank
RecreationSite
Playground
WaterFeature
Sidewalk
RoadSection
Bridge
IKEGO HOUSING / NAVY ANNEX
646 680 693
Battery Panel (IKE-724, See in Temporary back-up Auxiliary Generator Connecting Plan)
Rectifier Panel (IKE-690, See in Temporary back-up Auxiliary Generator Connecting Plan)
T-A-2-2 (See ④ in Temporary back-up Auxiliary Generator Connecting Plan)
T-A-2-2 (See ③, ④ in Temporary back-up Auxiliary Generator Connecting Plan)
REQUIRED TEMPORARY BACK-UP AUXILIARY GENERATOR MAP
T-A-1-5 (IKE-721, See in Temporary back-up Auxiliary Generator Connecting Plan)
CUI // FEDCONCUI // FEDCON
CUI // FEDCON
Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Rectangle
Tsutomu.Toriyama.JA Rectangle
Tsutomu.Toriyama.JA Rectangle
Tsutomu.Toriyama.JA Rectangle
Rectangle
| SR#21828261-Renew-18-D-0419-SD-r8.pdf |
| 016-ALL-ATTACH-r1 |
| 000-A-J-1502-07-001-CFAY |
| 07-001-025-IKE-843 |
| 001-025-01-02-UPS-INV |
| 001-025-01-03-UPS-PM |
| 07-001-026-EXTRA-YSK&IKE |
| 001-026-01-EXTRA-YSK |
| 001-026-01-01-YEXTRA-PLAN |
| 001-026-01-02-YETRA-INV |
| 001-026-01-03-YEXTRAR |
| 001-026-02-EXTRA-IKE |
| 001-026-02-01-IPLAN |
| 001-022-02-01-1-Diagram |
| 001-022-02-01-2-SS-EquipPlan |
| 001-022-02-01-3-SS-Asbuilt-LETER |
| 001-022-02-01-4-690-LETTER |
| 001-022-02-01-5-CableRoute |
| 001-022-02-01-7-BackUp |
| IKEGO G1.G2 (A4) |
| fiberPlan.pdf |
| 001-022-02-01-6-NetWork |
| 001-026-02-02-IINV |
| 001-026-02-03-EXTRA-REPAIR |
| 07-001-027-AZU-8600376 |
| 001-027-01-01-Plan |
| 001-027-01-02-INV |
| 001-027-01-03-PM |
| 07-001-028-SubST |
| 001-028-01-01-SubST-PLAN-r2 |
| 001-023-01-01-SubST-PLAN |
| 01-60HT-SS-E.E-SHOP-1 ・ 60HT-E.E SHOP-1 |
| 02-60HT-HMP-W2 |
| 03-60HT-HMP-W1 |
| 04-60HT-HMP-E2 |
| 05-60HT-HMP-E1 |
| 06-60HT-E.E SHOP-2 |
| 07-60HT-DD-5-2 |
| 08-60HT-DD-4_5 |
| 09-60HT-DD-4 |
| 10-60HT-DD-3 |
| 11-60HT-DD-1_2 |
| 12-60HT-BERTH-9-1 |
| 13-60HT-BERTH-8-3 |
| 14-60HT-BERTH-8-2 |
| 15-60HT-BERTH-8-1 |
| 16-60HT-BERTH-7 |
| 17-60HT-BERTH-6 |
| 18-60HT-BERTH-12-1 |
| 19-60HT-BERTH-1_1.5 |
| 001-023-01-02-SubST-INV |
| 001-023-01-03-SubST-PM |
| 001-023-01-04-LBS |
| 60HT-BERTH-12(7K1E5290)_Page_1 |
| 60HT-BERTH-12(7K1E5290)_Page_2 |
| 60HT-E.E.SHOP-2(7K1E5320)_Page_1 |
| 60HT-E.E.SHOP-2(7K1E5320)_Page_2 |
| 001-028-01-02-SubST-INV |
| 001-028-01-03-SubST-REPIR |
| 001-028-01-04-LBS |
| 60HT-BERTH-12(7K1E5290)_Page_1 |
| 60HT-BERTH-12(7K1E5290)_Page_2 |
| 60HT-E.E.SHOP-2(7K1E5320)_Page_1 |
| 60HT-E.E.SHOP-2(7K1E5320)_Page_2 |
| 000-A-J-1502-07-002-USNH |
| 07-002-001-CAMERA-YSK-1400 |
| 002-001-01-01-CAMERA_PLAN |
| 002-001-01-02-CAMERA_INV |
| 002-001-01-03-CAMERA-PM |
| 07-002-002-CARD-YSK-1400&1407&3201-r1 |
| 002-002-01-01-CARD-PLAN |
| 002-002-01-02-CARD-INV-r1. |
| 002-002-01-03-CARD-PM |
| 002-002-01-03-CARD-PM-1 |
| 002-002-01-03-CARD-PM-2 |
File details come from the government source that posted it. Updated .