View the file

Other files

File Type Posted
AMD0003.pdf PDF
AMD0002.pdf PDF
23B0405 (SDs) ELINs in Excel SS.xlsx XLSX spreadsheet
AMD0001.pdf PDF
23B0405B (SDs)_Part7.pdf PDF
23B0405B (SDs)_Part6.pdf PDF
23B0405B (SDs)_Part9.pdf PDF
23B0405B (SDs)_Part10.pdf PDF
23B0405B (SDs)_Part1.pdf PDF
23B0405B (SDs)_Part2.pdf PDF
23B0405A (SF1449).pdf PDF
23B0405B (SDs)_Part8.pdf PDF
23B0405B (SDs)_Part4.pdf PDF
23B0405C (NOTICE).pdf PDF
23B0405B (SDs)_Part3.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI // FEDCON

ATTACHMENT J-1502000-001-025-01-01

SITE PLAN FOR UPS SYSTEM AT IKE-843

ATTACHMENT J-1502000-001-025-01-01

ATTACHMENT J-1502000-001-025-01-01

ATTACHMENT J-1502000-001-025-01-01

ATTACHMENT J-1502000-001-025-01-01

ATTACHMENT J-1502000-001-025-01-01

ATTACHMENT J-1502000-001-025-01-01

ATTACHMENT J-1502000-07-001-025-01-02

INVENTORY FOR UPS SYSTEM AT IKE-843

1. UPS SYSTEM:

Model No. Capacity QTY OEM Serial No. Year

BA-PTT2030 (UPS Panel) 30 KVA 1 SET GS Uasa Co., Ltd 30079921 (UPS Panel)

MSE-100-6 (Battery) 180 Cell 1 SET GS Uasa Co., Ltd 30079922 (Battery) 2014

ATTACHMENT J-1502000-07001-025-01-03

REFERENCE PM REQUIREMENT FOR UPS SYSTEM AT IKE-843

1. Simple PM Work:

UPS:

(1) Check working condition at control panel.

(2) Check existing conditions for voltage, current and frequency.

(3) Check exterior condition

Batteries:

(1) Check exterior condition of batteries under their covers.

(2) Check total voltage for batteries.

(3) Check existing voltages, resistances and temperature between terminals by each battery,

2. Detail PM Work:

Conditions:

(1) Batteries::

(a) Check floating charge voltages.

(b) Check cell voltages.

(c) Check room temperature.

(2) UPS:

(a) Check input charge voltage.

(b) Check output charge voltage.

(c) Check output current.

(d) Check impedance voltage.

(e) Check inverter input voltage (DC).

(f) Check direct supply voltage (AC).

(g) Check inverter output voltage (DC).

(h) Check output voltage (AC).

UPS System:

(1) Check sign wave.

(2) Check changing at no load.

(3) Check voltage level.

(4) Tighten terminals.

(5) Clean component parts.

(6) Perform simulation fail test and check alarms working conditions.

(7) Perform no load distribution test.

(8) Check total working conditions for floating voltage and current, load voltage and current, and inverter output voltage.

INSPECTION 1, 2

CUI // FEDCON

ATTACHMENT-J-1502000-07-001-026-01-01

SITE PLAN FOR YOKOSUKA EXTRA HIGH VOLTAGE RECEIVING & DISTRIBUTION SYSTEMS

INSPECTION 3

CUI // FEDCON

INSPECTION 4

CUI // FEDCON

INSPECTION 5

CUI // FEDCON

INSPECTION 6

CUI // FEDCON

INSPECTION 7

CUI // FEDCON

ATTACHMENT J-1502000-07-001-026-01-02

INVENTORY FOR YOKOSUKA EXTRA HIGH VOLTAGE RECEIVING & DISTRIBUTION SYSTEMS

Bldg. No. Equipment QTY YSK-B94 Cubicle-type Gas Insulated Switchgear(C-GIS)

• 66kV Breaker: 6 Unit

• 66kV Disconnecting Switch: 16 Unit

• 66kV Grounding Disconnector: 14 Unit

1 Set

DC power supply 1 Set Extra High Voltage Monitoring Panel 1 Set

YSK-1278 Open-air-type Switchgear

• 66kV Gas Circuit Breaker: 4 EA

1 Unit

6.6kV Power Distribution Panel 25 Panel DC Power Supply 1 Set Extra High Voltage Monitoring Panel 1 Set

YSK-1923 Open Air Type Switchgear

• 66kV Gas Circuit Breaker: 3 EA

1 Set

6.6kV Power Distribution Panel 18 Panel Extra High Voltage Monitoring Panel 1 Set

YSK-1805 6.6kV/13.2kV Power Distribution Panel 99 Panel Frequency Converter (#1-6 FC) Note: Full-fledged inspection for #6 FC is out of scope

6 Unit

ATTACHMENT J-1502000-07-001-026-01-03

REFERENCE PM REQUIREMENT FOR YOKOSUKA EXTRA HIGH VOLTAGE RECEIVING &

DISTRIBUTION SYSTEMS

TABLE CONTENT FOR REFERENCE PM WORK

C-GIS = Cubicle type Gas Insulated Switchgear, FC = Frequency Converter, GCB = Gas Circuit Breaker.

VCB = Vacuum Circuit Breaker, VC = Vacuum Contactor

PM

No.

Facility No.

SOW Performance Period Base

(2024th) 1st

(2025th) 2nd

(2026th) 3rd

(2027th) 4th

(2028th) 1 YSK-B94 C-GIS Regular inspection, etc. X X X X 2 YSK-B94 C-GIS Detailed inspection, etc. X

3 YSK-1278,

YSK-1923,

YSK-1805

Power distribution panel Insulation degradation diagnosis, etc.

X X X X X

4 YSK-1278 GCB Regular Inspection X 5 YSK-1923 GCB Regular Inspection X 6 YSK-1805 FC Facilities On-line Diagnosis X X X X X 7 YSK-1805 FC Facilities Full-fledged

Inspection, Panel Inspection

#4 FC #1 FC #2 FC #5 FC #3 FC

Note:

1) Onsite work and work needed to take electric outage are not allowed during the Carrier stay at YSK-B12.

REFERENCE PM REQUIREMENT FOR YOKOSUKA EXTRA HIGH VOLTAGE RECEIVING & DISTRIBUTION SYSTEMS

Detail PM requirement

1. PM No.1: YSK-B94 C-GIS Regular inspection, etc (FY24-FY27) / Onsite Work: Six (6) days, Required Power Outage: six (6) days

No Equipment Subject to Inspection QTY Inspection Outline

1. C-GIS

(Power Receiving Unit & Feeder Unit)

Breaker

(52-O1, 52-O2, 52-11 52-22, 52-F1, 52-F2)

Regular inspection

6 Unit • Measurement of the main contact wipe.

• Inspection of tightening condition.

• Oil replenishment and grease application.

• Measurement of insulation resistance of control circuit.

• Switching test

Disconnecting switch

(89-O1, 89-O2, 89-1, 89-2, 89-11, 89-12, 89- 13, 89-14, 89-21, 89-22, 89B11, 89B21, 89B12, 89B22, 89-F1, 89-F2)

Regular inspection

16 Unit • Inspection of tightening condition

• Oil replenishment and grease application

• Measurement of insulation resistance of control circuit

• Switching test

Grounding disconnector

(89DE1, 89RE1,

89DE2, 89RE2, 89E11,

89E12, 89E13, 89E21, 89EB11, 89EB21,

89EB12, 89EB22,

89EF1, 89EF2)

Regular inspection

14 Unit

Matters related to the panel

Regular inspection

1 Set • Inspection of tightening condition

• Cleaning and inspection

2. B94 DC power supply Inspection 1 Set • Visual inspection

• Voltage test

• Protective device test

• Check operating state

• Measurement of insulation resistance

• Measurement of storage battery voltage

• Measurement of storage battery internal resistance

• Measurement of storage battery temperature

No Equipment Subject to Inspection QTY Inspection Outline

3. B94 Extra high voltage monitoring panel Simple inspection

1 Set • Visual inspection

• Check for abnormal smell

• Check for discoloration

• Check for abnormal sound

2. PM No. 2: YSK-B94 C-GIS Detailed inspection, etc. (FY28) / Onsite Work: six (6) days, Required Power Outage: six (6) days

1. C-GIS

(Power Receiving Unit) (Feeder Unit)

Breaker (52-O1, 52-O2, 52-11, 52-22, 52-F1, 52-F2)

Detailed inspection

6 Unit • Measurement of the main contact wipe

• Inspection of tightening condition

• Check the contact conditions and operation of switches

• Check engagement and operation of link

• mechanism

• Oil replenishment and grease application

• Measurement of insulation resistance of control circuit

• Switching test

Disconnecting switch (89-O1, 89-O2, 89-1, 89-2, 89-11, 89-12, 89-13, 89-14, 89-21, 89-22, 89B11, 89B21, 89B12, 89B22, 89-F1, 89-F2)

Detailed inspection

16 Unit • Inspection of tightening condition

• Check the contact conditions, operation and

• installation position of micro switches

• Check operation of interlock

• Check engagement and operation of link

• mechanism

• Oil replenishment and grease application

• Measurement of insulation resistance of control circuit

• Switching test

Grounding disconnector

(89DE1, 89RE1,

89DE2, 89RE2,

89E11, 89E12, 89E13, 89E21, 89EB11, 89EB21,

89EB12, 89EB22,

89EF1, 89EF2)

Detailed inspection

14 Unit

Matters related to the panel

Detailed inspection

1 Set • Inspection of tightening condition

• Cleaning and inspection

• Measurement of insulation of main circuit

2. B94 DC power supply Inspection 1 Set • Visual inspection

• Voltage test

• Protective device test

• Check operating state

• Measurement of insulation resistance

• Measurement of storage battery voltage

• Measurement of storage battery internal resistance

• Measurement of storage battery temperature

3. B94 Extra high voltage monitoring panel

Simple inspection

1 Set • Visual inspection

• Check for abnormal smell

3. PM No.3: YSK-1278, 1923 and 1805 Power distribution panel Insulation degradation diagnosis, etc. (FY24-FY28) /

Onsite Work: YSK-1278 one (1) days, YSK-1923 one (1) days, YSK-1805 two (2) days, Required Power Outage: None No Equipment Subject to Inspection QTY Inspection Outline

1. YSK-1278 Power distribution panel Diagnosis 25 Panels • Measurement of local heating

• Insulation degradation diagnosis YSK-1923 Power distribution panel Diagnosis 18 Panels YSK-1805 Power distribution panel Diagnosis 99 Panels

2. YSK-1278 DC power supply Inspection 1 Set • Visual inspection

• Voltage test

• Protective device test

• Check operating state

• Measurement of insulation resistance

• Measurement of storage battery voltage

• Measurement of storage battery internal resistance

• Measurement of storage battery temperature

3. YSK-1278

YSK-1923

Extra high voltage monitoring panel

Simple inspection

1 Set • Visual inspection

• Check for abnormal smell

4. PM No.4: YSK-1278 Gas circuit breaker inspection (FY26) / Onsite Work: five (5) days, Required Power Outage: four (4) days

1. Gas circuit breaker Breaker

(52R1, 52T1), (52R2, 52T2)

Regular Inspection

4 Unit • Oil replenishment of the mechanical subsystem.

• Inspection of the external condition of the mechanical subsystem.

• Measurement of insulation resistance

• Operation Test

5. PM No.5: YSK- 1923 Gas circuit breaker Detailed inspection (FY26) / Onsite Work: four (4) days, Required Power Outage: three (3) days

1. Gas circuit breaker Breaker

(52R3, 52R4, 52T3) Regular Inspection

3 Unit • Oil replenishment of the mechanical subsystem.

• Inspection of the external condition of the mechanical subsystem.

• Measurement of insulation resistance

• Operation Test

6. PM No. 6: YSK- 1805 FC on-line diagnosis (FY24-FY28) / Onsite Work: 12 days, Required Power Outage: None

1. Frequency converter #1 - 6FC Diagnosis 6 Unit • On-line insulation diagnosis.

7. PM No. 7: YSK- 1805 FC facilities Full-fledged inspection, panel inspection (FY24-FY27) / Onsite Work: 18 days, Required Power Outage: 18 Days

#4FC(FY24),#1FC(FY25),#2FC(FY26),#5FC(FY27),#3FC(FY28)

No Equipment Subject to Inspection QTY Inspection Outline

1. 1) Synchronous motor TAKL-KCP-10P-

2950kW-6600V 1 Unit 1) Inspect and clean the main unit.

2) Remove the coil protection cover and perform air dusting.

3) Pull out the rotor and perform air dusting, and inspect the stator and rotor coil.

4) Measure each section.

• Measure insulation resistance

• Shaft levelness

• Side gap

• End play

• Dye penetrant test on the metal

5) Disassemble, inspect and clean the standard.

2) Synchronous generator TAKL-KEP-12P- 3500kVA- 13800V

1 Unit

3) AC exciter for motors TAA-8P-31kVA 1 Unit 1) Inspect and clean the main unit.

2) Remove the coil protection cover and perform air dusting.

3) Measure each section.

• Air gap

• Measure spacing in the shaft through-hole

• Insulation resistance

4) Inspect the rotating rectifier

4) AC exciter for generators

TAA-8P-61kVA 1 Unit

5) Permanent magnet generator TAY-14P-4kVA 1 Unit 1) Inspect and clean the main unit.

2) Remove the coil protection cover and perform air dusting.

3) Measure each section.

• Air gap

• Measure spacing in the shaft through-hole

• Insulation resistance

6) Motor for rolling devices

3Φ-200V 1 Unit 1) Inspect and clean the main unit.

2) Measure insulation resistance.

7) On-site test, adjustment 1 Set 1) Test measurement (before start).

• Check the start-up status (Use memory hicorder)

• Vibration

• Voltage, current

• Bearing temperature

• Winding temperature

2) Test measurement (after assembly)

• Inching

• Check the start-up status (Use memory hicorder)

• Vibration

• Voltage, current

• Bearing temperature

• Winding temperature

8) Insulation diagnosis 1 Set 1) Off-line insulation diagnosis

9) Other

1) Coating on the outside.

2) Replacement of lubricating oil.

Note: Performed partially.

2. 1) Motor control panel 1 Panel 1) Inspect and clean the outside.

2) Check tightening.

3) Check for overheating and damage.

4) Static characteristics test of the automatic power factor regulator.

5) Measurement of insulation resistance.

2) Generator control panel 1 Panel 1) Inspect and clean the outside.

2) Check tightening.

3) Check for overheating and damage.

4) Static characteristics test of the automatic voltage regulator.

5) Measure insulation resistance

3) Generator panel 1 Panel 1) Inspect and clean the outside.

4) Motor panel 1 Panel 2) Check tightening.

3) Check for overheating and damage.

4) Measure insulation resistance. 5) Korndorfer panel 1 Panel

6) NGR master panel 1 Panel 1) Visual inspection

7) Suppressor 2 Unit 1) Inspect and clean the outside.

2) Check tightening.

3) Check for overheating and damage.

4) Measure insulation resistance.

8) Dry transformer 1 Unit

9) Instrument transformer 2 Unit

3. 1) Protective relay 1 Set 1) Inspect and clean the outside.

2) Check tightening.

3) Check set point value.

4) Characteristic test.

5) Protective interlocking test.

4. 2) VCB 1 Set 1) Inspection of tightening condition.

2) Cleaning and application of grease for the disconnector.

3) Measurement of the main contact wipe.

4) Check the contact conditions of switches.

5) Oil replenishment and grease application.

6) Switching test.

7) Measurement of insulation resistance.

200/5

F11

WH

F11

100/5

C1

400/5

F12

WH

F12

200/5

F13

WH

F13

200/5

F15

F15

200/5

F14

WH

F14

200/5

F16

F16

4000KVA 6600V 50Hz

TIE TR(NO.2)

T-A-2-ADMINT-B-2-1T-C-2-1 T-A-1-1T-B-1-1

(NARA)

T-C-1-1

(KAMAKURA)

T-B-1-2-B

FG2

WH

FG2

FG3

WH

FG3

FG1

WH

FG1

T-G-1-1

100/5

(SEWAGE)

T-B-1-1

(NARA)

SW/STA

(#724)

B3-BUS

100/5100/5

B2-BUSB2-BUS B1-BUS B1-BUS

R19.1

KVA

SR

KVA

SC

R19.1

KVA

SR

KVA

SC

R19.1

KVA

SR

KVA

SC

250 60200 250 6020038 38

222238

WHWH

ZCT

200mA/1.5mA

51 51 51

67 67 67

51 51 51 51 51 51 51

67 67 67 67 67 67 67

C1

3/3

30KVA

NAT1

F-10A

(G)

1/3

30KVA

NAT2

F-20A (G)

I L

GTR1

38.1

KVA

6600/190

NGTR1

10/5

NGR

0.95Ω 200A 30sec30sec

F-10A (G)

一次側換算抵抗値 380Ω

F-10A (G)

NGTR2

10/5

GTR2

38.1

KVA

6600/190

NGR

0.95Ω 200A 30sec30sec

一次側換算抵抗値 380Ω

VCB

52BT1

600A

VCB

52BT2

600A

VCB

52GB

600A

VCB

600A

52F23 C-2

VCB

600A

52C1

SC1

VCB

600A

52F11 A-1

VCB

600A

52F12 B-1

VCB

600A

52F13 C-1

VCB

600A

52F14 D-1

VCB

600A

52F15 E-1

VCB

600A

52F16 F-1

VCB

600A

52S2

(12.5kA)

VCB

600A

52F21 A-2

VCB

600A

52F22 B-2

VCB

600A

52F24 D-2

VCB

600A

52F25 E-2

VCB

600A

52F26 F-2

VCB

600A

52C2

SC2

VCB

600A

52FG3

G-2

VCB

600A

52FG2

G-1

VCB

600A

52FG1

SW/S

VCS

200A

88C11

F-50A (M)

VCS

200A

88C12

F-50A (M)

VCS

200A

88C13

F-50A (M)

I L

屋外タンク5000L 燃費209L/h

(23時間) 実負荷

100L/200KWH

(50時間)

S2 500/5

500/5

6600/110

P2

P2 51

87 4000KVA 6600V 50Hz

TIE TR(NO.1)

27S1

WHV W

S1 500/5

500/5

6600/110

P1

P151

VCB

600A

52S1

(12.5kA)

AAAAAAA

200/5

F21

WH51

A

400/5

F22

WH51

A

200/5

F23

WH51

A

200/5

F24

WH51

A

200/5

F25

WH51

A

200/5

F26

WH51

A

100/5

C2

A

A

AAA

PFVar

27 S2

WH VW

APF Var

C2

F26

F25

F24

F23

F22

F21

100/5

G G G 27 59 84

WH RH

PF

V

A

FW

SA

G

ENG

50Hz

875KVA

6600V

1050PS

1500RPM

SG

VCB

600A

52G

SA

R19.1

KVA

SR

KVA

SC

R19.1

KVA

SR

KVA

SC

R19.1

KVA

SR

KVA

SC

VCS

200A

88C21

F-50A (M)

VCS

200A

88C22

F-50A (M)

VCS

200A

88C23

F-50A (M)

BUSDUCT

600A

100/5

52P1GCB

800A

DS 89P1

DS 89RA12

52RA1GCB

800A

RA1

GRA1

100/5

DS

89LA11LA

LA

BUSDUCT

600A

LA

100/5

52P2

GCB

800A

DS89P2

DS89RA22

52RA2

GCB

800A

100/5

RA2

GRA2

DS89RA21

89LA21

LA

VD RA2

※D

※B

※C

※A

V

B1

B1

B1

(SC1)

59Vo

B2 64

Vo

B2

(BT2)

B2

(SC2)

V

B3

B3

B3

V

Vo

100/5 R2251

51 GR22

ESR24

ESR25

52R22GCB

800A

89R23

ESB 2

89B22 89B12

89R22 (R2)

52R21GCB

800A (O2)

ESR23

ESR22

89R11 (2)

ESR21

200/5 R2151

51 GR21

A

VD R2

66000V 50Hz

(北鎌倉2号線)

※ 米海軍池子線2号

ESB 1

89B21 89B11

89R12 (R1)

52R11GCB

800A (O1)

ESR13

ESR12

89R11 (1)

ESR11

200/5 R1151

51 GR11

A

VD R1

66000V 50Hz

(北鎌倉1号線)

※ 米海軍池子線1号

89RA11

VD RA1

100/5 R1251

51 GR12

ESR14

ESR15

52R12GCB

800A

89R13

LA89LA2 LA89LA1

IKE‐724 SW/STA

EVTRA HIGH VOLTAGE

SWITCH STATION

IKE‐690 SW/STA

SUB‐STATION

89M2

ESM2

66000/110V 200/5AVCT

ESM1

89M1

89B (ALWAYS OFF)

I L I L ロックフリー

I L I L

I L I L

I L I L

IKE-724

PLC

IKE-690

PLC

池子(#690)

テレメーター

(東芝)

#1805

SCADA

(東芝)

ISDN回線

Optical Fiber Cable to be Replaced

IKE-724

Control & Indication

横須賀(#1805)

テレメーター

(東芝)

O/I

Terminal

O/I

Terminal

66000V系

6600V系

66000V系

CUI // FEDCONCUI // FEDCON

CUI // FEDCON

ATTACHMENT-J-1502000-07-001-026-02-01

SITE PLAN FOR IKEGO EXTRA HIGH VOLTAGE RECEIVING & DISTRIBUTION SYSTEMS AT IKE

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Typewritten Text

IKEGO EXTRA HIGH VOLTAGE RECIEVING DISTRIBUTION SINGLE CONNECTING WIRING PLAN

Line

TITLE/TRANS,/SWICH ST

Power Switching Station

SKETCHED BY DATE

IKE-724

FILE,NO, BLDG,NO,

10 11

Multi-power Transformer Panel (MC-01)

Internal Transformer Panel (MC-02)

Extra High Voltage Monitoring Panel (ECB-03)

Extra High Voltage Protection Relay Panel (ECB-04)

Remote Station Panel (ECB-05)

取引用計量器盤(積算電力量計他)(ECB-06)

Storage Battery Panel

52R21 Gas Insulated Switchgear Panel (GIS) (GIS-12)

52R22 Gas Insulated Switchgear Panel(GIS) (GIS-18)

16 16

MOFバイパス用DS盤 (GIS-15)

No.1 Bus Line Panel (GIS-14)

No.2 Bus Line Panel (GIS-16)

52R11 Gas Insulated Switchgear (GIS) (GIS-11)

52R12 Gas Insulated Switchgear (GIS) (GIS-17)

MOF盤 (GIS-13)

EARTH TERMINAL BOX

TELPHONE TERMINAL BOX

IKE-724 EQUIPMENT PLAN

The existing PLC in the Remote Station Panel to be replaced.

CUI // FEDCONCUI // FEDCON

CUI // FEDCON

Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Rectangle

Tsutomu.Toriyama.JA Rectangle

CUI // FEDCONCUI // FEDCON

Typewritten Text

IKE-724 AS-BUILT PLAN

The existing PLC in the Remote Station Panel to be replaced.

CUI // FEDCONCUI // FEDCON

CUI // FEDCON

Typewritten Text

IKE-724 AS-BUILT PLAN

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Rectangle

Tsutomu.Toriyama.JA Rectangle

Tsutomu.Toriyama.JA Rectangle

The existing PLC in the Remote Station Panel to be replaced.

IKE-690 EQUIPMENT PLAN

CUI // FEDCONCUI // FEDCON

CUI // FEDCON

Line

Tsutomu.Toriyama.JA Rectangle

Tsutomu.Toriyama.JA Rectangle

Tsutomu.Toriyama.JA Rectangle

Tsutomu.Toriyama.JA Line

UNDERGROUND CABLE PLAN & FIBER CABLE PLAN

CUI // FEDCONCUI // FEDCON

CUI // FEDCON

F12 F14

T-A-1-1-C T-A-1-1-A

T-A-1-1-B

T-B-1-2 T-B-1-3

R31

F17

G6

R85

R86

R87

R82

OVERHEAD LINE

R84

R27

F4

F5

R13

R16

T-B-2-1

E4

T-B-2-2 R10

R11

D2

T-B-2-3

R23 E2

T-A-1-3

R24

T-B-2-4

T-B-2-5 T-B-2-6

T-A-2-1

R8

D4

R25 B12

R21

R20R18

A6

R19

B1

I3I6

R28R53

I10

I14

R37

R42

R44

R48

R49

R50

R47

R57R59

H8

H5

T-B-1-ELEM

K2

R81 K3

R3 R5 R7

R22

TITLE/TRANS./SWICH ST

IKEGO HILLS HIGH VOLTAGE

UNDER GRUNG NETWORK

SKETCHED BY DATE

SHEET NO. BLDG NO.

R1

C1

J2

J3

J7

H17

R39 H12

G4

G3

R17

B6

I9

R56

T-C-1-3 T-C-1-2 T-C-1-1

T-A-1-1

T-B-2-8

T-B-2-7

T-B-2-10 T-B-2-9

T-B-1-4

T-A-1-2

T-C-2-5

T-C-2-4

T-C-2-3 T-C-2-1

T-C-2-2

T-B-1-1

SS-B-1

T-B-1-2-B T-B-1-2-C

T-B-1-2-A

#724

T-G-1-1

K-10

K9 R83

R32 R33 R34 R35

遠方操作用光ケーブル

#690

TEL

TEL

TELTELTELTEL

G13

690-1 690-2

R114

R112

R113

G14

R119

A12

A18

A15 T-A-1-4

T-A-1-5

SS-A-2

T-A-2-ADMIN

A10

R74 R78

T-A-2-North

L3E

L2E

L1E

R126

R125

R76

R124

R79

L6E

L7E

L5E

L4E

L9

T-A-2-2

逗

子

市

共

同

使

用

エ

リ

ア

R120

R121

R122

R123

PB1

R69

R67

R63

R61

I36

I50

I28

横浜側

Optical Fiber Cable

CUI // FEDCONCUI // FEDCON

CUI // FEDCON

Rectangle

7 8

C C

D D

A A

B B

1 2 3 4 5 6

7 8

E E

F F

1 2 3 4 5 6

SUB/STA

Bldg690

TITLE/TRANS./SWICH ST

SKETCHED BY DATE

SHEET NO. BLDG NO.

SW/STA

Bldg724

「特高」 FEEDER NETWORK図

15m15m 90m 292m 220m 248m 302m 60m 46m 56m 14m 30m

SUB/STA

Bldg690

SW/STA

Bldg724

TEL

70m

TEL TEL TEL TEL TEL R35 R34 R33 R32 690-2

15m 310m 220m 250m 193m 104m 60m 46m 56m 14m 30m

SUB/STA~SW/STA光ケーブル

K10 R87 R86 R85 R84 R82 R35 R34 R33 R32 690-2

横浜側

横浜側 現行

施工

Existing

SUB/STA~SW/STA Optical Fiber cable

New

Yokohama City Side

Yokohama City Side

CUI // FEDCONCUI // FEDCON

CUI // FEDCON

Remove the existing optical fiber cable, and provide new optical fiber cable.

CUI // FEDCONCUI // FEDCON

CUI // FEDCON

optical fiber cable, and provide new optical fiber cable.

CUI // FEDCONCUI // FEDCON

CUI // FEDCON

optical fiber cable, and provide new optical fiber cable.

CUI // FEDCONCUI // FEDCON

CUI // FEDCON

Remove the existing optical fiber cable.

Provide new optical fiber cable

CUI // FEDCONCUI // FEDCON

CUI // FEDCON

Line

Tsutomu.Toriyama.JA Line

Provide new optical fiber cable

CUI // FEDCONCUI // FEDCON

CUI // FEDCON

Line optical fiber cable

CUI // FEDCONCUI // FEDCON

CUI // FEDCON

Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Provide new optical fiber cable

CUI // FEDCONCUI // FEDCON

CUI // FEDCON

Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line optical fiber cable

CUI // FEDCONCUI // FEDCON

CUI // FEDCON

Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line optical fiber cable

CUI // FEDCONCUI // FEDCON

CUI // FEDCON

Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Provide new optical fiber cable

The existing optical fiber cable to be avondoned.

CUI // FEDCONCUI // FEDCON

CUI // FEDCON

Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

824S

613615

S514

800362

818 820

799784

607 671

825AR

Legend AccessControlP

") Structure

Coordinate Grid

AccessControl

Fence

Wall

RecreationFeatureLine

RailTrack

Building

Structure

Storage Tank

RecreationSite

Playground

WaterFeature

Sidewalk

RoadSection

Bridge

IKEGO HOUSING / NAVY ANNEX

646 680 693

Battery Panel (IKE-724, See in Temporary back-up Auxiliary Generator Connecting Plan)

Rectifier Panel (IKE-690, See in Temporary back-up Auxiliary Generator Connecting Plan)

T-A-2-2 (See ④ in Temporary back-up Auxiliary Generator Connecting Plan)

T-A-2-2 (See ③, ④ in Temporary back-up Auxiliary Generator Connecting Plan)

REQUIRED TEMPORARY BACK-UP AUXILIARY GENERATOR MAP

T-A-1-5 (IKE-721, See in Temporary back-up Auxiliary Generator Connecting Plan)

CUI // FEDCONCUI // FEDCON

CUI // FEDCON

Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Rectangle

Tsutomu.Toriyama.JA Rectangle

Tsutomu.Toriyama.JA Rectangle

Tsutomu.Toriyama.JA Rectangle

Rectangle

SR#21828261-Renew-18-D-0419-SD-r8.pdf
016-ALL-ATTACH-r1
000-A-J-1502-07-001-CFAY
07-001-025-IKE-843
001-025-01-02-UPS-INV
001-025-01-03-UPS-PM
07-001-026-EXTRA-YSK&IKE
001-026-01-EXTRA-YSK
001-026-01-01-YEXTRA-PLAN
001-026-01-02-YETRA-INV
001-026-01-03-YEXTRAR
001-026-02-EXTRA-IKE
001-026-02-01-IPLAN
001-022-02-01-1-Diagram
001-022-02-01-2-SS-EquipPlan
001-022-02-01-3-SS-Asbuilt-LETER
001-022-02-01-4-690-LETTER
001-022-02-01-5-CableRoute
001-022-02-01-7-BackUp
IKEGO G1.G2 (A4)
fiberPlan.pdf
001-022-02-01-6-NetWork
001-026-02-02-IINV
001-026-02-03-EXTRA-REPAIR
07-001-027-AZU-8600376
001-027-01-01-Plan
001-027-01-02-INV
001-027-01-03-PM
07-001-028-SubST
001-028-01-01-SubST-PLAN-r2
001-023-01-01-SubST-PLAN
01-60HT-SS-E.E-SHOP-1 ・ 60HT-E.E SHOP-1
02-60HT-HMP-W2
03-60HT-HMP-W1
04-60HT-HMP-E2
05-60HT-HMP-E1
06-60HT-E.E SHOP-2
07-60HT-DD-5-2
08-60HT-DD-4_5
09-60HT-DD-4
10-60HT-DD-3
11-60HT-DD-1_2
12-60HT-BERTH-9-1
13-60HT-BERTH-8-3
14-60HT-BERTH-8-2
15-60HT-BERTH-8-1
16-60HT-BERTH-7
17-60HT-BERTH-6
18-60HT-BERTH-12-1
19-60HT-BERTH-1_1.5
001-023-01-02-SubST-INV
001-023-01-03-SubST-PM
001-023-01-04-LBS
60HT-BERTH-12(7K1E5290)_Page_1
60HT-BERTH-12(7K1E5290)_Page_2
60HT-E.E.SHOP-2(7K1E5320)_Page_1
60HT-E.E.SHOP-2(7K1E5320)_Page_2
001-028-01-02-SubST-INV
001-028-01-03-SubST-REPIR
001-028-01-04-LBS
60HT-BERTH-12(7K1E5290)_Page_1
60HT-BERTH-12(7K1E5290)_Page_2
60HT-E.E.SHOP-2(7K1E5320)_Page_1
60HT-E.E.SHOP-2(7K1E5320)_Page_2
000-A-J-1502-07-002-USNH
07-002-001-CAMERA-YSK-1400
002-001-01-01-CAMERA_PLAN
002-001-01-02-CAMERA_INV
002-001-01-03-CAMERA-PM
07-002-002-CARD-YSK-1400&1407&3201-r1
002-002-01-01-CARD-PLAN
002-002-01-02-CARD-INV-r1.
002-002-01-03-CARD-PM
002-002-01-03-CARD-PM-1
002-002-01-03-CARD-PM-2

File details come from the government source that posted it. Updated .