P719 Second Floor RCPs_rev 20 1218.pdf

PDF 2 MB Posted

Attached to
P719 DBB Wargaming Center, Quantico, VA Federal contract opportunity
Solicitation number
N4008020R5249
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This solicitation is for the design-bid-build construction of a new two-story academic instruction facility to support wargaming functions at Marine Corps Base Quantico in Virginia. The project scope includes constructing the 100,443 square foot low-rise Georgian-style academic building, a 132,116 square foot multi-story precast concrete parking structure, and a 1,650 square foot Area Distribution Node. The solicitation is unrestricted with full and open competition conducted under best value source selection. The construction value is estimated between $100-250 million. The Department of the Navy Naval Facilities Engineering Command is the issuing agency.

View the file

Other files for this federal contract opportunity

Other files attached to P719 DBB Wargaming Center, Quantico, VA, newest first.
File Type Posted
P719 AMENDMENT 0015.pdf PDF
BLDG-P719-1590908-CS511 - OPTION 3.pdf PDF
26 26 00.pdf PDF
BLDG-P719-1590908-CS512 - OPTION 2.pdf PDF
REVISED 32 31 13.53.pdf PDF
08 56 46.20 20.pdf PDF
P719 Wargaming Center Price Schedule dated 18 December 2020.docx DOCX document
BLDG-P719-1590908-Response to RFI 285.pdf PDF
BLDG-P719-1590908-Response to RFI 289.pdf PDF
05 52 00.pdf PDF
P719 AMENDMENT 0014.pdf PDF
P719 AMENDMENT 0013.pdf PDF
A-416 - ENLARGED AUDITORIUM PLAN_WOOD WALL CAP.pdf PDF
P719 AMENDMENT 0012.pdf PDF
07 60 00.pdf PDF
P719 Wargaming Center Price Schedule dated 14 December 2020.docx DOCX document
32 31 13.53 - without redlines.pdf PDF
31 21 13.pdf PDF
08 33 23.pdf PDF
10 22 13.pdf PDF
P719 AMENDMENT 0011.pdf PDF
P719 AMENDMENT 0010.pdf PDF
P719 AMENDMENT 0009.pdf PDF
32 31 13.53.pdf PDF
P719 AMENDMENT 0008.pdf PDF
Checklist for Reviewing Subk Plans.pdf PDF
P719 AMENDMENT 0007.pdf PDF
P719 AMENDMENT 0006.pdf PDF
P719 Site Visit Attendance Sheet.PDF PDF
P719 AMENDMENT 0005.pdf PDF
P719 AMENDMENT 0004.pdf PDF
P719 AMENDMENT 0002.pdf PDF
P719 AMENDMENT 0001.pdf PDF
ATTACHMENT C - Construction Experience Project Data Sheet.doc DOC document
SOLICTITATION N4008020R5249 - P719 WARGAMING CENTER MCBQ.pdf PDF
ATTACHMENT D - Past Performance Questionnaire.doc DOC document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2' x 2' ACOUSTICAL CEILING TILE

GYPSUM BOARD - PAINT

RECESSED LIGHT

10' - 0"

CEILING HEIGHT ABOVE FINISH FLOOR

HVAC AIR SUPPLY GRILLE

HVAC EXHAUST OR RETURN GRILLE

LED FIXTURE - WALL MOUNTED

WALL MOUNTED EXTERIOR LIGHT FIXTURE

EXIT SIGN

OPEN TO STRUCTURE

2' x 4' LED EMERGENCY FIXTURE - RECESSED

2' x 4' LED FIXTURE - RECESSED

2' x 2' LED FIXTURE - RECESSED

PENDANT LIGHT

WIRE MESH PARTITION CEILING

ROUND DIFFUSER

LED PENDANT

CIRCULAR PENDANT LIGHTING FIXTURE

ACCESS HATCH

B

2.8 3 4 5 62

D.5

C.8

C

B.3

B.2

A

5.3 6.2

D

MATCHLINE SEE SHEET A-153

M A

T C

H

LI

N E

S E

E S

H E

E T

A -1

M A

T C

H

LI

N E

S E

E S

H E

E T

A -1

BREAKOUT

EXECUTIVE CONF

232 CONTROL ROOM

EXECUTIVE CONF

220BREAK ROOM

WOMEN

MEN

MEN

STAIR 6

ST16

STAIR 5

ST15

CORR

C15

WARGAMING

10' - 0" A.F.F.

10' - 0" A.F.F.

10' - 0" A.F.F. 10' - 0" A.F.F.

9' - 0" A.F.F.

10' - 0" A.F.F.

9' - 0" A.F.F.

12' - 0" A.F.F.

9' - 0" A.F.F.

9' - 6" A.F.F.

12' - 0" A.F.F.

11' - 0" A.F.F.

11' - 0" A.F.F.

11' - 0" A.F.F.

1.4

B.9

3.2 3.8 6.3 6.66.4

D.2

C.6

C.1

ELECTRICAL

STORAGE

11' - 6" A.F.F.

WOMEN

CORR

C15

GOVT COMM

12' - 0" A.F.F.

CORR

C17

11' - 6" A.F.F.

CORR

C18

8' - 6" A.F.F.

A2

A-564

76.86.7

12' - 0" A.F.F.

10' - 0" A.F.F.

C2

A-541

C2

A-541

C2

A-541

C2

A-541

TYP TYP

B3

A-541

TYP

B1

A-541

TYP

B1

A-541

B2

A-541

B1

A-541

A1

A-542

TYP

11' - 6" A.F.F.

10' - 0" A.F.F.

4'

2'

2'

JAN

10' - 0" A.F.F.

10' - 0" A.F.F.

12' - 0" A.F.F.12' - 0" A.F.F.

10' - 0" A.F.F.

A4

A-564

TYP

TYP

ALIGN

TYP

ALIGN

HIGH POINT

31'-8" A.F.F.

LOW POINT

30'-8" A.F.F.

34' - 11" A.F.F.

HIGH POINT

31'-8" A.F.F.

LOW POINT

30'-8" A.F.F.

34' - 11" A.F.F.

30' - 8" A.F.F.

HIGH POINT

31'-8" A.F.F.

LOW POINT

30'-8" A.F.F.

HIGH POINT

31'-8" A.F.F.

LOW POINT

30'-8" A.F.F.

HIGH POINT

31'-8" A.F.F.

LOW POINT

30'-8" A.F.F.

HIGH POINT

31'-8" A.F.F.

LOW POINT

30'-8" A.F.F.

34' - 11" A.F.F.

10' - 0" A.F.F.

10' - 0" A.F.F.

10' - 0" A.F.F.

10' - 0" A.F.F.

ALIGN

TYP

10' - 10"

B2

A-541 __________ B2

A-541

TYP

3' - 0"

EQ

2' - 9"

10' - 6"

2' - 9"

EQ

8' - 0" A.F.F.

C2

A-541

8' - 6" A.F.F.

A3

A-541

10' - 0" A.F.F.

EQ EQ

*NOTE: CEILING ELEVATION

TAGS AT FIRST FLOOR LOBBY

ARE CALCULATED FROM FIRST

FLOOR FINISHED FLOORING

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

B -2

M

A R

IN

E

C O

R P

S B

A S

E Q

U A

N T

IC

O

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

OF

SEAL

CHK

APPROVED

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N

C

LA

S S

IF

IE

D

F O

R O

F F

IC

IA

L U

S E

O N

LY

P -7

W

A R

G A

M

IN

G C

E N

T E

R

AS NOTED

DRAWFORM REVISION: 12 APRIL 2018

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

Q U

A N

T

IC

O V

A

/1

/2

:4

:3

A

M C

R e v it

P ro je c ts

\B L

D G

P -1

-A

-W G

C -C e n tr a l_ w m c lo u ti e r@ b u rn s m c d

.c o m .r v t

R E

F

LE

C T

E D

C E

IL

IN

G P

LA

N

S

E C

O N

D F

LO

O

R

A R

E A

A

1590908

13129723

A-151

EVNOM NOM

KEY PLAN

A B

C D

E

4' 8' 16'0'

PLAN

NORTH

PLAN

NORTH

KEY PLAN

CEILING PLAN LEGEND

A B

C D

E

PLAN

NORTH

SCALE: 1/8" = 1'-0"

A1

REFLECTED CEILING PLAN - SECOND FLOOR - AREA A

WORK NOTES

63 ALIGN COLUMN SURROUND WITH EDGE OF BULKHEAD AT OVERHEAD

OPERABLE PARTITION POCKET, TYP. COORDINATE LOCATION WITH

OPERABLE PARTITION MFR

IS

S U

E D

F O

R C

O N

S T

R U

C T

IO

N

/1

/2

REFERENCE A-140 FOR GENERAL CEILING PLAN NOTES

B

8 9 10 1110.2 12

C.8

C

B.3

B.2

7.7

D

M A

T C

H

LI

N E

S E

E S

H E

E T

A -1

MATCHLINE SEE SHEET A-154

WOMEN

BREAK ROOM

BREAKOUT

211 EXECUTIVE CONF

STAIR 3

ST13

JAN

STORAGE

CONTROL ROOM

WARGAMING

STAIR 3

ST13

10' - 0" A.F.F.

9' - 0" A.F.F.

9' - 0" A.F.F.

11' - 0" A.F.F.

9' - 6" A.F.F.

10' - 0" A.F.F.

11' - 0" A.F.F.

B.9

11.7

C.6

C.1

ELECTRICAL

CORR

C10

MEN

CORR

C13

CORR

C11

CORR

C12

12' - 0" A.F.F.

A2

A-564

TYP

C2

A-541

TYP

C2

A-541

TYP

B1

A-541

B1

A-541

A1

A-542

TYP

TYP

TYP

TYP

A

LI

G N

B3

A-541

8' - 6" A.F.F.

10' - 0" A.F.F.

10' - 0" A.F.F.

10' - 0" A.F.F.

10' - 0" A.F.F.

A4

A-564

TYP

10' - 0" A.F.F.

11' - 6" A.F.F.

B2

A-541

TYP

10' - 0" A.F.F.

B1

A-541

B1

A-541

B1

A-541

B2

A-541

TYP

10' - 10"

10' - 0" A.F.F.

10' - 0" A.F.F.

12' - 0" A.F.F.

2' x 2' ACOUSTICAL CEILING TILE

GYPSUM BOARD - PAINT

RECESSED LIGHT

10' - 0"

CEILING HEIGHT ABOVE FINISH FLOOR

HVAC AIR SUPPLY GRILLE

HVAC EXHAUST OR RETURN GRILLE

LED FIXTURE - WALL MOUNTED

WALL MOUNTED EXTERIOR LIGHT FIXTURE

EXIT SIGN

OPEN TO STRUCTURE

2' x 4' LED EMERGENCY FIXTURE - RECESSED

2' x 4' LED FIXTURE - RECESSED

2' x 2' LED FIXTURE - RECESSED

PENDANT LIGHT

WIRE MESH PARTITION CEILING

ROUND DIFFUSER

LED PENDANT

CIRCULAR PENDANT LIGHTING FIXTURE

ACCESS HATCH

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

B -2

M

A R

IN

E

C O

R P

S B

A S

E Q

U A

N T

IC

O

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

OF

SEAL

CHK

APPROVED

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N

C

LA

S S

IF

IE

D

F O

R O

F F

IC

IA

L U

S E

O

W

A R

G A

M

IN

G C

E N

T E

R

AS NOTED

DRAWFORM REVISION: 12 APRIL 2018

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

Q U

A N

T

IC

O V

A

/1

/2

:4

:4

A

M C

R e v it

P ro je c ts

\B L

D G

P -1

-A

-W G

C -C e n tr a l_ w m c lo u ti e r@ b u rn s m c d

.c o m .r v t

R E

F

LE

C T

E D

C E

IL

IN

G P

LA

N

S

E C

O N

D F

LO

O

R

A R

E A

B

1590908

13129724

A-152

EVNOM NOM

KEY PLAN

A B

C D

E

PLAN

NORTH

4' 8' 16'0'

PLAN

NORTH

SCALE: 1/8" = 1'-0"

A1

REFLECTED CEILING PLAN - SECOND FLOOR - AREA B

CEILING PLAN LEGEND

IS

S U

E D

F O

R C

O N

S T

R U

C T

IO

N

/1

/2

1 2.8 3 4 5

F

E.6

E

D.5

5.3 6.2

MATCHLINE SEE SHEET A-151

M A

T C

H

LI

N E

S E

E S

H E

E T

A -1

GOVT COMM

CORR

C19

BREAKOUT

BREAKOUT

ELEV

EL13

STAIR 2

ST12

WARGAMING ROOM STORAGE

10' - 0" A.F.F.

9' - 6" A.F.F.

1.4 3.2 3.8

6.3

E.8

E.2

STAIR 5

ST15

WARGAMING

10' - 0" A.F.F.

CORR

C17

E.1

12' - 0" A.F.F. 12' - 0" A.F.F.

A1

A-563

A2

A-564

TYP

B1

A-541

TYP

11' - 6" A.F.F.

10' - 0" A.F.F.

T Y

P

2'

A1

A-542

B3

A-541

10' - 0" A.F.F.

10' - 0" A.F.F.

10' - 0" A.F.F.

10' - 0" A.F.F.

12' - 0" A.F.F.12' - 0" A.F.F. A4

A-564

TYP

A L

IG

N

*NOTE: CEILING ELEVATION TAGS AT

STAIRS ARE CALCULATED FROM

SECOND FLOOR FINISHED FLOORING

2' x 2' ACOUSTICAL CEILING TILE

GYPSUM BOARD - PAINT

RECESSED LIGHT

10' - 0"

CEILING HEIGHT ABOVE FINISH FLOOR

HVAC AIR SUPPLY GRILLE

HVAC EXHAUST OR RETURN GRILLE

LED FIXTURE - WALL MOUNTED

WALL MOUNTED EXTERIOR LIGHT FIXTURE

EXIT SIGN

OPEN TO STRUCTURE

2' x 4' LED EMERGENCY FIXTURE - RECESSED

2' x 4' LED FIXTURE - RECESSED

2' x 2' LED FIXTURE - RECESSED

PENDANT LIGHT

WIRE MESH PARTITION CEILING

ROUND DIFFUSER

LED PENDANT

CIRCULAR PENDANT LIGHTING FIXTURE

ACCESS HATCH

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

B -2

M

A R

IN

E

C O

R P

S B

A S

E Q

U A

N T

IC

O

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

OF

SEAL

CHK

APPROVED

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N

C

LA

S S

IF

IE

D

F O

R O

F F

IC

IA

L U

S E

O

W

A R

G A

M

IN

G C

E N

T E

R

AS NOTED

DRAWFORM REVISION: 12 APRIL 2018

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

Q U

A N

T

IC

O V

A

/1

/2

:4

:4

A

M C

R e v it

P ro je c ts

\B L

D G

P -1

-A

-W G

C -C e n tr a l_ w m c lo u ti e r@ b u rn s m c d

.c o m .r v t

R E

F

LE

C T

E D

C E

IL

IN

G P

LA

N

S

E C

O N

D F

LO

O

R

A R

E A

C

1590908

13129725

A-153

EVNOM NOM

KEY PLAN

A B

C D

E

PLAN

NORTH

4' 8' 16'0'

PLAN

NORTH

SCALE: 1/8" = 1'-0"

A1

REFLECTED CEILING PLAN - SECOND FLOOR - AREA C

CEILING PLAN LEGEND

IS

S U

E D

F O

R C

O N

S T

R U

C T

IO

N

/1

/2

8 9 10 1110.2 12

F

E.6

E

D.5

7.7

D

M A

T C

H

LI

N E

S E

E S

H E

E T

A -1

MATCHLINE SEE SHEET A-152

CORR

C10

GOVT COMM

STAIR 1

ST11

STAIR 4

ST14

CORR

C14

BREAKOUT

BREAKOUT

WARGAMING ROOM STORAGE

9' - 0" A.F.F.

10' - 0" A.F.F.

9' - 6" A.F.F.

11.7

E.8

E.2

D.2

WARGAMING

10' - 0" A.F.F.

8' - 0" A.F.F.

LIBRARY

CORR

C12

CORR

C14 E.1

A1

A-563

A2

A-564

TYP

B1

A-541

TYP

TYP

A1

A-542

TYP

11' - 6" A.F.F.

10' - 0" A.F.F.

T Y

P

2'

A1

A-542

TYP

63636363

B3

A-541

12' - 0" A.F.F.12' - 0" A.F.F.

10' - 0" A.F.F.10' - 0" A.F.F.

10' - 0" A.F.F.

11' - 6" A.F.F.

A4

A-564

TYP

TYP

10' - 10"

10' - 0" A.F.F.

*NOTE: CEILING ELEVATION TAGS AT

STAIRS ARE CALCULATED FROM

SECOND FLOOR FINISHED FLOORING

2' x 2' ACOUSTICAL CEILING TILE

GYPSUM BOARD - PAINT

RECESSED LIGHT

10' - 0"

CEILING HEIGHT ABOVE FINISH FLOOR

HVAC AIR SUPPLY GRILLE

HVAC EXHAUST OR RETURN GRILLE

LED FIXTURE - WALL MOUNTED

WALL MOUNTED EXTERIOR LIGHT FIXTURE

EXIT SIGN

OPEN TO STRUCTURE

2' x 4' LED EMERGENCY FIXTURE - RECESSED

2' x 4' LED FIXTURE - RECESSED

2' x 2' LED FIXTURE - RECESSED

PENDANT LIGHT

WIRE MESH PARTITION CEILING

ROUND DIFFUSER

LED PENDANT

CIRCULAR PENDANT LIGHTING FIXTURE

ACCESS HATCH

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

B -2

M

A R

IN

E

C O

R P

S B

A S

E Q

U A

N T

IC

O

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

OF

SEAL

CHK

APPROVED

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N

C

LA

S S

IF

IE

D

F O

R O

F F

IC

IA

L U

S E

O

W

A R

G A

M

IN

G C

E N

T E

R

AS NOTED

DRAWFORM REVISION: 12 APRIL 2018

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

Q U

A N

T

IC

O V

A

/1

/2

:4

:5

A

M C

R e v it

P ro je c ts

\B L

D G

P -1

-A

-W G

C -C e n tr a l_ w m c lo u ti e r@ b u rn s m c d

.c o m .r v t

R E

F

LE

C T

E D

C E

IL

IN

G P

LA

N

S

E C

O N

D F

LO

O

R

A R

E A

D

1590908

13129726

A-154

EVNOM NOM

KEY PLAN

A B

C D

E

PLAN

NORTH

4' 8' 16'0'

PLAN

NORTH

SCALE: 1/8" = 1'-0"

A1

REFLECTED CEILING PLAN - SECOND FLOOR - AREA D

CEILING PLAN LEGEND

WORK NOTES

63 ALIGN COLUMN SURROUND WITH EDGE OF BULKHEAD AT OVERHEAD

OPERABLE PARTITION POCKET, TYP. COORDINATE LOCATION WITH

OPERABLE PARTITION MFR

IS

S U

E D

F O

R C

O N

S T

R U

C T

IO

N

/1

/2

F

E.6

E

D.5

5.3 6.2 7.7

D

M A

T C

H

LI

N E

S E

E S

H E

E T

A -1

M A

T C

H

LI

N E

S E

E S

H E

E T

A -1

MATCHLINE SEE SHEET A-151

ELEV. CONTROL

ELEV

EL11

VIDEO PRODUCTION

ELEV

EL12

8' - 0" A.F.F.

WARGAMING ROOM STORAGE

CORR

C15

CORR

C10

WARGAMING ROOM STORAGE

6.3 6.66.4

E.8

E.2

D.2

10' - 0" A.F.F.

AUDITORIUM

11' - 6" A.F.F.

11' - 6" A.F.F.

11' - 6" A.F.F.

11' - 6" A.F.F.

11' - 6" A.F.F.

32' - 10" A.F.F.

VESTIBULE

VESTIBULE

76.86.7

E.1

10' - 0" A.F.F.

11' - 6" A.F.F.

11' - 6" A.F.F.

10' - 0" A.F.F. 10' - 0" A.F.F.

11' - 6" A.F.F.

T Y

P

2'

E Q

E Q

T Y

P

2'

A1

A-542

TYP

ALIGN

*NOTE: CEILING ELEVATION TAGS AT AUDITORIUM ARE

CALCULATED FROM FIRST FLOOR FINISHED FLOORING

2' x 2' ACOUSTICAL CEILING TILE

GYPSUM BOARD - PAINT

RECESSED LIGHT

10' - 0"

CEILING HEIGHT ABOVE FINISH FLOOR

HVAC AIR SUPPLY GRILLE

HVAC EXHAUST OR RETURN GRILLE

LED FIXTURE - WALL MOUNTED

WALL MOUNTED EXTERIOR LIGHT FIXTURE

EXIT SIGN

OPEN TO STRUCTURE

2' x 4' LED EMERGENCY FIXTURE - RECESSED

2' x 4' LED FIXTURE - RECESSED

2' x 2' LED FIXTURE - RECESSED

PENDANT LIGHT

WIRE MESH PARTITION CEILING

ROUND DIFFUSER

LED PENDANT

CIRCULAR PENDANT LIGHTING FIXTURE

ACCESS HATCH

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

B -2

M

A R

IN

E

C O

R P

S B

A S

E Q

U A

N T

IC

O

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

EPROJECT NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

OF

SEAL

CHK

APPROVED

UNCLASSIFIED - FOR OFFICIAL USE ONLY

UNCLASSIFIED - FOR OFFICIAL USE ONLY

U N

C

LA

S S

IF

IE

D

F O

R O

F F

IC

IA

L U

S E

O

W

A R

G A

M

IN

G C

E N

T E

R

AS NOTED

DRAWFORM REVISION: 12 APRIL 2018

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

Q U

A N

T

IC

O V

A

/1

/2

:4

:5

A

M C

R e v it

P ro je c ts

\B L

D G

P -1

-A

-W G

C -C e n tr a l_ w m c lo u ti e r@ b u rn s m c d

.c o m .r v t

R E

F

LE

C T

E D

C E

IL

IN

G P

LA

N

S

E C

O N

D F

LO

O

R

A R

E A

E

1590908

13129727

A-155

EVNOM NOM

KEY PLAN

A B

C D

E

PLAN

NORTH

4' 8' 16'0'

PLAN

NORTH

SCALE: 1/8" = 1'-0"

A1

REFLECTED CEILING PLAN - SECOND FLOOR - AREA E

CEILING PLAN LEGEND

IS

S U

E D

F O

R C

O N

S T

R U

C T

IO

N

/1

/2

Sheets
A-151 - REFLECTED CEILING PLAN - SECOND FLOOR - AREA A
A-152 - REFLECTED CEILING PLAN - SECOND FLOOR - AREA B
A-153 - REFLECTED CEILING PLAN - SECOND FLOOR - AREA C
A-154 - REFLECTED CEILING PLAN - SECOND FLOOR - AREA D
A-155 - REFLECTED CEILING PLAN - SECOND FLOOR - AREA E

File details come from the government source that posted it. Updated .