This document package includes a technical specification section for wire mesh partitions and a related federal contract opportunity notice for construction of a wargaming center.

The technical specification provides requirements for materials, design, and installation of wire mesh partition systems. It specifies steel and wire materials, panel and door frame styles, hardware, and finish requirements. Installation instructions are also included. The related federal contract opportunity is for the design and construction of a new wargaming center at Marine Corps Base Quantico, Virginia. It describes the project scope of work to include construction of a two-story academic building of over 100,000 square feet, a 132,000 square foot parking structure, and a 1,650 square foot communications facility. The procurement is being conducted through full and open competition on a best value basis.

View the file

Other files for this federal contract opportunity

Other files attached to P719 DBB Wargaming Center, Quantico, VA, newest first.
File Type Posted
P719 AMENDMENT 0015.pdf PDF
BLDG-P719-1590908-CS512 - OPTION 2.pdf PDF
REVISED 32 31 13.53.pdf PDF
08 56 46.20 20.pdf PDF
P719 Wargaming Center Price Schedule dated 18 December 2020.docx DOCX document
BLDG-P719-1590908-CS511 - OPTION 3.pdf PDF
26 26 00.pdf PDF
P719 Second Floor RCPs_rev 20 1218.pdf PDF
BLDG-P719-1590908-Response to RFI 285.pdf PDF
BLDG-P719-1590908-Response to RFI 289.pdf PDF
05 52 00.pdf PDF
P719 AMENDMENT 0014.pdf PDF
P719 AMENDMENT 0013.pdf PDF
A-416 - ENLARGED AUDITORIUM PLAN_WOOD WALL CAP.pdf PDF
P719 AMENDMENT 0012.pdf PDF
07 60 00.pdf PDF
32 31 13.53 - without redlines.pdf PDF
31 21 13.pdf PDF
08 33 23.pdf PDF
P719 AMENDMENT 0011.pdf PDF
P719 Wargaming Center Price Schedule dated 14 December 2020.docx DOCX document
P719 AMENDMENT 0010.pdf PDF
P719 AMENDMENT 0009.pdf PDF
32 31 13.53.pdf PDF
P719 AMENDMENT 0008.pdf PDF
Checklist for Reviewing Subk Plans.pdf PDF
P719 AMENDMENT 0007.pdf PDF
P719 AMENDMENT 0006.pdf PDF
P719 Site Visit Attendance Sheet.PDF PDF
P719 AMENDMENT 0005.pdf PDF
P719 AMENDMENT 0004.pdf PDF
P719 AMENDMENT 0002.pdf PDF
P719 AMENDMENT 0001.pdf PDF
SOLICTITATION N4008020R5249 - P719 WARGAMING CENTER MCBQ.pdf PDF
ATTACHMENT C - Construction Experience Project Data Sheet.doc DOC document
ATTACHMENT D - Past Performance Questionnaire.doc DOC document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-719 Wargaming Center eProject No. 1590908 Marine Corps Base, Quantico, VA Issued for Construction

SECTION 10 22 13

WIRE MESH PARTITIONS

08/16

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN IRON AND STEEL INSTITUTE (AISI)

AISI SG03-3 (2002; Suppl 2001-2004; R 2008) Cold-Formed Steel Design Manual Set

ASTM INTERNATIONAL (ASTM)

ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-02 Shop Drawings

Wire Mesh Partitions

Show layout, details, materials, dimensions, finishes, and all information necessary for fabrication and installation.

SD-03 Product Data

Wire Mesh Partitions

Submit for each type of partition, door, and window.

Recycled Content for Metal Post and Framing Materials; S

Recycled Content for Wire Materials; S

1.3 DELIVERY, STORAGE, AND HANDLING

Deliver materials in manufacturer's original, unopened containers or packaging with labels intact and legible. Deliver, store, and handle materials so as to prevent damage. Replace damaged or defective materials with new.

SECTION 10 22 13 Page 1

1.4 DESCRIPTION OF WORK

Wire mesh partitions must be all wire type. Provide partitions complete with fasteners, capping bars, adjustable floor sockets, bracing, doors, hardware, and other items necessary for a complete, useable, and rigid installation.

PART 2 PRODUCTS

2.1 WIRE MESH PARTITIONS MATERIALS

Metal post and framing materials listed below must contain a minimum of 15 percent post-consumer recycled content and wire materials must contain a minimum of 50 percent post-industrial recycled content. Provide data identifying percentage of recycled content for metal post and framing materials. Also provide data identifying percentage of recycled content for wire materials.

2.1.1 Steel Shapes, Plates, and Bars

ASTM A36/A36M.

2.1.2 Cold-Formed Steel

AISI SG03-3 .

2.1.3 Wire Mesh

Carbon steel wire, woven diamond mesh, intermediate crimped.

2.1.4 Floor Sockets

Cast or forged steel or ductile iron, adjustable, approximately 2-1/2 inches high.

2.2 NORMAL DUTY PARTITIONS

2.2.1 Wire Mesh

10 gage wire, 1-1/2 inch mesh.

2.2.2 Vertical Frames

1-1/4 by 5/8 inch cold-rolled C section channels or 1-1/4 by 5/8 by 1/8 inch channels.

2.2.3 Horizontal Frames

1 by 5/8 inch channels.

2.2.4 Center Reinforcing Bar

One 1 by 1/2 by 1/8 inch channel with all wires woven through, or two 1 by 3/8 by 1/8 inch channels bolted together with mesh in between.

2.2.5 Capping Bar

2-1/4 by one by 1/8 inch channel or 2 by 1/4 inch flat bar.

SECTION 10 22 13 Page 2

2.2.6 Corner Posts

Structural steel angles, 1-1/4 by 1-1/4 by 1/8 inch.

2.2.7 Line Posts

Unless otherwise indicated, provide partitions more than 12 feet high with flat bar line posts bolted between vertical frame channels. Sizes of posts must be as follows:

Partition Height Size of Posts

12 feet to 14 feet 8 inches 1-3/4 by 5/16 inch or 2 by 1/4 inch

14 feet 8 inches to 19 feet 8 inches 2-1/2 by 5/16 inch

19 feet 8 inches to 23 feet 8 inches 3 by 5/16 inch

2.2.8 Hinged Doors

Frames must be 1-1/4 by 1/2 by 1/8 inch channels with 1-1/4 by 1/8 inch flat bar cover on top and bottom rails and on hinge stile and a 1-3/8 by 3/4 by 1/8 inch angle riveted to the lock stile. Provide 1 1/2 pairs of regular weight, wrought steel, non-removable pin, butt hinges riveted or welded to the door and the door opening frame for each door.

2.2.9 Sheet Metal Base

Hot- or cold-rolled sheet steel, not lighter than 16 gage.

2.3 SLIDING DOORS

Frames must be 1-1/2 by 3/4 by 1/8 inch channels with 1-1/2 by 1/8 inch flat bar cover all around. Provide two four-wheel, roller bearing hangers and steel box track for each door.

2.4 DOOR OPENING FRAMES

Provide frames the same size and shape as the vertical frames for the mesh panels.

2.5 LOCKS

Provide each door with a mortise type lock with a six-pin tumbler lock cylinder on the outside and a recessed knob on the inside.

2.6 FABRICATION

2.6.1 Standard Panels

Wire must be woven into diamond mesh, intermediate crimped, and securely clinched to frames. Joints must be mortised and tenoned. Wire must be continuous at center reinforcing bars, either woven through a single channel or bolted between two channels. Panel vertical frames must have 1/4 inch bolt holes 12 inches o.c. for normal duty partitions.

SECTION 10 22 13 Page 3

2.6.2 Doors

Construction must be similar to that specified for panels. Wire mesh must be the same as that used in the adjacent partition panels.

2.6.3 Finish

Thoroughly clean ferrous metal, treat with phosphate, and paint with black enamel in the shop.

2.7 WIRE MESH PARTITION LOCKERS, DOUBLE TIER

Mesh bulk locker is made using 1/2" x 16 gauge flattened expanded metal doors and sides. Heavy gauge vertical frame channels and horizontal frame angles. Doors must have a welded brace (horizontal shelf) and heavy duty 13 gauge, 7-knuckle hinges for strength. Welded padlockable hasp and ergonomic door pull for security. 13" transom on top of doors to provide added overhead space. 22 guage steel shelf separates locker compartments.

Silver powder coat finish. Wall mounted to eliminate need for locker back panel.

Provide size as indicated on drawings.

PART 3 EXECUTION

3.1 INSTALLATION

3.1.1 Wire Mesh Partitions

Install plumb, level, and true to line, within a tolerance of 1/8 inch in 10 feet or the height or run of the partition, if less than 10 feet.

Anchor floor sockets to the floor with expansion bolts. Bolt vertical frames and posts together with 1/4 inch bolts 12 inches o.c. for normal duty partitions. Secure top frames to a continuous capping bar with 1/4 inch diameter U bolts not more than 28 inches o.c.

3.1.2 Doors

Install in accordance with the manufacturers' recommendations. Adjust as required so that doors and hardware operate freely and properly.

3.1.3 Bracing

Brace free standing partitions more than 20 feet in length, at intervals not greater than 20 feet with a steel channel brace connected to the capping bar and anchored to the building wall or framing member.

3.1.4 Touch-Up

Clean and paint scratches, abrasions, and other damage to shop painted surfaces to match the shop-applied finish.

Repair minor surface rust areas. Clean and prime with rust inhibitive primer paint. Apply final paint to match shop-applied finishes.

-- End of Section --

SECTION 10 22 13 Page 4

10 22 13 - WIRE MESH PARTITIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
1.4 DESCRIPTION OF WORK
PART 2 PRODUCTS
2.1 WIRE MESH PARTITIONS MATERIALS
2.1.1 Steel Shapes, Plates, and Bars
2.1.2 Cold-Formed Steel
2.1.3 Wire Mesh
2.1.4 Floor Sockets
2.2 NORMAL DUTY PARTITIONS
2.2.1 Wire Mesh
2.2.2 Vertical Frames
2.2.3 Horizontal Frames
2.2.4 Center Reinforcing Bar
2.2.5 Capping Bar
2.2.6 Corner Posts
2.2.7 Line Posts
2.2.8 Hinged Doors
2.2.9 Sheet Metal Base
2.3 SLIDING DOORS
2.4 DOOR OPENING FRAMES
2.5 LOCKS
2.6 FABRICATION
2.6.1 Standard Panels
2.6.2 Doors
2.6.3 Finish

2.7 WIRE MESH PARTITION LOCKERS, DOUBLE TIER

PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Wire Mesh Partitions
3.1.2 Doors
3.1.3 Bracing
3.1.4 Touch-Up