P719 AMENDMENT 0014.pdf

PDF 644 KB Posted

Attached to
P719 DBB Wargaming Center, Quantico, VA Federal contract opportunity
Solicitation number
N4008020R5249
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This amendment to solicitation N4008020R5249 provides responses to contractor questions and makes revisions to the price schedule. The solicitation is for design-bid-build construction of a wargaming center at Marine Corps Base Quantico, Virginia. Revisions to the price schedule include adding optional line items for a parking garage, ornamental security fence, turnstiles, and procurement of furniture, fixtures, and equipment. The period of performance for base bid line items is 835 days from contract award. Clarifications provided in response to contractor questions relate to specifications, drawings, and scope details for site work, utilities, building systems, and demolition requirements.

View the file

Other files for this federal contract opportunity

Other files attached to P719 DBB Wargaming Center, Quantico, VA, newest first.
File Type Posted
P719 AMENDMENT 0015.pdf PDF
BLDG-P719-1590908-CS511 - OPTION 3.pdf PDF
26 26 00.pdf PDF
BLDG-P719-1590908-CS512 - OPTION 2.pdf PDF
REVISED 32 31 13.53.pdf PDF
08 56 46.20 20.pdf PDF
P719 Wargaming Center Price Schedule dated 18 December 2020.docx DOCX document
P719 Second Floor RCPs_rev 20 1218.pdf PDF
BLDG-P719-1590908-Response to RFI 285.pdf PDF
BLDG-P719-1590908-Response to RFI 289.pdf PDF
05 52 00.pdf PDF
P719 AMENDMENT 0013.pdf PDF
A-416 - ENLARGED AUDITORIUM PLAN_WOOD WALL CAP.pdf PDF
P719 AMENDMENT 0012.pdf PDF
07 60 00.pdf PDF
P719 Wargaming Center Price Schedule dated 14 December 2020.docx DOCX document
32 31 13.53 - without redlines.pdf PDF
31 21 13.pdf PDF
08 33 23.pdf PDF
10 22 13.pdf PDF
P719 AMENDMENT 0011.pdf PDF
P719 AMENDMENT 0010.pdf PDF
P719 AMENDMENT 0009.pdf PDF
32 31 13.53.pdf PDF
P719 AMENDMENT 0008.pdf PDF
Checklist for Reviewing Subk Plans.pdf PDF
P719 AMENDMENT 0007.pdf PDF
P719 AMENDMENT 0006.pdf PDF
P719 Site Visit Attendance Sheet.PDF PDF
P719 AMENDMENT 0005.pdf PDF
P719 AMENDMENT 0004.pdf PDF
P719 AMENDMENT 0002.pdf PDF
P719 AMENDMENT 0001.pdf PDF
ATTACHMENT C - Construction Experience Project Data Sheet.doc DOC document
SOLICTITATION N4008020R5249 - P719 WARGAMING CENTER MCBQ.pdf PDF
ATTACHMENT D - Past Performance Questionnaire.doc DOC document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION N40080205249 - MILITARY CONSTRUCTION P-719, DESIGN-BID-BUILD OF WARGAMING CENTER, MARINE CORPS BASE

QUANTICO, VIRGINIA

SEE SF 30 BLOCK 14 CONTINUATION PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 12

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Jan-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008020R5249

X 9B. DATED (SEE ITEM 11)

07-May-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Jan-2021

CODE

NAVAL FACILITIES ENG COMMAND WASHINGTON

1314 HARWOOD ST

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008020R5249

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0014

The purpose of this amendment is to provide the following:

1. RFI Responses

2. Attachments

All other terms and conditions remain unchanged.

1. RFI RESPONSES

8. Specification Section 08 56 46.20 20 has been uploaded as an attachment to Amendment 0014.

12. Specification Section 08 56 46.20 20 has been uploased as an attachment to Amedment 0014.

50. Specification section 05 52 00 has been uploaded as an attachment to Amedment 0014.

143. Reference: Electrical, EP602

Please provide specifications for the PDUs shown on drawing EP602.

GOVERNMENT RESPONSE: Specification 26 26 00 has been uploaded as an attachment to Amedment 0014.

172. Reference: EP602

Please provide specifications for the PDUs shown on drawing EP602.

GOVERNMENT RESPONSE: Specification 26 26 00 has been uploaded as an attachment to Amedment 0014.

212. Reference: EP602

PDUs are shown on drawing EP602, but do not have a specification for them. Please provide specifications for the PDUs.

GOVERNMENT RESPONSE: Specification 26 26 00 has been uploaded as an attachment to Amedment 0014.

277. Reference: Price Schedule

Per Amendment No.5, RFI# 14, the response stated that "All structures in the project work site have been removed. The foundations of these structures are to be demolished by this contract, CLIN 0005." Please confirm that all buried foundations and the existing slab-on-grade construction demolition is to occur under CLIN 0005.

GOVERNMENT REVISED RESPONSE: In addition to RFI Response 14, all buried foundations and the existing slab-on-grade construction demolition is to occur under CLIN 0005.

278. Reference: 23 09 00

Referencing Specification 23 09 00 - 1.1.1b refers to tying the building DDC system into the existing Base Energy Management Control System (EMCS) Network, where is the physical location for this tie in point?

GOVERNMENT RESPONSE: The DDC system will be connected to the EMCS via a MCEN switch located in the WGC.

279. Reference: 23 09 00

Specification 23 09 00 - 1.1.1b refers to the building DDC system connecting via LAN to a central, Siemens's Apogee application Database. 1) Is Siemens sole sourced for building controls on this Project?

2) Would NAVFAC and Quantico Marine Corp Base support a Controls Subcontractor other than Siemens tying into the EMCS network? This would require a US Person directly accessing the EMCS and programming to communicate with their system.

GOVERNMENT RESPONSE: Quantico MCB does not have a sole source J&A in place at this time for Siemens controls. All requirements must be meet within specifications 23 09 00. Please review system requirements under paragraph 1.1.1.

280. Reference: 27 10 00

Specification call out for category 6 cable from the Comms Rm to the Consolidation points. The drawings with the rack elevation call for category 6A patch panels. Can you confirm the category of the copper cabling?

GOVERNMENT RESPONSE: Mentions of Cat 6A will be removed from rack elevations and schedules. WIll replace with Cat 6 patch panels.

281. Reference: 27 10 00

Drawing TN606 first floor outlet schedule, should these drops be mix fiber and copper on the same faceplate?

GOVERNMENT RESPONSE: D4 drops shall be a mixture of unclassified copper and fiber at the faceplate.

282. Reference: EP510

Drawing EP510 shows a detail for both a reinforced and non-reinforced ductbank. However, the plans do not indicate which detail is to be utilized for the project. Please confirm which detail should be utilized and if ductbanks require reinforcement.

GOVERNMENT RESPONSE: Reinforced ductbank detail (EP510/A4) must be utilized underneath all roadways and parking areas. Reinforcing must extend at least 5 feet beyond the edge of pavement. Utilize non-reinforced ductbank detail (EP510/A3) underneath all other areas not subject to trucks, cranes, and ultra-heavy loads.

283. Reference: Add 5; Add 6

RFI response 67 regarding the spray applied fireproofing needs to be addressed further. UL has not tested applying spray applied fireproofing to a cold formed metal truss assembly. That being the case, there isn't a means to determine how much fireproofing to apply to the cold form truss members to achieve a rating. A thickness for the fireproofing needs to be issued for us to bid this item, but regardless, it will not have a "rating" because UL has not tested the assembly.

GOVERNMENT RESPONSE: Provide intumescent paint for a 1 hr rating.

284. Reference: CU111, TN103

On CU111 there is a telecom ductbank and 2 new telecom manholes, but these are not shown on the Telecom drawings and no sizing for the ductbank has been provided. Please confirm this work is required and if so please provide ductbank sizing.

GOVERNMENT RESPONSE: There is no discrepancy noted between CU and TN sheets listed.

Note that existing telecom ductctank is to be preserved and protected between EX TMHV3C and EX TMH3D on CU113.

285. Reference: CU112, TN103

On TN103, a 12way telecom ductbank is shown tapping into the existing manhole and running into new ADN building from the east of the building. However, on the Civil plans (CU112) this work is not shown, and no existing telecom manhole is shown within the LOD to tap into. Please confirm whether this work is to be included in the scope of work.

GOVERNMENT RESPONSE: This work is required to be included in the scope. The existing telecom manhole is located within Morrell Ave. See drawing “BLDG-P719-1590908-Response to RFI 285” that has been uploaded with Amendment 0014.

286. Reference: TN101, TN102

Drawings TN101 and TN102 do not have ductbank profiles provided. Can these be provided similar to other work?

GOVERNMENT RESPONSE: Information to provide profiles at these locations is not available.

287. Reference: CU204

The plans show on sheets CU202 – CU204 that the proposed waterline is to be DIP, but we cannot find any information or specification to clarify what Class pipe is to be used. Please clarify.

GOVERNMENT RESPONSE: Provide pressure class 350 ductile iron water pipe.

288. Reference: CU204

The plans note on sheets CU202 – CU204 to provide mechanical restraint for all bends, tees and valves.

there are restraining schedules found on sheet CU502. Please clarify if “all” pipe is to be MJ pipe.

GOVERNMENT RESPONSE: Where mechanical joints are not specifically required by notes or details, either push-on joints or mechanical joints may be used for piping.

289. Reference: CU502

The restraining schedules found on sheet CU502 do not include 10”. Please provide.

GOVERNMENT RESPONSE: See drawing “BLDG-P719-1590908-Response to RFI 289” that has been uploaded with Amendment 0014.

A-451, A-151, A-152 Elevations and Reflected Ceiling Plans show different ceiling heights in the Executive Conference Rooms (212, 220, 232). Reflected ceiling plans (A-151, A-152) show 13'-0" AFF in all three rooms, while elevation B3/A-451 shows closer to 11'-0" with some space above the Acoustical Wall Panels at the top. Sections A-301 and A-312 through the building also appear to scale closer to 11'- 0". We assume the 13'-0" dimension is height above structure and includes the 2' of access floor. Please confirm the ceiling height should be 11'-0" AFF.

GOVERNMENT RESPONSE: This assumption is correct that the ceiling heights on the second floor are the height above the concrete slab, and not the raised access floor. This is due to a modelling annotation error and appears to be isolated to the second floor. Revised reflected ceiling plans noting the ceiling heights above the finished floor (ie., top of raised access floor) has been uploaded as an attachment, “P719 Second Floor RCPs_rev 20 1218” to this amendment.

290. Reference: A-155, A-452, A-453

Elevations and Reflected Ceiling Plans show different ceiling heights in the Auditorium. (194). Reflected ceiling plan (A-155) shows 34'-10" AFF in the room, while elevations on A-452 and A-453 scale closer to 32'-10". Section A-312 through the building also scales closer to 32'-10". We assume the 34'-10" dimension is height above structure and includes the 2' of access floor. Please confirm the ceiling height should be 32'-10" AFF.

GOVERNMENT RESPONSE: This assumption is correct that the ceiling heights on the second floor / auditorium are the height above the concrete slab, and not the raised access floor. This is due to a modelling annotation error and appears to be isolated to the second floor. Revised reflected ceiling plans noting the ceiling heights above the finished floor (ie., top of raised access floor) has been uploaded as an attachment, “P719 Second Floor RCPs_rev 20 1218” to this amendment.

291. Reference: A-451 to A-454, A-564

Sections and Reflected Ceiling Plans show different ceiling heights in the Breakout Rooms with Horizontal Operable Partitions (211, 215, 216, 231, 234, 235). Reflected ceiling plans show 12'-0"" AFF in the room, while sections through the partition (A2/A-564) show a partition height of 10'-0" with 2' of access flooring. Please confirm the operable partition height and ceiling height should be 10'-0" AFF.

GOVERNMENT RESPONSE: This assumption is correct that the ceiling heights on the second floor are the height above the concrete slab, and not the raised access floor. This is due to a modelling annotation error and appears to be isolated to the second floor. Revised reflected ceiling plans noting the ceiling heights above the finished floor (ie., top of raised access floor) has been uploaded as an attachment, “P719 Second Floor RCPs_rev 20 1218” to this amendment.

292. Reference: A-451 to A-454, A-564

Sections and Reflected Ceiling Plans show different ceiling heights in the Breakout Rooms with Vertical Operable Partitions (210, 230). Reflected ceiling plans show 14'-0" AFF in the rooms, while sections through the partition (A3/A-564) scale much closer to 12'-0". Section A-311 through the building also scales closer to 12'-0". We assume the 14'-0" dimension is height above structure and includes the 2' of access floor. Please confirm the ceiling height should be 12'-0" AFF.

GOVERNMENT RESPONSE: This assumption is correct that the ceiling heights on the second floor are the height above the concrete slab, and not the raised access floor. This is due to a modelling annotation error and appears to be isolated to the second floor. Revised reflected ceiling plans noting the ceiling heights above the finished floor (ie., top of raised access floor) has been uploaded as an attachment, “P719 Second Floor RCPs_rev 20 1218” to this amendment.

293. Reference: A-703, A-741, A-742

Second Floor Room Finish Schedule (A-703) calls out rooms 212 and 232 (Exec Conf Rooms) with PA-1 / CHR-1 / AWP-1 on the East Wall of room 212 and the South Wall of 232. Wall Finish Plans (A-741, A-

742) do not show AWP-1 on these walls, but instead just on e the West Wall of 212 and East Wall of 232.

Please confirm that the AWP is only on one wall in each room.

GOVERNMENT RESPONSE: Room 232: East wall to receive AWP-1 only. All other walls to receive PA-1 / CHR-1.

Room 212: West wall to receive AWP-1 only. All other walls to receive PA-1 / CHR- 1.

294. Reference: RFI #38

Regarding the Government’s reply to RFI #38. The requirements for the cast stone erection is geared to a true precast job where precast panels are used and not handset cast stone. The erectors for precast concrete are normally ironworkers and the connections are generally welded in place. These erectors carry the PCI certification that is noted in the specifications and won't install cast stone which is normally set in mortar. The masons who set cast stone don't have the PCI certification because it is not normally required for their work. So, we have a situation where the contractors who have the certification won't bid the work and the contractors who normally perform the work don't have the certification. Please reconsider the answer to RFI #38 by allowing the special masonry inspector to perform the quality control inspection for the cast stonework.

GOVERNMENT RESPONSE: It is acceptable for the cast stone erection to be inspected by a qualified masonry inspector who is employed by the testing agency in lieu of the current specified requirements.

295. Reference: CU101

Per Drawing CU101, note 9, Natural Gas must be installed by Natural Gas Provider. The Contractor is responsible for all fees associated with natural gas installation. Please confirm per this note, that each offeror shall include the cost for contracting with and performing installation of all site gas lines. Also, please confirm the gas provider for MCB Quantico is Columbia Gas of Virginia.

GOVERNMENT RESPONSE: Ameresco is the gas provider. Jeff Seveland is point of contact. Phone: 508 598 4405; Mobile 540 322 6512; jseveland@ameresco.com

296. Reference: Spec 32 31 13.53, CS506

Please clarify the security rating of the Ornamental Fence Systems. The specifications (Spec 32 31 13.53 Section 2.1.1) call for the security rating to be M40-P2(K8). The drawings (A3/CS506) call for the security rating to be M30-P2(K4).

GOVERNMENT RESPONSE: The security rating required for the ornamental fence is K4, M30-P2.

2. ATTACHMENTS

- 05 52 00

- 08 56 46.20 20

- 26 26 00

- BLDG-P719-1590908-CS511 – OPTION 3

- BLDG-P719-1590908-CS512 – OPTION 2

- BLDG-P719-1590908-Response to RFI 285

- BLDG-P719-1590908-Response to RFI 289

- P719 Second Floor RCPs_rev 20 1218

- REVISED 32 31 13.53

- P719 Wargaming Center Price Schedule dated 18 December 2020

SECTION 00010 - SOLICITATION CONTRACT FORM

CLIN 0001

The CLIN extended description has changed from:

BASE BID: Price for the entire work for Facility Wargaming Center, complete to the 5 foot line outside of the building, in accordance with the drawings and specifications, but excluding work described in CLIN 0002, 0003, 0004, 0005, 0006, 0007, 0008, and 0009. Period of performance is 835 days from contract award.

To:

BASE BID: Price for the entire work for Facility Wargaming Center, complete to the 5 foot line outside of the building, in accordance with the drawings and specifications, but excluding work described in CLIN 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, and 0011. Period of performance is 835 days from contract award.

CLIN 0002

BASE BID: Price for the entire work for Facility Area Distribution Node, complete to the 5 foot line outside of the building, in accordance with the drawings and specifications, but excluding work described in CLIN 0001, 0003, 0004, 0005, 0006, 0007, 0008, and 0009. Period of performance is 470 days from contract award.

BASE BID: Price for the entire work for Facility Area Distribution Node, complete to the 5 foot line outside of the building, in accordance with the drawings and specifications, but excluding work described in CLIN 0001, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, and 0011.

Period of performance is 470 days from contract award. See Note 9.

CLIN 0003

BASE BID: Price for the entire work for Facility Cinder City Switchgear Replacement, complete to the 5 foot line outside of the facility in accordance with the drawings and specifications, but excluding work described in CLIN 0001, 0002, 0004, 0005, 0006, 0007, 0008, and 0009. Period of performance is 470 days from contract award.

BASE BID: Price for the entire work for Facility Cinder City Switchgear Replacement, complete to the 5 foot line outside of the facility in accordance with the drawings and specifications, but excluding work described in CLIN 0001, 0002, 0004, 0005, 0006, 0007, 0008, 0009, 0010, and 0011. Period of performance is 470 days from contract award.

CLIN 0004

BASE BID: Price for the entire project Site Work, outside the facilities' 5 foot line, complete in accordance with the drawings and specification, but excluding work described in CLIN 0001, 0002, 0003, 0005, 0006, 0007, 0008, and 0009. Period of performance is 470 days from contract award.

BASE BID: Price for the entire project Site Work, outside the facilities' 5 foot line, complete in accordance with the drawings and specification, but excluding work described in CLIN 0001, 0002, 0003, 0005, 0006, 0007, 0008, 0009, 0010, and 0011. Period of performance is 470 days from contract award.

CLIN 0005

BASE BID: Price for DEMOLITION, EXCAVATION AND DISPOSAL OF BURIED CONCRETE AND DEBRIS GREATER THAN 1 CUBIC YARD IN SIZE complete in accordance with drawings and specifications and in accordance with the following schedule, but excluding work described in CLIN 0001, 0002, 0003, 0004, 0006, 0007, 0008, and 0009. Period of performance is 470 days from contract award.

BASE BID: Price for DEMOLITION, EXCAVATION AND DISPOSAL OF BURIED CONCRETE AND DEBRIS GREATER THAN 1 CUBIC YARD IN SIZE complete in accordance with drawings and specifications and in accordance with the following schedule, but excluding work described in CLIN 0001, 0002, 0003, 0004, 0006, 0007, 0008, 0009, 0010, and 0011. See Note 13. Period of performance is 470 days from contract award.

CLIN 0006

BASE BID: Price for Over excavation & Replacement of Unsuitable Soil, complete in accordance with the drawings and specifications and in accordance with the following schedule, but excluding work described in CLIN 0001, 0002, 0003, 0004, 0005, 0007, 0008, and 0009.

Period of performance is 470 days from contract award

BASE BID: Price for Over excavation & Replacement of Unsuitable Soil, complete in accordance with the drawings and specifications and in accordance with the following schedule, but excluding work described in CLIN 0001, 0002, 0003, 0004, 0005, 0007, 0008, 0009, 0010, and 0011. See Note 14. Period of performance is 470 days from contract award

CLIN 0007

BASE BID: Price for all work related to mill and overlay, complete in accordance with the drawings and specifications and in accordance with the following schedule, but excluding work described in CLIN 0001, 0002, 0003, 0004, 0005, 0006, 0008, and 0009. Period of performance is 835 days from contract award

BASE BID: Price for all work related to mill and overlay, complete in accordance with the drawings and specifications and in accordance with the following schedule, but excluding work described in CLIN 0001, 0002, 0003, 0004, 0005, 0006, 0008, 0009, 0010, and 0011. See Note

15. Period of performance is 835 days from contract award

CLIN 0008

OPTION 1: Price for providing all work in connection with Parking Garage, complete in accordance with the drawings and specifications, but excluding work described in CLIN 0001, 0002, 0003, 0004, 0005, 0006, 0007, and 0009. Period of performance is 835 days from contract award.

OPTION 1: Price for providing all work in connection with Parking Garage, complete in accordance with the drawings and specifications, but excluding work described in CLIN 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0009, 0010, and 0011.

CLIN 0009

The CLIN description has changed from PLANNED MOD FF&E to OPTION 2:

ORNAMENTAL SECURITY FENCE.

The CLIN extended description has changed from:

Planned Modification: Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in accordance with the plans and specifications and in accordance with the following schedule, but excluding work described in CLIN 0001, 0002, 0003, 0004, 0005, 0006, 0007, and 0008.

OPTION 2: Price for providing all work for ornamental security fence and turnstiles in accordance with the specifications and attached drawings details in accordance with the following schedule, but excluding work described in CLIN 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0010, and 0011. The final design will be provided post-award.

The pricing detail quantity 1,500.00 has been added.

The unit of issue has changed from Project to Linear Foot.

CLIN 0010 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0010 6 Each

OPTION OPTION 3: TURNSTILES

FFP

OPTION 3: Price for providing all work for turnstiles in accordance with the specifications and attached drawings details in accordance with the following schedule, but excluding work described in CLIN 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, and 0011. The final design will be provided post-award.

FOB: Destination

NET AMT

CLIN 0011 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

OPTION PLANNED MOD FF&E

FFP

Planned Modification: Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in accordance with the plans and specifications and in accordance with the following schedule, but excluding work described in CLIN 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, and

0010. BUDGET: $2,175,476

FOB: Destination

NET AMT

INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0010:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

The following Acceptance/Inspection Schedule was added for CLIN 0011:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

(End of Summary of Changes)