This amendment modifies a solicitation for design-bid-build construction services for a Wargaming Center at Marine Corps Base Quantico in Virginia. Key details include: the contractor must use only U.S. persons for construction who have been vetted by the base's Provost Marshall's Office; all documentation must be kept at the unclassified level; an upcoming amendment will clarify whether completion of ancillary contract line items relates only to the portions associated with the Area Distribution Node or all work under those line items; and there are no limitations on attendance at the pre-proposal conference and site visit. The opportunity involves construction of a new two-story academic facility of over 100,000 square feet, a 132,000 square foot multi-story parking structure, and replacement of an area distribution node and switchgear. The Navy is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to P719 DBB Wargaming Center, Quantico, VA, newest first.
File Type Posted
P719 AMENDMENT 0015.pdf PDF
BLDG-P719-1590908-CS511 - OPTION 3.pdf PDF
26 26 00.pdf PDF
BLDG-P719-1590908-CS512 - OPTION 2.pdf PDF
REVISED 32 31 13.53.pdf PDF
08 56 46.20 20.pdf PDF
P719 Wargaming Center Price Schedule dated 18 December 2020.docx DOCX document
P719 Second Floor RCPs_rev 20 1218.pdf PDF
BLDG-P719-1590908-Response to RFI 285.pdf PDF
BLDG-P719-1590908-Response to RFI 289.pdf PDF
05 52 00.pdf PDF
P719 AMENDMENT 0014.pdf PDF
P719 AMENDMENT 0013.pdf PDF
A-416 - ENLARGED AUDITORIUM PLAN_WOOD WALL CAP.pdf PDF
P719 AMENDMENT 0012.pdf PDF
07 60 00.pdf PDF
P719 Wargaming Center Price Schedule dated 14 December 2020.docx DOCX document
32 31 13.53 - without redlines.pdf PDF
31 21 13.pdf PDF
08 33 23.pdf PDF
10 22 13.pdf PDF
P719 AMENDMENT 0011.pdf PDF
P719 AMENDMENT 0010.pdf PDF
P719 AMENDMENT 0009.pdf PDF
32 31 13.53.pdf PDF
P719 AMENDMENT 0008.pdf PDF
Checklist for Reviewing Subk Plans.pdf PDF
P719 AMENDMENT 0007.pdf PDF
P719 AMENDMENT 0006.pdf PDF
P719 Site Visit Attendance Sheet.PDF PDF
P719 AMENDMENT 0005.pdf PDF
P719 AMENDMENT 0002.pdf PDF
P719 AMENDMENT 0001.pdf PDF
ATTACHMENT C - Construction Experience Project Data Sheet.doc DOC document
SOLICTITATION N4008020R5249 - P719 WARGAMING CENTER MCBQ.pdf PDF
ATTACHMENT D - Past Performance Questionnaire.doc DOC document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION N40080205249 - MILITARY CONSTRUCTION P-719, DESIGN-BID-BUILD OF WARGAMING CENTER, MARINE CORPS BASE

QUANTICO, VIRGINIA

SEE SF 30 BLOCK 14 CONTINUATION PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Nov-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008020R5249

X 9B. DATED (SEE ITEM 11)

07-May-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Nov-2020

CODE

NAVAL FACILITIES ENG COMMAND WASHINGTON

1314 HARWOOD ST

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008020R5249

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0004

The purpose of this amendment is to provide the following:

1. Document Control and Handling

2. Site Visit Information

3. Phase II RFI Responses

All other terms and conditions remain unchanged.

PHASE II RFI RESPONSE

Every effort shall be made to keep this project, along with documentation, at the unclassified level. Developmental or draft documents may not include computation or Unclassified//For Official Use Only. At no time will the facility identiy (in either a written or verbal manner) the fact that it is a controlled space be disclosed to persons without a need to know. References will only be to building or room number.

For the purposes of this CSP, documents will be considered FOR OFFICIAL USE ONLY and may include email, drawings, blue pronts, schematics, schedules, memorandums, sketches, etc.

which are generated in support of this project. This material may include descriptions of critical infrastructure components or sensitive items.

Only U.S. Government or approved Contractor Information Technology (IT) systems utilizing commercially available technical/information assurance controls shall be utilized to store, safeguard and transmit/receive email, tasking’s or other correspondence relating to this project.

The use of private internet services such as Gmail, Facebook or Hot-Mail shall not be used.

Documents/attachments shall be passwork protected when utilizing email services.

Construction documentation will only be disseminated to designated individuals with a vaild “need to know” and shall not be posted to public websites. All parties shall limit dissemination.

Access and duplication will be limited. The Contractor is required to maintain a detailed log of individuals/companies granted access to this material.

SITE VISIT INFORMATION

To expedite base access, it is highly recommended that anyone attending the site visit at MCB Quantico do the pre-screen information on the website before arriving at the VCC to receive a one day visitor pass. Please pre-screen at the following website:

https://www.quantico.marines.mil/Base-Access/

All unaffiliated visitors MUST:

Pre Register in DBIDS at: http://dbids-global.dmdc.mil/enroll#!/

**There is no cost to register in DBIDS**

PHASE II RFI RESPONSE

1. Spec WGC+ADN 01 14 00, Section 1.3.1.2.1

Phase 1 Amendment 0001 Item 3 stated that “All construction personnel must be US persons and will be vetted through Marine Corps Base Quantico’s Provost Marshalls Office (PMO) prior to access to the work-site.”

The specification states that “General construction of the secure area must be performed by U.S.

firms using U.S. citizens. This is at variance with the previous response. Please clarify.

GOVERNMENT RESPONSE: Amendment 0001 item 3 is correct. All construction activities must be performed by U.S. persons vetted through the MCB Quantico’s Provost Marshalls Office (PMO) as indicated in the construction security plan.

2. Reference: Price Schedule - Note 9

This note links the early completion of the ADN (CLIN 0002) with CLIN 0003, 0004, 0005 and 0006. We assume that this means only the applicable portions of those CLIN’s related to the ADN site need to be completed (i.e. Cinder City Switchgear Replacement, Sitework, Removal of Buried Concrete, Overecavation and Replacement of Unsuitable Soils); not the entirety of CLIN 0003-0006. Please confirm.

GOVERNMENT RESPONSE: Response will be provided in an upcoming amendment.

3. Reference: Phase II Amendment 3, Section 4

Is the Pre-proposal Conference and Site Visit limited to Offerors only or may Subcontractors attend?

GOVERNMENT RESPONSE: There are no limitations on the amount of people who can attend. Please note MCB Quantico base access requirements.

(End of Summary of Changes)