AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0001 is issued for the follow ing reason:
1. To provide Pre-Performance Inquiry (PPI) responses.
2. To provide a copy of a Moldova - U.S. agreement.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Apr-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N33191-14-R-0621
X 9B. DATED (SEE ITEM 11)
19-Mar-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Apr-2014
CODE
NAVFAC EUROPE AFRICA SOUTHWEST ASIA
VIALE PORTO CAPODICHINO
NAPOLI 80144
N33191 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N33191-14-R-0621
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
PPI'S AMENDMENT 0001
PPI #1. According to Solicitation N33191-14-R-0621, part III, REQUIREMENTS FOR OFFERORS, "Offerors must provide a Dun and Bradstreet (DUNS) number and NCAGE code when submitting proposals".
QUESTION: If offerors form a Joint Venture and each of its Members has an active NCAGE, DUNs, and SAM registration, do we need to obtain new NCAGE and DUNs for the Joint Venture when submitting proposal or it is acceptable to use leading MEMBER's NCAGE when submitting a proposal and obtain new NCAGE, DUNs and SAM registration for the Joint Venture prior to award of the contract?
RESPONSE: A true joint venture should obtain a new NCAGE and DUNs when submitting a proposal and shall be treated as a separate entity. If your business arrangement is more of a sub/prime relationship whereby experience(s) of the sub will be utilized for evaluation, a separate NCAGE and DUNs is more appropriate. Registration does not have to be complete before the RFP due date, but should be completed prior to award of the contract.
PPI #2. ITEM: 01.094: Deliver and erect a container system According to specifications this system is required to be with Ü-marking and quality control by the Federal Quality Association and with extended suitability certificate, issued by iSiB Dr. Möll GmbH Darmstadt.
Would government accept a local equivalent of this structure in case that it corresponds to the technical requirements?
RESPONSE: The quality standard of the container system shall comply with German standards DIN 18 800-7:
2002-09, class D. If there is an international standard which guaranties the same quality it can be accepted, but has to be proven and officially released by an international certified technical control association. The contractor shall submit the technical information of the container system to the Contracting Officer for approval prior to its purchase. Only container systems in compliance with required standards, or other international standards proven to have the same or higher level of quality, which is officially certified by an internationally recognized technical control association, shall be approved by the Contracting Officer.
PPI #3. Concerning the installation of electrical systems and wiring: Will the electrical systems, cables, transformers and all the electrical equipment required under this project be acceptable according to local standards?
RESPONSE: It is acceptable to use electrical systems, cables, transformers and all electrical equipment in compliance with local Moldovan standards. The personal protection shall be guaranteed according to the technical specification of the electrical systems, cables, transformers and all the electrical equipment required under this project.
In order to connect the high and low voltage systems, the installation shall comply with local Moldovan standards.
Among other applicable requirements, the high voltage installation:
‐ Shall comply with the specific technical regulations of the Electrical Network Operator, and
‐ Shall be approved by the Moldovan Estate Energy Inspectorate prior to inspection and approval by the
Electrical Network Operator.
In order to comply with these requirements, the contractor shall be responsible to prepare all necessary documents and technical designs in local language in order to allow for the approval of local competent authorities and entities.
Regarding the low voltage installation, Moldovan regulations require that it is approved by the Moldovan Estate Energy Inspectorate prior to connection. This is a requirement of this contract. Similarly as for the high voltage installation, the contractor shall be responsible to prepare all designs, specifications and documents in the local language for the approval of the competent agencies. It is not required by Moldovan regulations to have the low voltage installation approved by the Electrical Network Operator. However, to guarantee the quality of the low voltage electrical installation, this contract shall require a second independent inspection and approval by the Electrical Network Operator, or by an independent company authorized by the Electrical Network Operator. This second independent agency shall verify and approve all designs, equipment and field installation.
PPI #4. Please specify what is the meaning of the following symbols from the attached sketches: PN 66286098283;
PN 66321909864; PN 663530988; PN 6613809693... etc.
RESPONSE: These numbers are grid coordinates and they give the contractor the exact position on the ground.
The grid system is UTM 35N. Following position for example PN 66286098283, that means (from north to south) vertical 66286 and (from east-to west) horizontal 098283.
PPI #5. Please specify what is the procedure to follow regarding the tax exemption, excise duties and other custom taxes for products and goods imported in Moldova from EU countries or the United States for the purposes of this project?
RESPONSE: The procedure is one and applies to all so-called "operators of technical assistance". After the contract award ODC Moldova will work with the Moldovan Government a package of documents comprising the "operator's data sheet", copy of the contract with U.S. Govt, copies of contracts the company will sub-contract (if it will). In this case the company is the "main contractor" and other sub-contracted companies will carry out their activity under the main contractor's umbrella for the same project. The contractor will need to provide all necessary information to ODC Moldova, and work with them in compliance with Moldovan regulations in order to fulfil the requirements of the tax and duties exemptions.
An "operator of technical assistance" will start being exempt from VAT and import duties after the Moldovan Government publishes the updated list in the "Monitorul Oficial", a Moldovan Government publication that publishes all the new laws, government decisions, amendment to the laws/decisions that become effective after they are published. During one calendar year there are two windows open for this list to be updated, usually they are April and October. For estimating purposes, the contractor shall consider 2 opportunities a year, in order to schedule their works.
The assistance, rendered by the U.S. Govt to the Republic of Moldova falls under the provisions of the "Agreement Between the Government of the United States of America and the Government of Moldova Regarding Cooperation to facilitate the Provision of Assistance" signed at 21 March 1994. Article I, Item (A) says:
"Commodities, supplies, or other property, including services, provided or utilized in connection with United States assistance programs may be imported into, exported from, or used in
Moldova free from any tariffs, dues, customs duties, import taxes, and other similar taxes or charges, including value added taxes, imposed by Moldova, or any subdivision thereof. The parties understand that the provisions of this paragraph provide an exemption from the imposition of such taxes and charges on purchases made in Moldova."
The offerors shall be familiar with the Moldovan regulations regarding taxation and import duties and their potential exemptions. The Government shall not be responsible for any taxes and import duties that the contractor is required to pay by Moldovan authorities as a result of their actions or omissions.
Formal Moldova – U.S. agreement is included as Attachment 1 to this Amendment 0001.
PPI #6. What are the requirements, if any, in order to bring workers from outside the Republic of Moldova in order to perform their professional services in this project?
RESPONSE: The requirements to bring Human Resources from outside the Republic of Moldova depend on the type of worker and function to be performed.
1. Specialized workers:
If a company wants to bring in their human resources to implement a project from other countries, they may do this, but they have to follow the existing Moldovan legislation in registering these experts/specialist with the Bureau for Migration and Asylum of the Ministry of Internal Affairs and receive temporary work licenses, ID cards, etc. If a company is from the list of the countries that do not require Moldovan entry visa they still need to properly register as this visa is for short visits only and don't provide authorization to conduct works etc. It is the responsibility of the company to undertake all this registration process, the U.S. Government representatives will provide them with all confirmation paperwork as required by the process. Procedural information can be found at www.bma.gov.md
2. Non-specialized workers:
For less skilled workers, there is an additional step to the procedure described above, which requires objective justifications. The contractor should undertake and discuss with the Moldovan Ministry of Labor, and if such trade exist in Moldova, then there will be additional bureaucratic processes.
These procedures will incur time and cost.
(End of Summary of Changes)