TYPICAL ROAD SECTION HEAVY TRAFFIC

5050050

SLOPE 3% SLOPE 3%

GRAIN SIZE 30 cm 90/120 mm and 20 cm 0/56 mm

THICKNESS OF COMPACTED GRAVEL 50cm, SCALE 1 : 25

SHOULDER OUT OF GRAVEL, GRAIN SIZE 0-56 mm

HEAVY LOAD FILTER FABRIC UNDERNETH GRAVEL

900m

700m

500m

300m

200m

100m

B A S E L

IN

E

P1-1

P1-2

P1-3

P1-4

P1-5

P1-6

P1-7

P1-8

P1-9

P1-10

P2-1

P2-2

P2-3

P2-4

P2-5

P2-6

P2-7

P2-8

P3-6

P2-9

P2-10

P3-1

P3-2

P3-3

P3-4

P3-5

P3-7

P3-8

P3-9

P3-10

P4-6

P4-7

P4-8

P4-9

P4-10

P5-1

P5-2

P5-3

P5-4

P6-1

P6-2

P6-3

P6-4

P6-5

800m

P7-1

P7-5

P7-2

P7-3

P7-4

P7-6

PN 6652009630

V1 V2

V3

V5

V6

V4

MOUT

AS SHOWN

DIRK KELLAR, SAFETY DIRECTOR, JMTC

BULBOACA TRAINING AREA

MOLDOVA ARMY TRAINING AREA

CONCEPT DESIGN: 18.10.2013

25. JUNE 2013

SCALE 1 : 1250

PRE FINAL DESIGN: 31.10.2013

FINAL DESIGN: 03.12.2013

AREA OF MAIN ROAD TO BE REPAIRED

REPAIRED MAIN ROAD

SEE TYPICAL SECTION

OF MAIN ROAD

RENOVATION

Range # 3

UPGRADE MAIN TRAFFIC ROAD

FI

R

IN

G L

IN

E m m m m m m m Range # 2

LANE 9

LANE 8

LANE 7

LANE 6

LANE 5

LANE 4

LANE 3

LANE 2

LANE 1

LANE 10

P10.1

P9.1

P8.1

P7.1

P6.1

P5.1

P4.1

P3.1

P2.1

P1.1

P10.2

P9.2

P8.2

P7.2

P6.2

P5.2

P4.2

P3.2

P2.2

P1.2

P10.3

P9.3

P8.3

P7.3

P6.3

P5.3

P4.3

P3.3

P2.3

P1.3

Range # 1

GRAVELED WALKWAY 2 m WIDE

13. Feb 20141 DELETION OF ELECTRICAL SYSTEM 300 M RANGE HELMUT SCHWINDL

GRAVELED PARKING AREA 20 x 30 m

CONNECTED TO THE EXSISTING ROAD NETWORK

File details come from the government source that posted it. Updated .