Drawing_Sheet_11_of_11.pdf

PDF 265 KB Posted

Attached to
Renovate Firing Range, Bulboaca, Moldova
Solicitation number
N33191-14-R-0621
Issued by

About this file

Drawing 11 of 11

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AS SHOWN

DIRK KELLAR, SAFETY DIRECTOR, JMTC

BULBOACA TRAINING AREA

MOLDOVA ARMY TRAINING AREA

CONCEPT DESIGN: 08.11.2013

25. JUNE 2013

SCALE 1 : 2000

PRE FINAL DESIGN: 22.11.2013

ATTENTION:

FINAL DESIGN: 03.12.2013

UPGRADE COMBINED 300m RANGE

Range # 2

Range # 1

SCALE 1 : 2000

Range # 2

Range # 1

TO THE END TO CONNECT WITH RANGE NO. 1

RELOCATE BERM RIGHT WING FROM RANGE 2, IF FACING DOWN RANGE,

CLEAR ENTIRE BACK STOP BERM HIGHT IS IN THE TOTAL LENGHT 7 METER

RELOCATE BERM WING TO THE END

EXISTING RANGE LAYOUT (RANGE 1 & RANGE 2)

SCALE 1 : 1000

Range # 2

Range # 1

LANE 9

LANE 8

LANE 7

LANE 6

LANE 5

LANE 4

LANE 3

LANE 2

LANE 1

LANE 10

P10.1

P9.1

P8.1

P7.1

P6.1

P5.1

P4.1

P3.1

P2.1

P1.1

P10.2

P9.2

P8.2

P7.2

P6.2

P5.2

P4.2

P3.2

P2.2

P1.2

P10.3

P9.3

P8.3

P7.3

P6.3

P5.3

P4.3

P3.3

P2.3

P1.3

REINFORCEMENT MAT ROTARY

100 x 100 x 5 mm

GALVANIZED SQUARED STEEL PROFILE

WOODEN POST 80 x 80 mm

BOARDS PAINTED ORANGE

TRIANGLES OUT OF WOODEN

50 x 50 x 100 cm

CONCRETE FOUNDATION

FI

R

IN

G L

IN

E m m m m

(RANGE 1 & RANGE 2)

NEW COMBINED RANGE LAYOUT

m m m

TARGETRY, ROADS AND FIGHTING POSITIONS AT THE COMBINED RANGE

SCHEMATIC GROUNDING

0 1:2

GRAIN SIZE 20 cm 40/60 mm and 20 cm 0/56 mm

THICKNESS OF COMPACTED GRAVEL 40cm, SCALE 1 : 25

P9.1P10.1 P8.1 P7.1 P6.1 P5.1 P4.1 P3.1 P2.1 P1.1

P9.2P10.2 P8.2 P7.2 P6.2 P5.2 P4.2 P3.2 P2.2 P1.2

P9.3P10.3 P8.3 P7.3 P6.3 P5.3 P4.3 P3.3 P2.3 P1.3

GEOTEXTILE

SIDE VIEW

PERSONNEL TARGET PIT SIT, NEW

BASE LINE 0m

+0.00 m -1.00 m -0.50 m

DISTANCE 100 m 200 m 300 m

+7.00 m

318 m

NEW SUBGRDE

EXISTING SUBGRADE

+0.00 m +0.00 m +0.00 m +0.00 m

+0.00 m

PERSONEL FIGHTING POSITION

TARGETS 100 M DISTANCE

NEW BACK STOP BERM

TARGETS 300 M

TARGETS 200 M +0.60 m

+0.10 m

-0.40 m

+1.60 m

SECTION RANGE FLOOR

LANE LIMIT MARKER

SCALE 1 : 50

+0.00 m

SCALE LANE DEPTH, FIRING POSITION AND TARGET PITS 1 : 1000

HEIGHT 1 : 100

SCALE 1 : 200

SECTION NEW BACK STOP BERM

.59

TARGET PIT POSITION PER LANE

100100100

BASE LINE 100 m 200 m 300 m

SCALE 1 : 400

RANGE 1 AND 2

LAYOUT 300 m COMBINED RANGE 1&2, SECTIONS, DETAILS AND LOCATIONS

GRAVELED WALKWAY 2 m WIDE GRAVELED PARKING AREA 20 x 30 m

CONNECTED TO THE EXSISTING ROAD NETWORK

TYPICAL SECTION GRAVELED AREAS

SCALE 1 : 20

13. Feb 20141 DELETION OF ELECTRICAL SYSTEM 300 M RANGE HELMUT SCHWINDL

POTENTIAL EQUALIZATION BUSBAR

LONG GALVANIZED GROUNDING ROD

EACH TARGET PIT WILL BE EQUIPPED WITH A 3m

File details come from the government source that posted it. Updated .