Drawing_Sheet_8_of_11.pdf

PDF 118 KB Posted

Attached to
Renovate Firing Range, Bulboaca, Moldova
Solicitation number
N33191-14-R-0621
Issued by

About this file

Drawing 8 of 11

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AS SHOWN

DIRK KELLAR, SAFETY DIRECTOR, JMTC

BULBOACA TRAINING AREA

MOLDOVA ARMY TRAINING AREA

CONCEPT DESIGN: 18.10.2013

25. JUNE 2013

100 m

200 m 300 m

500 m

900 m

FIRING LINE

SCALE 1 : 1250

L V P P

LV

P P

700 m

L V P P

L V P P

350 m

400 m

250 m

650 m

800 m

FIRING LINE

0 m

E X

IS

T

IN

G R

O A

D

V1

V2

V3

V4

V5

LM2

LM1

LM3

LM4

LANE 9

LANE 8

LANE 7 LANE 6

LANE 5

LANE 4

LANE 3

LANE 2

WALKWAY 2m WIDE

SERVICE ROAD

V6

PRE FINAL DESIGN: 31.10.2013

LANE 1

LANE 10

P1-1

P2-3

P1-2

P1-3

P1-4

P1-5

P1-6

P1-7

P2-5

P1-8

P1-9

P2-6

P1-10

P2-1

P2-2

P2-4

P2-7

P2-8

P2-9

P2-10

P3-1

P3-2

P3-3

P3-4

P3-5

P3-6

P3-7

P3-8

P3-9

P3-10

P4-6

P4-7

P4-8

P4-9

P4-10

P5-1

P5-2

P5-3

P5-4

P7-1

P7-2

P7-3

P7-4

P7-5

P7-6

M1

M2

M3

M4

M5

M6

M7

M8

M9

ATTENTION:

P6-1

P6-2

P6-3

P6-4

P6-5

FINAL DESIGN: 03.12.2013

A re aP a rk in g

T o w e r

R a n g e

VEHICLE FIGHTING POSITION

FIRING POSITION

CONCRETE PERSONNEL

S ta ti o n

T ra n s fo rm e r

UPGRADE MULTI PURPOSE RANGE

0 3

RANGE LAYOUT WITH THE AREAS TO BE CLEAR FROM UNEXPLORED AMMUNITION

CLEAR AREA 5 m FROM CONSTRUCTION OR DIGGING

FROM UNEXPLODED ORDNANCE

MUST BE STAKED OUT AND FROM THERE THE AREA HAS TO BE CLEARED

THE ROAD NETWORK, TARGET PITS FIGHTING POSITIONS AND CABLE ROUTES

CLEAR AREA INSIDE THE GREEN BORDER 5 m FROM CONSTRUCTION OR DIGGING

RANGE 3

AREA TO BE CLEARED FROM UNEXPLODED ORDNANCE, 900 m

13. Feb 20141 DELETION OF ELECTRICAL SYSTEM 300 M RANGE HELMUT SCHWINDL

File details come from the government source that posted it. Updated .