Drawing_Sheet_4_of_11.pdf

PDF 192 KB Posted

Attached to
Renovate Firing Range, Bulboaca, Moldova
Solicitation number
N33191-14-R-0621
Issued by

About this file

Drawing 4 of 11

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P2-9 P2-8 P2-7 P2-6 P2-5 P2-4 P2-3 P2-2

AS SHOWN

DIRK KELLAR, SAFETY DIRECTOR, JMTC

BULBOACA TRAINING AREA

MOLDOVA ARMY TRAINING AREA

CONCEPT DESIGN: 25.06.2013

25. JUNE 2013

NEW RANGE TOWER

SCHEMATIC DATA CABLING

NEW TRANSFORMER STATION

NEW RANGE TOWER

SCHEMATIC GROUNDING

LVPP1

LVPP2

LVPP3

LVPP4

LVPP1

LVPP2

LVPP3

LVPP4

DATA CABLE, A-2Y(F)L2Y 10 x 2 x 0.8 mm

DATA CABLE, A-2Y(F)L2Y 10 x 2 x 0.8 mm

DATA CABLE, A-2Y(F)L2Y 10 x 2 x 0.8 mm

DATA CABLE, A-2Y(F)L2Y 10 x 2 x 0.8 mm

DATA CABLE, A-2Y(F)L2Y 10 x 2 x 0.8 mm

DATA CABLE, A-2Y(F)L2Y 10 x 2 x 0.8 mm

DATA CABLE, A-2Y(F)L2Y 10 x 2 x 0.8 mm

EARTH ELECTRODE, V4A, 30 x 3.5 mm

V1

V2

V3

TO THE GROUNDING SYSTEM

CONNECT ALL METAL STRUCTURES

V4

V5

V6

LIMIT MARKER, METAL CONSTRUCTION

GRAVEL

STEEL, 100x10, DIN 1014/1017

STEEL, 50x10, DIN 1014/1017

U-STEEL, 200, DIN 1026

WELDED WELDED

WELDED

STEEL, 100x10, DIN 1014/1017SCALE 1 : 5

M20

M10 M10

L-SHAPE, CONCRETE

GRAVEL

TIMBER 25/15

(by others)

CONCRETE FOUNDATION

REINFORCEMENT STEEL MATS

PLACED CONCRETE FOUNDATION

LIMIT MARKER HOLDING STRUCTURE WITH L-SHAPE PROTECTION

WOODEN LIMIT MARKER

SCALE 1 : 10

V1

V2

V3

V4

V5

V6 GALVANIZED GROUNDING ROD 3 m PER TARGET

PRE FINAL DESIGN: 30.08.2013

P2-1P2-10

P1-9 P1-8 P1-7 P1-6 P1-5 P1-4 P1-3 P1-2 P1-1P1-10 P1-9 P1-8 P1-7 P1-6 P1-5 P1-4 P1-3 P1-2 P1-1P1-10

P3-9 P3-8 P3-7 P3-6 P3-5 P3-4 P3-3 P3-2 P3-1P3-10 P3-9 P3-8 P3-7 P3-6 P3-5 P3-4 P3-3 P3-2 P3-1P3-10

P2-9 P2-8 P2-7 P2-6 P2-5 P2-4 P2-3 P2-2 P2-1P2-10

P4-9 P4-8 P4-7 P4-6P4-10 P4-9 P4-8 P4-7 P4-6P4-10

P5-4 P5-3 P5-2 P5-1 P5-4 P5-3 P5-2 P5-1

P6-5 P6-4 P6-3 P6-2 P6-1 P6-5 P6-4 P6-3 P6-2 P6-1

P7-5 P7-4 P7-3 P7-2P7-6 P7-1

P7-5 P7-4 P7-3 P7-2P7-6 P7-1

WITH 3 EA RECEPTACLES

LOW VOLTAGE POWER PANEL

FINAL DESIGN: 03.12.2013

SCHEMATIC EMPTY FIBER CONDUIT

LVPP1 LVPP2 LVPP3 LVPP4

NEW TRANSFORMER STATION

NEW RANGE TOWER

NEW HIGH VOLTAGE CONNECTION POINT

UPGRADE MULTI PURPOSE RANGE

NEW CONTROL STATION, RANGE 1&2

RANGE 3

Schematic Data Cabling and Grounding, Details Target Pit, 900 m Range

13. Feb 20141 DELETION OF ELECTRICAL SYSTEM 300 M RANGE HELMUT SCHWINDL

File details come from the government source that posted it. Updated .