FIRING LINE
R a n g e T o w e r
T ra n s fo rm e r S ta ti o n
FIRING LINE
0 m
P a rk in g A re a
E X
IS
T
IN
G R
O A
D
LANE 1
LANE 2
LANE 3
LANE 4
LANE 5
LANE 6
LANE 7
LANE 8
LANE 9
LANE 10
WALKWAY 2m WIDE
SERVICE ROAD
AS SHOWN
DIRK KELLAR, SAFETY DIRECTOR, JMTC
BULBOACA TRAINING AREA
MOLDOVA ARMY TRAINING AREA
CONCEPT DESIGN: 25.06.2013
25. JUNE 2013
SCALE 1 : 500
LOCATION OF TOWER, FIGHTING POSITIONS AND GRAVELED AREAS
0m Baseline
100m
200m
300m
400m
500m
600m
700m
800m
900m
LANE CENTER LINE
PREFABRICATED CONCRETE FIRING POSITION
RANGE DEPTH SCALE 1 : 2000
SCALE LANE WIDTH, FIRING POSITION AND TARGET PITS 1 : 100
RANGE DEPTH SCALE 1 : 2000
7,00
5,00
1,00
2,00
PRE FINAL DESIGN: 30.08.2013
CJB
SIDE VIEW
GEOTEXTILE
A A
PERSONEL TARGET PIT LOCATION PER LANE
SIDE CHANGE JUST AT P6-6 DUE TO TERRAIN
VEHICLE FIGHTING POSITION
FIRING POSITION
CONCRETE PERSONNEL
SCALE 1 : 100
DETAIL RAISED PERSONELL TARGET PIT
TOP VIEW
SECTION A-A
filled with Rock grain size 80-160 mm
Mesh 10 x 5 cm, wire size 5 mm
Gabions 100 x 100 x100 cm
Earth berm 3 sided 1 m high slope 2:1
Existing Terrain
DETAIL VEHICLE FIGHTING POSITION
TOP VIEW
SIDE VIEW
SCALE 1 : 100
20,00
FINAL DESIGN: 03.12.2013
UPGRADE MULTI PURPOSE RANGE
RANGE 3
Location of Personnel Target Pits and Firing Positions, 900 m
13. Feb 20141 DELETION OF ELECTRICAL SYSTEM 300 M RANGE HELMUT SCHWINDL