Drawing_Sheet_7_of_11.pdf

PDF 167 KB Posted

Attached to
Renovate Firing Range, Bulboaca, Moldova
Solicitation number
N33191-14-R-0621
Issued by

About this file

Drawing 7 of 11

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRING LINE

R a n g e T o w e r

T ra n s fo rm e r S ta ti o n

FIRING LINE

0 m

P a rk in g A re a

E X

IS

T

IN

G R

O A

D

LANE 1

LANE 2

LANE 3

LANE 4

LANE 5

LANE 6

LANE 7

LANE 8

LANE 9

LANE 10

WALKWAY 2m WIDE

SERVICE ROAD

AS SHOWN

DIRK KELLAR, SAFETY DIRECTOR, JMTC

BULBOACA TRAINING AREA

MOLDOVA ARMY TRAINING AREA

CONCEPT DESIGN: 25.06.2013

25. JUNE 2013

SCALE 1 : 500

LOCATION OF TOWER, FIGHTING POSITIONS AND GRAVELED AREAS

0m Baseline

100m

200m

300m

400m

500m

600m

700m

800m

900m

LANE CENTER LINE

PREFABRICATED CONCRETE FIRING POSITION

RANGE DEPTH SCALE 1 : 2000

SCALE LANE WIDTH, FIRING POSITION AND TARGET PITS 1 : 100

RANGE DEPTH SCALE 1 : 2000

7,00

5,00

1,00

2,00

PRE FINAL DESIGN: 30.08.2013

CJB

SIDE VIEW

GEOTEXTILE

A A

PERSONEL TARGET PIT LOCATION PER LANE

SIDE CHANGE JUST AT P6-6 DUE TO TERRAIN

VEHICLE FIGHTING POSITION

FIRING POSITION

CONCRETE PERSONNEL

SCALE 1 : 100

DETAIL RAISED PERSONELL TARGET PIT

TOP VIEW

SECTION A-A

filled with Rock grain size 80-160 mm

Mesh 10 x 5 cm, wire size 5 mm

Gabions 100 x 100 x100 cm

Earth berm 3 sided 1 m high slope 2:1

Existing Terrain

DETAIL VEHICLE FIGHTING POSITION

TOP VIEW

SIDE VIEW

SCALE 1 : 100

20,00

FINAL DESIGN: 03.12.2013

UPGRADE MULTI PURPOSE RANGE

RANGE 3

Location of Personnel Target Pits and Firing Positions, 900 m

13. Feb 20141 DELETION OF ELECTRICAL SYSTEM 300 M RANGE HELMUT SCHWINDL

File details come from the government source that posted it. Updated .