Seed Project_REPLACE WATER PIPE AT CLU A-BLOCK_20191216 - FINAL (1).PDF

PDF 1 MB Posted

Attached to
Djibouti JOC Amendment 05 Federal contract opportunity
Solicitation number
N33191
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Other files attached to Djibouti JOC Amendment 05, newest first.
File Type Posted
AMENDMENT_05_PPI Log.pdf PDF
CLDJ JOC Solicitation Revised 19 FEB 20.pdf PDF
Amendment 05 Attachment F Bid Schedule.pdf PDF
Amendment 05.pdf PDF
Amendment 04 Statement of Work.pdf PDF
Amendment 04 Attachment F-Bid Schedule.pdf PDF
Seed Project _Replace PVC Water Pipe at CLU A-Block.pdf PDF
Amendment 04.pdf PDF
AMENDMENT_04_PPI Log.pdf PDF
AMENDMENT_03_PPI Log.pdf PDF
AMENDMENT_03_.pdf PDF
Amendment 02 PPI Log.pdf PDF
Amendment 02 Statement of Work.pdf PDF
Amendment 02 NAVFAC EURAFSWA SOP_SF_002.pdf PDF
AMENDMENT_02_.pdf PDF
Amendment 02 Attachment F Bid Schedule.pdf PDF
AMENDMENT_01_Amendment to N3319119R0811.pdf PDF
AMENDMENT_01_New Access Questionnaire.xlsx XLSX spreadsheet
AMENDMENT_01_Badging Questionnaire.pdf PDF
AMENDMENT_01_SECNAV 5512-1.PDF PDF
AMENDMENT_01_N3319119R0811.pdf.PDF PDF
AMENDMENT_01_ PPI Log.pdf PDF
Attachment B CERT Non-Disclosure Statement.doc DOC document
Attachment A POAM.xlsx XLSX spreadsheet
Attachment D Const. Exp.doc DOC document
Solicitation 19 DEC.docx DOCX document
Attachment E Pre-Proposal Inq Form.doc DOC document
Statement of Work.pdf PDF
Attachment C PPQ.doc DOC document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Replace PVC Water Pipe at CLU A-Block SR: 17530837 Camp Lemonnier, Djibouti

Project / Work Order Number: 2020_P-DJ001/ SR # 17530837 Building / Location: CLU-VILLE A BLOCK, EAST SIDE, CLDJ Project Title: REPLACE PVC WATER PIPE AT CLU A-BLOCK Customer/Client: PWD – PRODUCTION DIVISION Scope of Work by: ROBERTO ASUNCION Date: 12 December 2019

Customer POC:

LT. Vladimirov, Igor A, USN Production Director, PWD Email: igor.a.vladimirov.mil@mail.mil Phone: (DSN) 311-824-5525

AE1 Jumper, Mark R, USN

FMS, PWD

Email: mark.r.jumper.mil@mail.mil Phone: (DSN) 311-824-5322

Project POC: Public Works Department FEAD, CLDJ LCDR Aviles, Angel, USN, CEC, PE FEAD Director, PWD Email: angel.aviles12.mil@mail.mil Phone: (DSN) 311-824-4139

1.0 Project Description

This design-build project proposes to replace portions of the existing polyvinyl chloride (PVC) water distribution system mains with ductile iron (DI) pipes. It will replace associated distribution valves, fittings, utility access covers, vaults or boxes, blow offs or other appurtenances. Work includes excavation of trenches, backfill, and repaving roads, sidewalks, and portions of aircraft apron.

2.0 Project Objectives

Contractor will provide the design-build services, supervision, materials, transportation, labor and equipment necessary to perform the following scope of work in accordance with the applicable U.S. regulations.

The proposed scope of work includes, but is not limited to the following new work elements:

Base Bid: Remove sections of existing 200mm PVC potable water main line pipe and install DI pipe with polyethylene encasement as indicated in Attachment B of this RFP. Replace all associated valves, fittings, lateral connections, blow offs or other appurtenances connected to the section of the distribution system that is to be replaced. Valves located on segments of pipe to be demolished must be removed, cleaned, tested to verify functionality, and provided to the government prior to contract completion.

Bid Option 1: Abandon in place the existing 200mm potable water main line pipe as indicated in Attachment B of this RFP by filling with flowable cementious low strength grout including plugs, bulkheads, excavation and backfill at locations as required to completely fill the line to be abandoned in place with grout to protect against future collapse of the line.

Relocate all lateral water line feeds from the abandoned 200mm potable water main line to the existing parallel 300mm DI potable main water line.

Remove sections of existing 200mm PVC potable water main line pipe and install DI pipe with polyethylene encasement as indicated in Attachment B of this RFP. Replace all associated valves, fittings, lateral connections, blow offs or other appurtenances connected to the section of the distribution system that is to be replaced. Valves located on segments of pipe to be demolished must be removed, cleaned, tested to verify functionality, and provided to the government prior to contract completion.

Bid Option 2: Remove sections of existing 200mm PVC potable water main line pipe and install DI pipe with polyethylene encasement as indicated in Attachment B of this RFP. Replace all associated valves, fittings, lateral connections, blow offs or other appurtenances connected to the section of the distribution system that is to be replaced. Valves located on segments of pipe to be demolished must be removed, cleaned, tested to verify functionality, and provided to the government prior to contract completion

Phasing:

Provide a phasing plan for installation, disinfection, performance testing and connection of new water pipes. System outages must be limited to the maximum extent possible with no more than four (4) hours and must be scheduled outside of normal working hours (0700-1700 Monday thru Friday). All outages must be coordinated with the PWD and disinfection must be coordinated with PWD EV staff who will test water quality immediately after disinfection.

2.1 Applicable Codes and Standards

In addition to the codes and standards listed in Attachment A – Performance Technical Specifications, the design and construction must be in accordance with the latest revision/edition of the following referenced codes and standards. The term "Latest Revision/Edition" is defined as the version as of the project award date.

1. UFC 1-200-01, General Building Requirements

2. UFC 1-300-08, Criteria for Transfer and Acceptance of Military Real Property

3. FC 1-300-09N, Navy and Marine Corps Design Procedures

4. UFC 3-201-01, Civil Engineering

5. UFC 3-800-10N, Environmental Engineering for Facility Construction

6. UFC 3-430-09 Exterior Mechanical Utility Distribution

7. UFC 3-230-01, Water Storage, Distribution, and Transmission, with Change 2

8. ACI 301-10 Specifications for Structural Concrete

9. American Water Works Association (AWWA) C652-02 Standard for Disinfection of Water

Storage Facilities

10. NSF Standard 60 – Drinking Water Treatment Chemicals

11. NSF Standard 61 – Drinking Water System Components

12. NAVFAC Management of Weight Handling Equipment manual (P-307)

3.0 Site Analysis

3.1 Existing Site Conditions

3.1.2 Topographic Survey

A topographic survey has not been performed. The contractor must provide a topographic survey for the project site to support the design of this project. The survey shall be tied to the established Base horizontal and vertical control. See ESR G10 for further survey requirements.

3.1.3 Geotechnical Information

Geotechnical Data: No geotechnical information has been provided as part of this RFP.

3.1.4 Site Utilities

Existing utilities on the project site include, but are not limited to: water, sewer, underground power and telecommunications and storm sewer systems.

The Contractor shall physically visit the site and is responsible for surveying, identifying and verifying all existing site utilities (to include locations, depths, size and materials) prior to starting design. The Contractor shall consult with PWD to coordinate the project design and connections to existing utilities.

3.2 Site Development

3.2.1 Vehicular Access and Circulation

Access to the project site will be using existing roadways and access driveways. Contractor must provide a traffic control plan as part of the design submittal package

3.2.2 Utilities

The Contractor must provide site utilities with service lines and connection points for water (fire protection), power and communications. Dig permits must be obtained from PWD prior to any utility trenching or excavation.

All disinfection activities must be coordinated and scheduled with the Contracting Officer a minimum of 15 days prior to requested operation. Superchlorination operations/activities will be immediately followed by sampling and testing performed by US Navy personnel before any new portion of waterline will be allowed to be connected to the existing system.

Each temporary connection to the potable water distribution system will require a backflow preventer to be installed upstream of the connection and must be planned and coordinated with the Contracting Officer.

4.0 Engineering Systems Requirements (ESR)

G10 Site Preparations G20 Site Improvements G30 Site Civil/Mechanical Utilities

G10 SITE PREPARATION

Perform a topographic survey of the project area that will be impacted by the work in accordance with FC 1-300-09N, Navy and Marine Corps Design Procedures. Include the topographic survey in all design submittals. The existence, size, and location of the utilities are not guaranteed by the Government in provided site plans. Verify the location of all utilities prior to construction. Electronic files of the existing utility information will be provided to the Contractor only after award of the Contract. Use ground penetrating radar or other similar methods for identify locations of underground utilities.

Jurisdictional tidal and non-tidal wetlands have not been identified on the project site.

G1010 SITE CLEARING

All grubbing and clearing residue, demolished material, rubbish and debris generated by this project must be hauled off-site and off station by the Contractor.

G1020 SITE DEMOLITION & RELOCATIONS

Preserve the following underground site elements: existing utilities to remain.

The items to be salvaged include water valves.

G102003 UNDERGROUND SITE DEMOLITION

Remove utilities as indicated on the drawing(s) in Attachment B. Remove all appurtenances associated with the utility to be removed so there is no presence of the utility at ground surface.

Abandon utility systems as indicated on the drawing(s) in Attachment B in a manner that conforms to applicable codes and regulations. When piping is abandoned in place, provide a minimum 24 inch (600 mm) plug length, fill abandoned piping with flowable fill. Remove existing utility structures to 3 feet (900 mm) below existing or new adjacent grade, whichever is greater. Break up bases to permit drainage. Fill with clean sand.

Fill piping under pavements with flowable fill.

G102005 UTILITY RELOCATION

Relocate utilities as indicated on the drawings in Attachment B.

G102007 SITE CLEANUP

Waste materials will become the property of the Contractor; transport, dispose of or recycle waste materials in accordance with Part 2 Section 01 57 19, Temporary Environmental Controls.

G1030 SITE EARTHWORK

Provide grading so the site will drain and to match existing drainage patterns. Blasting for rock excavation will not be permitted.

Provide materials required in excess of those resulting from excavations from off Government property.

All unsuitable material and surplus excavation must become the property of the Contractor and must be disposed of off Government property.

G1040 HAZARDOUS WASTE REMEDIATION

Not anticipated as part of the project.

G20 SITE IMPROVEMENTS

Provide accessibility in conformance with applicable requirements of UFC 1-200-01, General Building Requirements.

G2010 ROADWAYS

The design of pavements must take into consideration the anticipated daily traffic (H20 loadings) over the life of the project (20 years) as well as the existing soil conditions at the site.

Provide roadway, parking, and pedestrian pavement area patches of bituminous pavement or Portland cement concrete (PCC) pavement to match existing pavement section for trench repair as required. Permeable pavement must not be used. Aggregate pavement may not be used.

Provide other roadway improvements including pavement markings to match existing.

G202003 PAVED SURFACES

Provide Portland cement concrete with a minimum design flexural strength of 650 psi (4.48 MPa) in not more than 28 days.

G2030 PEDESTRIAN PAVING

Provide Portland cement concrete (PCC) sidewalks with pavement section to match existing where pipe trenches cross sidewalks. Saw cut pavement sections that are required to be removed at construction joints. Sidewalk replacement must be full width replacement.

G2040 SITE DEVELOPMENT

Restore all areas disturbed by construction equal to existing condition prior to construction.

G30 SITE CIVIL/MECHANICAL UTILITIES

G3010 WATER SUPPLY

The water system is a replacement of the existing water system. The existing water system serving the project is owned, operated and maintained by the federal government. Provide the new water system and connections to the existing water system in accordance with the requirements of this RFP or UFC 3-230-01 Water Storage, Distribution, and Transmission, Change 2 whichever is more stringent.

Provide connection to the existing water distribution system at the point indicated on the drawings in Attachment B.

Remove all existing water valves, blow offs and other appurtenances located along the section of water line that is indicated to be replaced on drawings in Attachment B. Install new valves, blow offs and other appurtenances to match existing system requirements.

G3020 SANITARY SEWER

Not used.

G3030 STORM SEWER

Not used.

5.0 Period of Performance

The contractor shall complete all the work under this work order within a maximum of 365 calendar days from the date of award.

6.0 Attachments

Attachment A – Performance Technical Specifications

Attachment B – Reference Drawings

Note: The information shown on the attached drawings is conceptual and must be investigated and verified for accuracy, fully coordinated, and developed through design by the contractor.

----- END of SCOPE OF WORK -----

Attachment A – Performance Technical Specifications

G10 Site Preparations G20 Site Improvements G30 Site Mechanical Utilities Z10 General Performance Technical Specification

Attachment A - SECTION G10 - Page 1

SECTION G10

SITE PREPARATION

12/18

G10 GENERAL

The RFP Scope including the Engineering System Requirements (ESR) provide project specific requirements. Attachment A, Performance Technical Sections (PTS) provide generalized technical requirements that apply to multiple facility types and include more requirements than are applicable to any one project. Therefore, only the RFP Attachment A requirements that apply to the project and further define the RFP Scope project specific requirements are required.

G10 1.1 DESIGN GUIDANCE

Provide the design and installation in accordance with the following references. This Performance Technical Specification (PTS) adds clarification to the fundamental requirements contained in the following Government Standards. The general requirements of this PTS section are located in PTS Section Z10, General Performance Technical Specification.

Industry standards, codes, and Government standards referenced in the section text that are not found in the Unified Master Reference List (UMRL) in the Construction Criteria Base (CCB) at the Whole Building Design Guide Website, are listed below for basic designation identification. Comply with the required and advisory portions of the current edition of the referenced standard at the time of contract award.

G10 1.1.1 Industry Standards and Codes

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

Refer to UMRL for reference designation identification.

G10 1.1.2 Government Standards

CORPS OF ENGINEERS (COE)

COE EM 385-1-1 Safety and Health Requirements Manual

UNIFIED FACILITIES CRITERIA (UFC)

UFC 1-200-01 DoD Building Code (General Building Requirements)(A reference in this PTS section to UFC 1-200-01 requires compliance with the Tri-Service Core UFCs that are listed therein, which includes the following significant UFC(s):UFC 1-200-02, High Performance and Sustainable Building Requirements UFC 3-201-01, Civil Engineering UFC 3-220-01, Geotechnical Engineering)

Attachment A - SECTION G10 - Page 2

UFC 3-810-01N Navy and Marine Corps Environmental Engineering for Facility Construction

UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS)

UFGS 31 23 00.00 20 Excavation and Fill

UFGS 01 57 19 Temporary Environmental Controls

UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls

UFGS 02 61 13 Excavation and Handling of Contaminated Material

UFGS 02 61 23 Removal and Disposal of PCB Contaminated Soils

UFGS 02 65 00 Underground Storage Tank Removal

G10 1.2 PERFORMANCE VERIFICATION AND ACCEPTABLE TESTING

Compliance with the requirements will be determined by a review of the design and construction submittals and by field inspection. See Specification Section 01 33 10.05 20, Design Submittal Procedures, and Specification Section 01 33 00.05 20, Construction Submittal Procedures, for additional requirements. Verify earthwork performance via testing detailed in the paragraph, "Field Quality Control", in UFGS Section 31 23 00.00 20, Excavation and Fill.

G10 1.3 DESIGN SUBMITTALS

Submit design submittals in accordance with Specification Section 01 33

10.05 20, Design Submittal Procedures, FC 1-300-09N, Navy and Marine CorpsDesign Procedures, UFC 3-201-01, Civil Engineering, and UFC 3-220-01, Geotechnical Engineering.

In addition, UFGS sections listed below or in the body of the PTS text are to be used by the Designer of Record (DOR) as a part of the design submittal.

If the UFGS products or systems are applicable to the project, the DOR is required to edit these referenced UFGS sections and submit them as a part of the design submittal specification. Edit the specification sections in accordance with the limitations stated in PTS section Z10, General Performance Technical Specifications.

UFGS 31 23 00.00 20, Excavation and Fill.

Attachment A - SECTION G10 - Page 3

G10 1.4 CONSTRUCTION SUBMITTALS

Submit construction submittals in accordance with PTS Section Z10, General Performance Technical Specifications. In addition to the Z10 requirements, the Designer of Record (DOR) is required to approve the following construction submittals as a minimum:

Submittals in Specification Section 01 57 19, Temporary Environmental Controls.

Submittals in UFGS Section 02 61 13, Excavation and Handling of Contaminated Material Submittals in UFGS Section 31 23 00.00 20, Excavation and Fill.

Waste Management Plan in accordance with Specification Section 01 74 19.05 20, Construction and Demolition Waste Management for Design-Build.

G10 1.5 GEOTECHNICAL REPORT

G10 1.5.1 Subsurface Soils Information

Provided subsurface soil information is included for the Contractor's information only, and is not guaranteed to fully represent all subsurface conditions. The data included in this RFP is intended for proposal preparation and preliminary design only. Perform, at the Contractor's expense, such subsurface exploration, investigation, testing, and analysis for the design and construction of the site improvements.

G10 1.5.2 Contractor-provided Geotechnical Engineer

The Contractor-provided Geotechnical Engineer is required to be experienced with soil conditions in the region where the project site is located. The Geotechnical Engineer is required to evaluate the RFP data, obtain and evaluate additional data to support the design and construction, and prepare a Geotechnical Report.

Coordinate work by the Contractor-provided Geotechnical Engineer at the project location with the Contracting Officer so as not to interfere with normal base operations. A minimum of two weeks prior to the Foundation Work Design submittal, provide the Contractor's Geotechnical Report (a searchable Adobe Acrobat PDF version on CD and two printed copies) for review and record keeping purposes. The report will become the property of the Government. Provide the geotechnical reports generated during construction, such as pile driving results and analysis, to the Contracting Officer. In addition, provide a searchable Adobe Acrobat PDF version and two printed copies for record keeping purposes.

G10 1.5.3 Contractor-Provided Geotechnical Report

Submit a written Geotechnical report based upon Government-provided subsurface investigation data and additional field and laboratory testing accomplished at the discretion of the Contractor's Geotechnical Engineer. Include in the Geotechnical Report all requirements listed in UFC 3-220-01, Geotechnical Engineering, paragraph entitled "Section 1803 Geotechnical Investigations"; in

Attachment A - SECTION G10 - Page 4 addition, include the following:

a. The project site description, vicinity map and site map indicating the location of borings and any other sampling locations.

Provide 24 hour groundwater observations for at least 20 percent of the borings, minimum one boring. Provide notes explaining any abbreviations or symbols used and describing any special site preparation requirements.

b. Results of field and laboratory testing, whether Government or Contractor-provided. Address existing subsurface conditions, selection and design of the foundation and floor slab, underground construction including utility installation and other site specific requirements (such as soil stabilization and slope stability).

c. Engineering analysis, discussion and recommendations Addressing:

1) Settlement analysis - Limit settlement in accordance with UFC 3-220-01 Geotechnical Engineering and EM 1110-1-1904 "Settlement Analysis".

2) Bearing Capacity analysis.

3) Foundation selection (shallow, deep, special) and construction considerations; dimensions, and installation procedures.

4) Site preparation (earthwork procedures and equipment, compaction requirements, building slab preparation, soil sensitivity to weather and equipment, groundwater influence on construction, mitigation of expansive soils or liquefaction potential, and dewatering requirements).

5) Sheeting and shoring considerations.

6) Pavement design calculations with parameters defined, actual or assumed, and recommended thicknesses and materials.

7) Infiltration rate.

8) Haul routes and stockpile locations for earthwork.

9) Calculations to support conclusions and recommendations.

10) Present recommendations on a structure-by-structure basis.

A registered Geotechnical Engineer is required to sign the Geotechnical Report.

Accompany the submitted report with a cover letter identifying any report recommendations proposed to be adopted into the design which are interpreted by the Contractor as a changed condition to the Geotechnical or Pavement related requirements of the RFP.

G10 1.5.4 Geotechnical Site Data required in Design Drawings

Attachment A - SECTION G10 - Page 5

The Contractor's final design drawings must include the Government-provided subsurface data presented in the RFP, as well as additional borings and laboratory test result data performed by the Contractor. The data provided is required to include:

a. Logs of Borings and related summary of laboratory test results and groundwater observations. Provide 24 hour groundwater observations for at least 20 percent of the borings, minimum one boring. Provide notes explaining any abbreviations or symbols used and describing any special site preparation requirements.

b. Indicate the locations of borings on the drawings. Revise the design drawings to reference the Contractor's Geotechnical Report as being a basis for design.

G1010 SITE CLEARING

G1010 1.1 GENERAL

Clear and grub project site for project construction.

G1010 1.2 BURNING

Where burning is permitted, adhere to the federal, state, and local regulations.

G101001 CLEARING

G101001 1.1 CLEARING

Clear trees, shrubs, brush and vegetation for construction of the project.

Clearing includes the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared.

G101001 1.2 PRESERVATION

Preserve and protect trees, shrubs and vegetation not directly impacted by the construction in accordance with Specification Section 01 57 19, Temporary Environmental Controls, and PTS Section G205005, paragraph 1.1 Existing Plant Material to Remain or be Transplanted.

G101002 TREE REMOVAL

Remove and dispose of trees to a depth of at least 18 inches (450 mm) below ground surface. Fill depressions with satisfactory material and compact. Mound fill 2 inches (50 mm) above adjacent surface to allow for settling when not part of a subbase.

G101003 STUMP REMOVAL

Remove stumps to a depth of at least 18 inches (450 mm) below ground surface. Fill depressions with satisfactory material and compact. Mound fill 2 inches (50 mm) above adjacent surface to allow for settling when not part of a subbase.

Attachment A - SECTION G10 - Page 6

G101004 GRUBBING

Within the clearing limits, remove and dispose of logs, shrubs, brush, matted roots, roots larger than 2 inches (50 mm) in diameter, and other debris to a depth of at least 18 inches (450 mm) below ground surface. Fill depressions made by grubbing with satisfactory material and compact to make the new surface conform to the adjacent surface of the ground.

G101006 DEBRIS DISPOSAL

Prevent spillage on pavements, streets, or adjacent areas. Dispose of surplus and unsuitable material off of Government property.

G1020 SITE DEMOLITION & RELOCATIONS

G1020 1.1 GENERAL

Demolition work includes the demolition, removal and legal disposal of existing construction debris to accommodate the new construction. Take precautions to prevent damages to existing utilities, construction and materials not scheduled for demolition, repair or replacement; repair damages to the construction and materials to the satisfaction of the Contracting Officer and at no additional cost to the Government.

G1020 1.2 AUTHORIZATION

Do not begin demolition until the Demolition Plan has been approved by, and authorization is received from, the Contracting Officer.

G1020 1.3 TITLE TO MATERIALS

Whenever possible, salvage or recycle features demolished in lieu of disposing of as waste in a landfill. Existing features to be demolished which are not salvageable or reused become the property of the Contractor, and must be removed from the project site. The Government will not be responsible for the condition, loss of, or damage to, such property after contract award. Materials and equipment cannot be viewed by prospective purchasers or sold on the site.

G1020 1.4 REUSE OF MATERIALS AND EQUIPMENT

Remove and store materials and equipment to be reused or relocated to prevent damage, and reinstall as the work progresses.

G1020 1.5 SALVAGED MATERIALS AND EQUIPMENT

Deliver salvaged materials and equipment that are to be removed by the Contractor and that are to remain the property of the Government to a storage site on the installation, in accordance with instructions of the Contracting Officer.

G102002 ABOVEGROUND SITE DEMOLITION

G102002 1.1 DUST AND DEBRIS CONTROL

Attachment A - SECTION G10 - Page 7

Prevent the spread of dust and debris to occupied portions of a building or on pavements and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water for dust control if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Sweep pavements to control the spread of debris that may result in foreign object damage potential to aircraft.

G102002 1.2 PROTECTION

G102002 1.2.1 Traffic Control

Where pedestrian and driver safety is endangered in the area of removal work, provide traffic control in accordance with FHWA Manual on Uniform Traffic Control Devices (MUTCD).

G102002 1.2.2 Foreign Object Damage (FOD)

Remove potential FOD debris and waste materials on or adjacent to operational airfield pavements due to the Contractor's operations.

Install a temporary barricade at the Contractor's expense. The barricade is required to include a fence covered with a fabric designed to stop the spread of debris. Anchor the fence and fabric to prevent displacement by winds or jet/prop blasts. Remove barricade when no longer required.

G102002 1.2.3 Existing Work

Protect existing work that is to remain in place, be reused, or remain the property of the Government. At no additional expense to the Government, repair items that are damaged during performance of the work to original condition, or replace with new. Do not overload pavements to remain.

G102002 1.3 PAVING AND SLABS

Remove concrete and asphaltic concrete paving and slabs as required for construction of project. Remove the existing aggregate base in areas to receive new pavement to the depth of the proposed pavement section below new finish grade. Remove the existing aggregate base in areas not to receive new pavement to a depth of 8 inches (200 mm) below existing adjacent grade and break remaining pavement (if any) to allow drainage. Provide neat sawcuts at limits of pavement removal; protect sawcuts so that new pavement butts against the existing without feathering.

G102003 UNDERGROUND SITE DEMOLITION

G102003 1.1 UTILITY TERMINATION

Terminate utilities in accordance with state and local rules and regulations; the nationally recognized code; and the requirements of the utility provider covering the specific utility; UFC 3-201-01, Civil Engineering; and approved by the Contracting Officer.

G102003 1.2 PROTECTION OF EXISTING UTILITIES

Protect existing utilities to remain. Where removal of existing utilities

Attachment A - SECTION G10 - Page 8 and pavement is required, provide approved barricades, temporary covering of exposed areas, and temporary services or connections. Repair damage to existing utilities to remain at no additional expense to the Government.

G102005 UTILITY RELOCATION

Repair relocated items that are damaged or replace damaged items with new undamaged items at no additional expense to the Government.

G102006 FENCING RELOCATION

Remove and replace post foundations. Repair relocated items that are damaged or replace damaged items with new undamaged items at no additional expense to the Government. Refer to Section G204001 for requirements for new fence systems.

G102007 SITE CLEANUP

Remove rubbish and debris from the installation daily; do not allow accumulations inside or outside the building(s) or on pavements. Store materials that cannot be removed daily in areas specified by the Contracting Officer.

G102007 1.1 SPILLS

In the event of a spill or release of hazardous substances, pollutant, contaminant or oil, notify the Contracting Officer immediately. Take immediate containment actions to minimize the effect of any spill or leak in accordance with the ESR and the approved spill work plan as described in Specification Section 01 57 19, Temporary Environmental Controls.

Perform clean up at no additional expense to the Government.

G1030 SITE EARTHWORK

G1030 1.1 GENERAL

This section includes the design and construction requirements for earthwork and grading related to construction of the roadways, parking, paved areas and other related sitework. Refer to Section A10, Foundations, for earthwork related to construction of structures, including building, footings, foundations, retaining walls, slabs, tanks, and utility appurtenances.

The Designer of Record is required to utilize UFGS Section 31 23 00.00 20, Excavation and Fill, for the project specification, and to submit the edited specification section as a part of the design submittal for the project.

G103001 GRADING

Provide site grading in accordance with the requirements of UFC 3-201-01, Civil Engineering.

G103001 1.1 ELEVATIONS

Establish finish floor elevations in accordance with UFC 1-200-01, DoD Building Code(General Building Requirements), and UFC 3-101-01, Architecture.

G103001 1.2 SITE GRADING

Attachment A - SECTION G10 - Page 9

Grade the site such that associated storm water runoff does not adversely affect surrounding sites. Preserve natural topographic features to minimize the impact on the existing drainage patterns at and adjacent to the site.

G103001 1.3 FINISHED SURFACES

Provide finish grading with drainage towards new and existing drainage features and with no resulting low spots that hold water or that direct runoff towards new or existing facilities or site amenities.

G103001 1.4 RODENT AND VEGETATION CONTROL

Prevent and eliminate standing water.

G103002 COMMON EXCAVATION

Preserve natural topographic features to minimize cut and fill requirements.

Unsuitable material and surplus excavation becomes the property of the Contractor, and must be disposed of as indicated in the Project Program.

G103003 ROCK EXCAVATION

If blasting is allowed, conduct it in accordance with EM 385-1-1 and Federal, state, and local safety regulations. Provide blasting mats and use non-electric blasting caps. Notify the Contracting Officer 24 hours prior to blasting.

Do not make requests for additional compensation for degree of hardness or difficulty encountered in removal of material. Unsuitable material and surplus excavation becomes the property of the Contractor, and must be disposed of as indicated in the Project Program.

G103004 FILL & BORROW

G103004 1.1 SOURCES

Where sufficient topsoil and satisfactory materials are not available on the project site, provide suitable borrow materials.

G103004 1.2 REQUIREMENTS FOR OFF SITE SOIL

Test off-site soil in accordance with UFGS Section 31 23 00.00 20, Excavation and Fill, section titled "Requirements for Off Site Soil".

G103004 1.3 UNSATISFACTORY SOIL MATERIALS

Remove uncontaminated unsatisfactory soil materials from the site.

Unsatisfactory materials are materials which do not comply with the requirements for satisfactory materials. Unsatisfactory materials also include man-made fills, trash, refuse, backfills from previous construction or material classified as satisfactory which contains root and other organic matter, frozen material, and stones larger than 3 inches. The Contracting Officer shall be notified of any contaminated materials.

G103004 1.4 TOPSOIL

Attachment A - SECTION G10 - Page 10

Refer to Section G2050, "Landscaping". Remove unsatisfactory, existing topsoil from the site in accordance with the Project Program.

G103005 COMPACTION

Provide compaction in accordance with UFGS Section 31 23 00.00 20, Excavation and Fill, and the recommendations of the Contractor's Geotechnical Engineer, whichever is greater.

G103006 SOIL STABILIZATION

Provide soil stabilization designed to function as required by site conditions in accordance with the State Highway specifications and standards in the state where the project is located. Apply and install geosynthetics in accordance with the manufacturer's written instructions.

G103007 SLOPE STABILIZATION

Provide slope stabilization methods in accordance with the State Highway specifications and standards in the state where the project is located. Design and install manufactured products, gabions, geogrids, rock anchors in accordance with the manufacturer's written instructions.

G103008 SOIL TREATMENT

G103009 SHORING

Provide sheeting, shoring, bracing, cribbing and underpinning in accordance with the Army Corps of Engineer's Safety and Health Requirements Manual (COE EM 385-1-1), UFC 3-220-01, Geotechnical Engineering, UFC 3-301-01, Structural Engineering, and other Federal, State and local codes and requirements.

Provide protection of existing structures.

G103010 TEMPORARY DEWATERING

The design of the temporary dewatering system is required to account for soil conditions, rainfall, fluctuations in the groundwater elevations and the potential settlement impact on adjacent facilities due to dewatering. Provide dewatering in accordance with UFGS Section 31 23 00.00 20, Excavation and Fill. While the excavation is open, maintain the water level continuously, at least 1.0 foot (0.30

m) below the working level.

French drains, sumps, ditches or trenches are not allowed within 3 feet (0.9 m) of the foundation of any structure without written approval of the Government's Civil/Geotechnical Reviewer.

G103011 TEMPORARY EROSION & SEDIMENT CONTROL

G103011 1.1 TEMPORARY EROSION & SEDIMENT CONTROL

Develop and implement temporary erosion and sediment control measures and other Best Management Practices (BMPs) prior to or in conjunction with commencement of earthwork in accordance with the state Erosion and Sediment Control Laws and Regulations. Remove non-permanent erosion control

Attachment A - SECTION G10 - Page 11 measures after vegetation is fully established.

G103011 1.2 MAINTENANCE

Maintain temporary erosion control measures in accordance with state Erosion and Sediment Control Laws and Regulations throughout the project until areas are fully stabilized.

G103090 OTHER SITE EARTHWORK

G103090 1.1 HISTORIC AND ARCHAEOLOGIC ARTIFACTS

Refer to Specification Section 01 50 00.05 20, Temporary Facilities and Controls for Design-Build.

G103090 1.2 PIPELINE CASING UNDER RAILROADS OR PAVEMENTS

Where required by code or local practice provide casing for piping under railroads or pavements. The Contractor is responsible for obtaining permits from government and nongovernment owners/agencies as required to perform the work.

G103090 1.3 TOPSOIL AND SEED

Provide topsoil and seed according to UFGS Section 31 23 00.00 20, Excavation and Fill, except when landscaping is required.

G1040 HAZARDOUS WASTE REMEDIATION

Perform work in accordance with specification and plans provided in Parts 5 and 6.

G1040 1.1 DISPOSAL

Manage, transport and dispose of waste materials in accordance with specification and plans provided in Parts 5 and 6.

-- End of Section --

Attachment A - SECTION G20 - Page 1

SECTION G20

SITE IMPROVEMENTS

12/18

G20 GENERAL

The RFP Scope including the Engineering System Requirements (ESR) provide project specific requirements. Attachment A, Performance Technical Sections (PTS) provide generalized technical requirements that apply to multiple facility types and include more requirements than are applicable to any one project. Therefore, only the RFP Attachment A requirements that apply to the project and further define the RFP Scope project specific requirements are required.

G20 1.1 DESIGN GUIDANCE

Provide the design and installation in accordance with the following references. This Performance Technical Specification (PTS) adds clarification to the fundamental requirements contained in the following Government Standards. The general requirements of this PTS section are located in PTS Section Z10, General Performance Technical Specification.

Industry standards, codes, and Government standards referenced in the section text that are not found in the Unified Master Reference List (UMRL) in the Construction Criteria Base (CCB) at the Whole Building Design Guide Website, are listed below for basic designation identification. Comply with the required and advisory portions of the current edition of the referenced standard at the time of Contract award.

G20 1.1.1 Industry Standards and Codes

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

AMERICAN SOD PRODUCERS ASSOCIATION (ASPA)

U.S CONSUMER PRODUCT SAFETY COMMISSION, PUBLICATION NO. 325

Refer to UMRL for reference designation identification.

G20 1.1.2 Government Standards

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

FS RR-F-191 Fencing and Wire and Post Metal (and Gates, Chain-link Fence Fabric, and Accessories)

FACILITIES CRITERIA (UFC)

UFC 1-200-01 DoD Building Code (General Building Requirements) (A reference in this PTS section to UFC 1-200-01 requires compliance with the Tri-Service Core

Attachment A - SECTION G20 - Page 2

UFCs that are listed therein, which includes the following significant UFC(s):UFC 1-200-02, High Performance and Sustainable Building RequirementsUFC 3-201-01, Civil EngineeringUFC 3-201-02, Landscape ArchitectureUFC 3-210-01, Low Impact Development UFC 3-220-01, Geotechnical Engineering

UFC 3-250-01 Pavement Design for Roads and Parking Areas

UFC 3-270-01 Asphalt Maintenance and Repair

UFC 3-270-02 Asphalt Crack Repair

UFC 3-270-03 Concrete Crack and Partial Depth Spall Repair

UFC 3-270-04 Concrete Repair

UFC 4-022-02 Selection and Application of Vehicle Barriers

UFC 4-022-03 Security Fences and Gates

G20 1.2 QUALITY ASSURANCE

Not Used.

G20 1.3 PERFORMANCE VERIFICATION AND ACCEPTANCE TESTING

Compliance with the requirements will be determined by a review of the design and construction submittals and by field inspection. See Specification Section 01 33 10.05 20, Design Submittal Procedures, and Specification Section 01 33 00.05 20, Construction Submittal Procedures, for additional requirements.

Verify satisfactory performance via Performance Verification, as detailed in this section of the RFP. Verify satisfactory performance also via testing as detailed in the paragraph, Field Quality Control, in UFGS Specification Sections utilized.

G20 1.3.1 Subgrade Preparation Performance Verification

Perform subgrade preparation in accordance with PTS Section G10. If required by the Designer of Record, perform proof rolling. Perform proof rolling in the presence of the Contracting Officer. Rutting or pumping of material is required to be undercut and replaced with satisfactory soil materials as defined in Section G10, Site Preparation.

G20 1.3.2 Base Course Performance Verification

Attachment A - SECTION G20 - Page 3

G20 1.3.2.1 Aggregate Base Course

a. Sampling: ASTM D75/D75M.

b. Gradation: ASTM C136.

c. Thickness: Confirm in-place compacted thickness.

Acceptable tolerances are plus or minus 0.5 inches (13 mm). One test for every 500 square yards (418 square meters); minimum 2 tests.

d. Density: ASTM D1556 or ASTM D6938. One field test for every 1000 square yards (836 square meters); minimum 2 tests. ASTM D1557, Method A, B or C; one laboratory test for the project.

e. Visual: Provide smooth surface with no ruts.

G20 1.3.2.2 Other Types of Base Courses

For other types of base courses, provide field testing in accordance with the SHS.

G20 1.3.3 Bituminous Concrete Pavement Performance Verification

• Visual: Provide finished surface that is uniform in texture and appearance and free of cracks and creases.

• Sampling: ASTM D979.

• Job Mix: Determine gradation and bitumen content. One sample for every 400 tons (362,500 kilograms); minimum 1 test.

• Thickness: ASTM D3549. Confirm in-place compacted thickness. Acceptable tolerances are plus or minus 0.5 inches (13 mm) for bituminous base course and plus or minus 0.25 inches (6 mm) for bituminous surface course. One test for every 500 square yards (418 square meters); minimum 2 tests.

• Surface Smoothness: Test surface smoothness by using a 10 foot (3 meter) straightedge in transverse and longitudinal directions to pavement. Acceptable tolerances are plus or minus 0.25 inches (6 mm) for bituminous base and surface courses.

• Density: Conduct field density of in-place compacted pavement in accordance with ASTM D2950 and correlated with ASTM D1188 or ASTM D2726/D2726M. One field test for every 1000 square yards (836 square meters); minimum 2 tests. One laboratory test for the project.

G20 1.3.4 Portland Cement Concrete Pavement Performance Verification

• Visual: Provide finished surface that is uniform in texture and appearance and free of cracks.

• Sampling: ASTM C31/C31M.

• Thickness: Acceptable tolerances are plus or minus 0.5 inches

(13 mm). One test for every 500 square feet (418 square meters);

minimum 2 tests.

• Surface Smoothness: Test surface smoothness by using a 12 foot (3.6 meter) straightedge in transverse and longitudinal directions to pavement. Provide finished surfaces of the pavements with no abrupt change of 0.71 inch (18 mm) or more.

• Strength: Samples for strength tests of each mix design of concrete placed each day are required to be taken not less than

Attachment A - SECTION G20 - Page 4 once a day, nor less than once for each 100 cubic yards (120 cubic meters) of concrete, nor less than once for each 5000 square feet (500 square meters).

1) Compressive Strength: ASTM C39/C39M. Make five test cylinders for each set of tests. Test two cylinders at 7 days, two cylinders at 28 days, and hold one cylinder in reserve.

Determine each strength test result by the average of two cylinders from the same concrete sample tested at 28 days. If the average of any three consecutive strength test results is less than f'c or if any strength test result falls below f'c by more than 500 psi, take a minimum of three ASTM C42/C42M core samples from the in-place work represented by the low test cylinder results and test. Consider the concrete represented by core test structurally adequate if the average of three cores is equal to at least 85 percent of f'c and if no single core is less than 75 percent of f'c. Retest locations represented by erratic core strengths.

2) Flexural Strength: ASTM C78/C78M. Make four test specimens for each set of tests. Test two specimens at 28 days, and the other two at 90 days. Concrete strength will be considered satisfactory when the minimum of the 90-day test results equals or exceeds the specified 90-day flexural strength, and no individual strength test is less than the design strength. If the ratio of the 28-day strength test to the specified 90-day strength is less than 65 percent, make necessary adjustments for conformance.

• Remove concrete not meeting strength criteria and provide new acceptable concrete at no expense to the Government. Repair core holes with nonshrink grout. Match color and finish of adjacent concrete.

G20 1.3.5 Concrete Joint Performance Verification

Install a test section of 500 linear feet (150 m) at start of sealing operation for each sealant to be used. Obtain approval of test section by Contracting Officer prior to installing additional joint seal. Reject joint sealer that fails to cure properly, or fails to bond to joint walls, or reverts to uncured state or fails in cohesion, or shows excessive air voids, blisters, or has surface defects, swells, or other deficiencies, or is not recessed within indicated tolerances. Remove rejected sealer and reclean and reseal joints.

G20 1.4 DESIGN SUBMITTALS

Submit design submittals in accordance with UFC 1-200-01, DoD Building Code(General Building Requirements), Specification Section 01 33 10.05 20, Design Submittal Procedures, FC 1-300-09N, Navy and Marine Corps Design Procedures, and UFC 3-201-01, Civil Engineering.

In addition, UFGS sections listed below or in the body of the PTS text are to be used by the Designer of Record (DOR) as a part of the design submittal.

If the UFGS products or systems are applicable to the project, the DOR is required to edit these referenced UFGS sections and submit them as a part of the design submittal specification. Edit the specification sections in accordance with the limitations stated in PTS Section Z10, General

Attachment A - SECTION G20 - Page 5

Performance Technical Specifications.

32 11 16.13, Sand-Clay [Base] [Subbase] Course

32 11 16.16, [Base Course for Rigid] [and Subbase Course for Flexible] [Subbase Course for Pervious] Paving

32 11 24, Graded Crushed Aggregate Base Course for [Pervious][Flexible] Pavement

32 11 26.16, Bituminous Concrete Base Course

32 11 33, Cement Stabilized [Base] [Subbase] Course at Airfields and Roads

32 11 36.13, Lean Concrete Base Course

32 12 17, Hot Mix Bituminous Pavement

32 13 13.06, Portland Cement Concrete Pavement for Roads and Site Facilities

32 13 43, Pervious Concrete Paving

32 16 15, Concrete Block Pavements

G20 1.6 ANTITERRORISM (AT) STANDARDS

Incorporate the minimum AT standards indicated in UFC 4-010-01, DoD Minimum Antiterrorism Standard for Buildings.

G20 1.7 PROJECT LIMITATIONS

Prior to the start of design, determine the exact limit-of-work line for the project periphery, considering items such as, but not limited to, utility work, landscape areas, and laydown areas. See PTS G2050 for limits of landscape areas.

G2010 ROADWAYS

G2010 1.1 PAVEMENT DESIGN

Provide geometric and pavement design, including minimum pavement sections, in accordance with UFC 3-201-01, Civil Engineering, and the State Department of Transportation. Provide pavement calculations in accordance with FC 1-300-09N, Navy and Marine Corps Design Procedures. Provide any required additional pavement design to provide a complete and useable facility.

For pavements subject to aircraft traffic or aircraft ground support equipment traffic consult Government Civil Reviewer for design criteria and requirements. State Department of Transportation standards are not acceptable for airfield pavements.

G2010 1.2 PAVEMENT AESTHETICS

Provide surfaces consistent in color and finish.

G2010 1.3 TRAFFIC CONTROL DEVICES

Attachment A - SECTION G20 - Page 6

Provide and install new traffic control devices (i.e., signs and markings) in accordance with the United States Department of Transportation Federal Highway Administration's Manual on Uniform Traffic Control Devices and their standard, "Rigid Sign Supports". Also provide new traffic control devices along/in the existing streets adjacent to the project site as necessary to provide complete traffic control to the new facilities.

G2010 1.4 EXISTING UTILITY STRUCTURES

Adjust existing utility structures to meet the new finished pavement grades as required.

G201001 BASES & SUBBASES

Prepare subgrade in accordance with Section G10, Site Preparation. Use geotextiles for separation or reinforcement in accordance with manufacturer's instructions. Provide base course under paved areas in accordance with the State Highway specifications (SHS) in the state where the project is located.

Place base course in accordance with the SHS for that particular base course and in layers of equal thickness with no compacted layer more than 6 inches (150 mm) thick. Compact base course at optimum moisture content to 100 percent ASTM D 1557 maximum dry density.

Where SHS are not available or applicable, the Designer of Record must utilize the UFGS Specification Sections referenced under paragraph 1.1.2 entitled "Government Standards" for the project specification. Submit these specifications in edited form as a part of the design submittal for the project.

G201002 CURBS & GUTTERS

Provide concrete curbs and gutters in accordance with the SHS and standards or as specified in UFC 3-201-01, Civil Engineering, whichever is more stringent.

Where the SHS do not include concrete materials for curbs and gutters, provide concrete in accordance with the standard mix of the SHS for a minimum compressive strength at 28 days of 3500 psi (25 MPa) concrete.

G201003 PAVED SURFACES

Where SHS are not available or applicable, the Designer of Record must utilize the UFGS Specification Sections referenced under paragraph 1.1.2 entitled "Government Standards" for the project specification. Submit these specifications in edited form as a part of the design submittal for the project.

G201003 1.1 PAVEMENT MIX

G201003 1.1.1 Bituminous Concrete Pavement

Provide bituminous concrete pavement in accordance with the standard mix of the SHS based on the pavement design and vehicle loading indicated in this RFP.

G201003 1.1.1.1 Bituminous Concrete Placement

Provide bituminous concrete placement, including minimum

Attachment A - SECTION G20 - Page 7 temperature during placement, joints, and maximum lift thickness in accordance with the SHS. Compact bituminous concrete in accordance with the SHS, modified to 96 percent of maximum laboratory density.

G201003 1.1.2 Portland Cement Concrete Pavement

If reinforced, provide the welded wire fabric in conformance to ASTM A185. Provide bar reinforcement in conformance to ASTM A615/A615M, Grade 400 (Grade 60).

Provide concrete in accordance with the standard mix of the SHS for the design strength required by UFC 3-201-01, Civil Engineering, plus allowable deviations. Unless noted otherwise in Part 3 or Part 6, provide a minimum compressive strength at 28 days of 3500 psi (25 MPa) concrete.

If required for sustainability…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .