AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 02 provides responses to PPI's, revises the Scope of Work and provides a revised Bid Schedule.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Jan-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3319119R0811
X 9B. DATED (SEE ITEM 11)
28-Jun-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Jan-2020
CODE
NAVFAC EUROPE AFRICA CENTRAL
PSC 817 BOX 51
FPO AE 09622-0051
N33191 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N3319119R0811
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 02
1. The purpose of this Amendment 02, provides Pre Proposal Inquiry Answers for solicitation N33191-19-R-0811 Djibouti JOC.
See attachment: AMENDMENT_02_PPI Log
2. Amendment 02, revises the bid schedule and incorporates “Attachment F – Bid
Schedule.”
3. Amendment 02, Deletes in its entirety: “Statement of Work” posted 19 December 2019
Replaces with revised “Amendment 02 Statement of Work” posted 24 January 2020 which incorporates revisions to the Statement of Work (all revisions are in red font). The following Statement of Work items are revised:
a. JOC General Requirements, paragraph C.1
b. SECTION 01 13 00.20, paragraph 1.9.d
c. SECTION 01 35 26.05 20, paragraphs 1.8.3, 1.8.3.2, 1.8.3.3
d. SECTION 01 78 00, paragraphs 1.2.1, 1.6.1.h, 3.3
4. Amendment 02, deletes the Word document "Solicitation 19 DEC.docx" which was uploaded on 19 December 2019. Per Amendment 01, Solicitation N3319119R0811 was provided in PDF format 8 January 2020.
5. Amendment 02, provides “NAVFAC EURAFSWA SOP_SF_002” as referenced in
SPEC SECTION 01 35 26.05 20.
6. Amendment 02, allows topography material to be brought to the site visit. The material will only be allowed on 31 January 2020 for the express purpose of the Site Visit only. It will not be allowed otherwise for any other reason.
7. Amendment 02, provides the attachment listing as follows:
Attachment C – Pre-Proposal Inquiry Form
Attachment D – Construction and Design Experience Project Data Sheet
N3319119R0811
Attachment E – Past Performance Questionnaire
Attachment F – Bid Schedule
Note: Attachment A – POAM and Attachment B – CERT of Non-Disclosure were deleted per Amendment 01.
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been deleted:
COEFFICIENT BID SCHEDULE
(End of Summary of Changes)