Attachment F
BID SCHEDULES
COEFFICIENT SCHEDULE JOB ORDER CONTRACT
On the Coefficient Schedule, the offeror is to propose the coefficients for the Base and each Option
Year for Pre-Priced, Non-Pre-Priced-Self Performance, and Non-Pre-Priced-Competitive Quotes.
Description of Coefficients – Refer to the General Requirements in section 00800 paragraph C.4
Coefficients for a description of what is and what is not to be included in the proposed Coefficients.
NOTES
(1) All coefficient prices remain in effect through the life of contract including all option periods.
(2) Coefficients are not to exceed more than two places to the right of the decimal.
(3) The completed Coefficient Schedule is to be submitted with the Price Proposal and will become a part of the contract award.
DESCRIPTION COEFFICIENT
ELIN 0001 CLIN 0001 – Base Year
Pre-Priced _________
Non-Pre-Priced-Self Performance _________
Non-Pre-Priced-Competitive Quotes _________
ELIN 0002 CLIN 0002 – 1st Option Period
Pre-Priced _________
Non-Pre-Priced-Self Performance _________
Non-Pre-Priced-Competitive Quotes _________
ELIN 0003 CLIN 0003 – 2nd Option Period
Pre-Priced _________
Non-Pre-Priced-Self Performance _________
Non-Pre-Priced-Competitive Quotes _________
ELIN 0004 CLIN 0004 – 3rd Option Period
Pre-Priced _________
Non-Pre-Priced-Self Performance _________
Non-Pre-Priced-Competitive Quotes _________
ELIN 0004 CLIN 0004 – 4th Option Period
Pre-Priced _________
Non-Pre-Priced-Self Performance _________
Non-Pre-Priced-Competitive Quotes _________
SEED PRICE SCHEDULE
DESCRIPTION SEED PROJECT
PRICE ($)
PROPOSED
COEFFICIENT
TOTAL PRICE ($)
Base Bid
Pre-Priced $ x = $
Non-Pre-Priced-Self Performance $ x = $
Non-Pre-Priced-Competitive Quotes $ x = $
Bid Option 1
Pre-Priced $ x = $
Non-Pre-Priced-Self Performance $ x = $
Non-Pre-Priced-Competitive Quotes $ x = $
Bid Option 2
Pre-Priced $ x = $
Non-Pre-Priced-Self Performance $ x = $
Non-Pre-Priced-Competitive Quotes $ x = $
TOTAL (Base Bid + Bid Option 1 + Bid Option 2) $
NOTES
(1) Select one of the above under Description (Pre-Priced, Non Pre-Priced – Self Performance, OR Non Pre-
Priced - Competitive Quotes).
(2) Enter seed project price in US dollars (without coefficient or VAT applied).
(3) Enter coefficient from Table 1 for the selected pricing method.
(4) Enter total price (seed project price x coefficient).
(5) Black out the unused fields (for the two unused pricing methods).
(6) All prices are in US dollars.
SAMPLE COEFFICIENT SCHEDULDE SEED PROJECT
DESCRIPTION (1) SEED PROJECT
PRICE $ (2)
COEFFICIENT (3)
TOTAL PRICE (4)
Non Pre-Priced – Self
Performance
Non Pre-Priced –
Competitive Quotes
$100
1.05
$105
Non Pre-Priced –
Competitive Quotes
PRE-PRICED LINE ITEM SCHEDULE
Offerors must provide pricing for the following including all labor, materials, supervision and equipment for:
UNIT PRICE
TOP END GENERATOR OVERHAUL (1st)
Base Year
1st Option Period
2nd Option Period
3rd Option Period
4th Option Period
TOP END GENERATOR OVERHAUL (2nd)
Base Year $___________
1st Option Period $___________
2nd Option Period $___________
3rd Option Period $___________
4th Option Period $___________
GENERATOR REPLACEMENT
Base Year $___________
1st Option Period $___________
2nd Option Period $___________
3rd Option Period $___________
4th Option Period $___________
Offeror agrees that bid is good and valid for 120 days after proposal receipt.
Offeror Signature
| Amendment 04 Attachment F-Bid Schedule |
| 2-CLDJ JOC - Pre-Priced Line Item Price Schedule AMENDMENT 5 |