Attachment D Const. Exp.doc

DOC document 67 KB Posted

Attached to
Djibouti JOC Amendment 05
Solicitation number
N33191
Issued by

View the file

Other files

File Type Posted
AMENDMENT_05_PPI Log.pdf PDF
CLDJ JOC Solicitation Revised 19 FEB 20.pdf PDF
Amendment 05 Attachment F Bid Schedule.pdf PDF
Amendment 05.pdf PDF
Amendment 04 Statement of Work.pdf PDF
Amendment 04.pdf PDF
AMENDMENT_04_PPI Log.pdf PDF
Seed Project _Replace PVC Water Pipe at CLU A-Block.pdf PDF
Amendment 04 Attachment F-Bid Schedule.pdf PDF
AMENDMENT_03_.pdf PDF
AMENDMENT_03_PPI Log.pdf PDF
Amendment 02 PPI Log.pdf PDF
Amendment 02 NAVFAC EURAFSWA SOP_SF_002.pdf PDF
Amendment 02 Attachment F Bid Schedule.pdf PDF
Amendment 02 Statement of Work.pdf PDF
AMENDMENT_02_.pdf PDF
AMENDMENT_01_Badging Questionnaire.pdf PDF
AMENDMENT_01_SECNAV 5512-1.PDF PDF
AMENDMENT_01_New Access Questionnaire.xlsx XLSX spreadsheet
AMENDMENT_01_N3319119R0811.pdf.PDF PDF
AMENDMENT_01_ PPI Log.pdf PDF
AMENDMENT_01_Amendment to N3319119R0811.pdf PDF
Attachment A POAM.xlsx XLSX spreadsheet
Seed Project_REPLACE WATER PIPE AT CLU A-BLOCK_20191216 - FINAL (1).PDF PDF
Attachment C PPQ.doc DOC document
Attachment B CERT Non-Disclosure Statement.doc DOC document
Solicitation 19 DEC.docx DOCX document
Statement of Work.pdf PDF
Attachment E Pre-Proposal Inq Form.doc DOC document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT D – CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : CON #1 CON #2 CON #3 CON #4

1. Experience for: Offeror Joint-Venture Other (Explain)

Firm Name:

Address:

Phone Number:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

New Construction Renovation Repair Alteration Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

Firm-Fixed Price Cost/Time and Material Other (explain):

Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

Design-Build Design-Bid-Build Delivery/Task Order (IDIQ) Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Design Project:

A/E Design Fee: Total Construction Value:

Type of Contract/Task Order: (Check ALL that apply)

Design-Build RFP Development Designer of Record Engineering Services Full Plans & Specs

Other (explain):

9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.

10. Provide a detailed description of what work your firm self-performed on this project:

11. Other Information:

Revised 7 December 2011

SOURCE SELECTION SENSITIVE INFORMATION

DISCLOSURE LIMITATIONS AS OUTLINED IN FAR 2.101 & 3.104 APPLY

Revised 7 December 2011

SOURCE SELECTION SENSITIVE INFORMATION

DISCLOSURE LIMITATIONS AS OUTLINED IN FAR 2.101 & 3.104 APPLY

File details come from the government source that posted it. Updated .