Amendment 04 Attachment F-Bid Schedule.pdf

PDF 415 KB Posted

Attached to
Djibouti JOC Amendment 05 Federal contract opportunity
Solicitation number
N33191
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Other files attached to Djibouti JOC Amendment 05, newest first.
File Type Posted
AMENDMENT_05_PPI Log.pdf PDF
CLDJ JOC Solicitation Revised 19 FEB 20.pdf PDF
Amendment 05.pdf PDF
Amendment 05 Attachment F Bid Schedule.pdf PDF
Amendment 04 Statement of Work.pdf PDF
Seed Project _Replace PVC Water Pipe at CLU A-Block.pdf PDF
Amendment 04.pdf PDF
AMENDMENT_04_PPI Log.pdf PDF
AMENDMENT_03_PPI Log.pdf PDF
AMENDMENT_03_.pdf PDF
Amendment 02 PPI Log.pdf PDF
AMENDMENT_02_.pdf PDF
Amendment 02 Attachment F Bid Schedule.pdf PDF
Amendment 02 Statement of Work.pdf PDF
Amendment 02 NAVFAC EURAFSWA SOP_SF_002.pdf PDF
AMENDMENT_01_Amendment to N3319119R0811.pdf PDF
AMENDMENT_01_Badging Questionnaire.pdf PDF
AMENDMENT_01_SECNAV 5512-1.PDF PDF
AMENDMENT_01_N3319119R0811.pdf.PDF PDF
AMENDMENT_01_ PPI Log.pdf PDF
AMENDMENT_01_New Access Questionnaire.xlsx XLSX spreadsheet
Attachment B CERT Non-Disclosure Statement.doc DOC document
Seed Project_REPLACE WATER PIPE AT CLU A-BLOCK_20191216 - FINAL (1).PDF PDF
Attachment A POAM.xlsx XLSX spreadsheet
Attachment E Pre-Proposal Inq Form.doc DOC document
Statement of Work.pdf PDF
Attachment C PPQ.doc DOC document
Attachment D Const. Exp.doc DOC document
Solicitation 19 DEC.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment F

BID SCHEDULES

COEFFICIENT SCHEDULE JOB ORDER CONTRACT

On the Coefficient Schedule, the offeror is to propose the coefficients for the Base and each Option

Year for Pre-Priced, Non-Pre-Priced-Self Performance, and Non-Pre-Priced-Competitive Quotes.

Description of Coefficients – Refer to the General Requirements in section 00800 paragraph C.4

Coefficients for a description of what is and what is not to be included in the proposed Coefficients.

NOTES

(1) All coefficient prices remain in effect through the life of contract including all option periods.

(2) Coefficients are not to exceed more than two places to the right of the decimal.

(3) The completed Coefficient Schedule is to be submitted with the Price Proposal and will become a part of the contract award.

DESCRIPTION COEFFICIENT

ELIN 0001 CLIN 0001 – Base Year

Pre-Priced _________

Non-Pre-Priced-Self Performance _________

Non-Pre-Priced-Competitive Quotes _________

ELIN 0002 CLIN 0002 – 1st Option Period

Pre-Priced _________

Non-Pre-Priced-Self Performance _________

Non-Pre-Priced-Competitive Quotes _________

ELIN 0003 CLIN 0003 – 2nd Option Period

Pre-Priced _________

Non-Pre-Priced-Self Performance _________

Non-Pre-Priced-Competitive Quotes _________

ELIN 0004 CLIN 0004 – 3rd Option Period

Pre-Priced _________

Non-Pre-Priced-Self Performance _________

Non-Pre-Priced-Competitive Quotes _________

ELIN 0004 CLIN 0004 – 4th Option Period

Pre-Priced _________

Non-Pre-Priced-Self Performance _________

Non-Pre-Priced-Competitive Quotes _________

SEED PRICE SCHEDULE

DESCRIPTION SEED PROJECT

PRICE ($)

PROPOSED

COEFFICIENT

TOTAL PRICE ($)

Base Bid

Pre-Priced $ x = $

Non-Pre-Priced-Self Performance $ x = $

Non-Pre-Priced-Competitive Quotes $ x = $

Bid Option 1

Pre-Priced $ x = $

Non-Pre-Priced-Self Performance $ x = $

Non-Pre-Priced-Competitive Quotes $ x = $

Bid Option 2

Pre-Priced $ x = $

Non-Pre-Priced-Self Performance $ x = $

Non-Pre-Priced-Competitive Quotes $ x = $

TOTAL (Base Bid + Bid Option 1 + Bid Option 2) $

NOTES

(1) Select one of the above under Description (Pre-Priced, Non Pre-Priced – Self Performance, OR Non Pre-

Priced - Competitive Quotes).

(2) Enter seed project price in US dollars (without coefficient or VAT applied).

(3) Enter coefficient from Table 1 for the selected pricing method.

(4) Enter total price (seed project price x coefficient).

(5) Black out the unused fields (for the two unused pricing methods).

(6) All prices are in US dollars.

SAMPLE COEFFICIENT SCHEDULDE SEED PROJECT

DESCRIPTION (1) SEED PROJECT

PRICE $ (2)

COEFFICIENT (3)

TOTAL PRICE (4)

Non Pre-Priced – Self

Performance

Non Pre-Priced –

Competitive Quotes

$100

1.05

$105

Non Pre-Priced –

Competitive Quotes

PRE-PRICED LINE ITEM SCHEDULE

Offerors must provide pricing for the following including all labor, materials, supervision and equipment for:

UNIT PRICE

TOP END GENERATOR OVERHAUL (1st or 2nd)

Base Year $

1st Option Period $

2nd Option Period $

3rd Option Period $

4th Option Period $

GENERATOR REPLACEMENT

Base Year $

1st Option Period $

2nd Option Period $

3rd Option Period $

4th Option Period $

Offeror agrees that bid is good and valid for 120 days after proposal receipt.

Offeror Signature

File details come from the government source that posted it. Updated .