This document is an Enclosure containing detailed amendment changes for Amendment 0003 (A0003) to the SURTASS-E RFP (N3220525R6003), issued by the Department of the Navy Military Sealift Command on August 5, 2026. The amendment restructures and updates the solicitation documents, moving content from the SF1449 form into a new Attachment 1_SPECIALTIME PROFORMA 2026 (2-26) format. Key changes include: updated laydays from 24 January 2027 to 15 April 2027; revised FAR clauses with additions of 24 new federal contract clauses and removal of 20 existing clauses; updates to fuel rates as of July 1, 2026; and re-numbering of all attachments to align with the new PROFORMA structure. Attachment updates include a revised Wage Determination (WD 2019-0288 Rev 26), updated Basic Pricing Data with current fuel rates, a DD-254 transferred to an updated template, revised Performance Work Statement with clarifications on timing requirements (reduced from 60-day to 45-day in multiple sections) and equipment specifications, updated Technical Evaluation Worksheet with added criteria, and new Attachment 21 providing guidelines for off-hire percentages related to readiness issues.
The amendment also addresses seven questions (18-24) submitted by potential offerors during discussions, providing clarifications on critical technical requirements. These clarifications confirm that IACS classification society notations equivalent to ABS UWN (Underwater Noise) are acceptable; clarify the noise specification tolerances and how they apply in practice; define measurement reference points for winch frame and PAM structure positioning; confirm that stern chutes are Government-Furnished Equipment (GFE); and specify clearances between mounting hardware and vessel deck. The Performance Work Statement underwent substantial revisions, including clarified language in Items 1.2, 1.3, 1.7, 2(a), 2(d)(1), 3(a), 3(d)-(g), 3(r)-(t), and 4(a)-(c); resolution of conflicting requirements between Part X and Section 4; updates to diagrams with added notes and supplemental drawings; and clarification of government-furnished equipment responsibilities.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enclosure 1 for Amendment 0003 The following changes have been made to the SF1449 as per A0003:
| Removed from SF1449 |
| Moved to PROFORMA |
| Updates |
| PART I (Boxes) |
| Now in Attachment 1 |
| Updated from MSC SPECIALTIME 2024 (REV 1. 12-24) to MSC SPECIALTIME 2026 (2-26). Box 27 has been changed. |
Box 5 – laydays have been changed and extended;
Now 24 JAN 2027 – 15 APR 2027.
| PART II |
| Now in Attachment 1 |
| FAR 52.212-4 updated per (DOW DEVIATION 01 FEB 26) |
(tailored pursuant to FAR 12.205(b)) See highlighted areas (a), (b), (g), (i)(6), and (t)
| PART III |
| Now in Attachment 1 |
| See highlighted areas (n), (q), (r), and (s) |
PART IV
(& General Definitions)
| Now in Attachment 1 |
| Minor language changes/removals found in section (at) and updated insurance value under (g) and (h-2)(2)(iii) highlighted. |
| PART V |
| Now in Attachment 1 |
| Updated insurance value under (e) highlighted |
| PART VI and VII |
| Now in Attachment 1 combined together and now called Part VI |
| Added (highlighted): 52.224-3, 52.228-3, 52.240-91, 52.240-93, 252.204-7014, 252.204-7015, 252.219-7996, 252.222-7004, 252.225-7048, 252.225-7062, 252.225-7963, 252.225-7975, 252.225-7993, 252.228-7006, 252.229-7003, 252.229-7005, 252.229-7006, 252.229-7007, 252.232-7011, 252.233-7001, 252.240-7997, 252.244-7999 |
Removed: 52.203-17, 52.204-2. 52.204-8, 52.204-16, 52.204-18, 52.204-21, 52.204-23, 52.204-25, 52.204-27, 52.204-30, 52.212-5, 52.222-9, 52.222-51, 52.222-53, 52.223-10, 52.225-13, 52.225-26, 52.226-6, 52.240-1, 252.204-7020, 252.215-7008, 252.215-7016, 252.219-7003, 252.225-7043, 252.227-7015, 252.227-7037, 252.242-7005, 252.244-7000
| PART VIII |
| Now in Attachment 1 |
| Full text clauses added to this section |
| PART IX |
| Now in Attachment 1 |
| See below table for Attachment changes |
| PART X |
| Now in Attachment 1 |
| Part X removed in its entirety and replaced with a new Part X. Please read carefully. Additionally, new Technical Proposal language is indicated via red text and changes to representations are highlighted. Attachment references were also updated. |
| PART XI |
| Now in Attachment 1 |
| Part XI removed in its entirety and replaced with a new Part XI. Please read carefully. Attachment references were updated. |
| PART XII and XIII |
| Now in Attachment 1 combined together and now called Part VII |
| Added (highlighted): 52.240-90, 252.204-7998, 252.215-7992, 252.215-7996 |
Removed: 52.204-24, 52.204-26, 52.223-22, 52.225-25, 252.209-7001, 252.209-7998, 252.247-7026
In addition to adding Attachment 1_SPECIALTIME PROFORMA 2026 (2-26), attachments were re-numbered to follow the new PROFORMA attachment format, and have been updated as shown in the table below:
| ORIGINAL NUMBER |
| NEW NUMBER |
| Update in A0003 |
| N/A |
| Attachment 1_SPECIALTIME PROFORMA 2026 (2-26) |
| New Attachment (was originally embedded within the SF1449 for this solicitation) |
| Attachment 1_Wage Determination |
| Attachment 2_Wage Determination |
| Now WD 2019-0288 Rev 26, updated 06/03/2026 |
| Attachment 2_GFP |
| Attachment 3_ GFP |
| Only updated Attachment # on Tab 1 |
| Attachment 3_Basic Pricing Data |
| Attachment 4_Basic Pricing Data |
| Updated Fuel Rates as of July 1, 2026 and updated Attachment # on each tab since A0002 |
| Attachment 4_DD-254 |
| Attachment 5_DD254 |
| Information in DD254 remains unchanged but originally posted DD254 was on an expired template. Document transferred to updated template and re-signed by all parties. |
| Attachment 5_ Crew Complement |
| Attachment 6_ Crew Complement |
| Only updated Attachment # in the file name, nothing within the document changed |
Attachment 6_ PWS (Performance Work Statement) Attachment 7_ PWS (Performance Work Statement) (See red text for all changes) Item 1.2 - clarification language added.
Item 1.3 – reduced from 60-day to 45-day Changes under Item 1.7: Requirements:
Item 1(f) – language added.
Item 1(g)3 - clarification language added.
Item1(l)/(l)3 – clarification language added.
Item 2(a) – clarification language added and reduced from 60-day to 45-day.
Item 2(d)(1) – clarification language added, sea state minimum reduced.
Item 2(g) – added “of” (minor edit) Item 3(a) removed language referring to items proposed under the RFP.
Item 3(d)(f)(g) – clarification of government furnished equipment added Item 3(r) completely rewritten for clarity of expected requirement Item 3(t) – minor edits Item 4(a) changed “should” to “shall” for clarification purposes.
Items 4(a) and 4(c) were re-written to establish the minimum requirement as Part X of the RFP and Section 4 of the PWS contained conflicting information.
Diagram 1c - Note has been added below Diagram 3 - Note #4 and an additional drawing has been added.
| Attachment 7_Request for Clarifications |
| Attachment 8_Request for Clarifications |
| Only updated Attachment # within the document since A0002 |
| Attachment 8_ ATFP |
| Attachment 9_ ATFP |
| Only updated Attachment # in the file name, nothing in the document changed since A0002 |
| Attachment 9 _ CBRN |
| Attachment 10 _ CBRN |
| Only updated Attachment # within the document since A0002 |
| Attachment 10_ SFLLL |
| Attachment 12_ SFLLL |
| Only updated Attachment # in the file name, nothing within the document changed |
| Attachment 11_ MSC SOM |
| Attachment 13_ MSC SOM |
| Only updated Attachment # in the file name, nothing within the document changed |
| Attachment 12_CDRL |
| Attachment 14_CDRL |
| Updated entire attachment so the CDRLs were all input into the required DD 1423 form |
| Attachment 13 _ MSCSP |
| Attachment 16 _ MSCSP |
| Updated Attachment # within the document and updated the footer to the correct PROFORMA version since A0002 |
| Attachment 14_Technical Evaluation Worksheet |
| Attachment 17_Technical Evaluation Worksheet |
| See red text for added “2” and changes in 5(c)(1), 5(c)(4), 5(c)(6), and 5(c)(7). |
| Attachment 15_ Shipyard Data |
| Attachment 20_ [Reserved] |
| Attachment marked reserved. |
| N/A |
| Attachment 21_Guidelines for Full/Partial Off-Hire Percentages on Readiness Issues |
| New attachment |
(used to be within the PROFORMA in ePS)
| Attachment 16 _ Amendment 0002 QA_s |
| Enclosure 1 for Amendment 0002 _QA_s |
| Removed as an attachment to the RFP and changed to Enclosure for Amendment 0002 |
*Note: references to specific attachments have likely been renumbered since submitting the Q&As.
Additionally, this amendment answers questions submitted during discussions by initial offerors for clarification purposes as shown below:
QUESTION 18: Please confirm that it is acceptable if the ABS UWN notation as referenced throughout the solicitation is substituted for an equivalent notation from an IACS classification society other than ABS.
Response: Yes. Please see updated language under PWS 4(a), as well as 5(c)(1) under Part X, Technical Proposal and the Technical Offer Worksheet.
QUESTION 19: Solicitation Part X TP (5)(c)(1) states, in part, that “Offeror shall provide certification that vessel meets the American Bureau of Shipping (ABS) Guide for the Classification Notation – Underwater Noise (UWN) Requirements for Research Vessels subsection 3/5 radiated noise requirement while towing at 5 knots.” Additionally, item 4(a) under PWS section 1.7 Requirements states that “During normal towing operations (4-6 knots), the ship radiated noise should not exceed the requirements as set forth in the ABS Guide for the Classification Notation – Underwater Noise (July 2018), Underwater Noise (UWN) requirements for Research Vessels, subsection 3/5.” Neither of the aforementioned references nor any other section of the solicitation appear to expressly require the vessel to obtain/possess the ABS UWN notation (or other classification society equivalent), and have the notation endorsed on the vessel’s Classification Certificate. Please clarify if it is required for the vessel to actually obtain/possess the ABS UWN notation or equivalent notation from an IACS classification society other than ABS.
Response: Please see updated language under PWS 4(a), as well as 5(c)(1) under Part X, Technical Proposal and the Technical Offer Worksheet.
QUESTION 20: PWS Section 4(c) provides some allowance for excesses to the specification. Specifically, it states the following: “Ship radiated noise profile excursions are permissible if the broadband noise source is no greater than 3dB, and, or any narrow band source is no greater than15dB above the requirements of part 4(a) [ABS UWN-R]. No more than 5 narrowband sources greater than 15dB will be considered acceptable. If at any time, the contractor is found to not meet the noise requirements, the Contractor must clearly demonstrate how the noise source can be mitigated. The determination of whether or not a source is or can be adequately mitigated is at the sole discretion of the government.”
A) Please clarify how this tolerance is intended to be applied in practice? The allowance for up to five tonal components 15 dB above the limit seems to represent a relatively large margin compared with the overall stringent noise limits.
B) The wording of this requirement is also somewhat challenging. It is not clear if the 3 dB broadband requirement needs to be met in addition to or instead of the 15 dB narrowband requirement. Furthermore, the ABS UWN-R limit is a one-third octave band limit, and not directly comparable to narrowbands. Please clarify if both the broadband and narrowband requirements need to be met.
C) Please also clarify if the narrowband level is to be directly compared to the numerical value of the one-third octave band limit at any specific frequency.
Response: Please see updated language under PWS 4(a) and 4(c).
QUESTION 21: Discussions notice Part X TP (5)(c)(4)(b) states “ Offeror needs to provide a drawing that displays that the measurement between the aft most section of the winch frame is no greater than twelve (12) feet (3.66m) forward of the overboarding platform.” Please clarify to which specific part of the overboarding platform should be used as the reference point for this measurement (i.e. the transom of the vessel, the forward edge of the winch handling system, etc.).
Response: See updated Note in red text under Diagram 1c.
QUESTION 22: PWS Diagrams 1a-1f. Please confirm that the stern chute shown in diagrams 1a-1f is provided by the Government as GFE.
Response: The stern chute is GFE as now indicated in 5(c)(4)(a), 5(c)(6) and 5(c)(7), and PWS 3(d), 3(f), and 3(g).
QUESTION 23: Discussions notice Part X TP (5)(c)(4)(c) states ” Offeror needs to provide a drawing that shows that the PAM structure and supports location does not exceed a forward distance of 50 feet from the axial center of the winch.” Please clarify which specific part of the PAM structure and supports should be used as the reference point for this measurement.
Response: Please see updated SPECIALTIME PROFORMA language in red text under 5(c)(4)(c) under Part X, Technical Proposal and 5(c)(4)(c) in the Technical Offer Worksheet.
QUESTION 24: PWS Diagram 3. Please advise the clearance between the bottom of the Vans and vessel’s deck after the Government-provided mounting hardware is installed/welded into place.
Response: Please see Note 4 in red text with supplemental drawing added below Diagram 3.