About this file
This is a vessel fleet documentation template used to capture shipyard work history for offerors responding to the SURTASS-E RFP (N3220525R6003). The spreadsheet template requires offerors to provide detailed information about all vessels in their fleet, documenting both qualifying U.S. shipyard work performed and qualifying foreign shipyard work performed. For each vessel entry, offerors must specify the vessel description, detailed descriptions of the work performed at each shipyard location, associated costs for the work completed, the shipyard name and address, and the inclusive dates when the work was performed. The template includes designated rows for recording approximate totals for both U.S. and foreign shipyard work costs, with both currently populated at $0.00 as placeholder values.
This documentation attachment supports the Navy's SURTASS-E solicitation issued by Military Sealift Command, which seeks to charter one U.S.-flagged vessel capable of towing an acoustic array at 4-6 knots for up to 60-day events in support of Navy operations. The vessel must maintain heading stability within 5 degrees at slow speeds, operate worldwide including Arctic and Antarctic regions, and achieve ABS Ice Class D0 certification for operations near the Marginal Ice Zone. The contract structure involves a one-year base period plus three one-year option periods and one 11-month option period on a fixed-price time charter basis with reimbursable elements.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Include all vessels in your fleet | [Reserved] | |||||
| VESSEL | DESCRIPTION OF QUALIFYING U.S. SHIPYARD WORK PERFORMED | COST OF WORK PERFORMED | DESCRIPTION OF QUALIFYING FOREIGN SHIPYARD WORK PERFORMED | COST OF WORK PERFORMED | SHIPYARD NAME AND ADDRESS | INCLUSIVE DATES OF WORK PERFORMED |
Approximate Total $0.00 Approximate Total $0.00