This document outlines a contract surveillance plan for aircrew, engineering, and operations services in support of various Naval Test Wing squadrons. Key details include that the contract requires category A and B aircrew and support personnel to conduct flight testing, data analysis, and reporting. Performance will be evaluated across areas such as quality, schedule, cost control, and management. The plan describes surveillance methods including a contractor performance assessment system, checklists, and corrective action requests to ensure requirements are met. Personnel from the various squadrons and test wings are identified as points of contact to oversee the contract.

Contractor Surveillance Plan

View the file

Other files

File Type Posted
N0042117R0055-0002_Released.pdf PDF
ATT_P-8__Fully_Burdened_Labor_Rates_Updated_21Feb19.xlsx XLSX spreadsheet
ATT_P-9_Breakout_of_Labor_Hours_Updated_21Feb19.xlsx XLSX spreadsheet
Government_Response_3_of_3.docx DOCX document
ATT_P-6_Prime_Cost_Summary_Updated_22Feb19.xls XLS spreadsheet
ATT_P-9_Breakout_of_Labor_Hours.xlsx XLSX spreadsheet
ATT_P-8__Streamlined_Rates_for_Order_Pricing_Updated_19Feb19.xlsx XLSX spreadsheet
N0042117R0055-0001.docx DOCX document
ATT_P-3_Past_Performance_Updated_19Feb19.xlsx XLSX spreadsheet
Government_Response_2_of_2.docx DOCX document
EXHIBIT_A_DD_Form_1423,_A001-A004_Updated_19Feb19.pdf PDF
Government_Response_1_of_2.docx DOCX document
Government_Response_1_of_2.docx DOCX document
UPDATED_RFP_N0042117R0055.pdf PDF
ATT_4_SAAR-N_Form_Rev_9_11_(2).pdf PDF
ATT_12_OCI_List.doc DOC document
ATT_9_Base_Acc_Req.doc DOC document
ATT_P-8__Streamlined_Rates_for_Order_Pricing.xlsx XLSX spreadsheet
EXHIBIT_A_DD_Form_1423,_A001-A004_rev.pdf PDF
ATT_P-2_Workforce_Hour_Matrix.xls XLS spreadsheet
ATT_P-5_Contractor_Performance_Assessment_Questionnaire.doc DOC document
ATT_P-7_Subcontracting_Cost_Summary.xls XLS spreadsheet
ATT_P-3_Past_Performance.xlsx XLSX spreadsheet
ATT_3_SAAR-N_Instructions.pdf PDF
ATT_13_BID_DD254.pdf PDF
ATT_8_Travel_Req.xls XLS spreadsheet
ATT_P-1_Workforce_Qualifications.xls XLS spreadsheet
ATT_P-6_Prime_Cost_Summary_rev.xls XLS spreadsheet
ATT_7_TASS_Reg_Req.pdf PDF
ATT_6_Funds_Expenditure_Report.xlsx XLSX spreadsheet
ATT_5_SAAR-N_Guidance_2016Oct19.docx DOCX document
RFP_N0042117R0055.pdf PDF
EXHIBIT_A_DD_Form_1423,_A005_19nov_rev.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Surveillance Plan (CSP)

For NAWCAD Naval Test Wing Atlantic (NTWL)

Squadrons VX-20, VX-23, HX-21, and Unites States Naval Test Pilot School (USNTPS), NAWCWD Naval Test Wing Pacific Test Squadrons VX-30 and VX-31 AIRCREW, ENGINEERING and OPERATIONS

1. Purpose

This Contract Surveillance Plan (CSP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the performance-based contract. The intent is to ensure that the contractor performs in accordance with the performance metrics, the Government receives the quality of services required under the contract, and that the actual performance results are documented in accordance with this plan.

This CSP describes how the Government will observe, evaluate and document the contractor’s performance in meeting the critical performance standards identified in the contract and task orders. Specifically, the CSP will identify the Government surveillance methods that will be utilized in determining the quality level of services and products delivered under the contract. The intent is to establish and properly execute a CSP that will assist the Government in obtaining services from the contractor.

This contract requirement is for aircrew, engineering, and operations for Naval Test Wing Atlantic, VX-20, VX-23, HX-21, and the US Navy Test Pilot School and NTWP VX-30 and VX-31. These test wing units provide full system spectrum test capability from complete aircraft down to sub-system components, expendable weapon, sensor, and deception articles and flight worthy software designed to operate and configure the system and its components. The resultant contract vehicle will be a competitively awarded performance-based contract awarded by the NAVAIR contracting office. The contract will contain a cost-plus-fixed-fee (CPFF) Contract Line Item Number (CLIN) for labor, and cost-reimbursable CLINS for Travel, and Material. The contract will be for one base year with four one-year option periods. Exercise of those options will be dependent on contractor performance in accordance with the criteria and incentives outlined in Enclosures 1-3. A properly executed CSP will assist the Government in achieving the objectives of this procurement.

2.

Authority Authority for issuance of this CSP is provided under Contract Section E – Inspection and Acceptance, which provides for inspections and acceptance of the services and documentation called for in the Statement of Work (SOW) and this document, to be executed by the Contracting Officer or a duly authorized representative.

3.

Scope

To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the Contract Surveillance Plan. The contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract.

The CSP on the other hand, is put in place to provide Government surveillance oversight of the contractor’s efforts to assure that they are timely, effective and are delivering the results specified in the contract.

4.

Government Resources The following definitions for Government resources are applicable to this plan:

Contracting Officer - A person duly appointed with the authority to enter into (Procuring Contracting Officer) (PCO) or administer (Administrative Contracting Officer) (ACO) contracts and make related determination and findings on behalf of the Government. The PCO for this contract is AIR-2.5.1.7A. The ACO, along with their assigned administrative duties, will be designated in the resulting contract. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.

Contracting Officers Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment. The PCO expects the resultant contact to be Type B as described in the DoD Standard for Certification of Contracting Officer’s Representatives for Service Contracts and the prospective COR will meet all appropriate training and certifications prior to appointment.

5. Responsibilities The following Government resources will have responsibility for the implementation of this CSP:

Contracting Officer – The Contracting Officer will monitor performance of all necessary actions for effective contracting to ensure compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance

Contracting Officer’s Representative – The COR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. In addition to the continuous monitoring of performance, the COR will also submit an annual assessment in the Navy’s Contractor Performance Assessment Reporting System (CPARS). For CPARS, the COR assesses general quality of the product or service, schedule, cost control, business relations, management, small business compliance, and other important areas. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.

Technical Point of Contact (TPOC) – The TPOC is responsible for technical administration of the contract and the tasks addressed throughout the PWS and CSP. The TPOC is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf

6. Methods of QA Surveillance

a. Contractor Performance Assessment Report System (CPARS) – The market place for information technology, engineering, and management support services is very competitive. As such, the successful offeror has a vested interest in the Government generated CPARS rating under this contract. Additionally, an evaluation using the CPARS format will be performed at the midpoint of each period of performance. This evaluation will be one determinant in exercising an option. The Government assessment for this procurement will address the quality of product or service, schedule, cost control, business relations, management, and other important areas. As this information may affect future source selections throughout DoD, and the continuation of the contract, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the CSP.

b. CSP - This CSP defines the surveillance process, responsibilities and acceptable quality standards that will apply to performance based contractual efforts and establish the basic scoring and reporting methodology for surveillance documentation. The below listed methods of surveillance will be used by the TPOC/COR in the technical administration of this CSP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Surveillance Activity Checklist.

7.

Surveillance

Contract surveillance will be withheld from DCMA via NAVAIR clause 5252.242-9511, Contract Administration Data, and assigned to the COR in a written letter of appointment. Surveillance shall be performed in accordance with the performance standards and incentives set forth herein. Enclosures (1), (2), (3) and (4) set forth the performance standards, definitions for evaluation areas and ratings, incentives, and activity checklist/surveillance methods for the contractor and TPOC/COR. The ratings (exceptional, very good, satisfactory, marginal, or unacceptable) will be substantiated with a data analysis score of the contractor’s performance compared to the threshold and objective for each squadron as described in Enclosure (2).

8. Documentation

In addition to providing quarterly reports to the Contracting Officer, the COR will maintain a complete file containing copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. The PCO will conduct a review and complete a written assessment of the file on an annual basis. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.

9. Revisions to the CSP Revisions are the joint responsibility of the TPOC/COR and PCO. The TPOC/COR and PCO, will review the CSP annually (if necessary) and make the proposed changes.

10. Enclosures Enclosure (1) – PERFORMANCE STANDARDS

Enclosure (2) – DEFINITIONS FOR EVALUATION AREAS/RATINGS Enclosure (3) – INCENTIVES

Enclosure (4) – ACTIVITY CHECKLIST

ENCLOSURE 1: PERFORMANCE-BASED QUALITY STANDARDS

Performance Objectives
SOW

Paragraph

Performance Standard
Acceptable Quality Level
Method of Surveillance
Incentives
Shall conduct Category A and B flight and weapon system operation, flight test engineering, navigation, flight technical support, and project specialist support in fixed, rotary wing, unmanned and lighter-than-air air vehicles systems types, models and series provided by the government. Additionally, the contractor shall participate in evaluations of flight simulation devices such as operational flight trainers, weapon system trainers, position/tactics trainers, or any other simulation device for an air vehicle. Contractor category A and B aircrew pilot, test flight officer, flight test engineer, navigator, in-flight technician, aircrewman/crew chief, sensor operator and project specialists conduct mission preflight planning, in-flight system operation and data collection, analysis of flight test data, coordination of test data gathering, assist in the preparation of test plans and test progress reporting in support of the flight test team.
3.3.1.1
Full coverage for all assigned events

- 95% availability (# events completed/ missed)

- Documented attendance (Y/N)

- Government: Observation and assessment of report content for accuracy, relevance.

- Contractor monthly report: met commitment, description of content from event See enclosure (3)

Personnel resources with requisite flight test category qualification available
- All contracted resources are A/B category ready or waived (Y/N)
- Resume

- Monthly crew approval request (DCMA Form 644 or GFR approved equivalent)

Provide, on a case by case basis as determined by a test activity commanding officer, Category C/D pilot for the applicable systems to this SOW.
3.3.1.1
Personnel resources with requisite flight test category qualification available
- Category C resources available and ready for upgrade to D when required (Y/N)

- Category A/B resources available and ready for upgrade (non-command) or waived for aircraft command when required.(Y/N)

- Resume

- Monthly crew approval request (DCMA Form 644 or GFR approved equivalent See enclosure (3)

The contractor shall operate the assigned aircraft, associated systems and instrumentation using proper and thorough preflight, in-flight, and post-flight procedures in compliance with the Naval Aviation Training and Operations Procedures Standardization (NATOPS) program or other flight operations procedures manuals provided by other DoD or commercial systems authorities for vehicles and systems under evaluation.

3.3.1.3
Applicable NATOPS Flight Manual, OEM furnished flight manuals (commercial, non-government owned), and Instrument Flight Manual compliance

OPNAV 3710.7 series, NFM, NVD instruction, EMC/SOFT instruction

- All contractor furnished aircrew pass and exceed examination score criteria (SCORE)

- Zero mishaps with individual contractor furnished crew member as predominant causal contributor (Y/N)

No lapse in currency, qualification caused by contractor

- Annual flight and instrument evaluation

- Government observation and report of real time flight performance

- Flight incident investigation

Monthly crew approval request – GFR reporting records

Government flight operations logs and records See enclosure (3)

The contractor shall provide aircrew preflight planning support for test missions as coordinated with mission briefers and engineering test team members. Preflight planning support shall include, but not be limited to: obtaining current, enroute and forecast weather for the flight; completing appropriate flight planning and flying requirements; and outlining crew duties, communications plans, test procedures, test data cards, and safety of flight requirements. Additionally, the contractor shall prepare preliminary inputs for preflight data packages and data requirements.
3.3.1.2
All contractor tasks completed on schedule with no consequential deviation (risks created) attributable to individual or contractor team
- 100% of tasks completed.

- No consequential errors.

- Government observation

- Product inspection See enclosure (3)

The contractor shall provide support in the conduct of aircraft air vehicle and mission systems flight tests. Support should include but not be limited to flight and ground tests, administrative flights, training flights, functional check flights, mission systems, performance, flying qualities, ordnance, HERO, EMC, EMI, and EMP. The contractor shall participate in test scenario development, mission planning and flight crew brief and debrief. The contractor shall coordinate with test data analysis to access quick-look data results and evaluate reduced flight test data to assess progress being made in achieving flight test objectives. The contractor shall provide the project engineer with reports indicating test program status, progress made to date and inputs to future test team objectives. The contractor shall document efforts in support of this task per Government Furnished Format. Frequency varies pending operational requirements
3.3.1.1
- All assigned tasks completed and compliant with test directive.

- Assignment for deliverables are documented in writing and attributed to the contractor. Drafts are ready for final approval.

- 100% of tasks completed (Y/N)

- Tasks not completed are documented and attributed to action nominated for subsequent correction by contractor (Y/N)

- Document drafts are usable close enough to final that no delay for re-write occurs.

- Government observation.

- Documented completion of written assignments presented by contractor.

- Inspection and approval by approving authority.

- Contractors monthly report (CDRL) See enclosure (3)

The contractor shall assess the performance of the system undergoing testing. The contractor shall compare system performance to specifications and analyze design problems noted with the proposed system implementation. The contractor shall deliver draft recommendations for system deficiency reports within 15 calendar days of discovery of Part II or III deficiencies and within 5 calendar days of discovery of Part I deficiencies (NAVAIRINST 3960.5 series germane). The contractor shall document recommendations per Government Furnished Format. Frequency varies pending operational requirements.
3.3.1.6
- Reporting will be qualified as credible and accurate.

- All data assigned to contractor will be accounted for and evaluated.

- Deficiency reports (DR) will be accurate, complete, and accounted for in applicable deficiency tracking systems.

- Credibility (Y/N)

- 100% of data assigned addressed.

- 100% of DRs written will be logged for accounting.

-Initial DRs will be 90% complete for quick look analysis (data analysis can be immature for quick look)

- 100% of incomplete events documented with reason by contractor and reported at debrief

- Personnel assigned to IPT labor qualification compliance for credibility.

- Test event will be checked against data assignment by test director or designee (inspection)

- Post flight, test cards will be inspected by test director to insure quick look DRs are documented (inspection)

- DR tracking system check.

- DRs will be sampled for initial look.

See enclosure (3)

Provide test pilot support for acquisition, development, test, evaluation, and acceptance of simulators including OFT’s, WST’s, and other aviation training devices to include, but not be limited to: Attending simulator system requirements reviews (SRR), preliminary design reviews (PDR), critical design reviews (CDR), design working groups; providing technical analysis of issues, report meeting results, analysis of significant issues and recommendation in a trip report per Government Furnished Format; review of simulator documents; providing planning for simulator test and evaluations including DT, pilot qualitative evaluations (QE), preliminary evaluations (PE), government preliminary inspections (GPI), and government final inspections (GFI); planning to consist of scope of test, data requirements, data acquisition methods, and resources required; Report results of test planning and recommendations to the cognizant government engineer per Government Furnished Format; Provide test pilot support for simulator tests and evaluations including DT, QE, PE, GPI, GFI, and other simulator tests. Frequency of all inputs varies pending operational requirements and other simulator tests.
3.3.3
- Qualified and current T/M/S crew members available

- All events scheduled for contractor involvement are attended

- All events are documented

- 90% of crew members scheduled make event.

- 100% of events are completed using back-up crew member

- Reports will be scored for credibility and accuracy.

- Inspection

- Observation

- Monthly report documenting content and attendance for assigned events See enclosure (3)

ENCLOSURE 2: DEFINITIONS FOR EVALUATION AREAS/RATINGS

2.1 This section describes the metrics used to measure contractor schedule and performance.

Quality of Product or Service - Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program task, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost performance, and schedule objectives. Assess how successfully the contractor meets program quality.

Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.

Cost Control - Assess the Contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or under run? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where tasks or contract sizing is based upon contractor provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.

Business Relations – Assess the timelines, completeness, and quality of a problem identification, corrective action plans, proposal submittals, the contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.

Management – Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantages and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.

Other areas – Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.

All efforts performed under the SOW and Government Furnished format reporting will be measured in accordance with the following evaluation rating.

Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good – Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the tasks and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory – Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal – Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractor’s performance of the task or sub-task contains a serious problem(s) for which the contractor’s actions appear or were ineffective.

ENCLOSURE 3: INCENTIVES

The following incentives shall apply to performance under this contract.

Assessment Period
Acceptable Performance Definition
How Measured

Incentives

All Years:

(Base plus Four Option Years)*

No measurement areas rated below “Satisfactory”.
CPARS annual evaluations
(+) Meet the acceptable performance definition as a condition for exercise of an option.*

(-) Does not meet the acceptable performance definition as a condition for exercise of an option.*

* Exercise of option periods are entirely at the discretion of the Government. The Government may not exercise an option unless all regulatory requirements are met and the contractor meets the acceptable performance definition as described herein

ENCLOSURE 4: SURVEILLANCE ACTIVITY CHECKLIST

Quarterly Surveillance:

The COR/TPOC will perform a Quarterly assessment of Quality, Schedule, Cost Control, Business Relations, Management, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in Enclosure 2.

Description
Surveillance Method
Date Planned
Date Completed
Quality
Schedule
Cost Control
Business Relations
Mgmt.
Other
Ensure all Performance Based Quality Standards and CDRLS are being completed in accordance with the contract requirements.
Government: Observation and assessment of report content for accuracy, relevance.

- Contractor monthly report: met commitment, description of content from event

TBA

MONTHLY SUMMARY OF RATINGS

Quality

Schedule

Number of Exceptional

Number of Very Good

Number of Satisfactory

Number of Marginal

Number of Unsatisfactory

Cost Control

Business Relations

Number of Unsatisfactory ________ Management

Other Areas

Annual Surveillance:

The COR/TPOC will perform an annual assessment of overall contract performance using the CPARS evaluation rating definitions listed in Enclosure (2) and the monthly summary ratings.

Description
Surveillance Method/Measure
Date Planned
Date Completed
Summary Rating/Results

Quality of Product or Service

Schedule

Cost Control

Business Relations

Management

Other Areas

Procedures

The Government COR or TPOC will perform Quarterly inspections to ensure Contractor compliance with the appropriate paragraphs of the SOW, other Government requirements, and the Contractor’s own procedures, and will record the results of the inspections, noting the date and time. If inspection indicates a performance threshold is not met, the COR or TPOC will notify the Contractor and the contracting officer of the deficiency for correction. The Contractor shall be given a reasonable time after notification to correct the unacceptable performance. The length of time allowed to correct the problem will depend upon the requirement, complexity of the corrective action(s), and the deficiency. The Contractor will notify the COR or TPOC if the time allowed for correction is not adequate. The COR shall not consider the corrective action(s) complete until all deficiencies have been corrected and determined by the COR to be adequate (Government follow up). Contractor non-responsiveness, deficiencies not adequately addressed or corrected after notification of such, or estimated dates of completion that are not acceptable to the COR will be forwarded to the PCO for action. TPOCS will perform monitoring, inspection, and communication functions only, all final judgments or assessments regarding contractual compliance will be made by the COR or PCO.

Surveillance of Non-Service Summary Items

All tasks may be inspected on any appropriate basis, at a frequency determined primarily by the COR and/or TPOC, but also at the direction of the PCO.

Record Retention

The COR will maintain a file containing documentation of results including reviews and verifications, delegation letters, current contract/mods, CSP, any correspondence with the Contractor, and any other beneficial communication for proper Contractor oversight. Surveillance records must be retained for a minimum of one year after completion of contract year and CPARS input.

Data Analysis

All inspection records, observations, monthly reports, CARs and other pertinent data will be reviewed monthly by the COR/TPOC to identify any trends in order to adjust surveillance activities. This does not preclude the necessity of adjusting surveillance due to specific incidents or deficiencies noted at any time. The review should include at a minimum a description of the data analyzed, a description of the conclusions/results, and actions planned/taken. These reviews will be documented and records maintained in the site continuity book.

Analysis of Results

At the end of the month, the COR will summarize all the information and compute the number of defects for each performance standard. The COR will determine if the Contractor’s performance for the specific standard is satisfactory or unsatisfactory based on an assessment of criticality of the defects. The contractor’s performance will be documented on the COR Monthly Report.

If one or more standard is unsatisfactory, further evaluation is required to determine if the Contractor's overall performance is unsatisfactory. The COR will assess the results of each performance standard, taking into consideration the importance and criticality of each in relation to the total service being evaluated. The COR will document the overall evaluation for the service on the Evaluation Summary.

Suggested Action

The Contractor should be notified immediately as to whether work performance has been satisfactory or not. If the Contractor's performance is unsatisfactory, a Corrective Action Request (CAR) should be issued and other actions, such as increasing the level of surveillance, may be considered.

Corrective Action Requests (CARs)

CARs may be issued as written findings. Written CARs will be issued when major deficiencies are detected, when minor deficiencies are noted that may affect system performance or the Contractor is clearly not performing to the contract requirements. Safety items and concerns automatically require the issuance of a written CAR, no questions asked.

The type and extent of corrective action to be taken depends on the nonconformance in terms of severity, frequency, and previous corrective actions. It is essential that the COR/TPOC pursue enforcement of all contractual requirements.

When contractual non-compliances are detected, corrective action must be initiated by the TPOC/COR utilizing CSP, Corrective Action Request (CAR) within 1 working day of discovery. A verbal notification of intent to submit a CAR must be made to NTWL GFR within 12 hours of discovery. Non-compliance issues should be resolved at the lowest possible level, but if the contractor is non-responsive, the COR/TPOC will escalate the CAR to a higher level of authority. The TPOC shall maintain a record of all CARs initiated (written, manual or electronic), action taken, and follow-up to verify implementation and effectiveness of the contractor actions. A Corrective Action Log shall be established for maintaining and tracking all Corrective Action Reports (CARs), issued to the contractor; All CARs shall be recorded and tracked by a control number.

A control numbering system shall be used, with the first twelve digits being the prime contract number, the next four digits will be the calendar year (CY) , next the activity/command and the last three digits will identify the corrective action request (i.e., XXXXXX-XX-TPS-001);

N00421-XX-C-XXX - Contract Number TBA-XXX

XX = CY - Calendar Year (i.e., 2011, 2012, 2013, etc.)

XXXX = Command issuing the CAR

XX X= 001, First CAR for the Activity/Command for the calendar year

Note: Each activity shall use the following codes:

Air Test and Evaluation Squadron Twenty – VX20

Air Test and Evaluation Squadron Twenty-One – HX21

Air Test and Evaluation Squadron Twenty-Three – VX23

Naval Test Pilot School – TPS

Air Test and Evaluation Squadron Thirty (Pt. Magu) - VX30

Air Test and Evaluation Squadron Thirty-One (China Lake) - VX31

The TPOC shall document in the corrective action log the control number, the specific deficiency, contractor personnel with whom the deficiency was discussed, the date the deficiency was resolved and the follow-up actions taken by the TPOC to verify the contractor has ensured effectiveness of corrective actions taken.

The TPOC is required to maintain overall visibility of all Level II CARs and above. The originator of a CAR shall follow up to verify the implementation and effectiveness of the contractor’s actions and close out the CAR when appropriate. If the contractor is not responsive to lower-level CARs, the activity TPOC will notify the COR for escalation of the matter.

Levels of CARs

The four (4) CAR levels are as follows:

Level I CAR is when a contractual noncompliance requires no special management attention to correct. A Level I CAR may be directed to working level personnel. Level I CARs will be written (manual or electronic). These should not be routed to the Wing Staff, but must be logged in the CAR Log.

Level II CARs are written (electronic) requests for corrective action for contractual noncompliance that are systemic in nature, and could adversely affect cost, schedule, or performance if not corrected in a timely manner. Level II requests are directed to the contractor management level responsible for the process (group supervisor). Level II and above CARs must be routed to the Wing Staff.

Level III CARs involve escalation of serious contractual non-compliances to top contractor management, and may incorporate contractual remedies such as reductions of progress payments, cost disallowances, cure notices, show cause letters (manual or electronic), or business management systems disapprovals. Prior to issuance, a Level III CAR must be coordinated with the PCO. Level III CARs must be directed to contractor top management. Contractor top management may be notified by the PCO that continued inaction may lead to more severe measures.

A copy of Level III CARs and all subsequent correspondence must be provided to the buying activity. All affected contract administration team members (including DCAA and buying activities as appropriate) should be kept informed of the status and disposition of Level III requests.

Level IV CARs involve contractual remedies such as suspension of progress payments or product acceptance activities, termination for default, and suspension or debarment, in accordance with FAR/DFARS policies and procedures. A Level IV CAR must be issued by the cognizant PCO and must be directed to contractor top management. A copy of the Level IV CAR and all subsequent correspondence must be provided to customer buying activities. Proper coordination and/or notification among Government activities of Level IV CARs are required.

When written CARs are issued the document must be specific in identifying the exact deficiency and the Contractor personnel with whom the deficiency was discussed. All written CARs will require the Contractor to identify the root cause of the deficiency, action taken to correct the specific deficiency, action taken to prevent recurrence, and the date when the corrective action will be implemented. The TPOC will perform a follow-up audit to assure that the Corrective Action has effectively resolved the deficiency.

NAVAL TEST WING ATLANTIC (NAVTESTWINGLANT)

NAVAL TEST WING ATLANTIC (NAVTESTWINGLANT) has responsibility for the Contracting Officer (COR) functions, Government Quality Assurance functions, Government Flight Representative (GFR) functions. Points of Contact (POC)

COR – TBD at contract award E-mail/Phone -

GFR – TBD at contract award E-mail/Phone-

TPOC’s from each location:

VX-20- Gerard Garay E-mail/Phone- gerard.garay@navy.mil / (301) 757-3302 HX-21- Pete Mora E-mail/Phone-peter.mora@navy.mil / (301) 342-1776 VX-23-Cam Donahue E-mail/Phone-cam.donohue@navy.mil / (301) 342-5580 TPS-John Hardison E-mail/Phone-john.hardison@navy.mil / (301) 757-5052 VX-30-Mark Price E-mail/Phone-mark.c.price@navy.mil / (805) 989-5991 VX-31-James R. Coppersmith E-mail/Phone-james.coppersmith@navy.mil / (760) 939-5405 Correspondence should be addressed to:

NAVAL TEST WING ATLANTIC

ATTN: TBD at contract award Patuxent River, MD 20670-1606 FAX Numbers: TBD Email and Phone contacts are:

COR – TBD at contract award GFR – TBD at contract award